Manufacturing device of prestressed fiber woven mesh reinforced concrete slab
Through the combination device of the cage-type variable distance stress-bearing frame structure and the roller module, the problems of multi-layer tensioning and prestressing in the prior art are solved, and the uniform tensioning and uniform tensioning of the fiber braided net in the prestressed TRC plate are achieved. The number of layers is controlled to improve the performance of the sheet.
Patent Information
- Application Number
- CN202410871819.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-11-19
AI Technical Summary
The existing manufacturing methods for the reinforced concrete sheets of prestressed fiber braided mesh cannot achieve multi-layer tensioning and it is difficult to ensure the consistency of prestresses between each layer of fiber braided mesh, which affects the performance of TRC sheets.
The cage-shaped variable distance stress-bearing frame structure, end anchoring and pretension module, self-stretching and main tensioning module, roller module and other combination devices are adopted to transmit tensile stress through the free rotation of the roller to ensure the tension of each layer of fiber braided net. The tensile stress is equal and the number of layers is controlled by controlling the number of passes of the fiber braided mesh on the bottom template.
A uniform control of the number of layers and distance between layers of fiber braided mesh in prestressed TRC plates is achieved, ensuring that the tension stresses between each layer of fiber braided mesh during prestressed tensioning are equal, and the thickness, length and The width improves the sheet's crack resistance, seepage and corrosion resistance.
Smart Images

Figure CN118977319A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of concrete reinforcement, in particular to a manufacturing device for a prestressed fiber braided mesh reinforced concrete slab. Background Art
[0002] Textile Reinforced Concrete (TRC) is a new type of high-performance composite material composed of fiber mesh and fine-grained concrete. It has received widespread attention in recent years due to its considerable bearing capacity, good toughness, corrosion resistance, anti-magnetization, light weight and easy construction.
[0003] The fiber mesh added to the concrete slab is mainly glass fiber mesh and carbon fiber mesh. However, due to the low elastic modulus of the fiber material, the fiber mesh inside the TRC board is far from reaching its destructive strength when it is destroyed. Introducing prestress in TRC can solve this problem. Relevant studies at home and abroad have pointed out that after applying prestress to the fiber mesh, concrete is poured to make a prestressed fiber mesh reinforced concrete slab (prestressed TRC slab), and its ultimate bearing capacity is significantly improved. At the same time, after applying prestress, the crack development mechanism of the slab can be delayed, the cracking load of the slab can be increased, the cracks of the slab can be made finer, and the crack resistance, impermeability and corrosion resistance of the slab can be improved.
[0004] Due to technical limitations, the TRC panels currently prepared in the laboratory often do not have prestressing and are simply manufactured by laying or placing fiber woven mesh and injecting concrete. The laboratory preparation methods of a few prestressed TRC panels cannot avoid problems such as high cost, poor quality, low efficiency, and a single shape of the manufactured panels.
[0005] In the field of prestressed composite panels, there are a variety of prestressing schemes: the existing Chinese invention patent with patent number CN1760154A discloses a method for prestressing fiber woven mesh reinforced concrete, which uses a pre-tensioning method to apply prestress to the fiber woven mesh reinforced concrete structure. After the fiber mesh and various devices of the prestressing device are connected, the fiber mesh is stretched and tensioned by rotating the screw, and the tensioning stress is measured by a sensor. This prestressing method is simple and intuitive, but it is difficult to ensure that the prestress of each fiber bundle is uniform when tensioning the fiber woven mesh, and it is impossible to complete the tensioning of multiple layers of fiber mesh.
[0006] The Chinese invention patent with patent number CN113442285A discloses a manufacturing device for prestressed fiber woven mesh reinforced concrete composite panels. By setting a pre-tensioning device, each fiber bundle is pre-tensioned, and the initial tensioning stress is adjusted to be consistent before uniform tensioning, thereby avoiding the problem of uneven prestress in the process of applying prestress to the fiber woven mesh to a certain extent, and can achieve tensioning of multiple layers of fiber mesh. However, this method can only keep the stress on each fiber bundle equal during the pre-tensioning stage. When the prestress on each fiber bundle exceeds the spring limit, it is also difficult to avoid the problem of uneven prestress.
[0007] Foreign researchers Hans W. Reinhardt and others made a prestressed fiber mesh reinforced concrete slab manufacturing device in the laboratory, which includes a square rigid steel frame with ten hydraulic pistons on each side. The capacity of each piston is 4 kN. The fabric is clamped with ten separate steel clamps, and the necessary lateral flexibility is allowed. The fiber mesh is prestressed by the hydraulic piston during tensioning. This scheme can adjust the prestress on each fiber bundle by controlling the stress of the piston, but it cannot complete the tensioning of multi-layer fiber mesh.
[0008] All the manufacturing methods of prestressed fiber mesh reinforced concrete panels mentioned above have a common problem, which is that it is difficult to ensure that the prestress between each layer of fiber mesh is consistent, which in turn affects the performance of TRC panels. How to evenly tension each layer of fiber mesh is the difficulty in manufacturing high-quality prestressed fiber mesh reinforced concrete panels at this stage. Summary of the invention
[0009] The present invention provides a manufacturing device for a prestressed fiber woven mesh reinforced concrete slab, which can control the number of fiber woven mesh layers and the distance between layers in a prestressed TRC slab; can ensure that the tension stress between each layer of the fiber woven mesh is equal during prestressing tensioning; can control the thickness, length and width of the prestressed TRC slab to achieve continuous and adjustable dimensions as much as possible; can ensure that the tension stress between each bundle of fibers in a single-layer fiber woven mesh is equal during prestressing tensioning.
[0010] The technical problem to be solved is that the current manufacturing method of prestressed fiber woven mesh reinforced concrete slab cannot achieve multi-layer tensioning and it is difficult to ensure that the prestress between each layer of fiber woven mesh is consistent.
[0011] In order to solve the above technical problems, the present invention adopts the following technical solutions: The present invention discloses a manufacturing device for a prestressed fiber woven mesh reinforced concrete slab, comprising a cage-type variable-distance force-bearing frame structure, an end anchoring and pre-tensioning module, a self-tightening and main tensioning module, and a roller module; an end anchoring and pre-tensioning module for fixing a fiber cloth is installed at one end of the cage-type variable-distance force-bearing frame structure, and a self-tightening and main tensioning module for applying prestress to the fiber cloth is installed at the top of the other end or the top of the same end, wherein the installation position of the self-tightening and main tensioning module is determined according to the number of layers of the fiber woven mesh arranged in the concrete slab, when the number of layers is an even number, the end anchoring and pre-tensioning module and the self-tightening and main tensioning module are located on the same side, and when the number of layers is an odd number, the end anchoring and pre-tensioning module and the self-tightening and main tensioning module are located on different sides; The self-tightening and main tensioning module is provided with a pair of three-rod mounted rotating chassis, three single rods are installed along the circumference between the two three-rod mounted rotating chassis, and the three single rods are used to fix and wind the tensioning end of the fiber cloth. The single rods are controlled to rotate by the three-rod mounted rotating chassis to twist and tension the tensioning end of the fiber cloth. The roller modules are installed in pairs at both ends of the cage-type variable-distance load-bearing frame structure. A plurality of parallel rollers are installed between each pair of the roller modules. After the anchoring end of the fiber cloth is connected to the end anchoring and pre-tensioning module, its tensioning end alternately bypasses the rollers at the corresponding positions of the anchoring end and the tensioning end and is connected to the single rod on the self-tightening and main tensioning module.
