Transition type micro-pressure oxygen-enriched cabin as well as production process and use method thereof

By designing micro-pressure oxygen-enriching chambers with segmented shells and independent unit systems, the problem of small size and difficulty in entering and exiting in the existing technology is solved, and convenient installation and rapid entry and exit are achieved, suitable for multiple people and Demand in plateau areas.

CN118975903APending Publication Date: 2024-11-19YABO PHARM CHEM EQUIP (JIANGSU) CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411095154.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The existing micro-pressure oxygen-rich tanks are small in size and are difficult to meet the needs of multiple people, and they are difficult to enter and exit quickly in emergencies, and there is a lack of civilian micro-pressure oxygen-rich tanks suitable for plateau areas.

Method used

A transitional micro-pressure oxygen-rich cabin is designed, including two independent cabins, the main cabin and the transition cabin. Through a segmented shell and connecting member structure, it is easy to install and enter the house, and the air pressure is controlled through an independent unit system to achieve Quick in and out and stable air pressure.

Benefits of technology

It realizes convenient installation and entry of micro-pressure oxygen-rich cabins, ensuring that personnel enter and exit the cabin quickly, while keeping the air pressure of the main cabin unchanged, solving the air leakage problem, and is suitable for multi-person use and plateau areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118975903A_ABST
    Figure CN118975903A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of micro-pressure oxygen-enriched cabins, in particular to a transition type micro-pressure oxygen-enriched cabin and a production process and using method.The micro-pressure oxygen-enriched cabin comprises a cabin body, the cabin body comprises a plurality of shells, partition plates, reinforcing pieces and a connecting piece, the reinforcing pieces are welded to the inner walls of the shells and the inner walls of the partition plates, and the connecting piece is arranged between the shells and the partition plates; each of the shell and the connecting piece comprises a frame body and welding edges positioned on two end surfaces of the frame body, the shell comprises a transition cabin shell and a main cabin shell, the connecting piece is welded between the transition cabin shell and the main cabin shell, the main cabin shell is welded through a flange, and the connecting piece is welded between the transition cabin shell and the main cabin shell. The partition plate comprises a first door plate, a second door plate and a bottom plate, the first door plate is welded to the transition cabin shell, and the second door plate is welded to the first main cabin shell; the unit system is arranged on one side of the main cabin shell at intervals, and the unit system communicates with the cabin body through a high-pressure pipe; the micro-pressure oxygen-enriched cabin is convenient to install, can enter and exit from the cabin conveniently and is particularly suitable for the civil field.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of micro-pressure oxygen-enriched cabins, and in particular to a transitional micro-pressure oxygen-enriched cabin and a production process and a use method thereof. Background Art

[0002] As a health care device, the micro-pressure oxygen-enriched chamber has a working pressure of less than or equal to 0.08MPa. It is a normal pressure container with no safety hazards and certain audio-visual entertainment functions. In recent years, it has received extensive attention in the civilian field. The current micro-pressure oxygen-enriched chamber is relatively small in size, which makes it difficult for multiple people to enter at the same time. Large-volume oxygen chambers also face problems such as difficulty in entering households.

[0003] In addition, considering the rapid opening of the cabin door and the health risks, when users enter and exit the oxygen chamber, they need to reduce the pressure inside the cabin to match the outside world. When an emergency occurs in the cabin or when there is an urgent need to leave the cabin, the existing micro-pressure oxygen-enriched cabins are also difficult to meet the needs of users to enter and exit quickly. At present, there are few micro-pressure oxygen-enriched cabins suitable for civilian use and that meet the requirements of working in plateau areas on the market. Summary of the invention

[0004] In view of the above-mentioned shortcomings of the prior art, the purpose of the present invention is to provide a transitional micro-pressure oxygen-enriched cabin and its production process and use method, so as to solve the problems existing in the micro-pressure oxygen-enriched cabin in the prior art.

