Anchoring device and anchoring method for fixing multiple submarine cables

By designing an anchoring device for submarine cables, using pre-dividing cable devices and bottom load bearing frames to limit cables of multiple submarine cables, and combining the fixing method of steel wire frames and resin glue, the inability to fix at the same time in the prior art is solved. The problem of multiple submarine cables improves the reliability and construction efficiency of anchoring and reduces costs.

CN118970798APending Publication Date: 2024-11-15SHANGHAI HENGTONG MARINE EQUIP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411156298.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing submarine cable anchoring devices cannot fix multiple submarine cables at the same time, and the mechanical fixing method leads to insufficient installation space and time-consuming operation, and the clamping components are easily damaged, resulting in anchor failure.

Method used

An anchoring device including J-type tube flange, pre-dividing cable device, bottom load bearing frame, rubber filling cylinder and steel wire frame were designed. The pre-dividing cable device and bottom load bearing frame were used to perform multiple submarine cables twice. The cable is limited and the outer armored steel wire of the submarine cable is fixed with a steel wire frame and resin glue to improve tensile strength and reliability.

Benefits of technology

The simultaneous fixation of multiple submarine cables is achieved, which improves the reliability and construction convenience of anchoring, reduces costs, and does not require a single submarine cable to anchor each, and has a compact structure and high operating efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118970798A_ABST
    Figure CN118970798A_ABST
Patent Text Reader

Abstract

The invention discloses an anchoring device and method for fixing multiple submarine cables, the anchoring device comprises a J-shaped pipe flange, a cable pre-splitting device, a bottom heavy frame, a glue pouring barrel, a top end cover and a steel wire frame, the bottom heavy frame is arranged on the J-shaped pipe flange, the cable pre-splitting device is arranged in the bottom heavy frame, and the glue pouring barrel is arranged on the top end cover. A plurality of first through holes in one-to-one correspondence with submarine cables are formed in the cable pre-distributing device, second through holes located above the first through holes are formed in the bottom force bearing frame, the glue pouring barrel is arranged at the top of the bottom force bearing frame, the steel wire frame is arranged in the glue pouring barrel, the top end cover is arranged at the top of the glue pouring barrel, and the cable pre-distributing device is arranged in the glue pouring barrel. Resin glue which immerses the steel wire frame and the outer armored steel wires is arranged in the glue pouring barrel, two times of cable distribution limiting of the submarine cables are carried out through the cable pre-distribution device and the bottom heavy frame, the outer armored steel wires of the submarine cables are fixed in the glue pouring barrel through cooperation of the steel wire frame and the resin glue, the tensile strength and the reliability are improved, and the cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of anchoring of submarine cables, and in particular to an anchoring device and an anchoring method for fixing a plurality of submarine cables. Background Art

[0002] In recent years, with the continuous increase in oil and gas exploitation in the continental shelf, the scale of marine resource development and space utilization has continued to expand, and marine engineering has become an important means to solve the current energy crisis. Among them, the development and utilization of marine oil and gas plays a vital role in the sustainable development of the global economy, and offshore oil and gas platforms are important carriers for the development and utilization of marine oil and gas.

[0003] Offshore platform power systems and communication systems are the main key systems of offshore oil and gas platforms. In order to ensure the smooth production and life of offshore platforms, the stability, safety and economy of offshore platform power systems and communication systems have become the focus and hotspot of research in recent years.

[0004] In order to reasonably distribute the J-tube resources of oil and gas platforms, it is necessary to simultaneously insert multiple submarine cables into the J-tube and fix them on the platform. Therefore, a set of anchoring devices is required to have the function of fixing multiple submarine cables. At present, the anchoring device of the submarine cable mainly fixes the submarine cable by fixing the armored steel wire, but due to the size of the flange at the top of the protective tube, the existing anchoring device has the following defects: 1. It can only fix one submarine cable and cannot be used to fix multiple submarine cables at the same time; 2. Fixing the armored steel wire mechanically requires bending and pressing the armored steel wire to a certain length, which results in more lateral space required to fix one submarine cable, and insufficient installation space will occur when handling other submarine cables; 3. In the existing anchoring devices for fixing multiple submarine cables, the cables must be passed through the base holes one by one, and the operation of multiple submarine cables is repeated, which is time-consuming and laborious.

