GIS (Geographic Information System) monitoring system, method and equipment of intelligent substation and storage medium

By dividing the monitoring area in the smart substation and utilizing image processing and sensor networks, the problems of insufficient real-time monitoring and accuracy are solved, achieving efficient environmental monitoring and dust control, and reducing the power requirements of the dust removal module.

CN118971379AActive Publication Date: 2024-11-15WENZHOU ELECTRIC POWER CONSTR CO LTD +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411433293.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2024-11-15
Estimated Expiration
2044-10-15

AI Technical Summary

Technical Problem

Existing environmental monitoring systems in smart substations suffer from insufficient real-time monitoring and accuracy, and the dust removal modules require high operating power, which can easily lead to resource waste.

Method used

The GIS monitoring system of the intelligent substation is adopted. By uniformly dividing the monitoring area, image processing technology and sensor network are used for environmental monitoring. Combined with the intelligent control of the dust removal module, the operating power requirements of the dust removal module are reduced.

Benefits of technology

This improved the real-time performance and accuracy of environmental monitoring, reduced the power requirements of the dust removal module, avoided energy waste, and ensured the comprehensiveness and resolution of monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118971379A_ABST
    Figure CN118971379A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of environment monitoring, and discloses a GIS monitoring system, method and device of an intelligent substation and a storage medium. The space of the substation is uniformly divided into a plurality of monitoring areas; the system comprises monitoring control equipment arranged at the central position of each monitoring area; the monitoring control equipment comprises a main control module, an illumination module, an image acquisition module and a dust removal module; the image acquisition module is used for acquiring a live-action image of the monitoring area after the illumination module is turned on, and sending the live-action image to the main control module; the main control module is used for identifying the dust density of the monitoring area based on the illumination power of the illumination module and the live-action image; and when the dust density is greater than a preset density threshold value, the dust removal module is started. The real-time performance and accuracy of environment monitoring are improved, the requirement for the operation power of the dust removal module is lowered, and waste of electric energy is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of environmental monitoring technology, and in particular to a GIS monitoring system, method, device and storage medium for a smart substation. Background Art

[0002] With the gradual development of smart substations, GIS (Gas Insulated Substation) has become the core equipment of power substation. The requirements for GIS installation environment have become more stringent, especially the cleanliness level of the installation environment must reach the ISO14644 standard of one million or above, that is, the number of 0.5 micron particles in each cubic meter of air must be less than 35.2 million. In actual use, due to the entry and exit of staff, there are often problems of excessive on-site pollution such as hair, dust, and debris; for this reason, a robot for intelligent inspection in the substation has been developed, and various sensors are installed on the robot that can intelligently move and avoid obstacles, so as to realize automatic monitoring of the environmental quality of the substation.

[0003] However, due to the large number of large equipment in the substation, the internal environmental quality is uneven, the sensor can only sense a limited range, and the sensing area is affected by the robot's moving position. It is easy for the robot to have no environmental quality problems in the area where it is currently located, while environmental problems may occur in areas that have not yet been inspected, resulting in poor real-time and accuracy of robot monitoring. If the number of robots is increased, it will not only affect the entry and exit of substation staff, but also increase the risk of staff accidentally bumping into and scratching the substation equipment, posing many safety hazards. In addition, after detecting environmental problems in a certain area, the entire substation is usually dusted, which requires a huge amount of power for the dust removal device and easily leads to a waste of resources. Summary of the invention

[0004] The present application provides a GIS monitoring system, method, device and storage medium for a smart substation, which can improve the real-time and accuracy of environmental monitoring, reduce the requirements for the operating power of the dust removal module, and avoid wasting electricity.

[0005] In a first aspect, an embodiment of the present application provides a GIS monitoring system for a smart substation, wherein the space of the smart substation is evenly divided into a plurality of monitoring areas; the system includes a monitoring control device located at a central position of each monitoring area; The monitoring and control device includes a main control module, a lighting module, an image acquisition module and a dust removal module; the image acquisition module is used to obtain the real-scene image of the monitoring area after the lighting module is turned on, and send the real-scene image to the main control module; The main control module is used to obtain the illumination power of the illumination module; obtain the brightness value of the real scene image according to the illumination power; perform illumination correction on the real scene image based on the brightness value and background extraction method to obtain a corrected image; segment the corrected image using a grayscale co-occurrence matrix to obtain a dust texture image; binarize the dust texture image to obtain a grayscale image; calculate the first area of ​​the first pixel value in the grayscale image and the second area of ​​the grayscale image; compare the first area with the second area to obtain the dust density; and determine whether the dust density is greater than a preset density threshold; if so, start the dust removal module.