[0012] By adopting the above scheme, when in use, the fiber woven mesh starts from the anchoring end, bypasses the bottom of the outermost roller, passes through the upper part of the bottom template parallel to the bottom template, reaches the outermost roller of the tensioning end, passes through the bottom of the roller, and wraps half a circle along the outer side of the roller, then turns back to the bottom template, passes through the bottom of the second roller outside the tensioning end, and passes through the upper part of the bottom template again parallel to the bottom template, returns to the anchoring end and passes through the bottom of the second roller outside the anchoring end in the same way as the tensioning end, and wraps half a circle along the outer side of the roller, then turns back to the bottom template, and passes out from the bottom of the third roller outside the anchoring end, and so on, until the fiber woven mesh reaches the target number of layers, and then is connected to the tensioning end. Each time the fiber woven mesh passes through the upper side of the bottom template, it is equivalent to laying a layer of fiber woven mesh. During tensioning, each layer of fiber woven mesh is tightly attached to the bottom of the rollers at both ends under the action of tension; since each layer of fiber woven mesh is essentially the same fiber woven mesh, it is just folded between the rollers, and the free rotation of the rollers can transfer the tensile stress on the two adjacent layers of fiber woven mesh, thereby ensuring that the tensile stress between each layer of fiber woven mesh is equal during prestressing. By controlling the number of times the fiber woven mesh passes on the upper part of the bottom template, the number of layers of fiber woven mesh in the prestressed TRC board can be controlled; Before use, the fiber woven net passes through the gap between the three single rods in a "J" shape. After the tensioning begins, the applied external force drives the three single rods to rotate continuously, and the fiber woven net begins to wrap around the outside of the three single rods. As the tensioning continues, the external force continues to increase, and the three single rods are twisted tighter and tighter under the action of the outer fiber woven net, thereby ensuring that the fiber woven net will not slip off under a large tensioning force while providing a considerable tensioning stroke.
[0013] The present invention provides a manufacturing device for a prestressed fiber braided mesh reinforced concrete slab. Further, the cage-type variable-distance force-bearing frame comprises two single-sided cage-type force-bearing frames installed in a mirror image and a length-controlling hollow long rod with holes connecting the two single-sided cage-type force-bearing frames; The single-sided cage-type load-bearing frame includes a hollow long-rod sliding sheath located on the edge and a plurality of hollow steel beams and columns connected between adjacent hollow long-rod sliding sheaths, wherein the hollow steel beams and columns are arranged in the vertical and horizontal directions; A plurality of locking bolt holes are arranged in the horizontal direction at the front of the hollow long rod sliding sheath, and a plurality of through holes are arranged at both ends of the length control hollow long rod with holes. The two ends of the length control hollow long rod with holes are correspondingly inserted into the hollow long rod sliding sheath and fixed by the length control locking bolts.
[0014] By adopting the above scheme, when the fiber mesh is tensioned, if the distance between the two side rollers in the length direction of the plate cannot change with the change of the target plate length, a large amount of fiber woven mesh will be pulled outside the concrete pouring area when making a shorter TRC plate, thereby causing a lot of waste. The solution adopted to solve this technical problem is: the two mirror-mounted single-sided cage-type force frames are connected by four hollow long rods with length control holes, and the single-sided cage-type force frame and a single hollow long rod with length control holes are connected by multiple length control locking bolts. When in use, first adjust the distance between the two single-sided cage-type force frames according to the target plate length, and ensure that the seven holes on the side of the hollow long rod sliding sheath are concentric with the holes on the hollow long rod with length control holes, and then insert the length control locking bolt into the hole to lock it, thereby controlling the distance between the single-sided cage-type force frames.
[0015] The present invention provides a manufacturing device for a prestressed fiber woven mesh reinforced concrete slab. Further, the end anchoring and pre-tensioning module is installed in a single-sided cage-type force-bearing frame, which is provided with an angle-adaptive tensioning column beam, and a plurality of groups of fiber cloth U-shaped clamps are installed under the angle-adaptive tensioning column beam, and a pair of fiber cloth U-shaped clamp inner wedges are installed in the fiber cloth U-shaped clamp for clamping the anchoring end of the fiber cloth; A connecting rod is provided at the top of the fiber cloth U-shaped clamp, the upper end of the connecting rod passes through the angle adaptive tensioning column beam and is connected to a fiber cloth clamp spring on the top surface of the angle adaptive tensioning column beam, and a fiber cloth U-shaped clamp gasket and a fiber cloth U-shaped clamp nut are provided on the fiber cloth clamp spring.
[0016] The present invention provides a manufacturing device for a prestressed fiber woven mesh reinforced concrete slab. Further, the end anchoring and pre-tensioning module also includes two sliding track column upper cover plates and two sliding track column lower cover plates. A sliding track column is installed between each set of sliding track column upper cover plates and sliding track column lower cover plates. A jack top sliding block is installed between the sliding track columns. The jack top sliding block is provided with a slide groove at a position corresponding to the sliding track column, and the sliding track column and the slide groove are slidably matched. A long jack is installed under the sliding block at the top of the jack, and a pressure sensor is installed between the long jack and the lower cover plate of the sliding track column; a sliding block end stress maintenance threaded rod is installed on the top of the sliding block at the top of the jack, and the upper end of the sliding block end stress maintenance threaded rod passes through the upper cover plate of the sliding track column and is installed with a stress maintenance hexagonal thick nut and a large washer under the thick nut; The angle-adaptive tensioning column beam is installed between the sliding blocks at the top of the jack and is rotationally matched with the sliding blocks at the top of the jack; Two parallel secondary tension module mounting beams are provided at the rear position between the hollow long rod sliding sheaths, and the upper cover plate of the sliding track column and the lower cover plate of the sliding track column are correspondingly installed on the secondary tension module mounting beams.
[0017] By adopting the above scheme, in order to ensure that the tension stress between each bundle of fibers in the single-layer fiber woven mesh is equal during prestressing, the present invention sets an end anchoring and pre-tensioning module at the other end of the fiber woven mesh. This module can pre-tension each fiber bundle, and after adjusting the initial tensioning stress to be consistent, the self-tightening and main tensioning module will perform uniform tensioning, thereby effectively solving the problem of uneven prestress in the process of applying prestress to the carbon fiber woven mesh, and improving the overall tensioning prestress of the fiber woven mesh.
[0018] The present invention provides a manufacturing device for prestressed fiber braided mesh reinforced concrete slab. Further, the self-tightening and main tensioning modules include two worm gear reducers, one end of the three-rod mounting rotating chassis is provided with three single-rod mounting grooves spaced apart along its circumferential direction, and the other end is provided with a transmission belt key shaft; the single rod is connected in the single-rod mounting groove, and the transmission belt key shaft is connected to the output port of the worm gear reducer; A matching cover mounting groove is arranged on the outer side of the single-rod mounting groove, and three three-rod mounting rotating chassis-matching covers are arranged on the three-rod mounting rotating chassis.
[0019] The present invention provides a manufacturing device for a prestressed fiber woven mesh reinforced concrete slab. Further, the roller module comprises upper and lower fixed thick plates, fixed columns, goblet-shaped fixing parts and friction fixing channel steel. The upper and lower fixed thick plates are arranged in two parallel rows. Multiple pairs of fixing columns are installed between the two upper and lower fixed thick plates. A goblet-shaped fixing part is installed between each pair of fixing columns. The goblet-shaped fixing part is provided with a fixing column sliding groove, and the fixing column and the fixing column sliding groove are slidably matched. The goblet-shaped fixing part is provided with a bearing chamber on the side opposite to each pair of roller modules, and the roller is connected to the bearing chamber. The goblet-shaped fixing piece is provided with a channel steel friction foot on the opposite side of each pair of roller modules, and a friction fixing channel steel is correspondingly provided at each channel steel friction foot. The two ends of the friction fixing channel steel are respectively connected to the upper and lower fixed thick plates through the friction fixing channel steel-locking threaded columns; the channel steel friction foot can slide along the friction fixing channel steel and can be fixed to the friction fixing channel steel in a close fit.