[0005] In addition, in the prior art, a utility model patent with publication number CN218888090U discloses an anchoring device for fixing multiple submarine cables, wherein multiple submarine cables can be centrally fixed through multiple through holes arranged on an anchoring base, and each submarine cable can be clamped and fixed through a clamping groove between a first clamping block and a second clamping block in a clamping assembly. However, the first clamping block and the second clamping block clamp the sheath of the submarine cable, and the sheath is easily damaged under the action of tension, resulting in the problem of anchoring failure, which needs to be improved. Summary of the invention

[0006] The main technical problem solved by the present invention is to provide an anchoring device and an anchoring method for fixing multiple submarine cables, which can anchor multiple submarine cables at the same time and improve the anchoring reliability and construction convenience.

[0007] In order to solve the above technical problems, a technical solution adopted by the present invention is: to provide an anchoring device for fixing multiple submarine cables, including: a J-shaped pipe flange, a pre-cable splitting device, a bottom bearing frame, a glue-filling cylinder, a top end cover and a wire frame, wherein the bottom bearing frame is arranged on the J-shaped pipe flange, the pre-cable splitting device is arranged in the bottom bearing frame, the pre-cable splitting device is provided with a plurality of first through holes corresponding to the submarine cables one by one, the bottom bearing frame is provided with a second through hole located above the first through hole, the glue-filling cylinder is arranged on the top of the bottom bearing frame, and the wire frame is arranged in the glue-filling cylinder. The top end cover is arranged on the top of the glue-filled cylinder, the submarine cable penetrates the first through hole and the second through hole from bottom to top and then extends into the glue-filled cylinder, the submarine cable includes a cable core and an outer armor steel wire wrapped on the outside of the cable core, the outer armor steel wire of the submarine cable in the glue-filled cylinder penetrates the steel wire rack upward and bends and diverges to the outside of the cable core, the glue-filled cylinder is provided with resin glue for immersing the steel wire rack and the outer armor steel wire, the cable core penetrates the top end cover and extends to above the top end cover, the top end cover is provided with threading holes corresponding to the cable core one by one, the pre-cable splitting device, the bottom load-bearing frame and the glue-filled cylinder respectively adopt a Hough type split structure.

[0008] In a preferred embodiment of the present invention, the Hough surface of the pre-cable separation device is staggered and crossed with the Hough surface of the bottom bearing frame, the Hough surface of the glue-filled cylinder is staggered and crossed with the Hough surface of the bottom bearing frame, and the wire rack adopts an integral structure or a Hough split structure.

[0009] In a preferred embodiment of the present invention, the pre-cable distribution device includes a first semi-circular disk and a second semi-circular disk that are relatively distributed, and the first semi-circular disk and the second semi-circular disk are respectively provided with connecting blocks located above the half surface, and the connecting blocks on the first semi-circular disk and the second semi-circular disk are fixed by a first screw.

[0010] In a preferred embodiment of the present invention, a first positioning pin pointing to the second semi-circular disk is arranged on the Haff surface of the first semi-circular disk, a first positioning hole corresponding to the first positioning pin is arranged on the Haff surface of the second semi-circular disk, a second positioning pin pointing to the first semi-circular disk is arranged on the Haff surface of the second semi-circular disk, and a second positioning hole corresponding to the second positioning pin is arranged on the Haff surface of the first semi-circular disk.

[0011] In a preferred embodiment of the present invention, the first through hole comprises a first closed through hole located on the half surface of the pre-cable distribution device and / or a first open through hole distributed in a circular array on the pre-cable distribution device, the edge of the pre-cable distribution device is provided with a first guide groove connected to the first open through hole, and the bottom of the pre-cable distribution device is vertically provided with partitions located on both sides of the first open through hole.

[0012] In a preferred embodiment of the present invention, the bottom load-bearing frame includes a first flange and a disc, the first flange is located below the disc, ribs connected to the first flange are arranged at intervals on the bottom edge of the disc, a second screw connected to the J-shaped tube flange is arranged on the first flange, ears extending to the J-shaped tube flange are arranged at intervals on the outer side of the pre-cable distribution device, a third screw connected to the J-shaped tube flange is arranged in the ear seat, a recessed groove corresponding to the ear seat is arranged at the bottom of the first flange, the second through hole includes a second closed through hole located on the half surface of the disc and / or a second open through hole distributed in a ring array on the disc, a second guide groove corresponding to the second open through hole is arranged on the disc and the edge of the first flange, and a filling block is arranged in the second guide groove on the disc.