[0005] The present invention first provides a transitional micro-pressure oxygen-enriched cabin, the transitional micro-pressure oxygen-enriched cabin comprising:

[0006] A cabin body, the cabin body comprises a multi-section shell, a partition, a reinforcement and a connecting piece, the inner walls of the shell and the partition are welded with reinforcement pieces, the shell and the connecting piece both comprise a frame and welding edges located at both end faces of the frame, the shell comprises a transition cabin shell and a main cabin shell, the main cabin shell comprises a first main cabin shell, a second main cabin shell and a third main cabin shell connected in sequence, the connecting piece is welded between the transition cabin shell and the main cabin shell, the main cabin shells are welded via flanges, the partition comprises a first door panel, a second door panel and a bottom panel, the first door panel is welded to the transition cabin shell, the second door panel is welded to the first main cabin shell, and the bottom panel is welded to the third main cabin shell;

[0007] and a unit system, which is spaced apart on one side of the main cabin shell, and the unit system is connected to the cabin body through a high-pressure pipe;

[0008] Wherein, the connecting member is provided with a first connecting member welding edge inwardly on the end surface of one side close to the transition cabin shell, and a second connecting member welding edge is provided inwardly on the end surface of one side close to the main cabin shell, the first main cabin shell includes a first main cabin welding edge provided near the side of the connecting member, the first main cabin welding edge includes a first connecting edge perpendicular to the frame of the first main cabin shell and a second connecting edge parallel to the frame of the first main cabin shell, the first connecting edge and the second connecting member welding edge are welded, the first connecting member welding edge and the transition cabin welding edge flange are welded, and the second connecting edge and the second door panel are welded.

[0009] Another aspect of the present invention further provides a production process of the transitional micro-pressure oxygen-enriched cabin as described above, the process comprising the following steps:

[0010] Welding the first door panel to the transition cabin shell, welding the second door panel to the first main cabin shell, and welding the bottom panel to the third main cabin shell;

[0011] Connecting the transition cabin shell, the connecting piece, the first main cabin shell, the second main cabin shell and the third main cabin shell in sequence;

[0012] Welding reinforcement members to the inner wall of the shell and the inner wall of the partition to form a cabin;

[0013] A unit system is arranged at intervals on one side of the main cabin.

[0014] In another aspect, the present invention further provides a method for using the transitional micro-pressure oxygen-enriched cabin as described above, the method comprising the following steps:

[0015] A transitional micro-pressure oxygen-enriched cabin is provided, wherein the main cabin of the transitional micro-pressure oxygen-enriched cabin is pressurized to ΔP=P 1 Stabilize the pressure and pressurize the transition tank to ΔP=P 2 Voltage regulation, P 1 >P 2 ;

[0016] Click the entry option on the first display screen outside the transition cabin. After the transition cabin is depressurized to ΔP=0, enter the transition cabin. The transition cabin is pressurized to ΔP=P 1 , enter the main cabin, and then the transition cabin begins to depressurize to ΔP=P 2 And hold, waiting for the next entry and exit command;

[0017] Click the exit option on the third display screen in the main cabin. After the transition cabin is pressurized to ΔP=P1, enter the transition cabin, the transition cabin is depressurized to ΔP=0, exit the transition cabin, and then the transition cabin begins to pressurize to ΔP=P 2 And keep waiting for the next command to enter or leave the cabin; where ΔP = actual air pressure in the cabin - actual air pressure in the external environment

[0018] The transitional micro-pressure oxygen-enriched cabin provided by the present invention has the following beneficial effects: The transitional micro-pressure oxygen-enriched cabin provided by the present invention is easy to install, and the segmented structure is convenient for household entry and can be applied to the civilian field. In order to control the rapid exit and entry of personnel, the cabin body includes a transition cabin and a main cabin. The two cabins are independent cabin bodies and can be pressurized separately. The main cabin can meet the entry and exit requirements of personnel during use, and the air pressure remains unchanged. By setting the air pressure of the transition cabin to be slightly lower than that of the standard cabin, emergency and rapid exit of personnel is achieved, and the air pressure of the main cabin remains unchanged, which will not affect the use of other users of the main cabin.

[0019] The two cabins have independent control units and control programs. The transition cabin maintains pressure difference and stabilizes pressure, ready for people in the cabin to exit quickly at any time. There is no need to start pressurization from 0. Controlling the pressure difference between the transition cabin and the main cabin also solves the problem of air leakage. The advantage of a separate control unit is that it can be adjusted. The pressure maintenance of the transition cabin can be adjusted between ΔP=0-30kpa. Users have the right to choose independently, which is convenient for quick entry or exit. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 Shown is a schematic structural diagram of the micro-pressure oxygen-enriched cabin body of the present invention.

[0021] Figure 2 Shown is a top cross-sectional view of the micro-pressure oxygen-enriched cabin body of the present invention.

[0022] Figure 3 Display as Figure 2 A magnified view of the welding part at point A.

[0023] Figure 4 Display as Figure 2 A partial enlarged view of the flange welding at point B in the middle.

[0024] Figure 5 Shown is a layout diagram of the shell of the micro-pressure oxygen-enriched cabin of the present invention.

