Preparation method of pipe orifice connecting piece of liquid tank air chamber
In the preparation of the pipe port connector of the liquid tank gas chamber, the auxiliary parts and bridge technology is used to solve the accuracy deviation caused by uneven roll pressure, and achieve higher dimensional accuracy and lower processing costs.
Patent Information
- Application Number
- CN202411300252.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-19
AI Technical Summary
The pipe port connections of the liquid tank gas chamber are prone to uneven stress during rolling, resulting in dimensional accuracy deviations, increasing construction difficulty and cost, and affecting efficiency.
By setting up auxiliary parts and bridges, build into a regular shape close to the entire rectangular plate. During the nesting stage, the pipe port connections are evenly connected to the auxiliary parts, ensuring uniform stress during roll forming, reducing twisting and deformation, and improving processing Accuracy and cost reduction.
The dimensional accuracy of the pipe port connector is achieved, which reduces the difficulty and cost of processing, solves the accuracy problem caused by uneven stress, and improves construction efficiency.
Smart Images

Figure CN118977068A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mechanical manufacturing, in particular to a method for preparing a pipe mouth connector of a liquid tank gas chamber. Background Art
[0002] When processing the pipe mouth connector of the liquid tank gas chamber, the plate material of the pipe mouth connector is generally cut out first, and then the cut plate material is roll-formed to obtain an arc-shaped connector that can be welded to the pipe mouth of the liquid tank gas chamber.
[0003] However, since the pipe mouth connector is generally an irregular long strip with a tortuous arc line, it is easy for the rolling part to be subjected to uneven force, which will cause the final size accuracy of the connector to deviate, and thus it is impossible to accurately weld it to the pipe mouth position of the liquid tank gas chamber, thereby increasing the construction difficulty and cost and affecting the construction efficiency. Summary of the invention
[0004] To this end, the technical problem to be solved by the present invention is to overcome the problem in the prior art that the pipe mouth connector is generally an irregular long strip structure with a tortuous arc, which is prone to uneven force on the rolling part during rolling, resulting in deviations in the dimensional accuracy of the final connector, making it impossible to accurately weld to the pipe mouth position of the liquid tank gas chamber, increasing the construction difficulty and construction cost and affecting the construction efficiency.
[0005] In order to solve the above technical problems, the present invention provides a method for preparing a pipe nozzle connector of a liquid tank gas chamber, comprising the following steps:
[0006] Step S1: determining a rectangular lofting reference plate according to the maximum length and the maximum width of the pipe nozzle connector, and cutting off a portion of the pipe nozzle connector shape on the lofting reference plate to obtain two first auxiliary parts and one second auxiliary part;
[0007] Step S2: setting a nesting plate of a predetermined size, and nesting the two pipe nozzle connectors, the two first auxiliary parts and the second auxiliary part on the nesting plate, wherein the nesting layout position is that the two pipe nozzle connectors are stacked in the width direction of the nesting plate, and the first auxiliary part and the second auxiliary part are respectively located on the side of the two pipe nozzle connectors away from each other;
[0008] Step S3: a plurality of bridges are evenly spaced between two pipe nozzle connectors, between the first auxiliary component and its adjacent pipe nozzle connector, and between the second auxiliary component and its adjacent pipe nozzle connector;
[0009] Step S4: taking a plate having the same size as the nesting plate, cutting it according to the nesting layout determined in steps S2 and S3, to obtain a preformed plate consisting of two pipe nozzle connectors connected by bridges, two first auxiliary parts and one second auxiliary part;
[0010] Step S5: Roll-forming the preformed plate;
[0011] Step S6: Cut off the bridge to obtain two formed pipe port connectors, and then weld them to the liquid tank to form them.
[0012] Preferably, in step S1, after determining the lofting reference plate, a plurality of transverse processing lines and longitudinal processing lines extending along the length direction and the width direction thereof are first drawn on the lofting reference plate using drawing software, and finally a pipe nozzle connector, a first auxiliary part and a second auxiliary part having corresponding transverse processing lines and longitudinal processing lines are obtained.
[0013] Preferably, in step S2, when nesting, it is necessary to ensure that the corresponding transverse processing lines on the pipe nozzle connector, the first auxiliary part and the second auxiliary part are aligned, and the bottom of the pipe nozzle connector located below is a predetermined distance from the bottom edge of the nesting plate, and then, based on the two pipe nozzle connectors, a gap of predetermined width is provided between the first auxiliary part and its adjacent pipe nozzle connector, and between the second auxiliary part and its adjacent pipe nozzle connector, respectively, and then the bridge is provided in the gap.