[0006] Furthermore, it also includes temperature sensors and humidity sensors installed on each insulating switchgear in the smart substation; Each temperature sensor and each humidity sensor is respectively connected to a main control module in a monitoring and control device corresponding to a monitoring area where the insulating switchgear is located; the monitoring and control device also includes an alarm module, a dehumidification module and a cooling module; The temperature sensor is used to obtain the real-time equipment temperature of the insulating switchgear and send it to the main control module; The humidity sensor is used to obtain the real-time equipment humidity of the insulating switchgear and send it to the main control module; The main control module is also used to control the alarm module to generate over-temperature alarm information according to the device number of the corresponding insulating switch device and start the cooling module when the temperature of any real-time device is higher than the first preset temperature threshold; Furthermore, when the humidity of any real-time device is higher than a preset humidity threshold, the control alarm module generates an over-humidity alarm message according to the device number of the corresponding insulating switch device, and starts the dehumidification module.

[0007] Furthermore, the monitoring and control device also includes an electrostatic monitoring module; the electrostatic monitoring module is arranged on the inner wall of the exhaust duct of the dust removal module; the electrostatic monitoring module is used to calculate the static electricity of the airflow and send it to the main control module when the dust removal module is turned on; The main control module is used to obtain the gas flow rate of the dust removal module and the monitoring area of ​​the electrostatic monitoring module; differentiate according to the airflow static electricity and the monitoring area to obtain the unit area current; calculate the collision probability according to the unit area current, dust density and gas flow rate; obtain the Stokes number of the particle according to the collision probability and the correction coefficient; obtain the average dust diameter based on the Stokes number, dust density and slip correction coefficient; and determine whether the average dust diameter is greater than a preset inhalation threshold; if so, determine whether there is a person in the real scene image; if so, control the alarm module to generate a stay away alarm message.

[0008] Furthermore, the image acquisition module is also used to obtain infrared images of the monitoring area and send them to the main control module; The main control module is also used to remove the pixel points corresponding to the human body in the infrared image when it is determined that there is a person in the real-scene image; calculate the grayscale value of each pixel point in the infrared image; obtain the real-time temperature of each pixel point according to the grayscale value of each pixel point; average the real-time temperature of each pixel point to obtain the real-time regional temperature; determine whether the real-time regional temperature is greater than the second preset temperature threshold, and if so, start the cooling module.

[0009] Furthermore, the dust removal module also includes a gas analysis unit; the gas analysis unit is used to analyze the composition and proportion of the inhaled gas when the dust removal module is started, and send the analysis results to the main control module for display.

[0010] Furthermore, the dust removal module also includes a heavy metal monitoring unit; the heavy metal monitoring unit includes a magnetic sheet and an X-ray spectrometer; the magnetic sheet is used to adsorb metal particles in the filtered material; the spectrometer is used to perform fluorescence spectrometer testing on each metal particle on the magnetic sheet to obtain quantitative results of different elements and send them to the main control module for display.

[0011] Furthermore, the system also includes a ground wave monitoring module; the ground wave monitoring module is installed at the center of the floor of the monitoring area; The ground wave monitoring module is used to issue an earthquake alarm when seismic waves are detected.

[0012] Furthermore, the main control module is also used to input the dust density, average dust diameter and real-time regional temperature into the trained power regulation model when starting the dust removal module to obtain the operating power of the dust removal module; and to control the dust removal module to work according to the operating power.

[0013] In a second aspect, an embodiment of the present application provides a GIS monitoring method for a smart substation, which is applied to a GIS monitoring system for a smart substation as described in any of the above embodiments, and the method includes: Acquire the illumination power of the illumination module and the real scene image of the image acquisition module; Obtain the brightness value of the real scene image according to the light power; Perform illumination correction on the real scene image based on brightness value and background extraction method to obtain a corrected image; The gray-level co-occurrence matrix is ​​used to segment the rectified image to obtain the dust texture image; Binarize the dust texture image to obtain a grayscale image; Calculate a first area of ​​a first pixel value in the grayscale image and a second area of ​​the grayscale image; Compare the first area with the second area to obtain the dust density; Determine whether the dust density is greater than a preset density threshold; if so, start the dust removal module.

[0014] Furthermore, the method also includes: Obtain the gas flow rate of the dust removal module, the monitoring area of ​​the electrostatic monitoring module, and the airflow static electricity; Differentiate the airflow static electricity and the monitoring area to obtain a current per unit area; Calculating the collision probability according to the current per unit area, the dust density and the gas flow rate; Obtaining the Stokes number of the particle according to the collision probability and the correction factor; Obtaining an average dust diameter based on the Stokes number, the dust density and the slip correction coefficient; Determine whether the average diameter of the dust is greater than a preset inhalation threshold; if so, determine whether there is a person in the real scene image; if so, control the alarm module to generate a stay away alarm message.

[0015] Furthermore, the above-mentioned determination of whether there is a person in the real scene image includes: Obtain a set of historical real-scene images of the monitored area, the historical real-scene images including real-scene images with people in them and real-scene images without people in them; The historical real-life image set is used to train the neural network to obtain a trained human body detection model; Input the real scene image into the human body detection model to obtain the detection result.