[0025] Figure 6 Shown is a schematic structural diagram of the transition compartment shell of the present invention.

[0026] Figure 7 Shown are a structural schematic diagram and a cross-sectional view of the first main shell of the present invention.

[0027] Figure 8 Display as Figure 7 A partial enlarged view of point C in the middle.

[0028] Fig. 9 It is a schematic structural diagram of the second main shell of the present invention.

[0029] Fig.10 Shown is a schematic structural diagram of the connecting piece of the present invention.

[0030] Fig.11 Shown is a schematic structural diagram of the third main shell of the present invention.

[0031] Fig.12 Shown is a schematic structural diagram of the flange of the present invention.

[0032] Fig.13 Shown is the layout diagram of the first unit system of the present invention.

[0033] Fig.14 Shown is a layout diagram of the second unit system of the present invention.

[0034] Fig.15 Shown is a logical schematic diagram of the method of using the present invention.

[0035] Fig.16 Shown is a schematic structural diagram of the second door body of the present invention. DETAILED DESCRIPTION

[0036] See also Figures 1 to 16 .

[0037] like Figure 1 As shown, the transitional micro-pressure oxygen-enriched cabin of the present invention includes a cabin body, the cabin body includes a plurality of shell sections and a connector 300, the cabin body includes a main cabin 200 and a transition cabin 100 connected to the main cabin 200, the transition cabin 100 is located on one side of the main cabin 200, and the transition cabin 100 facilitates users to quickly enter and exit the micro-pressure oxygen-enriched cabin while maintaining a constant air pressure in the main cabin 200. In some embodiments, the use environment of the micro-pressure oxygen-enriched cabin is an indoor plateau low-pressure environment.

[0038] like Figure 1 As shown, the cabin has a rectangular structure, that is, a square micro-pressure oxygen-enriched cabin. Compared with oxygen cabins of other shapes, the square oxygen cabin has a high utilization rate and can meet the needs of more users entering at the same time, expanding the scope of use of the oxygen cabin, for example, it can meet the needs of multiple people holding meetings at the same time. The shell of the cabin is made of carbon steel. The thickness of the shell is 2 to 4 mm, for example, 2.5 mm.

[0039] like Figure 5 As shown, the shell has a frame and welding edges arranged on both end surfaces of the frame. The welding edges can play a connecting role and can also serve as reinforcing ribs to enhance the stability of the oxygen chamber. The welding edges and the frame can be perpendicular.

[0040] like Figure 1 , Figure 2 and Figure 5As shown, in some embodiments, the main cabin 200 includes multiple sections of shells connected together. Specifically, the main cabin shell includes a first main cabin shell 201, a second main cabin shell 202, and a third main cabin shell 203 connected together. The transition cabin 100 only includes one section of shell. The cabin body also includes a partition, which includes a first door panel 104 connected to the transition cabin 100, a second door panel 201d connected to the first main cabin 201, and a bottom panel 203d connected to the third main cabin 203. The transition cabin door 105 and the main cabin door 201f are installed on the first door panel 104 and the second door panel 201d.

[0041] like Figure 1 and Figure 2 As shown, the first main cabin shell 201 is connected to the transition cabin shell 101. In some embodiments, the width a of the transition cabin shell 101 is 0.8-1m, the length b is 2-2.4m, and the height is 1.8-2.0m. The size of the transition cabin shell 101 is the same as the length, width and height of the first main cabin shell 201, the second main cabin shell 202, and the third main cabin 203. The shell of the cabin body adopts a segmented connection structure, which is easy to install and transport.

[0042] like Figure 1 As shown, for easy movement, the bottom of the transition cabin 100 and the main cabin 200 are both provided with rollers 600, such as universal wheels. The main cabin 200 and the transition cabin 100 are provided with observation windows 700, which can be made of high-viscosity polycarbonate.

[0043] like Figure 1 and Figure 5 , Figure 6 As shown, the transition cabin shell 101 includes a transition cabin frame 102, and the transition cabin shell 101 is provided with a first transition cabin welding edge 103a inwardly at one end away from the first main cabin 201, and the first transition cabin welding edge 103a includes a bent end 103a1 and a welding end 103a2, and the transition cabin shell 101 is provided with a second transition cabin welding edge 103b inwardly at one end close to the first main cabin 201. A first through hole 106 is also provided at the bottom of one side of the transition cabin 100, and the first through hole 106 includes a plurality of holes, which can be the air inlet, air outlet and sampling port of the pressurized air of the transition cabin 100.

