Heat supply network assembly configuration method and device of source network load storage system
By constructing and optimizing the simulation model of the source network load storage system, a variety of thermal network components are generated, which solves the problem of fluctuations in electricity and thermal loads in the park, improves the environmental protection and comfort of the heating system, and provides energy planning. Decision support.
Patent Information
- Application Number
- CN202411097661.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-15
AI Technical Summary
The existing source network load storage system is difficult to balance the seasonal and daily fluctuations of the park's electricity and heat load, resulting in insufficient environmental protection and comfort of the heating system.
By obtaining the grid and thermal network data of the target park, building a simulation system model, adjusting parameters to generate a variety of thermal network components, performing simulation analysis and capacity configuration, combining boilers, heat pumps, cogeneration units and fuel cell units to optimize components Configure to meet heating requirements.
It achieves a balance between electricity and thermal load in the park, improves the environmental protection and comfort of the heating system, and provides decision-making support for energy planning.
Smart Images

Figure CN118966923A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy management of a source-grid-load-storage system, and in particular to a method and device for configuring a heat network component of a source-grid-load-storage system. Background Art
[0002] The core of the concept of "source-grid-load-storage integration" is to deeply integrate the source of energy production, such as solar photovoltaic power generation, wind power generation, hydropower generation and other renewable energy power generation methods, with the power transmission network, user-side power consumption needs and energy storage systems, and then build a coordinated and unified energy system. The goal of this integration is to improve the efficiency of energy use by optimizing the configuration and use of energy, while achieving the best match and balance between energy supply and demand. The proposal of this concept aims to build a more efficient, stable and sustainable energy system to meet the growing energy demand of modern society while reducing the negative impact on the environment.
[0003] At present, heating through the source-grid-load-storage system is in the primary research stage; in specific research practice, the park enterprises show obvious characteristics of off-season and peak-season in response to the seasonal changes in market demand. In addition, the heat load of enterprises also shows significant daily fluctuations. Since the heat load of the park fluctuates, and the power of photovoltaic power generation and wind power generation of the source-grid-load-storage system changes due to seasonal climate, the power load fluctuates due to the rules of people's daily life. Therefore, how to balance the above changes and improve the environmental protection and comfort of the park heating system has become a major problem in this industry. Summary of the invention
[0004] The present invention provides a method and device for configuring a heat network component of a source-grid-load-storage system to achieve the technical effect of balancing the power load and heat load of a target park, while improving the environmental protection and comfort of the park's heating system.
[0005] In order to solve the above technical problems, an embodiment of the present invention provides a method for configuring a heat network component of a source-grid-load-storage system, comprising the following steps:
[0006] Obtain target power grid data and target heat network data of the target park, and adjust power grid parameters of a preset simulation system model based on a source-grid-load-storage system according to the target power grid data;
[0007] Generate a plurality of heating network component combinations according to the heating network components in the heating network component database, and sequentially input the plurality of heating network component combinations into the simulation system model after parameter adjustment, perform simulation analysis on the simulation system model based on the target heating network data, and output a heating network capacity configuration set integrated from the corresponding plurality of heating network capacity configurations;
[0008] Sorting and outputting the plurality of heating network capacity configurations in the heating network capacity configuration set according to a comprehensive optimization rule;
[0009] Wherein, the heat network components include boiler units, heat pump units, cogeneration units and fuel cell units.
[0010] Before constructing a simulation system model, the heat network component configuration method provided by the present invention first obtains the target power grid data and the target heat network data of the target park to determine the power load and heat load of the target park, and adjusts the model parameters according to the determined target power grid data to determine the basic objective function when the subsequent model performs component capacity configuration, and also determines the seasonal and daily changes in the heating demand and power supply demand of the target park, so as to facilitate the subsequent model to perform component capacity configuration.
[0011] After adjusting the parameters of the model according to the power grid data, the system will generate several corresponding combinations of heat network components according to the heat network components in the heat network component database, that is, the heat network component combination used to generate the park heating system, and input each heat network component combination into the model in turn to achieve the coupling of the heating system with the original power supply system of the model, that is, to achieve the coupling of the heat network and the power grid, and after the basic coupling, further adjust the parameters of the coupled total system according to the target heat network data of the target park, and then simulate the operation output and several capacity configurations corresponding to several component combinations. Through the secondary parameter adjustment, the heat load that needs to be met by the source-grid-load-storage system coupled with the heating system is determined, and the daily change trend and seasonal change trend of the heat load of the target park are further determined, which improves the fit between the output capacity configuration and the corresponding heat network component configuration, and also improves the feasibility and practicality of the output component capacity configuration.
[0012] After obtaining several component capacity configurations, the system can sort and output the output component capacity configurations according to the comprehensive optimization rules. That is, after comprehensively considering the advantages and disadvantages of the system in terms of environmental protection, economy, and technology, the optimal component capacity configuration is obtained by sorting the output multiple component capacity configuration sets. On the premise of meeting the electricity and heating needs of the target park, it provides strong decision-making support for the energy planning and optimization of the park.
[0013] As a preferred example, the grid parameters of a preset simulation system model based on a source-grid-load-storage system are adjusted according to the target grid data, specifically:
[0014] The target power grid data is parsed to obtain the target electric load, and the target power load corresponding to the target electric load is calculated and determined according to the target electric load, and then the photovoltaic power generation capacity and energy storage capacity of the simulation system model are parameter adjusted according to the target power load.
[0015] In order to determine the power load of the power supply system in the source-grid-load-storage system included in the model, the system of the present invention will also calculate and determine the corresponding target power load based on the target power load of the target park before building the simulation system model, so as to determine the photovoltaic power generation capacity and energy storage capacity in the model, provide reference data for subsequent model simulation operation, and improve the authenticity and reliability of the model.