[0020] By adopting the above solution, when using, first loosen the thick nut for the channel steel locking column, so that the goblet-shaped fixing piece can slide vertically and freely in the track composed of two fixing columns, and then tighten the thick nut for the channel steel locking column after adjusting the roller to the set height, and the friction fixing channel steel and the channel steel friction foot of the goblet-shaped fixing piece are switched to a "tightly pressed" state, and the huge friction force can fix the roller at its target height, completing the setting of the roller height; In order to realize the function of steplessly adjusting the height of the roller, a fixed column sliding groove is provided on each side of the goblet-shaped fixing part, a channel steel friction foot is provided at one end, and a bearing chamber is provided at the other end. A fixed column is provided in each of the fixed column sliding grooves on both sides, so that the goblet-shaped fixing part can only move up and down in the track formed by the two fixed columns, but cannot move or rotate in the horizontal plane.
[0021] The present invention provides a manufacturing device for a prestressed fiber woven mesh reinforced concrete slab. Furthermore, a pair of roller length shift guide angle steels are respectively provided at both ends of each upper and lower fixed thick plate, and each pair of roller length shift guide angle steels are provided with two roller length shift guide angle steels. Each pair of roller length shift guide angle steels forms a guide rail, which is clamped at one end of the upper and lower fixed thick plates. The upper and lower fixed thick plates can be adjusted along the length direction of the roller length shift guide angle steel. Holes are provided on the roller length shift guide angle steel and the upper and lower fixed thick plates, and roller length shift guide locking bolts are inserted into the holes to connect and fix the upper and lower fixed thick plates with the roller length shift guide angle steels. A track angle steel mounting block is provided on the cage-type variable-distance force-bearing frame structure, and the roller length shifting guide rail angle steel is connected to the track angle steel mounting block.
[0022] By adopting the above scheme, in order to realize the above function of changing rollers of different sizes, the fixed column in the roller module is fixed by two upper and lower fixed thick plates, which are installed in the track composed of roller length shift guide angle steel, and fixed by roller length shift guide locking bolt. When in use, first adjust the position of the upper and lower fixed thick plates in the roller length shift guide angle steel at both ends until the holes at both ends of the upper and lower fixed thick plates are concentric with the specific holes on the roller length shift guide angle steel, and then pass the roller length shift guide locking bolt through the hole to lock its position. When the position of the upper and lower fixed thick plates in the roller length shift guide angle steel is changed, the fixed column and the goblet-shaped fixing part inside it will be driven to move in the horizontal direction perpendicular to the fiber web tensioning, thereby controlling the distance between a pair of opposite goblet-shaped fixing parts, and then replacing rollers of different lengths.
[0023] The present invention provides a manufacturing device for a prestressed fiber woven mesh reinforced concrete slab. Further, the roller comprises a large roller frame and a small roller frame, and the large roller frame and the small roller frame in each group of rollers are alternately arranged.
[0024] The present invention provides a manufacturing device for a prestressed fiber woven mesh reinforced concrete slab, further comprising a template module, the template module being arranged at the bottom of a cage-type variable-distance force-bearing frame structure, comprising a combined steel plane template and an angle steel-based spliced side template, the combined steel plane templates being connected by U-shaped clips, and spliced square tubes being inserted into the inner main load-bearing steel ribs of adjacent combined steel plane templates; The angle steel base can be spliced with the side formwork to be installed on both sides of the length direction of the combined steel plane formwork, which includes the head side formwork, the short side formwork of the trunk, the middle side formwork of the trunk, the long side formwork of the trunk and the short side formwork of the tail. The structures of the short side formwork of the trunk, the middle side formwork of the trunk and the long side formwork of the trunk are similar, and only the lengths are different. The structures all include the head side tenon, the head bottom tenon, the tail side tenon, the tail bottom tenon and the magnet installation groove. The head side tenon and the tail side tenon are bite-fitted and complementary in structure and size; the head bottom tenon and the tail bottom tenon are bite-fitted and complementary in structure and size; the magnet installation grooves are all opened on the upper surface of the bottom edges of the short side formwork of the trunk, the middle side formwork of the trunk and the long side formwork of the trunk, and magnets of corresponding sizes are installed inside the magnet installation grooves; The head side template and the tail short side template have similar structures, one end of one side template is provided with a head side tenon and a head bottom tenon, and the vertical outer side surface of the other end is fixed with a lifting eye screw installation key; the other side template is provided with a tail side tenon and a tail bottom tenon at one end, and the vertical outer side surface of the other end is fixed with a lifting eye screw installation key; the upper surface of the bottom edge of the head side template and the tail short side template is provided with a magnet installation groove, and a magnet is installed in the magnet installation groove; The upper part of the combined steel plane formwork is provided with overlapping pieces perpendicular to the angle steel base splicable side formwork at both ends of the angle steel base splicable side formwork. The overlapping pieces are located at the bottom of the eye screw installation key and are fixed by the eye screw.
[0025] By adopting the above scheme, in order to control the thickness, length and width of the prestressed TRC plate and make the size continuously adjustable as much as possible, the bottom template of the present invention adopts a splicing template, and the size of the prestressed TRC plate is controlled by controlling the size of the splicing template. The splicing template includes a combined steel plane template and an angle steel-based splicable side template.
[0026] The present invention provides a manufacturing device for a prestressed fiber woven mesh reinforced concrete slab, further comprising a horizontal device, which is arranged at the bottom surface of both ends of the overall combined steel plane template, and comprises a square groove tube with a top groove, and the two ends of the square groove tube are sleeved with square groove tube end sleeves, and the outer sides of the square groove tube end sleeves are each provided with a manual tightening wire rod, and two movable sliding bite claws are provided in the square groove tube, and the center of the square groove tube end sleeve is provided with a hole for the tensioning rope to pass through, one end of the tensioning rope is connected to the middle part of the manual tightening wire rod, and the other end is connected to the sliding bite claw far away from the manual tightening wire rod, and the sliding bite claw bites on the combined steel plane template; the manual tightening wire rod is installed with a regular triangle anti-rotation key; Two connecting keys with holes are provided at the bottom of the square groove tube, namely a connecting block with holes at the bottom of the tube and a connecting block with grooves at the bottom of the tube. The connecting block with holes at the bottom of the tube and the connecting block with grooves at the bottom of the tube are respectively connected with lifting threaded columns through connecting bolts and nuts. The lifting threaded columns are hinged with the square groove tube through the connecting block with holes at the bottom of the tube and the connecting block with grooves at the bottom of the tube. A horizontal module mounting block is installed on the cage-type variable-distance force-bearing frame structure. Each lifting threaded column passes through the corresponding horizontal module mounting block and is fixed by height control nuts arranged on the upper and lower sides of the horizontal module mounting block.
[0027] By adopting the above scheme, the horizontality of the bottom mold is adjusted by using a leveling device, and the bottom mold is fixed.
[0028] Compared with the prior art, the present invention has the following beneficial effects: The present application can control the number of fiber woven mesh layers and the distance between layers in the prestressed TRC board; can ensure that the tension stress between each layer of the fiber woven mesh is equal during prestressing; can control the thickness, length, and width of the prestressed TRC board to make the size continuously adjustable as much as possible; can ensure that the tension stress between each bundle of fibers in a single-layer fiber woven mesh is equal during prestressing.