[0044] like Figure 1 and Figure 5As shown, the connection between the transition cabin shell 101 and the first main cabin shell 201 is a split connection, which can ensure the stability of the micro-pressure oxygen-enriched cabin and the convenience of installation. Specifically, the split connection includes a connector 300, and the connector 300 includes a connector frame 301 and a first connector welding edge 302 and a second connector welding edge 303 disposed inwardly at both ends of the connector frame 301. The connector 300 can also be carbon steel. The width L of the connector 300 can be 80 to 100 mm.

[0045] like Figure 3 As shown, specifically, the first connecting piece welding edge 302 and the second transition compartment welding edge 103b are flange-welded, and the second connecting piece welding edge 303 and the first main compartment shell 201 are welded.

[0046] like Fig.10 As shown, evenly distributed first mounting holes S1 are provided on the first connecting member welding edge 302 and the second transition compartment welding edge 103b.

[0047] like Figure 5 and Figure 7 As shown, the first main cabin shell 201 includes a first main frame 201a and a first main cabin outer welding edge 201b and a first main cabin inner welding edge 201c disposed inwardly at both ends of the first main frame 201a.

[0048] Specifically, the first main cabin outer welding edge 201b includes a first connecting edge 201b1 perpendicular to the first main frame 201a and a second connecting edge 201b2 parallel to the first main frame 201a. The first connecting edge 201b1 is welded to the second connecting member welding edge 303. The first connecting edge 201b1 and the second connecting edge 201b2 are connected together at a right angle. The length of the first main cabin inner welding edge 201c is equal to L1.

[0049] Specifically, the length of the first connecting member welding edge 302 is L1, the length of the second connecting member welding edge 303 is L2, the length of the second transition tank welding edge 103b can be equal to L2, in some embodiments, the length of the first connecting edge 201b1 is greater than or equal to L2 and less than L1, the length of the second connecting edge 201b2 is L3, and further L1>L2>L3. In some embodiments, the size range of L1 can be 40-50mm, the size range of L2 can be 12-15mm, and the size range of L1 can be 9-10mm.

[0050] like Figure 5As shown, the cabin body further includes a first door panel 104, and both ends of the first door panel 104 may also have welding edges 104a, and the welding edges 104a are welded to the welding ends 103a2 in the first transition cabin welding edges 103a, and the first door panel 103 is provided with a transition cabin door 104. The length of the welding edge 104a on the first door panel 104 may be equal to L3.

[0051] like Figure 2 As shown, the cabin body also includes a second door panel 201d, a main cabin door 201f is arranged on the second door panel 201d, and welding edges at both ends of the second door panel 201d are welded to the second connecting edge 201b2.

[0052] like Figure 5 As shown, it is worth noting that the lengths of the welding edges at adjacent positions of the present invention are the same, and the flange width dimension at the flange welding point is also the same as the length of the welding edge.

[0053] In some embodiments, the second main cabin shell 202 may include two, and the second main cabin shell 202 includes a second main frame 202a and second main cabin welding edges 202b disposed inwardly at both ends of the second main frame 202a.

[0054] like Figure 1 As shown, the third main cabin shell 203 may include a third main frame 203a and a third main cabin welding edge disposed inwardly on the end surface where the two ends of the third main frame 203a are located. A second through hole 203g is also disposed at the bottom of one side of the third main cabin, and the second through hole 203g includes a plurality of holes, and the second through hole 203g may be an air inlet, an air release port, and a sampling port for pressurized oxygen in the main cabin. A network connection port 203f is also disposed at the top of one side of the third main cabin for convenience of civilian use.

[0055] like Figure 5 and Fig. 9 As shown, the third main cabin welding edge includes a third main cabin inner welding edge 203b close to one end of the second main cabin and a third main cabin outer welding edge 203c away from one end of the second main cabin, the third main cabin inner welding edge 203b is welded to the second main cabin welding edge 202b, the third main cabin outer welding edge 203c includes a bent end 203c1 and a welding end 203c2, and the welding end 203c2 is welded to the welding edges 203e at both ends of the bottom plate 203d. The length of the third main cabin inner welding edge 203b is equal to L1. The length of the welding end of the third main cabin outer welding edge 203c is equal to L3.

[0056] like Figure 2 and Figure 4 , Figure 5As shown, the second main cabin welding edge 202b is flange-welded with the first main cabin welding edge and the third main cabin welding edge adjacent to both sides, that is, it is flange-welded with the first main cabin inner welding edge 201c and the third main cabin inner welding edge 203b. The flange welding can be welded by clamping the welding edge with two flanges 500. Further, the flange 500 can be welded on both sides of the corresponding welding edge and then fastened and sealed with bolts and seals. The length of the second main cabin welding edge 202b is L1.