[0016] As a preferred example, the generating of several combinations of heating network components according to the heating network components in the heating network component database specifically includes:
[0017] At least one unit component is selected from the boiler unit and the heat pump unit in the heat network component library as a mandatory unit component in the generated heat network component combination, and one unit component is randomly selected from the unit components other than the boiler unit and the heat pump unit in the heat network component library as an optional unit component in the heat network component combination;
[0018] The mandatory unit components and the optional unit components are integrated to generate the heating network component combination, and the selection process of the mandatory unit components and the optional unit components is iterated to generate the several heating network component combinations.
[0019] When the system generates a heat network component combination based on the heat network components in the heat network component database, the system will first select a component unit between the boiler unit and the heat pump unit as a mandatory component unit, which is used as the heat network component combination, i.e., the basic heating component of the model heating system. Then, a unit component is randomly selected from the components other than the above two basic heating components as an optional unit component in the heat network component combination, i.e., used as a unit component that can provide both power and heat in the model heating system.
[0020] By combining the two selected unit components, namely the required unit component and the optional unit component, a heating network component combination can be generated, and the above process is repeated until the newly generated component combination overlaps with the generated component combination, then it is determined that all corresponding heating network component combinations have been generated according to the heating network component database.
[0021] As a preferred example, the plurality of heating network component combinations are sequentially input into the simulation system model after parameter adjustment, and simulation analysis is performed on the simulation system model based on the target heating network data, specifically:
[0022] Analyzing the target heat network data to obtain a target heat load, and calculating the target heat load according to the target heat load, and sequentially inputting the plurality of heat network component combinations into the simulation system model;
[0023] The simulation system model after the component input is updated with the heat network parameters according to the target heat load, so that the simulation system model simulates the operation of the input heat network component combination according to the target heat load and the target power load.
[0024] After inputting several generated combinations of heating network components, namely the model heating system, into the model and coupling them with the original power supply system in the model, the system will also update the heating network parameters of the model according to the target heating network data obtained from the target park before conducting simulation operation analysis on the model. That is, the system will update the parameters of the source grid-load-storage system that has coupled the power supply system and the heating system according to the target heating network data, and conduct simulation operation analysis on the model after the parameter update, and output the component capacity configuration corresponding to the input heating network component combination to provide data support for subsequent sorting.
[0025] As a preferred example, the sorting and outputting of the plurality of heating network capacity configurations in the heating network capacity configuration set according to the comprehensive optimization rule is specifically as follows:
[0026] The comprehensive optimization rule is parsed to obtain corresponding economic indicators and environmental indicators, and the plurality of heating network capacity configurations in the heating network capacity configuration set are sorted and output according to the economic indicators and the environmental indicators.
[0027] After obtaining several pairs of heating network component combinations and component capacity configurations, the system can sort several capacity configurations according to the economic indicators and environmental indicators in the comprehensive optimization rules, determine the optimal capacity configuration and its corresponding heating network component combination, and provide strong decision-making support for the energy planning and optimization of the park.
[0028] Correspondingly, an embodiment of the present invention further provides a heat network component configuration device of a source-grid-load-storage system, the heat network component configuration device comprising a model parameter adjustment module, a model component simulation module and a component configuration output module;
[0029] The model parameter adjustment module is used to obtain the target power grid data and target heat network data of the target park, and adjust the power grid parameters of the preset simulation system model based on the source-grid-load-storage system according to the target power grid data;
[0030] The model component simulation module is used to generate several combinations of heating network components according to the heating network components in the heating network component database, and sequentially input the several combinations of heating network components into the simulation system model after parameter adjustment, simulate and analyze the simulation system model based on the target heating network data, and output a heating network capacity configuration set integrated with several corresponding heating network capacity configurations; wherein the heating network components include boiler units, heat pump units, cogeneration units and fuel cell units;
[0031] The component configuration output module is used to sort and output the several heating network capacity configurations in the heating network capacity configuration set according to a comprehensive optimization rule.
[0032] As a preferred example, the model parameter adjustment module adjusts the grid parameters of the preset simulation system model based on the source-grid-load-storage system according to the target grid data, specifically:
[0033] The target power grid data is parsed to obtain the target electric load, and the target power load corresponding to the target electric load is calculated and determined according to the target electric load, and then the photovoltaic power generation capacity and energy storage capacity of the simulation system model are parameter adjusted according to the target power load.
[0034] As a preferred example, the model component simulation module generates several combinations of heating network components according to the heating network components in the heating network component database, specifically including:
[0035] At least one unit component is selected from the boiler unit and the heat pump unit in the heat network component library as a mandatory unit component in the generated heat network component combination, and one unit component is randomly selected from the unit components other than the boiler unit and the heat pump unit in the heat network component library as an optional unit component in the heat network component combination;
[0036] The mandatory unit components and the optional unit components are integrated to generate the heating network component combination, and the selection process of the mandatory unit components and the optional unit components is iterated to generate the several heating network component combinations.
[0037] As a preferred example, the model component simulation module sequentially inputs the plurality of heating network component combinations into the simulation system model after parameter adjustment, and performs simulation analysis on the simulation system model based on the target heating network data, specifically:
[0038] Parsing the target heat network data to obtain a target heat load, calculating the target heat load according to the target heat load, and updating heat network parameters of the simulation system model according to the target heat load;
[0039] The several combinations of heating network components are sequentially input into the simulation system model after parameter update, so that the simulation system model simulates the operation of the input combinations of heating network components according to the target heat load and the target electricity load.