[0014] Preferably, when arranging the first auxiliary part and the second auxiliary part, it is necessary to ensure that the longitudinal processing lines thereon are parallel to the longitudinal processing lines on the pipe nozzle connector.
[0015] Preferably, in step S5, longitudinal rolling is performed along the direction of the longitudinal processing line with the direction of the transverse processing line as the rolling axis.
[0016] Preferably, in step S5, the rolling process is completed after rolling until both ends of the preformed plate are aligned to form a cylindrical structure.
[0017] Preferably, in step S5, the plate is cut by a laser cutting machine.
[0018] Preferably, in step S6, a cutting line is first drawn on the bridge and then the bridge is removed along the cutting line.
[0019] Preferably, in step S3, it is necessary to ensure that the pipe nozzle connector, the first auxiliary part and the second auxiliary part are all located within the plate surface range of the nesting plate.
[0020] Preferably, the width of the bridge is between 50 mm and 100 mm, and the interval between adjacent bridges is within the range of 300 mm to 500 mm.
[0021] The above technical solution of the present invention has the following beneficial effects compared with the prior art:
[0022] The method for preparing a pipe nozzle connector for a liquid tank gas chamber described in the present invention provides auxiliary parts, and in the nesting stage, the pipe nozzle connector and the auxiliary parts are assembled into a regular shape close to a whole rectangular plate, and bridging connection structures are evenly provided between adjacent pipe nozzle connectors and auxiliary parts; so that after unloading, the pipe nozzle connector and the auxiliary parts form an integrated plate surface, and the overall plate surface is subjected to more uniform force during roll forming than when the pipe nozzle connector with an irregular structure is separately roll formed, thereby obtaining a pipe nozzle connector with higher dimensional accuracy, and since the pipe nozzle connector and the auxiliary parts are not completely fitted and connected, the processing difficulty and cost of cutting and separating the formed pipe nozzle connector are relatively small, which well solves the problem of processing accuracy caused by distortion and deformation of special-shaped parts due to uneven force in the existing processing process, while also taking into account the control of processing costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to make the content of the present invention more clearly understood, the present invention is further described in detail below according to specific embodiments of the present invention in conjunction with the accompanying drawings, wherein
[0024] Figure 1 It is a structural schematic diagram of a pipe nozzle connector of a method for preparing a pipe nozzle connector of a liquid tank gas chamber according to a preferred embodiment of the present invention;
[0025] Figure 2 It is a structural schematic diagram of a first auxiliary part and a second auxiliary part of a method for preparing a pipe mouth connector of a liquid tank gas chamber in a preferred embodiment of the present invention;
[0026] Figure 3 It is a schematic diagram of the arrangement positions of parts during nesting in a method for preparing a pipe port connector of a liquid tank gas chamber according to a preferred embodiment of the present invention;
[0027] Figure 4 It is a structural schematic diagram of a bridge of a method for preparing a pipe port connector of a liquid tank gas chamber according to a preferred embodiment of the present invention;
[0028] Figure 5 It is a schematic diagram of a nesting plate of a method for preparing a pipe port connector of a liquid tank gas chamber according to a preferred embodiment of the present invention;
[0029] Figure 6 It is a structural schematic diagram of a method for preparing a pipe mouth connector of a liquid tank gas chamber according to a preferred embodiment of the present invention, including a preformed plate composed of a rolled pipe mouth connector, a first auxiliary part, a second auxiliary part and a bridge.
[0030] Explanation of the reference numerals in the specification: 1. pipe nozzle connector; 2. first auxiliary part; 3. second auxiliary part; 4. sleeve plate; 5. bridge; 6. transverse processing line; 7. longitudinal processing line. DETAILED DESCRIPTION
[0031] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments so that those skilled in the art can better understand the present invention and implement it, but the embodiments are not intended to limit the present invention.