[0057] like Fig.12 As shown, the flange 500 is a hollow rectangular flange, and a second mounting hole S2 matching the first mounting hole S1 is provided on the flange 500, and bolts are provided in the mounting holes (S1, S2). The number of the mounting holes (S1, S2) can be 1-2 / 10cm, and a sealing material is provided between the flange 500 and the clamped welding edge. The sealing material can be, for example, polyurethane, silicone, sponge, etc., and the flange 500 and the welding edge are connected together by bolts and welding. The thickness of the flange can be 5mm. The length of the welding edge at the flange welding can be equal to L1. The welding edges of the first door panel 104, the second door panel 201d and the bottom plate 203d can all be equal to L3.

[0058] The cabin body also includes a reinforcement member, which may be a channel steel, and the channel steel may be welded to the inner wall of the shell and the partition, and the cabin body also includes an interior decoration member, which is arranged on the inner side of the reinforcement member. The reinforcement member may be Q345R steel.

[0059] The cabin body also includes a display screen, which includes a first display screen, a second display screen and a third display screen. The first display screen can be set outside the transition cabin 100, the second display screen can be set inside the transition cabin 100, and the third display screen can be set inside the main cabin 200. The functions of the display screen include but are not limited to controlling the air pressure in the transition cabin 100 and the main cabin 200, and displaying conventional parameters such as carbon dioxide concentration, temperature, humidity, and lighting switches.

[0060] like Figure 2 and Fig.13 as well as Fig.14As shown, the micro-pressure oxygen-enriched cabin includes an organic unit system 400, which is arranged on one side of the cabin body, and further, can be arranged beside the second main shell and the third main shell. The unit system includes a casing 401 and a first unit system and a second unit system located in the casing 401. The casing 401 and the cabin body can be connected through a high-pressure pipe 402. Specifically, there is a gap between the casing 401 and the cabin body, and the gap can be greater than 20 cm. This can avoid the resonance problem caused by the compressor. The first unit system can be the The transition cabin matches the micro-pressure air, and the second unit can match the micro-pressure oxygen for the main cabin. The first unit includes an air compressor, a gas tank, and a filter connected together. The filter is connected to the first through hole 106. The second unit includes an air unit and an oxygen unit. The air unit includes an air compressor, a gas tank, and a filter connected together. The oxygen unit includes an oxygen generator, an oxygen tank and a compressor. The oxygen generator, the oxygen tank and the compressor are connected in series. The air unit and the oxygen unit are connected in parallel and connected to the second through hole 203g of the main cabin 200.

[0061] The micro-pressure oxygen-enriched cabin may also include a controller to control a valve to achieve functions such as pressurization, pressure relief, and ventilation, which belongs to the prior art and will not be described in detail here.

[0062] A plurality of silencers are also connected in series at the air inlet holes of the first through hole 106 and the second through hole 203g in the cabin. In some embodiments, the power of the air compressor is 4-5KW, and the power of the compressor is 4-5KW.

[0063] The first unit system of the present invention can be connected to the transition cabin 100, and the second unit system can be connected to the main cabin 200, so that the transition cabin 100 and the main cabin 200 can be two independent cabins, which can ensure that the air pressure in the main cabin 200 is constant, and the user can quickly enter and exit the micro-pressure oxygen-enriched cabin.

[0064] The present invention also provides a production process of the transitional micro-pressure oxygen-enriched cabin as described above, the production process comprising the following steps:

[0065] — S101 welding the first door panel to the transition cabin shell, welding the second door panel to the first main cabin shell, and welding the bottom panel to the third main cabin shell;

[0066] — S102 sequentially connects the transition cabin shell, the connecting piece, the first main cabin shell, the second main cabin shell and the third main cabin shell;

[0067] —S103 welding reinforcement members to the inner wall of the shell and the inner wall of the partition to form a cabin;

[0068] —S104 A unit system is arranged at intervals on one side of the main cabin.

[0069] In step S101, the transition cabin shell to which the first door panel is welded, the first main cabin shell to which the second door panel is welded, and the third main cabin shell to which the bottom plate is welded may also be subjected to a painting process.

[0070] In step S102, the connection can be made by first welding the connecting piece 300 and the first main cabin shell 201 and then painting them, which is convenient for indoor installation. Specifically, the flange welding can be made by first welding the flange to the corresponding welding edge and then fixing it with bolts indoors.