[0040] As a preferred example, the component configuration output module sorts and outputs the plurality of heating network capacity configurations in the heating network capacity configuration set according to a comprehensive optimization rule, specifically:
[0041] The comprehensive optimization rule is parsed to obtain corresponding economic indicators and environmental indicators, and the plurality of heating network capacity configurations in the heating network capacity configuration set are sorted and output according to the economic indicators and the environmental indicators. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 : A flow chart of an embodiment of a method for configuring a heat network component of a source-grid-load-storage system provided by the present invention;
[0043] Figure 2 : A structural schematic diagram of an embodiment of a heat network component configuration device for a source-grid-load-storage system provided by the present invention;
[0044] Figure 3 : A structural diagram of a first type of heat network component combination of the source-grid-load-storage system provided by the present invention;
[0045] Figure 4 : A structural diagram of a second heat network component combination of the source-grid-load-storage system provided by the present invention;
[0046] Figure 5 : A structural diagram of a third type of heat network component combination of the source-grid-load-storage system provided by the present invention;
[0047] Figure 6 : A structural diagram of a fourth type of heat network component combination of the source-grid-load-storage system provided by the present invention;
[0048] Figure 7 : The annual cycle variation diagram of the heat load of the target park provided by the present invention;
[0049] Figure 8 : A line chart showing changes in system energy cost, investment return rate and carbon emissions of the combined heat and power unit provided by the present invention with respect to the random capacity of the unit;
[0050] Fig. 9 : A line chart showing the changes in system energy cost, investment return rate and carbon emissions with random group capacity of the fuel cell unit provided by the present invention. DETAILED DESCRIPTION
[0051] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0052] Embodiment 1
[0053] Please refer to Figure 1, which is a flow chart of an embodiment of a method for configuring a heat network component of a source-grid-load-storage system provided by the present invention, including steps 101 to 103, each of which is specifically as follows:
[0054] Step 101: Obtain target power grid data and target heating network data of a target park, and adjust power grid parameters of a preset simulation system model based on a source-grid-load-storage system according to the target power grid data.
[0055] Before constructing a simulation system model, the heat network component configuration method provided in an embodiment of the present invention first obtains the target power grid data and the target heat network data of the target park to determine the power load and heat load of the target park, and adjusts the model parameters according to the determined target power grid data to determine the basic objective function when the subsequent model performs component capacity configuration. At the same time, it also determines the seasonal and daily changes in the heating demand and power supply demand of the target park, which is convenient for the subsequent model to perform component capacity configuration.
[0056] Specifically, in this embodiment, the grid parameters of the preset simulation system model based on the source-grid-load-storage system are adjusted according to the target grid data, specifically:
[0057] The target power grid data is parsed to obtain the target electric load, and the target power load corresponding to the target electric load is calculated and determined according to the target electric load, and then the photovoltaic power generation capacity and energy storage capacity of the simulation system model are parameter adjusted according to the target power load.
[0058] In order to determine the power load of the power supply system in the source-grid-load-storage system included in the model, the system of the present invention will also calculate and determine the corresponding target power load based on the target power load of the target park before building the simulation system model, so as to determine the photovoltaic power generation capacity and energy storage capacity in the model, provide reference data for subsequent model simulation operation, and improve the authenticity and reliability of the model.
[0059] In this embodiment, the simulation system model based on the source-grid-load-storage system constructed by the system has a preset power supply network equipped with AC lines (AC) and DC lines (DC), which at least includes a power grid, photovoltaic power generation equipment, energy storage equipment and electric loads connected through the power supply network. Therefore, when the system adjusts the parameters of the model according to the target power grid data, it will calculate and determine the target power load based on the electric load of the target park, and then adjust the model's power grid capacity, photovoltaic power generation equipment capacity and energy storage equipment capacity according to the target power load.
[0060] Step 102: Generate several heating network component combinations according to the heating network components in the heating network component database, and input the several heating network component combinations into the simulation system model after parameter adjustment in sequence, perform simulation analysis on the simulation system model based on the target heating network data, and output a heating network capacity configuration set integrated from the corresponding several heating network capacity configurations.
[0061] After adjusting the parameters of the model according to the power grid data, the system will generate several corresponding combinations of heat network components according to the heat network components in the heat network component database, that is, the heat network component combination used to generate the park heating system, and input each heat network component combination into the model in turn to achieve the coupling of the heating system with the original power supply system of the model, that is, to achieve the coupling of the heat network and the power grid, and after the basic coupling, further adjust the parameters of the coupled total system according to the target heat network data of the target park, and then simulate the operation output and several capacity configurations corresponding to several component combinations. Through the secondary parameter adjustment, the heat load that needs to be met by the source-grid-load-storage system coupled with the heating system is determined, and the daily change trend and seasonal change trend of the heat load of the target park are further determined, which improves the fit between the output capacity configuration and the corresponding heat network component configuration, and also improves the feasibility and practicality of the output component capacity configuration.
[0062] Specifically, in this embodiment, the generation of several combinations of heating network components according to the heating network components in the heating network component database specifically includes:
[0063] Selecting at least one unit component from the boiler unit and the heat pump unit in the heat network component library as a mandatory unit component in the generated heat network component combination, and randomly selecting at most one unit component from the unit components other than the boiler unit and the heat pump unit in the heat network component library as an optional unit component in the heat network component combination;
[0064] The mandatory unit components and the optional unit components are integrated to generate the heating network component combination, and the selection process of the mandatory unit components and the optional unit components is iterated to generate the several heating network component combinations.
[0065] When the system generates a heat network component combination based on the heat network components in the heat network component database, the system will first select a component unit between the boiler unit and the heat pump unit as a mandatory component unit, which is used as the heat network component combination, i.e., the basic heating component of the model heating system. Then, at most one unit component is randomly selected from the components other than the above two basic heating components as an optional unit component in the heat network component combination, i.e., used as a unit component that can provide both power and heat in the model heating system.
[0066] By combining the two selected unit components, namely the required unit component and the optional unit component, a heating network component combination can be generated, and the above process is repeated until the newly generated component combination overlaps with the generated component combination, then it is determined that all corresponding heating network component combinations have been generated according to the heating network component database.