[0029] The present invention will be further described below in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1is a perspective view of a manufacturing device for a prestressed fiber woven mesh reinforced concrete slab of the present invention; Figure 2 is a perspective view of a single-sided cage-type force-bearing frame of the present invention; Figure 3 is a perspective view of the end anchoring and pre-tensioning module of the present invention; Figure 4 It is a partial perspective view of the end anchoring and pre-tensioning module of the present invention, mainly showing the angle-adaptive tensioning column beam and its upper parts; Figure 5 is a perspective view of the self-tightening and main tensioning module; Figure 6 It is a perspective view of the three-bar mounted rotating chassis; Figure 7 A perspective view of the drum module Figure 1 The front oblique upper view mainly shows the parts of the device that controls the height of the roller; Figure 8 A perspective view of the drum module Figure 2 The oblique upper view from the back mainly shows the parts of the device that controls the height of the roller; Fig. 9 It's the roller module parts that exploded. Figure 1 The front oblique upper view mainly shows the parts of the device that controls the height of the roller; Fig.10 It's the roller module parts that exploded. Figure 2 The oblique upper view from the back mainly shows the parts of the device that controls the height of the roller; Fig.11 is a perspective view of a goblet-type fixture; Fig.12 It is a perspective view of the drum; Fig.13 It is a perspective view of the formwork module, mainly showing the parts of the formwork horizontal device; Fig.14 It is a schematic diagram of the formwork module, mainly showing the parts of the formwork horizontal device, and some of the structures are cut away; Fig.15 is a perspective view of the sliding bite jaw; Fig.16 is a perspective view of manually tightening the winding rod; Fig.17 It is a perspective view of the template module, mainly showing the parts that can be spliced into templates of different sizes; Fig.18 It is a perspective view of the template modules that can be spliced into templates of different sizes at another angle, and some parts are removed to show the splicing between the templates; Fig.19 It is a perspective view of the parts in the angle steel base that can be spliced into the side mold.
[0031] Reference numerals: 1. Cage-type variable-distance force-bearing frame structure; 101. Single-sided cage-type force-bearing frame; 1011. Hollow long rod sliding sheath; 1012. Secondary tension module mounting beam; 1013. Reducer mounting platform; 1014. Track angle steel mounting block; 1015. Universal wheel mounting plate; 1016. Hollow steel beam column; 1017. Locking bolt hole; 1018. Horizontal module mounting block; 102. Length control hollow long rod with hole; 103. Length control locking bolt; 104. Universal wheel; 2. End anchoring and pre-tensioning module; 201. Long jack; 202. Pressure sensor; 203. Sliding track column; 204. Sliding track column upper cover plate; 205. Sliding track column lower cover plate; 206. Angle adaptive tensioning column beam; 207. Fiber cloth U-shaped clamp; 208, fiber cloth clamp spring; 209, fiber cloth U-shaped clamp nut; 210, fiber cloth U-shaped clamp gasket; 211, fiber cloth U-shaped clamp inner wedge; 212, jack top sliding block; 213, sliding block end stress maintenance threaded rod; 214, stress maintenance hexagonal thick nut; 215, thick nut under the large washer; 3, self-tightening and main pull module; 301, single rod; 302, three-rod installation rotating chassis; 3021, single rod installation slot; 3022, matching cover installation slot; 3023, transmission belt key shaft; 303, three-rod installation rotating chassis-matching cover; 304, worm gear reducer; 305, hand wheel; 4, roller module; 401, fixed column; 402, friction fixing channel steel; 40 3. Channel steel for friction fixation - locking threaded column; 404. Goblet-shaped fixing piece; 4041. Fixed column sliding groove; 4042. Bearing chamber; 4043. Channel steel friction foot; 405. Roller length shift guide angle steel; 406. Roller length shift guide locking bolt; 407. Upper and lower fixed thick plates; 408. Thick nut for channel steel locking column; 409. Large washer for channel steel; 411. Roller; 4111. Large roller frame; 4113. Bearing roller connecting column; 412. Cylindrical roller bearing; 5. Formwork module; 501. Combined steel plane formwork; 502. Angle steel base can be spliced with side formwork; 5021. Head side formwork; 5022. Short side formwork for trunk; 5023. Middle side formwork for trunk; 5024. Long side formwork for trunk ; 5025, tail short side template; 5031, head side tenon; 5032, head bottom tenon; 5033, tail side tenon; 5034, tail bottom tenon; 5035, magnet installation slot; 5036, eye screw installation key; 504, U-shaped card; 505, spliced square tube; 506, overlapping sheet; 507, eye screw; 508, square groove tube; 5082, tube bottom hole connection block; 5083, tube bottom groove connection block; 509, square groove tube end sleeve; 510, sliding bite claw; 5101, bite single claw; 5102, hollow sliding sleeve; 5103, tension rope connection column; 511, manually tighten the winding rod; 5111, rope winding shaft; 5112, rope threading hole; 5113, equilateral triangle anti-rotation key;5114, handle; 512, lifting threaded column; 513, height control nut; 515, tension rope; 516, magnet. ; DETAILED DESCRIPTION
[0032] like Figure 1-19 As shown, the present invention discloses a manufacturing device for a prestressed fiber woven mesh reinforced concrete slab, comprising a cage-type variable-distance force-bearing frame structure, an end anchoring and pre-tensioning module, a self-tightening and main tensioning module, a roller module and a template module, wherein one end of the cage-type variable-distance force-bearing frame structure is installed with the end anchoring and pre-tensioning module, and the top of the other end or the top of the same end is installed with the self-tightening and main tensioning module, wherein the installation position of the self-tightening and main tensioning module is determined according to the number of layers of the fiber woven mesh arranged in the concrete slab, when the number of layers is an even number, the end anchoring and pre-tensioning module and the self-tightening and main tensioning module are located on the same side, and when the number of layers is an odd number, the end anchoring and pre-tensioning module and the self-tightening and main tensioning module are located on different sides; the roller modules are respectively installed at both ends of the cage-type variable-distance force-bearing frame structure, and the template module is installed at the bottom of the cage-type variable-distance force-bearing frame structure.
[0033] The cage-type variable-distance load-bearing frame structure includes two single-sided cage-type load-bearing frames installed in a mirror-image manner, a hollow long rod with a length control hole connecting the two single-sided cage-type load-bearing frames, and a universal wheel installed at the bottom of the single-sided cage-type load-bearing frames, wherein the two single-sided cage-type load-bearing frames are connected by four hollow long rods with length control holes, and the single-sided cage-type load-bearing frame and the single hollow long rod with a length control hole are connected by multiple length control locking bolts; four universal wheel mounting plates are symmetrically arranged at the bottom of the single-sided cage-type load-bearing frame, and the four universal wheels are mounted on the universal wheel mounting plates.
[0034] The single-sided cage-type force-bearing frame includes four hollow long-rod sliding sheaths located on the edges and multiple hollow steel beams and columns connected between adjacent hollow long-rod sliding sheaths. The hollow steel beams and columns are arranged in the vertical and horizontal directions. The hollow steel beams and columns are fixed on the hollow long-rod sliding sheaths to form a force-bearing skeleton with the hollow long-rod sliding sheaths, thereby maintaining the single-sided cage-type force-bearing frame with sufficient rigidity when subjected to tension.
[0035] The front parts of the four hollow long rod sliding sheaths are provided with multiple locking bolt holes in the horizontal direction. The locking bolt holes penetrate the hollow long rod sliding sheaths. The locking bolt holes on the same hollow long rod sliding sheath are located in the same horizontal plane. The length of the length control locking bolt should be greater than the width of the hollow long rod sliding sheath, and the diameter of the length control locking bolt should be slightly smaller than the diameter of the locking bolt hole to ensure that the length control locking bolt can penetrate the hollow long rod sliding sheath and be freely disassembled.