[0071] In step S103, the welded reinforcements can be welded by a process of superimposed full welding and intermittent welding, and the remaining welding is a full welding process. Specifically, the four upper and lower left and right surfaces of the cabin shell and the inner wall of the partition are evenly welded with reinforcements. The reinforcements are arranged so that there are 5 to 6 reinforcements for every 1 meter of inner wall length. This can prevent deformation of the cabin. The reinforcements can be channel steels, and the width of the channel steels can be 8 to 10 cm.

[0072] In step S103, the length ratio of full weld and intermittent weld in the welding of the reinforcement is (2-3):1. The specific intermittent welding process can be a weld length of 50-60 mm and a spacing of 40-50 mm. The process of superimposed intermittent welding and full welding can control the deformation, and the stability of the oxygen chamber can be enhanced in combination with certain reinforcements.

[0073] In step S104, the unit system 400 and the cabin body may be connected via a high-pressure pipe to avoid resonance problems caused by high-power compressors and air compressors.

[0074] Another aspect of the present invention further provides a method for using the transitional micro-pressure oxygen-enriched cabin as described above, the method comprising the following steps:

[0075] —S201 provides a transitional micro-pressure oxygen-enriched cabin, the main cabin of which is pressurized to ΔP=P 1 Stabilize the pressure and pressurize the transition tank to ΔP=P 2 Voltage regulation, P 1 >P 2 ;

[0076] —S202 Click the entry option on the first display screen outside the transition cabin. After the transition cabin is depressurized to ΔP=0, enter the transition cabin. The transition cabin is pressurized to ΔP=P 1 , enter the main cabin, and then the transition cabin begins to depressurize to ΔP=P 2 And hold, waiting for the next entry and exit command;

[0077] —S203 Click the exit option on the third display screen in the main cabin. After the transition cabin is pressurized to ΔP=P1, enter the transition cabin. The transition cabin is depressurized to ΔP=0, exit the transition cabin, and then the transition cabin begins to be pressurized to ΔP=P 2 And hold, waiting for the next entry and exit command;

[0078] Specifically, the ΔP is a relative pressure difference, ΔP=actual air pressure in the cabin-actual air pressure of the external environment.

[0079] like Fig.10 As shown, in step S201, the difference between P1 and P2 is not greater than 5Kpa, for example, 1 Can be equal to 30Kpa, the P 2 It can be equal to 25Kpa. The present invention sets P 1 >P 2 , that is, setting P2 slightly larger than P1 can facilitate closing the main cabin door and reduce the time of leaving the cabin.

[0080] like Fig.16 As shown, the transition door 105 and the main door 201f may have the same structure. A sealing ring O is provided between the transition door 105 and the main door 201f of the present invention and the first door panel 104 and the second door panel 201d. The sealing ring O can realize automatic door opening and closing in conjunction with the method of use when there is a pressure difference between the external environment of the cabin body, the main cabin 200 and the transition cabin 100.

[0081] Specifically, one side of the main door 201f is fixedly connected to the second door panel 201d via a fixing member 201f1, and the other side of the main door 201f is fixedly connected to a door handle 201f2.

[0082] The present invention is further described below through further specific examples and performance tests. In the example, the lengths of adjacent welded edges welded together are the same.

[0083] Example 1

[0084] Example 1: Figure 5 The oxygen cabin solution shown includes two second main cabins, wherein each cabin shell has a width of 1m, a length of 2.4m, a height of 1.9m, a shell thickness of 2.5mm, a flange thickness of 5mm, a welding edge length of the first door panel and the second door panel and the corresponding cabin shell equals L3, and a welding edge length of the flange welding between the two second main cabins and the cabin shells on both sides equals L1. The welding edge of the first connecting piece is welded to the transition cabin shell flange, and the welding edge of the second connecting piece is welded to the first main cabin shell.

[0085] The welding density of the reinforcements on each surface of the shell and partition is 6 pieces / meter, and the adjacent reinforcements are connected together. The welding adopts full welding and intermittent welding processes. The ratio of full welding and intermittent welding length is 2:1, the intermittent welding seam length is 50mm, and the spacing is 50mm.