[0013] In a preferred embodiment of the present invention, the disc includes a third semi-disc and a fourth semi-disc that are relatively distributed, and the first flange includes a first semi-circular arc plate and a second semi-circular arc plate that are relatively distributed, the first semi-circular arc plate is located below the third semi-circular disc, and the second semi-circular arc plate is located below the fourth semi-circular disc.

[0014] In a preferred embodiment of the present invention, the glue pouring cylinder includes an inverted cone cylinder structure composed of a first arc cover and a second arc cover relative to each other, a second flange is provided at the bottom of the glue pouring cylinder, a fourth screw connected to the disc is provided on the second flange, a fifth screw connected to the filling block is provided on the second flange, a mounting block extending downward into the glue pouring cylinder is provided at the bottom of the top cover, a sixth screw connected to the mounting block is provided on the side of the glue pouring cylinder, and connecting plates are respectively provided on the outer sides of the junction of the first arc cover and the second arc cover, and the two connecting plates are fixed by the seventh screw.

[0015] In order to solve the above technical problems, another technical solution adopted by the present invention is: to provide an anchoring method for fixing multiple submarine cables, comprising the following steps: The multiple submarine cables bundled together are passed upward from the bottom of the J-shaped tube of the platform to the top of the J-shaped tube flange, and the multiple submarine cables bundled together are separated by a pre-cable separation device so that each submarine cable passes through a first through hole respectively, and the first cable separation and limiting is performed; The upper part of the submarine cable is passed through the steel wire rack of the integral structure respectively, and the outer sheath and outer armor steel wire are removed at the position where the steel wire mesh sleeve is marked on the end of the submarine cable with wire cutters, and then the wrapped steel wire mesh sleeve is installed. The lifting ears on the steel wire mesh sleeves on multiple submarine cables are connected with lifting tools to lift multiple cables; The pre-cable distribution device and the bottom bearing frame are installed on the J-shaped pipe flange, so that each submarine cable vertically passes through a corresponding second through hole, and the second cable distribution is limited; Remove the outer sheath of the portion of the submarine cable located above the bottom bearing frame to expose the outer armor wires, bend the outer armor wires outwards on the wire frame, spread them out, and clean them; Install the glue-filling cylinder on the bottom load-bearing frame, and slowly pour the filling resin glue into the glue-filling cylinder along the side wall of the cavity of the glue-filling cylinder until the scattered outer armor steel wires are immersed; After the resin glue solidifies, remove the wire mesh sleeve, remove the inner armor wires on the top of the multiple submarine cables, and finally pass the cable cores of the multiple submarine cables through the threading holes on the top cover respectively, and install the top cover.

[0016] In order to solve the above technical problems, another technical solution adopted by the present invention is: providing another anchoring method for fixing multiple submarine cables, comprising the following steps: The multiple submarine cables bundled together are passed upward from the bottom of the J-shaped tube of the platform to the top of the J-shaped tube flange, and the multiple submarine cables bundled together are separated by a pre-cable separation device so that each submarine cable passes through a first through hole respectively, and the first cable separation and limiting is performed; Use wire cutters to remove the outer sheath and outer armor wire at the position marked on the end of the submarine cable where the wire mesh sleeve is installed, then install the wrapped wire mesh sleeve, use lifting tools to connect the lifting ears on the wire mesh sleeves on multiple submarine cables, and lift multiple cables; The pre-cable distribution device and the bottom bearing frame are installed on the J-shaped pipe flange, so that each submarine cable vertically passes through a corresponding second through hole, and the second cable distribution is limited; Remove the outer sheath of the portion of the submarine cable located above the bottom bearing frame to expose the outer armor wires, bend the outer armor wires outwards to spread them out, and clean them; Install the glue pouring cylinder on the bottom load-bearing frame, place the wire frame of the half-type split structure in the glue pouring cylinder, and use the binding wire to bundle the wire frame of the half-type split structure to form a whole; Slowly pour the filling resin glue into the glue-filling cylinder along the side wall of the cavity of the glue-filling cylinder until the scattered outer armor steel wires are immersed; After the resin glue solidifies, remove the wire mesh sleeve, remove the inner armor wires on the top of the multiple submarine cables, and finally pass the cable cores of the multiple submarine cables through the threading holes on the top cover respectively, and install the top cover.