[0032] Reference Figure 1-Figure 6 As shown, a method for preparing a pipe mouth connector of a liquid tank gas chamber of the present invention comprises the following steps:
[0033] Step S1: determining a rectangular lofting reference plate according to the maximum length A and the maximum width B of the nozzle connector 1, and using drawing software to cut off the portion of the nozzle connector 1 on the lofting reference plate to obtain two first auxiliary parts 2 and one second auxiliary part 3;
[0034] Step S2: using nesting software to set a nesting plate 4 of a predetermined size, and nesting two pipe nozzle connectors 1, two first auxiliary parts 2 and one second auxiliary part 3 on the nesting plate 4, wherein the nesting layout position is that the two pipe nozzle connectors 1 are stacked in the width direction of the nesting plate 4, and the first auxiliary parts 2 and the second auxiliary parts 3 are arranged on the side away from each other of the two pipe nozzle connectors 1 and in a herringbone shape;
[0035] Step S3: using nesting software, a plurality of bridges 5 are evenly spaced between two pipe nozzle connectors 1, between the first auxiliary component 2 and its adjacent pipe nozzle connector 1, and between the second auxiliary component 3 and its adjacent pipe nozzle connector 1;
[0036] Step S4: taking a plate having the same size as the nesting plate 4, cutting it according to the nesting data determined in steps S2 and S3, and obtaining a preformed plate consisting of two nozzle connectors 1 connected by a bridge 5, two first auxiliary parts 2 and one second auxiliary part 3;
[0037] Step S5: Roll-forming the preformed plate obtained by cutting in step S4;
[0038] Step S6: Cut off the bridge 5 to obtain two formed pipe port connectors 1, and then weld them to the liquid tank.
[0039] Specifically, the pipe nozzle connector 1 is a symmetrical structure in the shape of an arc, which can be described as a structure formed by a long side of a rectangular plate being bent to one side and protruding, and another long side being bent to the same side and concave. The pipe nozzle connector 1 is arranged on a rectangular plate with the same maximum length and maximum width, and after removing the pipe nozzle connector 1, two first auxiliary parts 2 close to a right triangle shape (whose hypotenuse is an arc side) and a second auxiliary part 3 close to an isosceles triangle shape (whose two sides are a continuous arc side) can be obtained.
[0040] Specifically, in step S2, when nesting is performed using the nesting software, the two pipe nozzle connectors 1 are first stacked in the width direction of the nesting plate 4, specifically, the protruding portion of the pipe nozzle connector 1 located on the upper side is tightly attached to the concave portion of the pipe nozzle connector 1 located on the lower side, and it is ensured that the corresponding transverse processing lines 6 on the two pipe nozzle connectors 1 are located on the same straight line; at this time, two arc-shaped gaps are formed between the two pipe nozzle connectors 1, which are symmetrical on the left and right and extend from the middle position of the pipe nozzle connector 1 to the two ends of the pipe nozzle connector 1 respectively. Then, the two first auxiliary parts 2 are symmetrically arranged on both sides of the pipe nozzle connector 1 located below, so that the first auxiliary parts 2 are aligned with the transverse processing line 6 on the pipe nozzle connector 1, and there is a gap of a predetermined width between the arc edge of the first auxiliary part 2 and the pipe nozzle connector 1; at the same time, the second auxiliary part 3 is arranged above the other pipe nozzle connector 1, and the second auxiliary part 3 can be embedded in the concave position of the pipe nozzle connector 1, so that the corresponding transverse processing line 6 on the second auxiliary part 3 and the pipe nozzle connector 1 are aligned, and there is a gap of a predetermined width between the arc edge of the second auxiliary part 3 and the pipe nozzle connector 1, and the nesting layout is completed. The gap formed or reserved between the two pipe nozzle connectors 1 and the first auxiliary part 2 and the second auxiliary part 3 is used to reserve space for setting the bridge 5 in step S3, and multiple bridge 5 structures parallel to the width direction of the nesting plate are evenly spaced along the extension direction of the gap, and the nesting editing is completed.
[0041] Specifically, through the above-mentioned nesting data (i.e., nesting arrangement), a plate with the same size as the nesting plate 4 can be cut into a preformed plate consisting of two nozzle connectors 1, two first auxiliary parts 2 and one second auxiliary part 3 connected by a bridge 5 using a cutting device. At this time, most of the shapes or features of the nozzle connector 1 have been obtained, but they are not completely separated or peeled off. The two nozzle connectors 1 are connected by the bridge 5 and still form an integrated plate surface with the first auxiliary part 2 and the second auxiliary part 3; it can be imagined that when the overall plate surface is roll-formed, the force will be more uniform compared to the nozzle connector 1 with an irregular structure when it is roll-formed alone. By using this principle, a nozzle connector 1 with higher dimensional accuracy can be obtained, and because the nozzle connector 1 is not completely fitted and connected with the first auxiliary part 2 and the second auxiliary part 3, the processing difficulty and cost of cutting and separating the formed nozzle connector 1 are relatively small, which well solves the processing accuracy problem caused by the distortion and deformation of special-shaped parts due to uneven force in the existing processing process, and takes into account the control of processing costs.