[0086] Example 2

[0087] The oxygen cabin solution adopted in Example 1 includes only one second main cabin, wherein each cabin shell is 1m wide, 2.4m long, and 1.9m high, the length of the welding edge of the first door panel and the second door panel and the corresponding cabin shell is equal to L3, and the length of the welding edge of the flange welding between the second main cabin and the cabin shells on both sides is equal to L1. The welding edge of the first connecting piece is welded to the flange of the transition cabin shell, and the welding edge of the second connecting piece is welded to the first main cabin shell.

[0088] The welding density of the reinforcements on each surface of the shell and partition is 5 pieces / meter. The welding adopts full welding and intermittent welding processes. The length ratio of full welding and intermittent welding is 3:1. The length of intermittent welding seam is 50mm and the spacing is 40mm.

[0089] Comparative Example 1

[0090] Comparative Example 1 is similar to Example 1, in that all the reinforcement members are fully welded to the shell and the inner wall of the partition, and other processes remain unchanged.

[0091] Table 1 shows some parameter data of the embodiments and comparative examples.

[0092] Table 1 Parameters of Examples and Comparative Examples

[0093] L1 / mm L2 / mm L3 / mm Example 1 41 15 9 Example 2 41 15 9 Comparative Example 1 41 15 9

[0094] evaluate

[0095] The following examples and comparative examples were subjected to performance evaluation, and the evaluation results are shown in Table 2. The specific evaluation method includes:

[0096] (1) Specific test method for deformation: After the pressure reaches the rated pressure of 1.3 atmospheres, the deformation is measured with a horizontal ruler after maintaining the pressure for 1 hour.

[0097] (2) Specific noise test method: After repeatedly pressurizing to the rated pressure of 1.3 atmospheres, maintain the pressure for 1 hour, and use a national standard noise tester to test the noise values ​​during pressurization and pressure maintenance multiple times, and take the largest value as reference.

[0098] (3) Specific test method for air tightness: After pressurizing to the rated pressure of 1.3 atmospheres, maintain the pressure for 1 hour The digital display shows whether the pressure has dropped. The pressure drop rate within 1 hour must be less than 5%.

[0099] Table 2 Performance evaluation table of embodiments and comparative examples

[0100]

[0101] It can be seen from Examples 1 and 2 that the larger the volume of the oxygen chamber, the more difficult it is to control its deformation. With the same test method, the deformation of Example 1 is greater, and the deformation of the internal reinforcements cannot be controlled within 0.3 cm by using a full welding process.

[0102] The above embodiments are only illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. When the embodiments give a numerical range, it should be understood that, unless otherwise specified in the present invention, the two endpoints of each numerical range and any numerical value between the two endpoints can be selected. Unless otherwise defined, all technical and scientific terms used in the present invention have the same meaning as those commonly understood by those skilled in the art. In addition to the specific methods, equipment, and materials used in the embodiments, according to the technical personnel of the present art's grasp of the prior art and the records of the present invention, any methods, equipment, and materials of the prior art similar or equivalent to the methods, equipment, and materials described in the embodiments of the present invention can also be used to implement the present invention. Anyone familiar with this technology can modify or change the above embodiments without violating the spirit and scope of the present invention. Therefore, all equivalent modifications or changes completed by those with ordinary knowledge in the art without departing from the spirit and technical ideas disclosed in the present invention should still be covered by the claims of the present invention.

Claims

1. A transitional micro-pressure oxygen-enriched cabin, Features: The transitional micro-pressure oxygen-enriched cabin comprises: A cabin body, the cabin body comprises a multi-section shell, a partition, a reinforcement and a connecting piece, the inner walls of the shell and the partition are welded with reinforcement pieces, the shell and the connecting piece both comprise a frame and welding edges located at both end faces of the frame, the shell comprises a transition cabin shell and a main cabin shell, the main cabin shell comprises a first main cabin shell, a second main cabin shell and a third main cabin shell connected in sequence, the connecting piece is welded between the transition cabin shell and the main cabin shell, the main cabin shells are welded via flanges, the partition comprises a first door panel, a second door panel and a bottom panel, the first door panel is welded to the transition cabin shell, the second door panel is welded to the first main cabin shell, and the bottom panel is welded to the third main cabin shell; and a unit system, which is spaced apart on one side of the main cabin shell, and the unit system is connected to the cabin body through a high-pressure pipe; Wherein, the connecting member is provided with a first connecting member welding edge inwardly on the end surface of one side close to the transition cabin shell, and a second connecting member welding edge is provided inwardly on the end surface of one side close to the main cabin shell, the first main cabin shell includes a first main cabin welding edge provided near the side of the connecting member, the first main cabin welding edge includes a first connecting edge perpendicular to the frame of the first main cabin shell and a second connecting edge parallel to the frame of the first main cabin shell, the first connecting edge and the second connecting member welding edge are welded, the first connecting member welding edge and the transition cabin welding edge flange are welded, and the second connecting edge and the second door panel are welded.