[0036] A plurality of through holes are equidistantly arranged on the sides of both ends of the hollow long rod with a length control hole. The holes should be symmetrically arranged along the length direction of the hollow long rod with a length control hole. The size and spacing of the holes should correspond to the size and spacing of the locking bolt holes to ensure that a plurality of length control locking bolts can pass through the above-mentioned through holes to achieve a locking effect.
[0037] Two parallel secondary tension module mounting beams are provided at the rear position between every two hollow long rod sliding sheaths located on the same horizontal plane, and the secondary tension module mounting beams are located in the same horizontal plane of the hollow long rod sliding sheaths.
[0038] The end anchoring and pre-tensioning module is located in a single-sided cage-type load-bearing frame, which includes two upper covers of sliding track columns and two lower covers of sliding track columns. Both the upper covers of sliding track columns and the lower covers of sliding track columns are provided with outer holes; through holes are provided near the end of the secondary tensioning module mounting beam, and the size and spacing of the through holes should correspond to the outer holes on the upper covers of sliding track columns and the lower covers of sliding track columns. The upper covers of sliding track columns and the lower covers of sliding track columns are fixed to the secondary tensioning module mounting beam by connecting bolts and nuts.
[0039] Four sliding track columns are installed between each set of sliding track column upper cover and sliding track column lower cover, and a jack top sliding block is installed in the middle of the four sliding track columns. The jack top sliding block is provided with a slide groove corresponding to the position of the sliding track column, and the sliding track column and the slide groove are slidably matched; a long jack is installed under the jack top sliding block, and a pressure sensor is installed between the long jack and the sliding track column lower cover. A sliding block end stress maintenance threaded rod is installed on the top of the jack top sliding block, and the upper end of the sliding block end stress maintenance threaded rod passes through the sliding track column upper cover and is installed with a stress maintenance hexagonal thick nut and a large washer under the thick nut, and the bottom of the large washer under the thick nut is tightly attached to the top of the sliding track column upper cover.
[0040] An angle-adaptive tensioning column beam is installed between two sliding blocks at the top of the jack located at the same height. The angle-adaptive tensioning column beam can rotate in the sliding block at the top of the jack. A plurality of fiber cloth U-shaped clamps are installed on the bottom surface of the angle-adaptive tensioning column beam along the length direction of the angle-adaptive tensioning column beam. A connecting screw is provided on the top of the fiber cloth U-shaped clamp. The upper end of the connecting screw penetrates the angle-adaptive tensioning column beam and is connected to a fiber cloth clamp spring on the top surface of the angle-adaptive tensioning column beam. A fiber cloth U-shaped clamp gasket and a fiber cloth U-shaped clamp nut are provided on the fiber cloth clamp spring. The fiber cloth U-shaped clamp is fixed to the angle-adaptive tensioning column beam by the U-shaped clamp gasket and the fiber cloth U-shaped clamp nut. By setting the fiber cloth clamp spring, the initial pre-tensioning force of the anchoring section of the fiber cloth can be controlled to be consistent by controlling the tensioning amount of the fiber cloth clamp spring; a pair of fiber cloth U-shaped clamp inner wedges are installed in the fiber cloth U-shaped clamp.
[0041] The self-tightening and main tensioning modules include two worm gear reducers, which can be driven by a hand wheel or a motor. The one-way input characteristics of the worm gear structure can reduce the prestress loss after the tensioning is completed. Two reducer mounting platforms are symmetrically arranged on both sides of the upper part of the single-sided cage-type force frame, and the reducer mounting platform is located in front of the mounting beam of the secondary tensioning module. The reducer mounting platform is provided with a through hole, and the size of the through hole corresponds to the mounting hole at the bottom of the worm gear reducer at the corresponding position. The worm gear reducer is installed on the reducer mounting platform through connecting bolts and nuts.
[0042] The output ports on the sides of the worm gear reducer are each connected to a three-rod mounted rotating chassis, the two three-rod mounted rotating chassis are installed oppositely and coaxially, three single rods are arranged between the two three-rod mounted rotating chassis, and three three-rod mounted rotating chassis-matching covers are also arranged on the three-rod mounted rotating chassis.
[0043] One end of the three-rod mounted rotating chassis is provided with three compact single-rod mounting grooves spaced apart along its circumferential direction. The size of the single-rod mounting groove is slightly larger than that of the single rod. A matching cover mounting groove is provided on the outer side of the single-rod mounting groove. The other end of the three-rod mounted rotating chassis is provided with a transmission belt key shaft.
[0044] During installation, the worm gear reducer should be first connected to the reducer installation platform of the single-sided cage-type force frame through connecting bolts and nuts, and then one end of the three-rod mounting rotating chassis with a transmission belt key shaft should be connected to the worm gear reducer, and then three single rods should be installed in the single-rod installation groove of the three-rod mounting rotating chassis. Finally, the three-rod mounting rotating chassis-matching cover should be inserted into the matching cover installation groove to complete the installation of the self-tightening and main tensioning modules.
[0045] Four roller modules are arranged, two of them form a pair, the two pairs of roller modules are respectively installed in the single-sided cage-type force-bearing frame, and are located in the middle lower part of the single-sided cage-type force-bearing frame, and the two pairs of roller modules are symmetrically installed along the length direction of the cage-type variable-distance force-bearing frame structure; five rollers are installed between each pair of roller modules.
[0046] The drum module includes upper and lower fixed thick plates, fixed columns, goblet-shaped fixing parts and friction fixing channel steel. Two upper and lower fixed thick plates are arranged in parallel. Five pairs of fixing columns are installed between the two upper and lower fixed thick plates. Each pair of fixing columns is provided with two columns. Ten through holes located on the same straight line are opened in the middle of the upper and lower fixed thick plates in sequence. Threads are provided at both ends of the fixing column, and the middle size of the fixing column is larger than the size of the through holes on the upper and lower fixed thick plates. The threaded end of the fixing column passes through the through holes at the corresponding positions and is fixed with two layers of nuts.
[0047] A goblet-shaped fixing piece is installed between each pair of fixing columns, and multiple goblet-shaped fixing pieces are arranged in parallel. Fixed column sliding grooves are respectively provided on both sides of the goblet-shaped fixing piece. The fixing columns are located in the fixed column sliding grooves, so that the goblet-shaped fixing piece can slide up and down along the fixing columns and ensure that the goblet-shaped fixing piece will not move in the horizontal plane.
[0048] The roller is mounted on a goblet-shaped fixing piece. The goblet-shaped fixing piece is provided with a bearing chamber on one side opposite to each pair of roller modules. The roller is connected to the bearing chamber.
[0049] The goblet-shaped fixing piece is provided with a channel steel friction foot on the opposite side of each pair of roller modules, and a friction fixing channel steel is correspondingly provided at each channel steel friction foot. Five threaded holes are provided on the side surfaces of the upper and lower fixed thick plates, and the threaded holes are correspondingly opened between each pair of through holes on the upper and lower fixed thick plates. Holes are opened at both ends of each friction fixing channel steel, and the two ends of the friction fixing channel steel are respectively connected to the upper and lower fixed thick plates by means of friction fixing channel steel-locking threaded columns passing through the corresponding holes, channel steel locking thick nuts and channel steel large washers, so that the friction fixing channel steel is vertically fixed on the outside of the channel steel friction foot, and the channel steel friction foot can be moved and adjusted along the friction fixing channel steel; by adjusting the channel steel locking thick nuts, the friction fixing channel steel can be made to be tightly attached to or separated from the channel steel friction foot of the goblet-shaped fixing piece, so that the goblet-shaped fixing piece can be switched between a free state of vertical sliding in a track composed of two fixing columns and a fixed state pressed by the channel steel.