[0017] The beneficial effects of the present invention are as follows: an anchoring device and an anchoring method for fixing a plurality of submarine cables pointed out by the present invention perform two-time cable separation and positioning of a plurality of submarine cables through a pre-cable separation device and a bottom load-bearing frame, thereby improving the position stability of the submarine cable in the glue-filled cylinder, and utilizing the cooperation of a wire rack and resin glue to fix the outer armor steel wire of the submarine cable in the glue-filled cylinder, thereby greatly improving the tensile strength of the submarine cable, and achieving high anchoring reliability, and realizing the anchoring of a plurality of submarine cables at the same time, with high operating efficiency, and without the need to anchor a single submarine cable one by one, making the structure of the anchoring device more compact, and reducing the anchoring cost of a plurality of submarine cables. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative work, among which: Figure 1 It is a structural schematic diagram of a preferred embodiment of an anchoring device and an anchoring method for fixing multiple submarine cables of the present invention; Figure 2 yes Figure 1 Exploded diagram of Figure 3 yes Figure 2 Schematic diagram of the structure of the pre-cable distribution device. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] See also Figure 1~Figure 3 , the embodiment of the present invention includes: like Figure 1 and Figure 2 The anchoring device shown for fixing multiple submarine cables takes the anchoring of 5 submarine cables as an example, and includes: a J-shaped pipe flange 1, a pre-cable-splitting device 6, a bottom bearing frame 2, a glue-filled cylinder 3, a top end cover 4 and a wire frame 7. The bottom bearing frame 2 is arranged on the J-shaped pipe flange 1, and the pre-cable-splitting device 6 is arranged in the bottom bearing frame. The pre-cable-splitting device 6 is provided with a plurality of first through holes 61 corresponding to the submarine cables 8 one by one, so as to perform the first cable-splitting and limiting of the submarine cables 8.

[0021] like Figure 2 and Figure 3 As shown, the pre-cable distribution device 6 includes a first semi-circular disk 62 and a second semi-circular disk 63 that are relatively distributed. The first semi-circular disk 62 and the second semi-circular disk 63 are respectively provided with a connecting block 66 located above the half surface. The connecting blocks 66 on the first semi-circular disk 62 and the second semi-circular disk 63 are fixed by a first screw, which is convenient for assembly.

[0022] A first positioning pin 64 pointing to the second semi-disk is arranged on the Haff surface of the first semi-disk 62, a first positioning hole corresponding to the first positioning pin 64 is arranged on the Haff surface of the second semi-disk 63, a second positioning pin 68 pointing to the first semi-disk 62 is arranged on the Haff surface of the second semi-disk 63, and a second positioning hole 65 corresponding to the second positioning pin 68 is arranged on the Haff surface of the first semi-disk 62, thereby improving the assembly convenience of the first semi-disk 62 and the second semi-disk 63 and the structural reliability after assembly.

[0023] In this embodiment, the first through hole 61 includes a first closed through hole 611 located on the half surface of the pre-cable splitting device and four first open through holes 612 distributed in a circular array on the pre-cable splitting device 6, and the cable splitting of the five submarine cables is limited at the same time. The edge of the pre-cable splitting device is provided with a first guide groove 613 connected to the first open through hole 612, which is conducive to the submarine cable entering the first open through hole 612 from the first guide groove 613. The bottom of the pre-cable splitting device 6 is vertically provided with partitions 67 located on both sides of the first open through hole 612, which assists in limiting the two sides of the submarine cable extending upward through the first open through hole 612 and reducing the swing amplitude of the submarine cable.

[0024] like Figure 2 As shown, the bottom bearing frame 2 is provided with a second through hole 24 located above the first through hole, for performing the second cable distribution and positioning of the five submarine cables 8. In this embodiment, the bottom bearing frame 2 includes a first flange 23 and a disc 21, the first flange 23 is located below the disc 21, and a rib plate 22 connected to the first flange 23 is arranged at intervals on the bottom edge of the disc 21. The first flange 23 and the disc 21 are supported and connected and fixed by welding at both ends of the rib plate 22, and the tensile effect is good.

[0025] A second screw connected to the J-shaped tube flange 1 is arranged on the first flange 23, and ears 69 extending to the J-shaped tube flange 1 are arranged at intervals on the outer side of the pre-cable distribution device 6. A third screw connected to the J-shaped tube flange 1 is arranged in the ear seat 69, and a card groove corresponding to the ear seat 69 is arranged in the bottom of the first flange 23, and they do not affect each other.