[0042] Furthermore, in step S1, after determining the lofting reference plate, a plurality of transverse processing lines 6 and longitudinal processing lines 7 extending respectively along the length direction and the width direction are first drawn on the lofting reference plate using drawing software, and finally the nozzle connector 1, the first auxiliary part 2 and the second auxiliary part 3 having corresponding transverse processing lines 6 and longitudinal processing lines 7 are obtained. Specifically, after drawing a plurality of transverse processing lines 6 and longitudinal processing lines 7 on the lofting base plate, the drawing software is then used to separate the parts having the same shape as the nozzle connector 1 to obtain the first auxiliary part 2 and the second auxiliary part 3. At this time, the above-mentioned complete transverse processing lines 6 and longitudinal processing lines 7 will be "divided" by the nozzle connector 1, the first auxiliary part 2 and the second auxiliary part 3. All the corresponding transverse processing lines 6 and longitudinal processing lines 7 mentioned below are the above-mentioned complete transverse processing lines 6 and longitudinal processing lines 7 that are "divided".
[0043] Reference Figure 3 and Figure 4As shown, further, in step S2, when nesting, it is necessary to ensure that the corresponding transverse processing lines 6 on the pipe nozzle connector 1, the first auxiliary part 2 and the second auxiliary part 3 are aligned, and the bottom of the pipe nozzle connector 1 located below is a predetermined distance from the bottom edge of the nesting plate 4, and then, based on the two pipe nozzle connectors 1, a gap of predetermined width is provided between the first auxiliary part 2 and its adjacent pipe nozzle connector 1, and between the second auxiliary part 3 and its adjacent pipe nozzle connector 1, and then a bridge 5 is provided in the gap. More preferably, since the two pipe mouth connectors 1 will be stacked during nesting, when the first auxiliary part 2 and the second auxiliary part 3 are obtained in step S1, the size of the layout reference plate can be determined based on the maximum width and maximum length of the two stacked pipe mouth connectors 1. In this way, when determining the nesting plate 4, it is only necessary to increase the margin of a predetermined size on one side on the basis of the layout reference plate to determine the size of the nesting plate 4. The size of the nesting plate 4 is closer to the board surface formed after the layout bridge 5, which can minimize the waste generated during cutting and cutting, and reduce the cost of material use and processing to a certain extent.
[0044] Furthermore, when arranging the first auxiliary part 2 and the second auxiliary part 3, it is necessary to ensure that the longitudinal processing line 7 thereon is parallel to the longitudinal processing line 7 on the pipe nozzle connector 1. Specifically, since the first auxiliary part 2 and the second auxiliary part 3 need to ensure a predetermined gap size with the corresponding pipe nozzle connector 1 when nesting, and are not completely fitted, the longitudinal processing lines 7 only need to be parallel.
[0045] Furthermore, in step S5 , longitudinal rolling is performed along the direction of the longitudinal processing line 7 with the direction of the transverse processing line 6 as the rolling axis.
[0046] Furthermore, in step S5, the rolling process is completed after the two ends of the preformed plate are rolled together to form a cylindrical structure.
[0047] Furthermore, in step S5, the plate is cut by a laser cutting machine, which has the advantages of fast cutting speed, high cutting quality, non-contact processing, wide application range, simple operation and low maintenance cost.
[0048] Furthermore, in step S6, a cutting line is first drawn on the bridge 5 and then the bridge 5 is cut along the cutting line. It is conceivable that when the dimensional accuracy of the nozzle connector 1 is particularly strict, a substrate for scribing can be pre-set to assist scribing, thereby improving the precision during cutting and ensuring the final size of the workpiece.
[0049] Furthermore, in step S3 , it is necessary to ensure that the pipe nozzle connector 1 , the first auxiliary component 2 and the second auxiliary component 3 are all located within the plate surface range of the nesting plate 4 .