[0067] In this embodiment, see Figures 3 to 6 , Figures 3 to 6 The source-grid-load-storage system coupled to the heating system provided in this embodiment controls the connection of the heating network unit components to the heating network, which means that according to the actual planning of the park, some heating network unit components may not be designed for heating, that is, their heating function is not designed, and only their power supply function is designed. As for which heating network unit components are designed without heating, the system needs to make flexible selections based on the actual needs of the park, and this embodiment does not further limit the specific component design.
[0068] In addition, in this embodiment, when the system is combining the required unit components and the optional unit components, it can select one unit component in the required unit components and select one unit component in the optional unit components for component combination as described in this embodiment, or select only one unit component in the required unit components for component combination as described in another example of this embodiment, or select one unit component in the required unit components and select multiple unit components in the optional unit components for component combination as described in another example of this embodiment. The system will select and combine components according to user needs or actual conditions, and this embodiment does not further limit the number of components in the component combination.
[0069] like Figure 3 As shown, Figure 3 The structural diagram of the first heat network component combination of the source-grid-load-storage system provided by the present invention, Figure 3 The source-grid-load-storage system coupled with the heating system shown in the figure includes a boiler unit, a power grid, a converter, a photovoltaic module and a lithium battery energy storage device, wherein the main structure of the boiler unit described in this embodiment includes a boiler and a natural gas pipeline. Figure 3 In the structure diagram shown, the power grid can supply power to the electrical load of the target park through the AC line to meet the power load of the electrical load. It can also convert the AC power into DC power through the converter for lithium battery energy storage, that is, for energy storage equipment energy storage, and the photovoltaic module can also generate electricity for lithium battery energy storage; and the boiler is connected to the thermal load end of the target park through the heat network to transport heat to meet the thermal load required by the thermal load end. Therefore, Figure 3 The heat supply system coupled in the source-grid-load-storage system shown includes only one boiler unit as a heat network component combination, that is, the number of optional unit components described in this embodiment can be zero.
[0070] This embodiment also provides Figure 3 For another example similar to the system shown, see Figure 6 , Figure 6 The structure diagram of the fourth heat network component combination of the source-grid-load-storage system provided by the present invention, Figure 6 The heating system shown includes only one heat pump unit. Figure 3 The boiler units shown are the same and are used to connect to the heat load end of the target park through the heat network and transport heat to meet the heat load required by the heat load end.
[0071] Accordingly, this embodiment also provides another example, see Figure 4 and Figure 5 ,in, Figure 4 The structure diagram of the second heat network component combination of the source-grid-load-storage system provided by the present invention. Figure 4 As shown, the heating system not only includes Figure 3 The boiler unit shown also includes a combined heat and power unit. Figure 4 The cogeneration unit in the heating system shown can supply both electricity and heat, so it is not only connected to the heat load end of the target park through the heat network to transport heat, but also supplies power to the electrical load of the target park through the AC line.
[0072] and Figure 4 The structure of the system shown is similar, see Figure 5 , Figure 5 The structural diagram of the third type of heat network component combination of the source-grid-load-storage system provided by the present invention. Figure 5 As shown, the heating system is not only Figure 3 The boiler unit is shown as well as an SOFC unit, i.e., the fuel cell unit described in this embodiment. The SOFC unit, i.e., a solid oxide fuel cell (Solid Oxide Fuel Cell) unit, belongs to the third generation fuel cell and is an all-solid-state chemical power generation device that directly converts chemical energy stored in fuel and oxidant into electrical energy in an efficient and environmentally friendly manner at medium and high temperatures. Figure 5 The SOFC unit shown is Figure 4 The cogeneration unit shown has similar functions, that is, it can be used for both heating and electricity. Therefore, it not only connects to the heat load end of the target park through the heat network to transport heat, but also supplies electricity to the electrical load of the target park through the DC line.
[0073] In this embodiment, the heat pump unit includes one or more heat pumps, the cogeneration unit includes one or more cogeneration units, and the SOFC unit includes one or more solid oxide fuel cells. The user can set the specific quantity of each component in the above unit components according to actual needs.
[0074] Furthermore, in this embodiment, the plurality of heating network component combinations are sequentially input into the simulation system model after parameter adjustment, and simulation analysis is performed on the simulation system model based on the target heating network data, specifically:
[0075] Analyzing the target heat network data to obtain a target heat load, and calculating the target heat load according to the target heat load, and sequentially inputting the plurality of heat network component combinations into the simulation system model;
[0076] The simulation system model after the component input is updated with the heat network parameters according to the target heat load, so that the simulation system model simulates the operation of the input heat network component combination according to the target heat load and the target power load.
[0077] After inputting several generated combinations of heating network components, namely the model heating system, into the model and coupling them with the original power supply system in the model, the system will also update the heating network parameters of the model according to the target heating network data obtained from the target park before conducting simulation operation analysis on the model. That is, the system will update the parameters of the source grid-load-storage system that has coupled the power supply system and the heating system according to the target heating network data, and conduct simulation operation analysis on the model after the parameter update, and output the component capacity configuration corresponding to the input heating network component combination to provide data support for subsequent sorting.
[0078] In this example, the heat load in the target park shows significant daily fluctuations. The maximum daily heat load fluctuation range is from 11:00 to 21:00, which is the peak period of production in the target park. During this period, the heat consumption is usually between 75% and 100% of the maximum load. In the off-peak period, the heat consumption is relatively low, but still remains between 50% and 90% of the maximum load. From a seasonal perspective, see Figure 7 , Figure 7 The periodic variation diagram of the heat load of the target park provided by the present invention is as follows: Figure 7 As shown, January to March of each year is the period of low heat load in the target park, while from April to July, the heat load of the park will increase significantly and reach 80% to 100% of the annual maximum load. Therefore, it can be determined that this period is the peak period of industrial production in the target park. From August to December, the heat load of the target park gradually decreases from the highest load to a lower period.