[0026] In this embodiment, the second through holes 24 include three second closed through holes 241 located on the half surface of the disk 21 and two second open through holes 242 distributed in an annular array on the disk 21. The disk 21 and the edge of the first flange 23 are provided with second guide grooves 25 corresponding to the second open through holes 242, which is conducive to the submarine cable entering the second open through holes 242 from the outside, and the construction is convenient. The second guide groove 25 on the disk 21 is provided with a filling block 26 to radially limit the submarine cable in the second guide groove 25 on the disk 21 and fill the redundant position in the second guide groove 25 to avoid leakage during glue pouring.

[0027] The disc 21 includes a third semi-disc 211 and a fourth semi-disc 212 that are relatively distributed, and the first flange 23 includes a first semi-circular arc plate 231 and a second semi-circular arc plate 232 that are relatively distributed. The first semi-circular arc plate 231 is located below the third semi-disc 211 and is connected by a rib plate. The second semi-circular arc plate 232 is located below the fourth semi-disc 212 and is connected by another rib plate. The structure is stable.

[0028] The glue-filling cylinder 3 is arranged on the top of the bottom load-bearing frame 2, the steel wire frame 7 is arranged in the glue-filling cylinder 3, and the top cover 4 is arranged on the top of the glue-filling cylinder 3 to seal after glue filling. The submarine cable 8 extends into the glue-filling cylinder 3 after passing through the first through hole 61 and the second through hole 24 from bottom to top. The submarine cable includes a cable core and an outer armor steel wire wrapped on the outside of the cable core. The outer armor steel wire of the submarine cable in the glue-filling cylinder passes through the steel wire frame upward and bends and diverges to the outside of the cable core. The resin glue that immerses the steel wire frame 7 and the outer armor steel wire is arranged in the glue-filling cylinder 3, which strengthens the anchoring of the outer armor steel wire in the glue-filling cylinder 3 and improves the tensile resistance of the submarine cable 8.

[0029] The cable core of the submarine cable 8 passes through the top cover 4 and extends to the top of the top cover. The top cover 4 is provided with threading holes corresponding to the cable core, which is convenient for construction. The pre-cable splitting device 6, the bottom load-bearing frame 2 and the glue-filling cylinder 3 respectively adopt a Hough-type split structure to anchor multiple submarine cables simultaneously. In this embodiment, the Hough surface of the pre-cable splitting device 6 and the Hough surface of the bottom load-bearing frame 2 are staggered and crossed at 90°, and the Hough surface of the glue-filling cylinder 3 and the Hough surface of the bottom load-bearing frame 2 are staggered and crossed at 90° to resist stress in different directions and ensure the structural stability after assembly. The wire rack 7 can adopt an integral structure or a Hough-type split structure, which is flexible to choose. The wire rack 7 allows the force on the outer armor steel wire to be quickly released to the anchoring device and the offshore oil and gas platform, thereby improving the tensile resistance of the submarine cable.

[0030] like Figure 2 As shown, the glue-filling cylinder 3 includes an inverted cone cylinder structure composed of a first arc cover 31 and a second arc cover 32. A second flange 33 is provided at the bottom of the glue-filling cylinder 3. A fourth screw connected to the disc 21 is provided on the second flange 33, and the connection is stable. A fifth screw connected to the filling block 26 is provided on the second flange 33 to fix the filling block 26. Connecting plates 34 are respectively provided on the outer sides of the junction of the first arc cover 31 and the second arc cover 32. The two connecting plates 34 are fixed by the seventh screw to ensure the tightness of the connection between the first arc cover 31 and the second arc cover 32 and avoid the problem of glue leakage.

[0031] A mounting block 41 extending downward into the glue-filling cylinder 3 is provided at the bottom of the top cover 4 , and a sixth screw connected to the mounting block 41 is provided on the side of the glue-filling cylinder 3 to fix the top cover 4 .