[0016] Furthermore, the method also includes: Obtaining detection results of infrared images and real scene images from the image acquisition module; If the detection result is that there is a person, the pixels corresponding to the human body in the infrared image are removed; Calculate the gray value of each pixel in the infrared image; The real-time temperature of each pixel is obtained according to the gray value of each pixel; The real-time temperature of each pixel is averaged to obtain the real-time regional temperature; Determine whether the real-time regional temperature is greater than a second preset temperature threshold, and if so, start the cooling module.

[0017] Furthermore, the method also includes: Obtain dust density, average dust diameter and real-time regional temperature, and input them into the trained power regulation model to obtain the operating power of the dust removal module; control the dust removal module to work according to the operating power.

[0018] In a third aspect, an embodiment of the present application provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of a GIS monitoring method for a smart substation as described in any of the above embodiments are performed.

[0019] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of a GIS monitoring method for a smart substation as in any of the above embodiments.

[0020] In summary, compared with the prior art, the technical solution provided in the embodiment of the present application has at least the following beneficial effects: The embodiment of the present application provides a GIS monitoring system for a smart substation. Firstly, by evenly dividing the monitoring area, targeted environmental monitoring and dust removal are achieved in a single monitoring area. Since the working range of the dust removal module is reduced, the requirement for the operating power of the dust removal module is reduced, thereby avoiding the waste of electricity caused by cleaning the entire station at the same time. Secondly, the dust density monitored by the present application is determined by the real-scene image under the lighting environment. Compared with setting up a smoke sensor, the image processing-based method of the present application will not miss any corner of the monitoring area, and the monitoring is more comprehensive. Compared with obtaining the image of the entire substation for analysis, the real-scene image of the present application is only for one monitoring area, with higher resolution and better calculation accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A layout diagram of a GIS monitoring system for a smart substation provided in accordance with an embodiment of the present application.

[0022] Figure 2 A structural diagram of a monitoring and control device provided for one embodiment of the present application.

[0023] Figure 3 A flowchart of a GIS monitoring method for a smart substation provided in one embodiment of the present application.

[0024] Figure 4 A flow chart of a method for calculating the average dust diameter provided in one embodiment of the present application. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.

[0026] Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making any creative work shall fall within the scope of protection of this application.

[0027] See also Figure 1 The embodiment of the present application provides a GIS monitoring system for a smart substation, in which the space of the smart substation is evenly divided into multiple monitoring areas; the system includes a monitoring control device located at the center of each monitoring area.

[0028] like Figure 1 As shown, the monitoring and control devices and the corresponding monitoring areas have corresponding numbers: monitoring area 1 corresponds to monitoring and control device 1, monitoring area 2 corresponds to monitoring and control device 2... and so on.

[0029] The monitoring and control equipment includes a main control module, a lighting module, an image acquisition module and a dust removal module; the image acquisition module is used to obtain the real-scene image of the monitoring area after the lighting module is turned on, and send the real-scene image to the main control module.

[0030] The main control module is used to obtain the illumination power of the illumination module; obtain the brightness value of the real scene image according to the illumination power; perform illumination correction on the real scene image based on the brightness value and background extraction method to obtain a corrected image; segment the corrected image using a grayscale co-occurrence matrix to obtain a dust texture image; binarize the dust texture image to obtain a grayscale image; calculate the first area of ​​the first pixel value in the grayscale image and the second area of ​​the grayscale image; compare the first area with the second area to obtain the dust density; and determine whether the dust density is greater than a preset density threshold; if so, start the dust removal module.

[0031] like Figure 1 As shown, the monitoring and control equipment is located at the center of the ceiling of each monitoring area. The main control module can control the lighting module to turn on according to the received and manually input lighting instructions. The dust removal module uses a bag filter element made of fiber weaving to capture solid particles in the dust-containing gas, which can achieve a dust removal effect with an accuracy of 0.3μm.

[0032] The setting of the preset density threshold can refer to the requirements in the "Record Card for Control of Key Links in the Quality and Process of Installation of Main Electrical Equipment in Substation Projects": 0.5 μm / m 3 Particles<3.52×10 7 , 1μm / m 3 Particles<8.32×l0 6 , 5μm / m 3 Particles<2.93×l0 5 That is, dust-free operation does not mean completely eliminating dust, but controlling it within a certain range.

[0033] Furthermore, after starting the dust removal module, the main control module continues to monitor the dust density in the monitoring area in real time. If it is detected that the dust density is lower than the preset density threshold and the difference with the preset density threshold reaches the pause value, the dust removal module is stopped.

[0034] The above-mentioned embodiment provides a GIS monitoring system for a smart substation. Firstly, by evenly dividing the monitoring area, targeted environmental monitoring and dust removal are achieved in a single monitoring area. Since the working range of the dust removal module is reduced, the requirement for the operating power of the dust removal module is reduced, thereby avoiding the waste of electric energy caused by cleaning the entire station at the same time. Secondly, the dust density monitored by the present application is determined by the real-scene image under the lighting environment. Compared with setting up a smoke sensor, the image processing-based method of the present application will not miss any corner of the monitoring area, and the monitoring is more comprehensive. Compared with obtaining the image of the entire substation for analysis, the real-scene image of the present application is only for one monitoring area, with higher resolution and better calculation accuracy.