[0050] Furthermore, the width of the bridge 5 is between 50mm-100mm, and the interval between adjacent bridges 5 is within the range of 300mm-500mm. It is conceivable that the width of the bridge 5 structure should not be too large, and it is sufficient to ensure that a certain connection force can be provided so that the preformed plate composed of the nozzle connector 1, the first auxiliary part 2 and the second auxiliary part 3 will not be deformed during the rolling process, which can reduce the subsequent cutting difficulty and cutting workload and reduce the processing cost. At the same time, it is conceivable that the interval between the bridges 5 can be arranged according to different situations, all of which are based on ensuring that the above-mentioned preformed plate will not be deformed due to uneven force during the rolling process.
[0051] Obviously, the above embodiments are merely examples for the purpose of clear explanation and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the present invention.
Claims
1. A method for preparing a pipe port connector for a liquid tank gas chamber, characterized in that: The following steps are involved: Step S1: determining a rectangular lofting reference plate according to the maximum length and the maximum width of the pipe nozzle connector, and cutting off a portion of the pipe nozzle connector shape on the lofting reference plate to obtain two first auxiliary parts and one second auxiliary part; Step S2: setting a nesting plate of a predetermined size, and nesting the two pipe nozzle connectors, the two first auxiliary parts and the second auxiliary part on the nesting plate, wherein the nesting layout position is that the two pipe nozzle connectors are stacked in the width direction of the nesting plate, and the first auxiliary part and the second auxiliary part are respectively located on the side of the two pipe nozzle connectors away from each other; Step S3: a plurality of bridges are evenly spaced between two pipe nozzle connectors, between the first auxiliary component and its adjacent pipe nozzle connector, and between the second auxiliary component and its adjacent pipe nozzle connector; Step S4: taking a plate having the same size as the nesting plate, cutting it according to the nesting layout determined in steps S2 and S3, to obtain a preformed plate consisting of two pipe nozzle connectors connected by bridges, two first auxiliary parts and one second auxiliary part; Step S5: Roll-forming the preformed plate; Step S6: After cutting off the bridge to obtain two formed pipe mouth connectors, they are welded to the liquid tank.
2. The method for preparing the pipe port connector of the liquid tank gas chamber according to claim 1, characterized in that: In step S1, after determining the lofting reference plate, use drawing software to first draw a plurality of transverse processing lines and longitudinal processing lines extending along its length direction and width direction respectively on the lofting reference plate, and finally obtain a pipe nozzle connector, a first auxiliary part and a second auxiliary part with corresponding transverse processing lines and longitudinal processing lines.
3. The method for preparing the pipe port connector of the liquid tank gas chamber according to claim 2, characterized in that: In step S2, when nesting, it is necessary to ensure that the corresponding transverse processing lines on the pipe nozzle connector, the first auxiliary part and the second auxiliary part are aligned, and the bottom of the pipe nozzle connector located below is a predetermined distance from the bottom edge of the nesting plate, and then, based on the two pipe nozzle connectors, there are gaps of predetermined widths between the first auxiliary part and its adjacent pipe nozzle connector, and between the second auxiliary part and its adjacent pipe nozzle connector, and then the bridge is arranged in the gap.
4. The method for preparing the pipe port connector of the liquid tank gas chamber according to claim 3, characterized in that: When arranging the first auxiliary part and the second auxiliary part, it is necessary to ensure that the longitudinal processing lines thereon are parallel to the longitudinal processing lines on the pipe nozzle connector.
5. The method for preparing the pipe port connector of the liquid tank gas chamber according to claim 4, characterized in that: In step S5, longitudinal rolling is performed along the direction of the longitudinal processing line with the direction of the transverse processing line as the rolling axis.
6. The method for preparing the pipe port connector of the liquid tank gas chamber according to claim 5, characterized in that: In step S5, the rolling process is completed after the two ends of the preformed plate are rolled together to form a cylindrical structure.
7. The method for preparing the pipe port connector of the liquid tank gas chamber according to claim 1, characterized in that: In step S5, the plate is cut by a laser cutting machine.
8. The method for preparing the pipe port connector of the liquid tank gas chamber according to claim 1, characterized in that: In step S6, a cutting line is first drawn on the bridge and then the bridge is removed along the cutting line.
9. The method for preparing the pipe port connector of the liquid tank gas chamber according to claim 1, characterized in that: In step S3, it is necessary to ensure that the pipe nozzle connector, the first auxiliary part and the second auxiliary part are all located within the plate surface range of the nesting plate.
10. The method for preparing the pipe port connector of the liquid tank gas chamber according to claim 1, characterized in that: The width of the bridge is between 50 mm and 100 mm, and the interval between adjacent bridges is within the range of 300 mm to 500 mm.