[0079] Therefore, when the capacity configuration of the source, grid, load and storage system in the model has been determined, the system will be Figures 3 to 6The systems shown are added to the model in turn, and the model simulates the operation of the heating system therein. Among them, the system establishes and simulates the heat pump model and the boiler model through the HOMER software. Specifically, since the MATLAB component can provide a MATLAB environment, the system of this embodiment establishes a heat pump model in the MATLAB environment through the MATLAB component that can be applied to the HOMER software (such as HOMER Pro) and uses it in conjunction with the HOMER software to solve the problem that the HOMER software itself does not have the ability to simulate the heat pump component. The specific examples are as follows:
[0080] Through the MATLAB component, users can write specific functions and algorithms in the MATLAB environment according to their own needs, and integrate the written functions into the simulation process of the HOMER Pro software. During the simulation process, the HOMER Pro software will call the integrated functions and perform corresponding calculations and analyses according to the preset parameters and conditions, so that the HOMER Pro software can fully utilize MATLAB's advantages in numerical calculation, data processing and graphical display, thereby realizing accurate modeling and efficient simulation of complex energy systems.
[0081] Therefore, in this embodiment, the HOMER software is used in conjunction with the heat pump model and the boiler model. The MATLAB environment will serve as the simulation core of the heat pump model and the boiler model, providing HOMER Pro with the necessary input data and performance parameters; HOMER Pro uses these data to perform overall energy system optimization calculations, and ultimately derives the optimal configuration and operation strategy for the entire system including the heat pump and boiler.
[0082] The efficiency expression of the heating power of the heat pump model described in this embodiment is as follows:
[0083] Q HP =P H ×COP
[0084] Among them, COP represents the coefficient of performance of the heat pump, which can be taken as 4, Q HP Indicates the heating capacity of the heat pump output in kWh, P H It represents the electric power input by the heat pump in kWh. Since the economic efficiency of the heat pump unit is related to its initial investment cost, operation and maintenance cost and electricity consumption cost, the economic calculation expression of the heat pump model is as follows:
[0085] C HP =C in +C om +C E
[0086] Among them, C HPRepresents the cost item of the heat pump, including the initial investment cost C in , Operation and maintenance cost C om And the power consumption cost C E .
[0087] For the boiler model, the calculation expression for the corresponding hourly operating cost is as follows:
[0088]
[0089] Among them, C na is the natural gas price after environmental costs are included; η bo Indicates the thermal energy utilization rate of the boiler, LHV na Indicates the low calorific value of natural gas. Natural gas is the main fuel for boilers. bo Represents the output thermal power of the boiler. In this embodiment, η bo The preferred setting is 85%, LHV na The preferred setting is 9.8 kWh / m 3 .
[0090] According to the above formula, when the model takes the minimum energy cost of the system as the goal, the capacity configuration of the renewable energy system provided by different schemes to meet the electrical load and thermal load of the system is calculated, and the simulation operation is performed through the integrated HOMER software, the various schemes provided in this embodiment under the condition of the lowest energy cost can be obtained, that is, Figures 3 to 6 The capacity configuration of the renewable energy heating system required by the system shown in FIG. Figures 3 to 6 The capacity configuration table of the heating system output by the simulation operation of the system shown is as shown in the following table:
[0091]
[0092] Among them, the scheme 1 shown in the table is Figure 3 The system shown in the table has a heating system including a boiler unit; Scheme 2 shown in the table is Figure 4 The system shown in the table has a heating system including a boiler unit and a cogeneration unit; Scheme 3 shown in the table is Figure 5 The system shown in the table has a heating system including a boiler unit and a SOFC unit; Scheme 4 shown in the table is Figure 6 The system tacitly shows that the heating system includes a heat pump unit.
[0093] Step 103: sorting and outputting the plurality of heating network capacity configurations in the heating network capacity configuration set according to a comprehensive optimization rule.
[0094] After obtaining several component capacity configurations, the system can sort and output the output component capacity configurations according to the comprehensive optimization rules. That is, after comprehensively considering the advantages and disadvantages of the system in terms of environmental protection, economy, and technology, the optimal component capacity configuration is obtained by sorting the output multiple component capacity configuration sets. On the premise of meeting the electricity and heating needs of the target park, it provides strong decision-making support for the energy planning and optimization of the park.
[0095] Specifically, in this embodiment, the plurality of heating network capacity configurations in the heating network capacity configuration set are sorted and output according to the comprehensive optimization rule, specifically:
[0096] The comprehensive optimization rule is parsed to obtain corresponding economic indicators and environmental indicators, and the plurality of heating network capacity configurations in the heating network capacity configuration set are sorted and output according to the economic indicators and the environmental indicators.
[0097] After obtaining several pairs of heating network component combinations and component capacity configurations, the system can sort several capacity configurations according to the economic indicators and environmental indicators in the comprehensive optimization rules, determine the optimal capacity configuration and its corresponding heating network component combination, and provide strong decision-making support for the energy planning and optimization of the park.
[0098] This example uses HOMER software to compare and analyze several combinations of heating systems from the two dimensions of economy and environmental protection, and outputs the corresponding simulation results. The energy cost, net present value, internal rate of return, return on investment and annual carbon emissions of the heating systems provided by the above four different schemes are shown in the following table:
[0099]
[0100] It can be seen from the above table that among the four different schemes provided in this embodiment, the comprehensive energy cost of scheme 2, which is composed of a cogeneration unit and a boiler unit for heating, is the lowest, which is 0.520 RMB; while the comprehensive energy costs of scheme 1, which is composed of photovoltaic power generation equipment, lithium battery energy storage equipment and a boiler unit, and scheme 4, which is composed of photovoltaic power generation equipment, lithium battery energy storage equipment and a heat pump unit, are relatively low; and the comprehensive energy cost of scheme 3, which is composed of photovoltaic power generation equipment, lithium battery energy storage equipment and a solid oxide fuel cell (SOFC) unit, is the highest.