[0035] See also Figure 2 In some embodiments, the system also includes temperature sensors and humidity sensors installed on each insulating switch device in the smart substation; each temperature sensor and each humidity sensor is respectively connected to a main control module in a monitoring and control device corresponding to a monitoring area where the insulating switch device is located; the monitoring and control device also includes an alarm module, a dehumidification module and a cooling module.

[0036] The temperature sensor is used to obtain the real-time device temperature of the insulating switch device and send it to the main control module; the humidity sensor is used to obtain the real-time device humidity of the insulating switch device and send it to the main control module; the main control module is also used to control the alarm module to generate over-temperature alarm information according to the device number of the corresponding insulating switch device when any real-time device temperature is higher than the first preset temperature threshold, and start the cooling module; and, when any real-time device humidity is higher than the preset humidity threshold, the control alarm module generates over-humidity alarm information according to the device number of the corresponding insulating switch device, and starts the dehumidification module.

[0037] The resolution of the temperature sensor is 0.1°C, and the measurement range of the humidity sensor is 0%RH-100%RH. The dehumidification module draws humid air into the machine through a fan, and through heat exchange, the moisture in the air condenses into water droplets, and the treated dry air is discharged outside the machine. This cycle reduces the humidity in the monitored area.

[0038] Furthermore, temperature sensors, humidity sensors, etc. are all detachable, which makes it convenient for staff to realize dynamic digital detection of key construction procedures and process quality, avoiding the shortcomings of conventional manual review that are easy to miss based on experience, empowering project quality and making construction quality traceable.

[0039] Specifically, the insulating switchgear is usually a gas-insulated switchgear, which is filled with insulating gas and has high requirements for temperature and humidity. The insulating switchgear number of each sensor has been set inside the main control module, so when it is detected that the temperature or humidity of the corresponding insulating switchgear exceeds the standard, the staff can be reminded as soon as possible to deal with it.

[0040] During the specific implementation, the main control module can be connected to the electronic screen to organize the dust density, real-time equipment temperature and real-time equipment humidity into a curve display, and the corresponding data curve can be extracted and displayed according to the time period input by the user; the electronic screen can also display the alarm records of all data, sorted by alarm time, area, equipment name, alarm level, and alarm content.

[0041] The above embodiment installs the temperature sensor and the humidity sensor on the insulating switchgear of the substation, which can accurately obtain the real-time status of the equipment, and the monitoring and processing of temperature and humidity are more accurate and real-time.

[0042] In some embodiments, the monitoring and control device also includes an electrostatic monitoring module; the electrostatic monitoring module is arranged on the inner wall of the exhaust duct of the dust removal module; the electrostatic monitoring module is used to calculate the static electricity of the airflow and send it to the main control module when the dust removal module is turned on.

[0043] The main control module is used to obtain the gas flow rate of the dust removal module and the monitoring area of ​​the electrostatic monitoring module; differentiate according to the airflow static electricity and the monitoring area to obtain the unit area current; calculate the collision probability according to the unit area current, dust density and gas flow rate; obtain the Stokes number of the particle according to the collision probability and the correction coefficient; obtain the average dust diameter based on the Stokes number, dust density and slip correction coefficient; and determine whether the average dust diameter is greater than a preset inhalation threshold; if so, determine whether there is a person in the real scene image; if so, control the alarm module to generate a stay away alarm message.

[0044] Among them, the preset inhalation threshold is between 5μm-10μm. Furthermore, the dust removal module is usually selected as an exhaust filter device, and the electrostatic monitoring module is arranged on the inner wall of the exhaust duct. When the dust removal module is working, the dust particles in the flowing gas in the exhaust duct collide and move with each other, thereby generating electric charges and forming static current. In addition to calculating whether the particle size meets the human inhalation standard based on the generated static current, the present application can also enable the main control module to reduce the operating power of the dust removal module when the static electricity of the airflow is greater than a certain value, thereby reducing the gas flow rate, thereby avoiding the static electricity of the dust airflow in the monitoring area from affecting various electrical equipment.

[0045] The above embodiment obtains the average dust diameter through airflow electrostatic calculation and issues an alarm based on the average dust diameter, which can prevent dust particles from being inhaled by staff in the monitoring area before being sucked into the dust removal module, thereby ensuring the dust cleanliness of the monitoring area while also taking care of the health of the staff.

[0046] In some embodiments, the image acquisition module is also used to obtain infrared images of the monitoring area and send them to the main control module.

[0047] The main control module is also used to remove the pixel points corresponding to the human body in the infrared image when judging that there is a person in the real scene image; calculate the gray value of each pixel point in the infrared image; obtain the real-time temperature of each pixel point according to the gray value of each pixel point; average the real-time temperature of each pixel point to obtain the real-time regional temperature; judge whether the real-time regional temperature is greater than the second preset temperature threshold, and if so, start the cooling module. The second preset temperature threshold is less than the first preset temperature threshold.