[0032] Anchoring Example 1: An anchoring method for fixing a plurality of submarine cables comprises the following steps: The bundled multiple submarine cables 8 are passed upward from the bottom of the platform J-shaped tube 11 to the top of the J-shaped tube flange 1, and the bundled multiple submarine cables 8 are separated by the pre-cable separation device, so that each submarine cable passes through a first through hole 61 respectively, and the first cable separation and limiting are performed. The diameter of the first through hole 61 can be flexibly selected to adapt to submarine cables of different diameters; In this embodiment, a steel wire rack 7 penetrating the integral structure is used, and the upper part of the submarine cable is respectively penetrated through the steel wire rack 7 of the integral structure. The steel wire rack 7 can adopt a multi-layer three-dimensional grid structure to facilitate the penetration of the submarine cable and the flow of the resin glue; Use wire cutters to remove the outer sheath and outer armor wire at the position marked on the end of the submarine cable for installing the wire mesh sleeve, and then install the wrapped wire mesh sleeve 5. Figure 1 As shown, the lifting lugs on the wire mesh sleeves 5 on the multiple submarine cables are connected with a lifting tool to lift the multiple cables, which is convenient for subsequent assembly; The pre-cable distribution device 6 and the bottom bearing frame 2 are installed on the J-shaped pipe flange 1, so that each submarine cable vertically passes through a corresponding second through hole 24, and the second cable distribution is limited; Remove the outer sheath of the portion of the submarine cable located above the bottom bearing frame 2 to expose the outer armor wire, bend the outer armor wire outward on the wire frame 7 and spread it out, strengthen the entanglement between the outer armor wire and the wire frame 7, and clean the outer armor wire to ensure the bonding with the resin glue; Install the glue-filling cylinder 3 on the bottom load-bearing frame 2, and slowly pour the filling resin glue into the glue-filling cylinder along the side wall of the cavity of the glue-filling cylinder 3 until the scattered outer armor steel wire and the wire frame 7 are immersed. The resin glue can isolate water vapor, provide anti-corrosion protection for the cavity inside of the glue-filling cylinder 3, and also avoid the rust problem of the outer armor steel wire; After the resin glue solidifies, the wire mesh sleeve 5 is removed, the inner armor wires on the top of the multiple submarine cables are removed, and finally the cable cores of the multiple submarine cables are respectively passed through the threading holes on the top cover 4, and the top cover 4 is installed.

[0033] Anchoring Example 2: An anchoring method for fixing a plurality of submarine cables comprises the following steps: The bundled multiple submarine cables 8 are passed upward from the bottom of the platform J-shaped tube 11 to the top of the J-shaped tube flange 1, and the bundled multiple submarine cables are separated by the pre-cable separation device 6, so that each submarine cable passes through a first through hole 61, and the first cable separation and limiting is performed; Use wire cutters to remove the outer sheath and outer armor wire at the position marked on the end of the submarine cable where the wire mesh sleeve is installed, and then install the wrapped wire mesh sleeve 5. Use a lifting tool to connect the lifting ears on the wire mesh sleeves on multiple submarine cables to lift multiple cables to a position on the offshore oil and gas platform suitable for subsequent component installation; The pre-cable distribution device 6 and the bottom bearing frame 2 are installed on the J-shaped pipe flange 11, so that each submarine cable vertically passes through a corresponding second through hole 24, and the second cable distribution is limited; Remove the outer sheath of the portion of the submarine cable located above the bottom bearing frame 2 to expose the outer armor wires, bend the outer armor wires outwards and spread them out, and clean them, which is conducive to the subsequent bonding of the outer armor wires with the resin glue; In this embodiment, the steel wire frame 7 adopts a half-type split structure steel wire frame, and the glue-filling cylinder 3 is installed on the bottom load-bearing frame 2, and the half-type split structure steel wire frame 7 is placed in the glue-filling cylinder 3, and the half-type split structure steel wire frame 7 is bundled with a wire to form a multi-layer three-dimensional grid structure. The resin glue for filling is slowly poured into the glue-filling cylinder along the side wall of the cavity of the glue-filling cylinder 3 until the scattered outer armor steel wires and the steel wire frame 7 are immersed; After the resin glue solidifies, the wire mesh sleeve 5 is removed, the inner armor wires on the top of the multiple submarine cables are removed, and finally the cable cores of the multiple submarine cables are respectively passed through the threading holes on the top cover 4, and the top cover 4 is installed.

[0034] In summary, the anchoring device and anchoring method for fixing multiple submarine cables pointed out in the present invention can be applied to an already built offshore oil and gas platform. During the operation of the already built oil and gas platform, in order to effectively expand the future power supply capacity and communication capacity of the platform, there will be a problem of mismatch between the number of submarine cables and J-tubes, resulting in the phenomenon of using one J-tube for multiple submarine cables. Under the premise of not increasing the number of J-tubes, the present invention can anchor multiple submarine cables at the same time, reducing costs, and has good adaptability to the diameter and deadweight of the submarine cables, and is easy to operate.