[0101] Correspondingly, the net present values of the heating systems provided by different schemes are not much different. Among them, Scheme 4, which consists of photovoltaic power generation equipment, lithium battery energy storage equipment and heat pump units, has the lowest net present value, while Scheme 3, which consists of photovoltaic power generation equipment, lithium battery energy storage equipment and SOFC units, has the highest net present value.
[0102] From the perspective of internal rate of return and investment return, Plan 2 has the highest investment return and internal rate of return, which are 13.0% and 16.7% respectively; Plan 3 and Plan 4 have the same internal rate of return, which are both 16.4%, and Plan 1, Plan 3 and Plan 4 have an investment return of 12.7%. It can be concluded that Plan 3 and Plan 4 have higher investment return and internal rate of return, while Plan 1 has the lowest investment return and internal rate of return.
[0103] From the perspective of environmental protection, Scheme 1, which consists of photovoltaic power generation equipment, lithium battery energy storage equipment and boiler units, has the highest annual carbon emissions, reaching 1,372,326 kg, far exceeding other schemes. The main reason is that the boiler has low energy utilization efficiency, low carbon emissions and pollutant emission control levels, so the boiler has great potential for energy saving, carbon reduction and pollution reduction. Scheme 4, which combines cogeneration units and boiler units for heating, has the lowest annual carbon emissions, only 746,225 kg, because the cogeneration unit is an efficient way of energy utilization, which can generate electricity and heat energy at the same time, improving the comprehensive utilization efficiency of energy. Therefore, in the cogeneration unit, the energy of the fuel can be fully utilized, reducing energy waste and thus reducing carbon emissions.
[0104] Therefore, considering the simulation results of the economic and environmental indicators of the above four schemes, the system of this embodiment determines that the scheme based on photovoltaic power generation equipment, lithium battery energy storage equipment, cogeneration unit and solid oxide fuel cell for coordinated heating provides the best system performance. And the capacity of each component determined by the system calculation is photovoltaic panels (48500kW), lithium battery components (7100kWh), cogeneration unit (500kW), and the solid oxide fuel cell capacity is 500kW.
[0105] For the component capacity configuration corresponding to the optimal system described in this embodiment, that is, a scheme based on photovoltaic power generation equipment, lithium battery energy storage equipment, cogeneration units and solid oxide fuel cells for coordinated heating, in order to further determine the capacity changes of the cogeneration unit and the SOFC unit in the scheme, and their impact on the energy cost, return on investment and annual carbon emission rate of the entire system, this embodiment, under the premise of keeping the system's electrical load and thermal load constant and the capacities of other units unchanged, specifically determines the rated capacity change range of the cogeneration unit (or thermal power unit) and the SOFC unit to be 0 to 1000kW, and gradually adjusts the capacity of the cogeneration unit and the SOFC unit within this range, so as to simulate the operating conditions and economic performance of the system under different configurations, and then simulate and output the corresponding simulation results through the model of HOMER software.
[0106] For details, see Figure 8 , Figure 8The line chart of the combined heat and power unit provided by the present invention for the system energy cost, return on investment and carbon emissions as a function of the unit capacity. Figure 8 As shown in the figure, the change of the unit capacity of the cogeneration unit has a significant impact on the energy cost, carbon emissions and return on investment of the system. Specifically, as the unit capacity of the cogeneration unit gradually increases, the energy cost and carbon emissions of the system show a trend of first decreasing and then increasing. The main reason for this phenomenon is that the increase in the unit capacity of the cogeneration unit can effectively improve the energy utilization efficiency of the system, reduce energy waste, and thus reduce energy costs in the early stage. A higher unit capacity of the cogeneration unit also means more efficient energy conversion. Therefore, as the capacity of the cogeneration unit increases, carbon emissions will be reduced accordingly.
[0107] However, when the unit capacity of the cogeneration unit exceeds a certain critical value, the energy cost and carbon emissions of the system begin to show an upward trend. The reason for this is that the excessive unit capacity of the cogeneration unit increases the complexity of system operation, making energy management and optimization more difficult, which in turn leads to an increase in energy costs. In addition, the excessive unit capacity of the cogeneration unit may also lead to a decrease in energy utilization efficiency, resulting in an increase in carbon emissions.
[0108] From the perspective of economic efficiency, as the capacity of the CHP unit increases, the system's return on investment first gradually increases, and then begins to decrease after reaching a peak. This shows that when the capacity of the CHP unit is moderate, the system can achieve higher economic benefits and quickly recover the investment cost. However, when the capacity of the CHP unit is too large, although the continued increase in the capacity of the CHP unit may increase the energy output of the system, due to the increase in fuel costs and possible increases in operating and maintenance costs, this move may also lead to a decrease in the system's return on investment.
[0109] Accordingly, see Fig. 9 , Fig. 9 The line chart of the fuel cell unit provided by the present invention on the system energy cost, return on investment and carbon emissions as a function of the random group capacity. Fig. 9 As shown in the figure, the change of SOFC unit capacity also has a significant impact on the energy cost, carbon emissions and return on investment of the system. Specifically, as the capacity of the SOFC unit increases, the energy cost of the system shows a continuous upward trend due to the high cost of the SOFC unit itself. This upward trend shows that in the process of increasing the capacity of the SOFC unit, the energy production cost of the system gradually increases, which is mainly due to the complexity and high cost of SOFC technology.