[0048] Specifically, in the substation, in addition to the temperature of the insulating switchgear itself, the temperature of the entire environment is also within the monitoring range of the present application, because even if the insulating switchgear itself is not overheated due to an internal fault, the external regional temperature will also affect the insulating switchgear. Therefore, the present application can also dynamically adjust the cooling module according to the real-time regional temperature to ensure the stability of the internal ambient temperature of the substation, thereby ensuring that the operation of the power equipment is not affected by the external temperature.

[0049] The above embodiment realizes real-time regional temperature monitoring and cooling module control on the basis of monitoring the temperature of the implementing equipment of the insulating switchgear, and further ensures the monitoring accuracy and control stability of the substation ambient temperature.

[0050] In some embodiments, the dust removal module also includes a gas analysis unit; the gas analysis unit is used to analyze the composition and proportion of the inhaled gas when the dust removal module is started, and send the analysis results to the main control module for display.

[0051] Among them, the gas analysis unit may include an SF6 pressure sensor to realize the manipulation of SF6 pressure data, thereby realizing the conversion of SF6 gas density and weight, and providing functions such as SF6 data monitoring, data meter reading, pressure warning and leakage monitoring.

[0052] Specifically, the main control module can store a list of harmful gases and a list of flammable gases, such as SF6, CO, sulfur dioxide, nitrogen oxides, fluorine and hydrogen. If the gas components in the list appear in the analysis results and their proportion exceeds the requirements of the "Record Card for Control of Key Links in the Installation Quality Process of Major Electrical Equipment in Substation Projects", the alarm module will also be controlled to sound an alarm; at the same time, the gas exchange function of the dust removal module will be started to exchange the inhaled gas with the outside air after filtering.

[0053] The above-mentioned embodiment realizes the monitoring of gas composition and proportion in the substation, which enables the staff in the monitoring area to observe in real time whether there are harmful gases or flammable gases, so as to stay away from or deal with them in time to avoid serious safety accidents.

[0054] In some embodiments, the dust removal module also includes a heavy metal monitoring unit; the heavy metal monitoring unit includes a magnetic sheet and an X-ray spectrometer; the magnetic sheet is used to adsorb metal particles in the filtered material; the spectrometer is used to perform fluorescence spectrometer testing on each metal particle on the magnetic sheet to obtain quantitative results of different elements and send them to the main control module for display.

[0055] Among them, the magnetic sheet can use an array type Hall sensor.

[0056] Specifically, there are many electrical equipment or combined electrical appliances in the substation, and a lot of metal materials are used in the production of these equipment and appliances. As the use time increases, there is a high possibility of metal chips falling off. Once these metal chips enter the human body with the dust, they will accumulate in the body and be difficult to excrete, which will seriously damage human health over the years.

[0057] Therefore, this application sets up a heavy metal monitoring unit to detect the content of heavy metal particles in the air in each monitoring area of ​​the substation. The main control module can also set corresponding thresholds for each heavy metal element, and mark the metal elements that exceed the corresponding thresholds in red on the display screen, further reminding the substation staff to be careful about inhaling heavy metal particles.

[0058] Furthermore, the metal particles adsorbed by the magnetic sheet can be periodically pasted onto the filter membrane to facilitate removal for chemical analysis.

[0059] In some embodiments, the system further includes a ground wave monitoring module; the ground wave monitoring module is installed at the center of the floor of the monitoring area; the ground wave monitoring module is used to issue an earthquake alarm when a seismic wave is detected. Specifically, the relevant data of the on-site monitoring will be automatically transmitted to the electronic large screen, so that the electrical construction personnel can see it at a glance and take different measures in a timely manner according to the situation.

[0060] In some embodiments, the main control module is further used to input the dust density, dust average diameter and real-time regional temperature into the trained power regulation model when starting the dust removal module to obtain the operating power of the dust removal module; and control the dust removal module to work according to the operating power. The operating power setting standard of the dust removal module is to ensure that the filtration efficiency is greater than or equal to 95%.

[0061] Specifically, considering the Brownian motion of dust particles and the influence of the settling velocity of dust particles of different sizes on the suction efficiency, it can be concluded that the dust density and average diameter are positively correlated with the operating power of the dust removal module, and negatively correlated with the temperature of the implementation area; therefore, comprehensively considering these three factors to adjust the appropriate dust removal operating power can greatly reduce the dust removal energy consumption.

[0062] See also Figure 3 Another embodiment of the present application provides a GIS monitoring method for a smart substation, which is applied to a GIS monitoring system for a smart substation as in any of the above embodiments, and the method includes: Step S01, obtaining the illumination power of the illumination module and the real scene image of the image acquisition module.

[0063] Step S02, obtaining the brightness value of the real scene image according to the light power.

[0064] Step S03, performing illumination correction on the real scene image based on brightness value and background extraction method to obtain a corrected image.