[0035] The above are only embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. An anchoring device for fixing multiple submarine cables, which can simultaneously anchor multiple submarine cables, characterized in that: include: J-shaped pipe flange, pre-cable splitting device, bottom bearing frame, glue-filling cylinder, top cover and wire frame, the bottom bearing frame is arranged on the J-shaped pipe flange, the pre-cable splitting device is arranged in the bottom bearing frame, the pre-cable splitting device is arranged with a plurality of first through holes corresponding to the submarine cables one by one, the bottom bearing frame is arranged with a second through hole located above the first through hole, the glue-filling cylinder is arranged on the top of the bottom bearing frame, the wire frame is arranged in the glue-filling cylinder, the top cover is arranged on the top of the glue-filling cylinder, the submarine cable is arranged from the bottom The cable is passed through the first through hole and the second through hole upwards and then extends into the glue-filled cylinder. The submarine cable includes a cable core and an outer armor steel wire wrapped on the outside of the cable core. The outer armor steel wire of the submarine cable in the glue-filled cylinder passes through the steel wire rack upwards and bends and diverges toward the outside of the cable core. The glue-filled cylinder is provided with resin glue for immersing the steel wire rack and the outer armor steel wire. The cable core passes through the top end cover and extends to above the top end cover. The top end cover is provided with threading holes corresponding to the cable core one by one. The pre-cable splitting device, the bottom load-bearing frame and the glue-filled cylinder respectively adopt a Hough-type split structure.

2. The anchoring device for fixing multiple submarine cables according to claim 1, characterized in that: The Hough surface of the pre-cable separation device is staggered and crossed with the Hough surface of the bottom bearing frame, the Hough surface of the glue-filled cylinder is staggered and crossed with the Hough surface of the bottom bearing frame, and the wire frame adopts an integral structure or a Hough split structure.

3. The anchoring device for fixing multiple submarine cables according to claim 1, characterized in that: The pre-cable distribution device comprises a first semi-circular disk and a second semi-circular disk which are relatively distributed. The first semi-circular disk and the second semi-circular disk are respectively provided with connection blocks located above the half surface. The connection blocks on the first semi-circular disk and the second semi-circular disk are fixed by first screws.

4. The anchoring device for fixing a plurality of submarine cables according to claim 3, characterized in that: The first semi-circular disk is provided with a first positioning pin pointing to the second semi-circular disk on its Haff surface, the second semi-circular disk is provided with a first positioning hole corresponding to the first positioning pin on its Haff surface, the second semi-circular disk is provided with a second positioning pin pointing to the first semi-circular disk on its Haff surface, and the first semi-circular disk is provided with a second positioning hole corresponding to the second positioning pin on its Haff surface.

5. The anchoring device for fixing multiple submarine cables according to claim 1, characterized in that: The first through hole includes a first closed through hole located on the Hough surface of the pre-cable distribution device and / or a first open through hole distributed in a circular array on the pre-cable distribution device, the edge of the pre-cable distribution device is provided with a first guide groove connected to the first open through hole, and the bottom of the pre-cable distribution device is vertically provided with partitions located on both sides of the first open through hole.

6. The anchoring device for fixing a plurality of submarine cables according to claim 1, characterized in that: The bottom load-bearing frame includes a first flange and a disc, the first flange is located below the disc, ribs connected to the first flange are arranged at intervals on the bottom edge of the disc, a second screw connected to the J-shaped tube flange is arranged on the first flange, ears extending to the J-shaped tube flange are arranged at intervals on the outer side of the pre-cable distribution device, a third screw connected to the J-shaped tube flange is arranged in the ear seat, a recessed groove corresponding to the ear seat is arranged at the bottom of the first flange, the second through hole includes a second closed through hole located on the half surface of the disc and / or a second open through hole distributed in a ring array on the disc, a second guide groove corresponding to the second open through hole is arranged on the disc and the edge of the first flange, and a filling block is arranged in the second guide groove on the disc.

7. The anchoring device for fixing a plurality of submarine cables according to claim 6, characterized in that: The disc includes a third semi-disc and a fourth semi-disc which are relatively distributed, and the first flange includes a first semi-circular arc plate and a second semi-circular arc plate which are relatively distributed, the first semi-circular arc plate is located below the third semi-circular disc, and the second semi-circular arc plate is located below the fourth semi-circular disc.