2. The transitional micro-pressure oxygen-enriched cabin according to claim 1, It is characterized in that The length of the welding side of the first connecting piece is L1, the length of the welding side of the second connecting piece is L2, the length of the first connecting side is greater than or equal to L2 and less than L1, the length of the second connecting side is L3, and L1>L2>L3 is satisfied.

3. The transitional micro-pressure oxygen-enriched cabin according to claim 1, It is characterized in that The second main compartment shell includes at least two second main compartment shells connected in series.

4. The transitional micro-pressure oxygen-enriched cabin according to claim 1, It is characterized in that The width of the single-stage shell is 0.8-1m, the length is 2-2.4m, and the height is 1.8-2.0m.

5. The transitional micro-pressure oxygen-enriched cabin according to claim 1, It is characterized in that The transition cabin shell is provided with a first transition cabin welding edge inwardly at one end facing away from the first main cabin shell, the first transition cabin welding edge includes a bent end and a welding end, and the welding edge on the first door body is welded to the welding end on the first transition cabin welding edge.

6. The transitional micro-pressure oxygen-enriched cabin according to claim 1, It is characterized in that The third main cabin welding edge includes a third main cabin inner welding edge close to one end of the second main cabin shell and a third main cabin outer welding edge away from one end of the second main cabin shell. The third main cabin inner welding edge is welded to the second main cabin welding edge, and the third main cabin outer welding edge includes a bent end and a welding end. The welding end of the third main cabin welding edge is welded to the welding edges at both ends of the bottom plate.

7. A production process for a transitional micro-pressure oxygen-enriched cabin according to any one of claims 1 to 6, Features: The production process comprises the following steps: Welding the first door panel to the transition cabin shell, welding the second door panel to the first main cabin shell, and welding the bottom panel to the third main cabin shell; Connecting the transition cabin shell, the connecting piece, the first main cabin shell, the second main cabin shell and the third main cabin shell in sequence; Welding reinforcement members to the inner wall of the shell and the inner wall of the partition to form a cabin; A unit system is arranged at intervals on one side of the main cabin.

8. The production process according to claim 7, It is characterized in that The flange welding comprises the steps of clamping two flanges on both sides of a welding edge and filling a sealing member and then fully welding the flanges. A first mounting hole is provided on the flanges, and a second mounting hole is provided on the welding edge between the flanges.

9. The production process according to claim 7, It is characterized in that The welding reinforcement is carried out by superimposing full welding and intermittent welding, the length ratio of the full welding and intermittent welding is (2-3):1, and the intermittent welding process includes a weld length of 50-60 mm and a spacing of 40-50 mm.

10. A method for using the transitional micro-pressure oxygen-enriched cabin according to any one of claims 1 to 6 or the transitional micro-pressure oxygen-enriched cabin prepared according to any one of the production processes of claims 7 to 9, It is characterized in that The method of use comprises the following steps: A transitional micro-pressure oxygen-enriched cabin is provided, wherein the main cabin of the transitional micro-pressure oxygen-enriched cabin is pressurized to ΔP=P 1 Stabilize the pressure and pressurize the transition tank to ΔP=P 2 Voltage regulation, P 1 >P 2 ; Click the entry option on the first display screen outside the transition cabin. After the transition cabin is depressurized to ΔP=0, enter the transition cabin. The transition cabin is pressurized to ΔP=P 1 , enter the main cabin, and then the transition cabin begins to depressurize to ΔP=P 2 And hold, waiting for the next entry and exit command; Click the exit option on the third display screen in the main cabin. After the transition cabin is pressurized to ΔP=P1, enter the transition cabin, the transition cabin is depressurized to ΔP=0, exit the transition cabin, and then the transition cabin begins to pressurize to ΔP=P 2 And hold, waiting for the next entry and exit command; Where ΔP = actual air pressure in the cabin - actual air pressure in the external environment.

Citation Information

Patent Citations

  • Chamber controlling device for pressure chamber

    CN101953741A

  • Multi-person plateau life pressurizing cabin

    CN109025375A

  • Multi-person plateau life pressurizing cabin and control method thereof

    CN109025376A

  • Vehicle-mounted aluminum alloy micro-pressure medical oxygen cabin

    CN114028116A

  • Adjustable split combined type oxygenation cabin

    CN210554419U