[0065] Specifically, the real-scene image may be a real-scene video composed of multiple real-scene image frames. The background extraction method may specifically adopt an optical flow method or an inter-frame difference method. The brightness value is used to correct each image frame so that the brightness of each image frame acquired at different times is the same, thereby ensuring the accuracy of the background extraction algorithm; the corrected image is a physical image frame after cutting the background.

[0066] Step S04: segment the corrected image using a gray level co-occurrence matrix to obtain a dust texture image.

[0067] Specifically, the gray-level co-occurrence matrix is ​​obtained by statistically analyzing the situations in which two pixels at a certain distance on the image have a certain gray level. It is defined as the frequency or probability P(i,j) of the gray-level value j at a point away from a fixed position (distance d, orientation θ) starting from the pixel point with gray-level value i (the frequency or probability of the gray-level value pair (i,j) in a certain position relationship in the statistical pixel point pair), that is, all estimated values ​​can be expressed in the form of a matrix, which is called the gray-level co-occurrence matrix.

[0068] The dust texture features in the corrected image can be identified through the gray level co-occurrence matrix and used as the dust texture image.

[0069] The present application extracts texture features before image binarization, which can make the recognition accuracy of the pixels where the dust particles are located higher during binarization, and the generation of the first pixel value and the calculation result of the first area higher in accuracy.

[0070] Step S05, binarizing the dust texture image to obtain a grayscale image.

[0071] Step S06, calculating a first area of ​​a first pixel value in the grayscale image and a second area of ​​the grayscale image.

[0072] Step S07, comparing the first area with the second area to obtain dust density.

[0073] Among them, the first pixel value is 0, the pixel point of the first pixel value corresponds to the pixel point where the dust particle is located, and the second area is the entire area of ​​the grayscale image. By comparing the first area with the second area, the density of the dust in the air can be obtained.

[0074] Step S08, determining whether the dust density is greater than a preset density threshold; if so, starting the dust removal module.

[0075] The above-mentioned embodiment identifies the dust density in the monitoring area based on lighting brightness and real-scene images. Compared with the method in which the sensor is mounted on a robot for sensing, the method of the present application is not affected by distance, thereby improving the accuracy and real-time performance of dust monitoring in substations.

[0076] In some embodiments, the main control module is further connected to an electrostatic monitoring module, and the electrostatic monitoring module is disposed on the inner wall of the exhaust duct of the dust removal module. The method may further include: Step S11, obtaining the gas flow rate of the dust removal module, the monitoring area of ​​the static electricity monitoring module and the airflow static electricity.

[0077] Step S12, performing differentiation according to the airflow static electricity and the monitoring area to obtain the current per unit area.

[0078] Step S13, calculating the collision probability according to the current per unit area, the dust density and the gas flow rate.

[0079] Step S14, obtaining the Stokes number of the particle according to the collision probability and the correction coefficient.

[0080] Step S15, obtaining an average dust diameter based on the Stokes number, the dust density and the slip correction coefficient.

[0081] Step S16, determining whether the average diameter of the dust is greater than a preset inhalation threshold; if so, determining whether there is a person in the real scene image; if so, controlling the alarm module to generate a stay away alarm message.

[0082] Here, the gas flow rate is assumed to be The monitoring area is , the static electricity of air flow is , t is the monitoring time, and the dust density is , after differentiating the monitoring area, the current per unit area is expressed as ; Collision probability The calculation formula is: Assume the known correction factor is , divide the collision probability by the correction factor and then square it to get the Stokes number .

[0083] Let the known slip correction coefficient be , then the average diameter of dust The calculation formula is: Furthermore, the above-mentioned judgment of whether there is a person in the real-scene image can be implemented by using a target detection model: obtaining a set of historical real-scene images of the monitoring area, the historical real-scene images including real-scene images with people and real-scene images without people; using the set of historical real-scene images to train a neural network to obtain a trained human body detection model; inputting the real-scene image into the human body detection model to obtain a detection result.

[0084] When the dust removal module is working, a large amount of dust will be sucked up. If a worker stays in the monitoring area at this time, he will inevitably inhale some of the dust. Therefore, the above embodiment can determine whether the air quality of the current substation meets the standard for human inhalation by calculating the average diameter of the dust, and warn people to stay away from the area if it does not meet the standard.

[0085] In some embodiments, the method further comprises: Step S21, obtaining detection results of the infrared image and the real scene image of the image acquisition module.

[0086] Step S22: If the detection result is that there is a person, remove the pixel points corresponding to the human body in the infrared image.

[0087] Step S23, calculating the gray value of each pixel in the infrared image.

[0088] Step S24, obtaining the real-time temperature of each pixel according to the grayscale value of each pixel.

[0089] Step S25, averaging the real-time temperatures of each pixel point to obtain the real-time regional temperature.

[0090] Step S26, determining whether the real-time regional temperature is greater than a second preset temperature threshold, and if so, starting the cooling module.

[0091] Specifically, the output result of the human body detection model is also a real-life image. If a human body is detected, the human figure will be framed by a rectangular frame. Therefore, the image output by the human body detection model and the infrared image can be aligned, and the rectangular frame can be used to cut the infrared image, so that the influence of human body temperature can be shielded when calculating the temperature of the implementation area.