[0050] A pair of roller length shift guide angle steels are respectively provided at the two ends of each upper and lower fixed thick plate, and each pair of roller length shift guide angle steels are provided with two, and each pair of roller length shift guide angle steels constitutes a guide rail, which is clamped at one end of the upper and lower fixed thick plates. The upper and lower fixed thick plates can be adjusted along the length direction of the roller length shift guide angle steel, and holes of the same size are opened in the length direction of the roller length shift guide angle steel and at both ends of the upper and lower fixed thick plates, and roller length shift guide rail locking bolts are inserted into the holes to connect and fix the upper and lower fixed thick plates with the roller length shift guide angle steels.
[0051] Eight sets of track angle steel mounting blocks are arranged in each single-sided cage-type force-bearing frame. The track angle steel mounting blocks are fixed on the hollow steel beam column. Each set of track angle steel mounting blocks is provided with through holes. The roller length shift guide angle steel is provided with holes corresponding to the through holes. The roller length shift guide angle steel is connected to the track angle steel mounting blocks by connecting bolts and nuts, thereby fixing the roller module to the single-sided cage-type force-bearing frame.
[0052] When installing the drum module, the following sequence should be followed: first install the ten fixing columns in the sliding grooves of the fixing columns on both sides of the five goblet-shaped fixing parts, then place the ten fixing columns side by side and keep all the goblet-shaped fixing parts in the same direction, then pass the through holes of the two upper and lower fixing thick plates through the threaded sections at both ends of the fixing columns, and at the same time ensure that the side threaded holes of the two upper and lower fixing thick plates are in the same direction as the friction feet of the channel steel, and then install two connecting bolts and nuts on the threaded sections at both ends of the fixing columns, install the ten fixing columns, five goblet-shaped fixing parts and the two upper and lower fixing thick plates together, and complete the installation of the front parts of the drum module.
[0053] After the front parts of the drum module are installed, install the friction fixing channel steel-locking threaded column in the side threaded holes of the two upper and lower fixed thick plates, and then insert the holes on the friction fixing channel steel into the friction fixing channel steel-locking threaded column. At this time, the friction fixing channel steel is parallel to the fixed column, and then install the large washer for the channel steel and the rear nut for the channel steel locking column on the friction fixing channel steel-locking threaded column, that is, the outside of the friction fixing channel steel. After the installation is completed, the inner side of the friction fixing channel steel is tightly attached to the channel steel friction foot of the goblet-type fixing part.
[0054] After completing the above installation, install eight roller-length shift guide angle steels on both sides of the upper and lower fixed thick plates, with one roller-length shift guide angle steel on each side. One roller module includes eight roller-length shift guide angle steels. Finally, install the above eight roller-length shift guide angle steels on the track angle steel mounting block of the single-sided cage-type force-bearing frame, and the installation is completed.
[0055] Ten rollers are arranged, and five rollers are arranged in parallel in each single-sided cage-type force frame. The rollers include a replaceable large roller frame or a small roller frame, a bearing roller connecting column and a cylindrical roller bearing. The cylindrical roller bearing is installed in the bearing chamber. One end of the bearing roller connecting column is installed in the cylindrical roller bearing, and the other end is connected to the large roller frame or the small roller frame, that is, the two ends of the large roller frame or the small roller frame are connected outward in sequence: the bearing roller connecting column, the cylindrical roller bearing, and the goblet-type fixing part.
[0056] The height of the above-mentioned roller can be controlled by adjusting the position of the high-foot cup-shaped fixing part on the fixing column. The roller can be replaced with rollers of different lengths by adjusting the position of the upper and lower fixed thick plates in the roller module on the roller length shift guide angle steel. The five rollers in each cage-type variable-distance force-bearing frame structure should be installed in a rule that there must be a small roller frame between two large roller frames.
[0057] When installing the roller, first pull out the roller length shift guide locking bolt of the roller module from the hole, adjust the position of the roller module in the roller length shift guide angle steel, and after reaching the corresponding position, install the cylindrical roller bearings at both ends of the roller in the bearing chamber of the goblet-type fixing part, and then install the remaining parts of the roller. Finally, insert the roller length shift guide locking bolt back into the holes of the roller length shift guide angle steel and the upper and lower fixed thick plates to complete the fixing of the roller module.
[0058] The template module includes a combined steel plane template, a horizontal device and an angle steel base spliced side template. The combined steel plane templates are connected by U-shaped clips, and spliced square tubes are inserted into the inner main load-bearing steel ribs of adjacent combined steel plane templates.
[0059] The horizontal device is arranged at the bottom surface of both ends of the overall combined steel plane formwork, and is used to limit and adjust the combined steel plane formwork. It includes a square groove tube with a top groove, and the two ends of the square groove tube are sleeved with square groove tube end sleeves. A manual tightening winding rod is provided on the outside of each square groove tube end sleeve, and two movable sliding bite claws are provided in the square groove tube. A hole for the tensioning rope to pass through is provided in the center of the square groove tube end sleeve. One end of the tensioning rope is connected to the middle part of the manual tightening winding rod, and the other end is connected to the sliding bite claw far away from the manual tightening winding rod.
[0060] Among them, the sliding bite claw includes a hollow sliding sleeve, a bite single claw is provided on the top of the hollow sliding sleeve, the size of the bite single claw should be larger than the thickness of the combined steel plane formwork, a tensioning rope connecting column is provided in the hollow sliding sleeve, and the tensioning rope is connected to the tensioning rope connecting column, wherein the tensioning rope has a certain elasticity.
[0061] The manual tightening winding rod includes a rope winding shaft arranged in the middle, a rope passing hole is opened in the middle of the rope winding shaft, and an equilateral triangle anti-rotation key is respectively provided at both ends of the rope winding shaft. The side length of the equilateral triangle anti-rotation key should be larger than the diameter of the rope winding shaft, and a handle is respectively provided on the outer side of the equilateral triangle anti-rotation key. When in use, the two manual tightening winding rods are rotated by manpower to wrap the tensioning rope around the rope winding shaft of the manual tightening winding rod, so that the sliding bite claw connected to the tensioning rope slides along the inner side of the square groove tube toward its center until the sliding bite claw contacts and bites the combined steel plane template placed on the upper side of the square groove tube. At this time, after releasing the external force, adjust the direction of the equilateral triangle anti-rotation key so that the side of the equilateral triangle anti-rotation key fits against the side of the sleeve at the end of the square groove tube. Due to its structure, it will achieve self-locking, thereby achieving the purpose of fixing the combined steel plane template.
[0062] Two connecting keys with holes are provided at the bottom of the square groove tube, namely, a connecting block with holes at the bottom of the tube and a connecting block with grooves at the bottom of the tube. The connecting block with holes at the bottom of the tube and the connecting block with grooves at the bottom of the tube can provide deformation margin during the leveling process of the square groove tube. The connecting block with holes at the bottom of the tube and the connecting block with grooves at the bottom of the tube are respectively connected with lifting threaded columns through connecting bolts and nuts. The lifting threaded columns are hinged with the square groove tube through the connecting block with holes at the bottom of the tube and the connecting block with grooves at the bottom of the tube; a horizontal module mounting block is installed at the bottom of the front end of the single-sided cage-type force frame, each lifting threaded column passes through the corresponding horizontal module mounting block, and is fixed by height control nuts arranged on the upper and lower sides of the horizontal module mounting block, and the height control nuts can also control the height of the lifting threaded column in the horizontal module mounting block.