[0110] As the capacity of SOFC units increases, the return on investment of the system shows a trend of gradual decline. This trend shows that although SOFC technology can improve the energy conversion efficiency and environmental performance of the system, due to its high cost, the economic benefits of the system gradually decrease with the increase of capacity, which means that in the process of expanding the capacity of SOFC units, the system and users also need to weigh the relationship between the performance improvement and cost increase.
[0111] From the perspective of environmental protection, that is, from the perspective of the change in annual carbon emissions, as the capacity of the SOFC unit increases, the system's carbon emissions first decrease slightly, and then remain at a certain level. This shows that in the initial stage, the application of SOFC units can effectively reduce the system's carbon emissions and improve environmental protection performance; however, as the capacity further increases, the trend of reducing annual carbon emissions gradually slows down and eventually stabilizes.
[0112] Through the above simulation results, users can further determine the impact of cogeneration unit components and SOFC unit components on the heating system of the target park, and use this as reference data to further train the system model, so that the simulation system model can output component capacity configuration that is more in line with user needs and the actual situation of the target park, thereby further improving the economy, comfort and environmental protection of the source, grid, load and storage system of the target park.
[0113] In order to better illustrate the working principle and step flow of a method and device for configuring a heat network component of a source-grid-load-storage system of the present invention, reference may be made to, but is not limited to, the relevant records above.
[0114] Accordingly, see Figure 2 , Figure 2 A schematic diagram of the structure of an embodiment of a heat network component configuration device for a source-grid-load-storage system provided by the present invention. Figure 2 As shown, the heating network component configuration device includes a model parameter adjustment module 201, a model component simulation module 202 and a component configuration output module 203.
[0115] The model parameter adjustment module 201 is used to obtain the target power grid data and target heating network data of the target park, and adjust the power grid parameters of the preset simulation system model based on the source-grid-load-storage system according to the target power grid data.
[0116] Furthermore, the model parameter adjustment module 201 adjusts the grid parameters of the preset simulation system model based on the source-grid-load-storage system according to the target grid data, specifically:
[0117] The target power grid data is parsed to obtain the target electric load, and the target power load corresponding to the target electric load is calculated and determined according to the target electric load, and then the photovoltaic power generation capacity and energy storage capacity of the simulation system model are parameter adjusted according to the target power load.
[0118] The model component simulation module 202 is used to generate several combinations of heating network components according to the heating network components in the heating network component database, and input the several combinations of heating network components into the simulation system model after parameter adjustment in turn, simulate and analyze the simulation system model based on the target heating network data, and output a heating network capacity configuration set integrated with several corresponding heating network capacity configurations; wherein the heating network components include boiler units, heat pump units, cogeneration units and fuel cell units.
[0119] Furthermore, the model component simulation module 202 generates several combinations of heating network components according to the heating network components in the heating network component database, specifically including:
[0120] At least one unit component is selected from the boiler unit and the heat pump unit in the heat network component library as a mandatory unit component in the generated heat network component combination, and one unit component is randomly selected from the unit components other than the boiler unit and the heat pump unit in the heat network component library as an optional unit component in the heat network component combination; the mandatory unit components and the optional unit components are integrated to generate the heat network component combination, and the selection process of the mandatory unit components and the optional unit components is iterated to generate the several heat network component combinations.
[0121] Furthermore, the model component simulation module 202 sequentially inputs the plurality of heating network component combinations into the simulation system model after parameter adjustment, and performs simulation analysis on the simulation system model based on the target heating network data, specifically:
[0122] The target heating network data is parsed to obtain the target heat load, and the target heat load is calculated according to the target heat load, and the heating network parameters of the simulation system model are updated according to the target heat load; the several combinations of heating network components are sequentially input into the simulation system model after parameter update, so that the simulation system model simulates the operation of the input heating network component combination according to the target heat load and the target power load.
[0123] The component configuration output module 203 is used to sort and output the plurality of heating network capacity configurations in the heating network capacity configuration set according to a comprehensive optimization rule.
[0124] Furthermore, the component configuration output module 203 sorts and outputs the plurality of heating network capacity configurations in the heating network capacity configuration set according to a comprehensive optimization rule, specifically:
[0125] The comprehensive optimization rule is parsed to obtain corresponding economic indicators and environmental indicators, and the plurality of heating network capacity configurations in the heating network capacity configuration set are sorted and output according to the economic indicators and the environmental indicators.
[0126] In summary, the embodiment of the present invention provides a method and device for configuring a heat network component of a source-grid-load-storage system, which adjusts the parameters of a simulation system model by acquiring target power grid data from a target park, generates a variety of heat network component combinations according to a heat network component database, inputs them into the model in sequence, and simulates and analyzes the model based on the target heat network data, outputs a heat network capacity configuration set integrating several heat network capacity configurations, and sorts and outputs the heat network capacity configuration set according to the overall comprehensive optimization rule. The seasonal and daily changes in the park's heating demand and power supply demand are determined through the target power grid data and target heat network data of the target park, which improves the fit between the capacity configuration and the heat network components, as well as the feasibility and practicality of the component capacity configuration; sorting is performed according to the comprehensive optimization rules, which comprehensively considers the environmental protection, economic and technical advantages and disadvantages of the system, and provides strong decision-making support for the energy planning and optimization of the park.
[0127] It should be understood that, although each step in the flow chart of each embodiment of the present invention is shown in sequence according to the indication of the arrow, these steps are not necessarily performed in sequence according to the order indicated by the arrow. Unless there is a clear explanation in this article, the execution of these steps does not have strict order restrictions, and these steps can be performed in other orders. Moreover, at least a portion of the steps in the example of each embodiment can include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and the execution order of these sub-steps or stages is not necessarily performed in sequence, but can be performed in turn or alternately with at least a portion of other steps or sub-steps or stages of other steps.