[0092] In some embodiments, the method further includes: obtaining dust density, average dust diameter and real-time regional temperature, and inputting them into a trained power regulation model to obtain the operating power of the dust removal module; and controlling the dust removal module to work according to the operating power.

[0093] Specifically, for the dust removal module, its energy consumption is affected by the operating power and operating time; therefore, when creating and training the power regulation model, the energy consumption calculation formula is used as the objective function, and the power regulation range of the dust removal module is used as the constraint condition. The regional volume, dust density, average dust diameter and real-time regional temperature are input into the model, and the time required for dust removal at different powers is calculated and substituted into the objective function. After multiple iterations, the operating power value that minimizes the objective function, i.e., the energy consumption, is obtained and output.

[0094] The above-mentioned embodiment optimizes the operating power of the dust removal module by training the power regulation model, which can minimize the energy consumption of the dust removal module and further reduce the power consumption of the dust removal module on the basis of reducing the dust removal range.

[0095] An embodiment of the present application provides a computer device, which may include a processor, a memory, a network interface and a database connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal via a network connection. When the computer program is executed by the processor, the processor executes the steps of a GIS monitoring method for a smart substation as in any of the above embodiments.

[0096] The working process, working details and technical effects of the computer equipment provided in this embodiment can be found in the above embodiment of a GIS monitoring method for a smart substation, which will not be described in detail here.

[0097] An embodiment of the present application provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of a GIS monitoring method for a smart substation as in any of the above embodiments are implemented. The computer-readable storage medium refers to a carrier for storing data, which may include but is not limited to a floppy disk, an optical disk, a hard disk, a flash memory, a USB flash drive and / or a memory stick, etc. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The working process, working details and technical effects of the computer-readable storage medium provided in this embodiment can be found in the above embodiment of a GIS monitoring method for a smart substation, which will not be repeated here.

[0098] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in the present application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0099] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0100] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. A GIS monitoring system for a smart substation, characterized in that: The space of the smart substation is evenly divided into a plurality of monitoring areas; the system includes a monitoring control device arranged at the center of each monitoring area; The monitoring and control device includes a main control module, a lighting module, an image acquisition module and a dust removal module; The image acquisition module is used to obtain a real-scene image of the monitoring area after the lighting module is turned on, and send the real-scene image to the main control module; The main control module is used to obtain the illumination power of the lighting module; obtain the brightness value of the real scene image according to the illumination power; perform illumination correction on the real scene image based on the brightness value and background extraction method to obtain a corrected image; segment the corrected image using a grayscale co-occurrence matrix to obtain a dust texture image; binarize the dust texture image to obtain a grayscale image; calculate the first area of ​​the first pixel value in the grayscale image and the second area of ​​the grayscale image; compare the first area with the second area to obtain the dust density; and determine whether the dust density is greater than a preset density threshold; if so, start the dust removal module.

2. The GIS monitoring system for smart substation according to claim 1 is characterized in that: It also includes temperature sensors and humidity sensors installed on each insulating switchgear in the smart substation; Each of the temperature sensors and each of the humidity sensors is respectively connected to the main control module in the monitoring and control device corresponding to the monitoring area where the insulating switchgear is located; The monitoring and control equipment also includes an alarm module, a dehumidification module and a cooling module; The temperature sensor is used to obtain the real-time device temperature of the insulating switch device and send it to the main control module; The humidity sensor is used to obtain the real-time equipment humidity of the insulating switchgear and send it to the main control module; The main control module is also used to control the alarm module to generate over-temperature alarm information according to the device number corresponding to the insulating switch device and start the cooling module when any of the real-time device temperatures is higher than the first preset temperature threshold; Furthermore, when the humidity of any of the real-time devices is higher than a preset humidity threshold, the alarm module is controlled to generate over-humidity alarm information according to the device number corresponding to the insulating switch device, and the dehumidification module is started.

3. The GIS monitoring system for smart substation according to claim 2 is characterized in that: The monitoring and control device further comprises an electrostatic monitoring module; the electrostatic monitoring module is arranged on the inner wall of the exhaust duct of the dust removal module; The static electricity monitoring module is used to calculate the static electricity of the airflow and send it to the main control module when the dust removal module is turned on; The main control module is used to obtain the gas flow rate of the dust removal module and the monitoring area of ​​the electrostatic monitoring module; to differentiate the airflow electrostatics and the monitoring area to obtain the current per unit area; to calculate the collision probability according to the current per unit area, the dust density and the gas flow rate; to obtain the Stokes number of the particle according to the collision probability and the correction coefficient; to obtain the average dust diameter based on the Stokes number, the dust density and the slip correction coefficient; and to determine whether the average dust diameter is greater than a preset inhalation threshold; if so, to determine whether there is a person in the real scene image; if so, to control the alarm module to generate a stay alarm message.