[0063] When the sliding engagement claw successfully engages with the combined steel plane template, the axis of the square groove tube is parallel to the combined steel plane template, and two lifting threaded columns are connected to the bottom of the square groove tube. Each lifting threaded column has two height control nuts. The threaded section at the lower part of the lifting threaded column is sleeved in the horizontal module mounting block. By screwing the two height control nuts on the lifting threaded column, the height of the single lifting threaded column is controlled, and then the axis level of the square groove tube is controlled, thereby finally achieving the effect of controlling the combined steel plane template.
[0064] When installing the module, first install the lifting threaded column on the two horizontal module mounting blocks of the single-sided cage-type force-bearing frame, and then install two height control nuts on the lifting threaded column, respectively located at the upper and lower parts of the horizontal module mounting blocks, and then connect the tube bottom hole connecting block and the tube bottom groove connecting block at the bottom of the square groove tube with the lifting threaded column through connecting bolts and nuts, and then install two sliding bite claws relatively in the square groove tube, install square groove tube end sleeves and manually tightening winding rods at both ends of the square groove tube, and finally use a tensioning rope to connect the sliding bite claws and the farther manually tightening winding rod to complete the installation of the template module.
[0065] The angle steel based splicable side formwork is installed on both sides of the length direction of the combined steel plane formwork. It is a series of parts based on angle steel and processed through cutting, milling, welding and other processes. It includes a head side formwork, a trunk short side formwork, a trunk middle side formwork, a trunk long side formwork and a tail short side formwork. The above parts are connected end to end to form an angle steel based splicable side formwork. When pouring concrete on the left side of a single-row angle steel based splicable side formwork, the front is the head and the rear is the tail for explanation.
[0066] The short side formwork of the trunk, the middle side formwork of the trunk, and the long side formwork of the trunk are similar in structure, and only differ in length, which are 10cm, 20cm, and 50cm respectively. Their structures all include the head side tenon, the head bottom tenon, the tail side tenon, the tail bottom tenon, and the magnet installation groove. The head side tenon and the tail side tenon are interlocking and complementary in structure and size; the head bottom tenon and the tail bottom tenon are interlocking and complementary in structure and size. The side tenon structure at the joint increases the length of the crack that the internal poured concrete needs to penetrate to the outside, so that it is difficult for the concrete at the joint to leak. The head bottom tenon and the tail bottom tenon are complementary in structure and size, so as to ensure that the two adjacent side formworks can be firmly connected together, and the disassembly and assembly can be completed in one step. By selecting side formworks of different lengths for splicing and combination, side formworks of different lengths can be assembled to control the length of the plate.
[0067] The magnet installation grooves are all arranged on the upper surfaces of the bottom edges of the short side template of the trunk, the middle side template of the trunk and the long side template of the trunk. The short side template of the trunk and the middle side template of the trunk are each provided with a magnet installation groove at the center of the upper surface of the bottom edge. The long side template of the trunk is provided with two magnet installation grooves along the length direction on the upper surface of the bottom edge. Magnets of corresponding sizes are installed inside the magnet installation grooves, so that the splicable edge template is firmly adsorbed on the combined steel plane template by magnetic force. After removing the magnets in turn, the splicable side template of the angle steel base can slide freely on the upper part of the combined steel plane template. By controlling the distance between a pair of splicable side templates of the angle steel base, the width of the template can be changed, thereby controlling the width of the plate.
[0068] The head side template and the tail short side template have similar structures, one end of one side template is provided with a head side tenon and a head bottom tenon, and the vertical outer side surface of the other end is fixed with a lifting eye screw mounting key; the other side template is provided with a tail side tenon and a tail bottom tenon at one end, and the vertical outer side surface of the other end is fixed with a lifting eye screw mounting key; the upper surface of the bottom edge of the head side template and the tail short side template are provided with a magnet mounting groove, and a magnet is installed in the magnet mounting groove.
[0069] The upper part of the combined steel plane formwork is provided with overlapping pieces perpendicular to the angle steel base splicable side formwork at both ends of the angle steel base splicable side formwork. The overlapping pieces are located at the bottom of the eye screw installation key and are fixed by the eye screw.
[0070] During installation, first insert the spliced square tube into the inner main load-bearing steel rib of the combined steel plane formwork, then use U-shaped clips to splice the combined steel plane formwork, and then use angle steel base to splice the side formwork to combine a side formwork of a specific length according to the size of the target plate, and use a magnet to fix it on the combined steel plane formwork. Finally, after laying multiple layers of fiber woven mesh, install the overlapping sheets between each layer of fiber woven mesh under the eye screw installation keys of the head side formwork and the tail short side formwork, and fix the two stacks of overlapping sheets with eye screws.
[0071] In order to control the number of layers of fiber woven mesh in the prestressed TRC board and the distance between the layers, and to ensure that the tension stress between each layer of fiber woven mesh is equal during prestressing, the present application uses multiple parallel arranged and height-adjustable rollers to adjust the position of the fiber woven mesh. It is assumed here that the two ends of the bottom template are the anchoring end and the tensioning end, respectively. The above two roller modules are respectively installed at the two ends of the cage-type frame structure module. The two rollers of the same height in the two roller modules can be regarded as a group. The closer the roller is to the inside (i.e., closer to the bottom template), the higher its position. When in use, the fiber mesh starts from the anchoring end, bypasses the bottom of the outermost roller, passes through its upper part parallel to the bottom template, reaches the outermost roller of the tensioning end, passes through the bottom of the roller, and wraps half a circle along the outer side of the roller, then turns back to the bottom template, passes through the bottom of the second roller outside the tensioning end, and passes through its upper part again parallel to the bottom template, returns to the anchoring end and passes through the bottom of the second roller outside the anchoring end in the same way as the tensioning end, and wraps half a circle along the outer side of the roller, then turns back to the bottom template, passes out from the bottom of the third roller outside the anchoring end, and so on, until the fiber mesh reaches the target number of layers, and then is connected to the tensioning end. Each time the fiber mesh passes through the upper side of the bottom template, it is equivalent to laying a layer of fiber mesh. During tensioning, each layer of fiber woven mesh is tightly attached to the bottom of the rollers at both ends under the action of tension. Therefore, the height of the fiber woven mesh in the prestressed TRC board can be achieved by controlling the height of the roller. In addition, since each layer of fiber woven mesh is essentially the same fiber woven mesh, it is just folded and shuttled between the rollers. The free rotation of the rollers can transfer the tensile stress on the two adjacent layers of fiber woven mesh, thereby ensuring that the tensile stress between each layer of fiber woven mesh is equal during prestressing. By controlling the number of times the fiber woven mesh passes over the upper part of the bottom template, the number of layers of fiber woven mesh in the prestressed TRC board can be controlled.
[0072] The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A manufacturing device for prestressed fiber woven mesh reinforced concrete slab, characterized in that: The invention comprises a cage-type variable-distance force-bearing frame structure (1), an end anchoring and pre-tensioning module (2), a self-tightening and main tensioning module (3) and a roller module (4); one end of the cage-type variable-distance force-bearing frame structure (1) is installed with an end anchoring and pre-tensioning module (2) for fixing the fiber cloth, and the top of the other end or the top of the same end is installed with a self-tightening and main tensioning module (3) for applying prestress to the fiber cloth, wherein the installation position of the self-tightening and main tensioning module (3) is determined according to the number of layers of the fiber woven mesh arranged in the concrete slab, when the number of layers is an even number, the end anchoring and pre-tensioning module (2) and the self-tightening and main tensioning module (3) are located on the same side, and when the number of layers is an odd number, the end anchoring and pre-tensioning module (2) and the self-tightening and main tensioning module (3) are located on different sides; The self-tightening and main tensioning module (3) is provided with a pair of three-rod mounted rotating chassis (302) which are rotatably arranged, and three single rods (301) are installed between the two three-rod mounted rotating chassis (302) along the circumference thereof, and the three single rods (301) are used to fix and wind the tensioning end of the fiber cloth, and the single rods (301) are controlled to rotate by the three-rod mounted rotating chassis (302) to twist and tension the tensioning end of the fiber cloth; The roller modules (4) are installed in pairs at both ends of a cage-type variable-distance force-bearing frame structure (1), and a plurality of parallel rollers (411) are installed between each pair of the roller modules (4). After the anchoring end of the fiber cloth is connected to the end anchoring and pre-tensioning module (2), its tensioning end alternately bypasses the rollers (411) at corresponding positions of the anchoring end and the tensioning end, and then is connected to the single rod (301) on the self-tightening and main tensioning module (3).