[0128] The specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for configuring heat network components of a source-grid-load-storage system, characterized in that: The following steps are involved: Obtaining target power grid data and target heat network data of the target park, and adjusting power grid parameters of a preset simulation system model based on a source-grid-load-storage system according to the target power grid data; Generate a plurality of heating network component combinations according to the heating network components in the heating network component database, and sequentially input the plurality of heating network component combinations into the simulation system model after parameter adjustment, perform simulation analysis on the simulation system model based on the target heating network data, and output a heating network capacity configuration set integrated from the corresponding plurality of heating network capacity configurations; Sorting and outputting the plurality of heating network capacity configurations in the heating network capacity configuration set according to a comprehensive optimization rule; Wherein, the heat network components include boiler units, heat pump units, cogeneration units and fuel cell units.
2. A method for configuring heat network components of a source-grid-load-storage system according to claim 1, characterized in that: The adjusting of the grid parameters of the preset simulation system model based on the source-grid-load-storage system according to the target grid data is specifically as follows: The target power grid data is parsed to obtain the target electric load, and the target power load corresponding to the target electric load is calculated and determined according to the target electric load, and then the photovoltaic power generation capacity and energy storage capacity of the simulation system model are parameter adjusted according to the target power load.
3. A method for configuring heat network components of a source-grid-load-storage system according to claim 1, characterized in that: The generating of several heating network component combinations according to the heating network components in the heating network component database specifically includes: At least one unit component is selected from the boiler unit and the heat pump unit in the heat network component library as a mandatory unit component in the generated heat network component combination, and one unit component is randomly selected from the unit components other than the boiler unit and the heat pump unit in the heat network component library as an optional unit component in the heat network component combination; The mandatory unit components and the optional unit components are integrated to generate the heating network component combination, and the selection process of the mandatory unit components and the optional unit components is iterated to generate the several heating network component combinations.
4. A method for configuring heat network components of a source-grid-load-storage system according to claim 1, characterized in that: The plurality of heating network component combinations are sequentially input into the simulation system model after parameter adjustment, and simulation analysis is performed on the simulation system model based on the target heating network data, specifically: Analyzing the target heat network data to obtain a target heat load, and calculating the target heat load according to the target heat load, and sequentially inputting the plurality of heat network component combinations into the simulation system model; The simulation system model after the component input is updated with the heat network parameters according to the target heat load, so that the simulation system model simulates the operation of the input heat network component combination according to the target heat load and the target power load.
5. The method for configuring heat network components of a source-grid-load-storage system according to claim 1, characterized in that: The step of sorting and outputting the plurality of heating network capacity configurations in the heating network capacity configuration set according to the comprehensive optimization rule is specifically as follows: The comprehensive optimization rule is parsed to obtain corresponding economic indicators and environmental indicators, and the plurality of heating network capacity configurations in the heating network capacity configuration set are sorted and output according to the economic indicators and the environmental indicators.
6. A heat network component configuration device for a source-grid-load-storage system, characterized in that: The heating network component configuration device includes a model parameter adjustment module, a model component simulation module and a component configuration output module; The model parameter adjustment module is used to obtain the target power grid data and target heat network data of the target park, and adjust the power grid parameters of the preset simulation system model based on the source-grid-load-storage system according to the target power grid data; The model component simulation module is used to generate several combinations of heating network components according to the heating network components in the heating network component database, and sequentially input the several combinations of heating network components into the simulation system model after parameter adjustment, simulate and analyze the simulation system model based on the target heating network data, and output a heating network capacity configuration set integrated with several corresponding heating network capacity configurations; wherein the heating network components include boiler units, heat pump units, cogeneration units and fuel cell units; The component configuration output module is used to sort and output the several heating network capacity configurations in the heating network capacity configuration set according to a comprehensive optimization rule.
7. A heat network component configuration device for a source-grid-load-storage system according to claim 6, characterized in that: The model parameter adjustment module adjusts the grid parameters of the preset simulation system model based on the source-grid-load-storage system according to the target grid data, specifically: The target power grid data is parsed to obtain the target electric load, and the target power load corresponding to the target electric load is calculated and determined according to the target electric load, and then the photovoltaic power generation capacity and energy storage capacity of the simulation system model are parameter adjusted according to the target power load.
8. A heat network component configuration device for a source-grid-load-storage system according to claim 6, characterized in that: The model component simulation module generates several combinations of heating network components according to the heating network components in the heating network component database, specifically including: At least one unit component is selected from the boiler unit and the heat pump unit in the heat network component library as a mandatory unit component in the generated heat network component combination, and one unit component is randomly selected from the unit components other than the boiler unit and the heat pump unit in the heat network component library as an optional unit component in the heat network component combination; The mandatory unit components and the optional unit components are integrated to generate the heating network component combination, and the selection process of the mandatory unit components and the optional unit components is iterated to generate the several heating network component combinations.
9. A heat network component configuration device for a source-grid-load-storage system according to claim 6, characterized in that: The model component simulation module sequentially inputs the plurality of heating network component combinations into the simulation system model after parameter adjustment, and performs simulation analysis on the simulation system model based on the target heating network data, specifically: Parsing the target heat network data to obtain a target heat load, calculating the target heat load according to the target heat load, and updating heat network parameters of the simulation system model according to the target heat load; The several combinations of heating network components are sequentially input into the simulation system model after parameter update, so that the simulation system model simulates the operation of the input combinations of heating network components according to the target heat load and the target electricity load.
10. A heat network component configuration device for a source-grid-load-storage system according to claim 6, characterized in that: The component configuration output module sorts and outputs the plurality of heating network capacity configurations in the heating network capacity configuration set according to a comprehensive optimization rule, specifically: The comprehensive optimization rule is parsed to obtain corresponding economic indicators and environmental indicators, and the plurality of heating network capacity configurations in the heating network capacity configuration set are sorted and output according to the economic indicators and the environmental indicators.