8. The anchoring device for fixing a plurality of submarine cables according to claim 7, characterized in that: The glue pouring cylinder includes an inverted cone cylinder structure composed of a first arc cover and a second arc cover relative to each other, a second flange is provided at the bottom of the glue pouring cylinder, a fourth screw connected to the disc is provided on the second flange, a fifth screw connected to the filling block is provided on the second flange, a mounting block extending downward into the glue pouring cylinder is provided at the bottom of the top end cover, a sixth screw connected to the mounting block is provided on the side of the glue pouring cylinder, and connecting plates are respectively provided on the outer sides of the junction of the first arc cover and the second arc cover, and the two connecting plates are fixed by the seventh screw.

9. An anchoring method for fixing multiple submarine cables, characterized in that: The anchoring device for fixing a plurality of submarine cables according to any one of claims 1 to 8 comprises the following steps: The multiple submarine cables bundled together are passed upward from the bottom of the J-shaped tube of the platform to the top of the J-shaped tube flange, and the multiple submarine cables bundled together are separated by a pre-cable separation device so that each submarine cable passes through a first through hole respectively, and the first cable separation and limiting is performed; The upper part of the submarine cable is passed through the steel wire rack of the integral structure respectively, and the outer sheath and outer armor steel wire are removed at the position where the steel wire mesh sleeve is marked on the end of the submarine cable with wire cutters, and then the wrapped steel wire mesh sleeve is installed. The lifting ears on the steel wire mesh sleeves on multiple submarine cables are connected with lifting tools to lift multiple cables; The pre-cable distribution device and the bottom bearing frame are installed on the J-shaped pipe flange, so that each submarine cable vertically passes through a corresponding second through hole, and the second cable distribution is limited; Remove the outer sheath of the portion of the submarine cable located above the bottom bearing frame to expose the outer armor wires, bend the outer armor wires outwards on the wire frame, spread them out, and clean them; Install the glue-filling cylinder on the bottom load-bearing frame, and slowly pour the filling resin glue into the glue-filling cylinder along the side wall of the cavity of the glue-filling cylinder until the scattered outer armor steel wires are immersed; After the resin glue solidifies, remove the wire mesh sleeve, remove the inner armor wires on the top of the multiple submarine cables, and finally pass the cable cores of the multiple submarine cables through the threading holes on the top cover respectively, and install the top cover.

10. An anchoring method for fixing a plurality of submarine cables, characterized in that: The anchoring device for fixing a plurality of submarine cables according to any one of claims 1 to 8 comprises the following steps: The multiple submarine cables bundled together are passed upward from the bottom of the J-shaped tube of the platform to the top of the J-shaped tube flange, and the multiple submarine cables bundled together are separated by a pre-cable separation device so that each submarine cable passes through a first through hole respectively, and the first cable separation and limiting is performed; Use wire cutters to remove the outer sheath and outer armor wire at the position marked on the end of the submarine cable where the wire mesh sleeve is installed, then install the wrapped wire mesh sleeve, use lifting tools to connect the lifting ears on the wire mesh sleeves on multiple submarine cables, and lift multiple cables; The pre-cable distribution device and the bottom bearing frame are installed on the J-shaped pipe flange, so that each submarine cable vertically passes through a corresponding second through hole, and the second cable distribution is limited; Remove the outer sheath of the portion of the submarine cable located above the bottom bearing frame to expose the outer armor wires, bend the outer armor wires outwards and spread them out, and clean them; Install the glue pouring cylinder on the bottom load-bearing frame, place the wire frame of the half-type split structure in the glue pouring cylinder, and use the binding wire to bundle the wire frame of the half-type split structure to form a whole; Slowly pour the filling resin glue into the glue-filling cylinder along the side wall of the cavity of the glue-filling cylinder until the scattered outer armor steel wires are immersed; After the resin glue solidifies, remove the wire mesh sleeve, remove the inner armor wires on the top of the multiple submarine cables, and finally pass the cable cores of the multiple submarine cables through the threading holes on the top cover respectively, and install the top cover.

Citation Information

Cited By

  • Submarine cable cabin-penetrating sealing anchoring structure and submarine cable cabin-penetrating sealing anchoring method

    CN122512308A