4. The GIS monitoring system for smart substation according to claim 3 is characterized in that: The image acquisition module is also used to obtain the infrared image of the monitoring area and send it to the main control module; The main control module is also used to remove the pixel points corresponding to the human body in the infrared image when it is determined that there is a person in the real-scene image; calculate the grayscale value of each pixel point in the infrared image; obtain the real-time temperature of each pixel point according to the grayscale value of each pixel point; average the real-time temperature of each pixel point to obtain the real-time regional temperature; determine whether the real-time regional temperature is greater than a second preset temperature threshold, and if so, start the cooling module.

5. The GIS monitoring system for smart substation according to claim 1 is characterized in that: The dust removal module also includes a gas analysis unit; the gas analysis unit is used to analyze the composition and proportion of the inhaled gas when the dust removal module is started, and send the analysis results to the main control module for display.

6. The GIS monitoring system for smart substation according to claim 1 is characterized in that: The dust removal module also includes a heavy metal monitoring unit; the heavy metal monitoring unit includes a magnetic sheet and an X-ray spectrometer; The magnetic sheet is used to absorb metal particles in the filtered material; the spectrometer is used to perform fluorescence spectrometer test on each of the metal particles on the magnetic sheet to obtain quantitative results of different elements and send them to the main control module for display.

7. The GIS monitoring system for smart substation according to claim 1 is characterized in that: It also includes a ground wave monitoring module; the ground wave monitoring module is installed at the center of the floor of the monitoring area; The ground wave monitoring module is used to issue an earthquake alarm when a seismic wave is detected.

8. The GIS monitoring system for smart substation according to claim 4 is characterized in that: The main control module is also used to input the dust density, the average dust diameter and the real-time regional temperature into the trained power regulation model when starting the dust removal module to obtain the operating power of the dust removal module; And, controlling the dust removal module to work according to the operating power.

9. A GIS monitoring method for a smart substation, characterized in that: A GIS monitoring system for a smart substation according to at least one of claims 1 to 8, comprising: Acquire the illumination power of the illumination module and the real scene image of the image acquisition module; Obtaining a brightness value of the real scene image according to the light power; Performing illumination correction on the real scene image based on the brightness value and background extraction method to obtain a corrected image; Using a gray level co-occurrence matrix to segment the corrected image to obtain a dust texture image; Binarizing the dust texture image to obtain a grayscale image; Calculating a first area of ​​a first pixel value in the grayscale image and a second area of ​​the grayscale image; Compare the first area with the second area to obtain dust density; Determine whether the dust density is greater than a preset density threshold; if so, start the dust removal module.

10. The GIS monitoring method for smart substation according to claim 9, characterized in that: Also includes: Obtain the gas flow rate of the dust removal module, the monitoring area of ​​the electrostatic monitoring module, and the airflow static electricity; Differentiate the airflow static electricity and the monitoring area to obtain a current per unit area; Calculating the collision probability according to the current per unit area, the dust density and the gas flow rate; Obtaining the Stokes number of the particle according to the collision probability and the correction factor; Obtaining an average dust diameter based on the Stokes number, the dust density and the slip correction coefficient; Determine whether the average diameter of the dust is greater than a preset inhalation threshold; if so, determine whether there is a person in the real scene image; if so, control the alarm module to generate a stay away alarm message.

11. The GIS monitoring method for smart substation according to claim 10, characterized in that: The determining whether there is a person in the real scene image includes: Acquire a set of historical real-scene images of the monitoring area, wherein the historical real-scene images include real-scene images with people in them and real-scene images without people in them; The historical real-life image set is used to train the neural network to obtain a trained human body detection model; The real scene image is input into the human body detection model to obtain a detection result.

12. The GIS monitoring method for smart substation according to claim 11, characterized in that: Also includes: Acquire the detection results of the infrared image of the image acquisition module and the real scene image; If the detection result is that there is a person, then remove the pixel points corresponding to the human body in the infrared image; Calculating the grayscale value of each pixel in the infrared image; Obtaining the real-time temperature of each pixel point according to the grayscale value of each pixel point; Averaging the real-time temperatures of the pixels to obtain the real-time regional temperature; Determine whether the real-time regional temperature is greater than a second preset temperature threshold, and if so, start the cooling module.

13. The GIS monitoring method for smart substation according to claim 12, characterized in that: Also includes: The dust density, the average dust diameter and the real-time regional temperature are obtained and input into a trained power regulation model to obtain the operating power of the dust removal module; and the dust removal module is controlled to work according to the operating power.

14. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the GIS monitoring method for the smart substation as described in any one of claims 9 to 13 are implemented.

15. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the GIS monitoring method for a smart substation as claimed in any one of claims 9 to 13 are implemented.

Citation Information

Patent Citations

  • System for real-time and online monitoring smoke particles

    CN107452011A

  • Pulverized coal concentration measuring method and device based on image recognition

    CN108956400A

  • Monitoring operation and maintenance method, system and device for photovoltaic power station, and storage medium

    CN114596267A

  • Machine room environment prediction type monitoring control system

    CN116880305A

  • Intelligent monitoring system of transformer substation

    CN117578723A