2. The manufacturing device of a prestressed fiber braided mesh reinforced concrete slab according to claim 1, characterized in that: The cage-type variable-distance force-bearing frame structure (1) comprises two single-sided cage-type force-bearing frames (101) installed in a mirror image and a length-controlling hollow long rod with holes (102) connecting the two single-sided cage-type force-bearing frames (101); The single-sided cage-type force-bearing frame (101) comprises a hollow long rod sliding sheath (1011) located on the edge and a plurality of hollow steel beams (1016) connected between adjacent hollow long rod sliding sheaths (1011), wherein the hollow steel beams (1016) are arranged in the vertical and horizontal directions; A plurality of locking bolt holes (1017) are provided in the horizontal direction at the front of the hollow long rod sliding sheath (1011), and a plurality of through holes are correspondingly provided at both ends of the length control holed hollow long rod (102). The two ends of the length control holed hollow long rod (102) are correspondingly inserted into the hollow long rod sliding sheath (1011) and fixed by the length control locking bolts (103).
3. The manufacturing device of a prestressed fiber braided mesh reinforced concrete slab according to claim 2, characterized in that: The end anchoring and pre-tensioning module (2) is installed in a single-sided cage-type force-bearing frame (101), on which an angle-adaptive tensioning column beam (206) is provided, and a plurality of groups of fiber cloth U-shaped clamps (207) are installed under the angle-adaptive tensioning column beam (206), and a pair of fiber cloth U-shaped clamp inner wedges (211) are installed in the fiber cloth U-shaped clamp (207) for clamping the anchoring end of the fiber cloth; A connecting rod is provided at the top of the fiber cloth U-shaped clamp (207), the upper end of which passes through the angle-adaptive tensioning column beam (206) and is connected to a fiber cloth clamp spring (208) on the top surface of the angle-adaptive tensioning column beam (206), and a fiber cloth U-shaped clamp gasket (210) and a fiber cloth U-shaped clamp nut (209) are provided on the fiber cloth clamp spring (208).
4. The manufacturing device of the prestressed fiber braided mesh reinforced concrete slab according to claim 3, characterized in that: The end anchoring and pre-tensioning module (2) further comprises two sliding track column upper covers (204) and two sliding track column lower covers (205), a sliding track column (203) is installed between each set of sliding track column upper covers (204) and sliding track column lower covers (205), a jack top sliding block (212) is installed between the sliding track columns (203), a sliding groove is provided at the position of the jack top sliding block (212) corresponding to the sliding track column (203), and the sliding track column (203) is slidably matched with the sliding groove; A long jack (201) is installed under the sliding block (212) at the top of the jack, and a pressure sensor (202) is installed between the long jack (201) and the lower cover plate (205) of the sliding track column; a sliding block end stress maintaining threaded rod (213) is installed on the top of the sliding block (212) at the top of the jack, and the upper end of the sliding block end stress maintaining threaded rod (213) passes through the upper cover plate (204) of the sliding track column and is installed with a stress maintaining hexagonal thick nut (214) and a large washer (215) under the thick nut; The angle-adaptive tensioning column beam (206) is installed between the sliding blocks (212) at the top of the jack and is rotationally matched with the sliding blocks (212) at the top of the jack; Two parallel secondary tension module mounting beams (1012) are provided at the rear position between the hollow long rod sliding sheaths (1011), and the sliding track column upper cover plate (204) and the sliding track column lower cover plate (205) are correspondingly mounted on the secondary tension module mounting beams (1012).
5. The manufacturing device of a prestressed fiber braided mesh reinforced concrete slab according to claim 1, characterized in that: The self-tightening and main tensioning module (3) comprises two worm gear reducers (304); one end of the three-rod mounting rotating chassis (302) is provided with three single-rod mounting grooves (3021) spaced apart along its circumferential direction, and the other end is provided with a transmission belt key shaft (3023); the single rod (301) is connected in the single-rod mounting groove (3021), and the transmission belt key shaft (3023) is connected to the output port of the worm gear reducer (304); A matching cover mounting groove (3022) is provided on the outer side of the single-rod mounting groove (3021), and three three-rod mounting rotating chassis-matching covers (303) are provided on the three-rod mounting rotating chassis (302).
6. The manufacturing device of a prestressed fiber braided mesh reinforced concrete slab according to claim 1, characterized in that: The roller module (4) comprises upper and lower fixed thick plates (407), fixed columns (401), goblet-shaped fixing parts (404) and friction fixing channel steel (402); two upper and lower fixed thick plates (407) are arranged in parallel; a plurality of pairs of fixed columns (401) are installed between the two upper and lower fixed thick plates (407); a goblet-shaped fixing part (404) is installed between each pair of fixed columns (401); a fixed column sliding groove (4041) is provided on the goblet-shaped fixing part (404); the fixed column (401) and the fixed column sliding groove (4041) are slidably matched; a bearing chamber (4042) is provided on the goblet-shaped fixing part on the side opposite to each pair of roller modules (4); and the roller (411) is connected to the bearing chamber (4042); The goblet-shaped fixing member (404) is provided with a channel steel friction foot (4043) on the opposite side of each pair of roller modules (4); each channel steel friction foot (4043) is provided with a corresponding friction fixing channel steel (402); both ends of the friction fixing channel steel (402) are respectively connected to the upper and lower fixing thick plates (407) via friction fixing channel steel-locking threaded columns (403); the channel steel friction foot (4043) can slide along the friction fixing channel steel (402) and can be fixed to the friction fixing channel steel (402) in a close contact manner.
7. The manufacturing device of the prestressed fiber braided mesh reinforced concrete slab according to claim 6, characterized in that: A pair of roller length shift guide angle steels (405) are respectively provided at both ends of each upper and lower fixed thick plate (407), and each pair of roller length shift guide angle steels (405) is provided with two roller length shift guide angle steels (405). Each pair of roller length shift guide angle steels (405) forms a guide rail, which is clamped at one end of the upper and lower fixed thick plates (407). The upper and lower fixed thick plates (407) can be adjusted along the length direction of the roller length shift guide angle steel (405). Holes are provided on the roller length shift guide angle steel (405) and the upper and lower fixed thick plates (407), and roller length shift guide locking bolts (406) are inserted into the holes to connect and fix the upper and lower fixed thick plates (407) and the roller length shift guide angle steel (405); The cage-type variable-distance force-bearing frame structure (1) is provided with a track angle steel mounting block (1014), and the roller length shifting guide rail angle steel (405) is connected to the track angle steel mounting block (1014).
8. The manufacturing device of the prestressed fiber braided mesh reinforced concrete slab according to claim 7, characterized in that: The rollers (411) include a large roller frame (4111) and a small roller frame, and the large roller frames (4111) and the small roller frames in each group of rollers (411) are arranged alternately.
9. The manufacturing device of a prestressed fiber braided mesh reinforced concrete slab according to claim 1, characterized in that: It also includes a template module (5), which is arranged at the bottom of the cage-type variable-distance force-bearing frame structure (1), and includes a combined steel plane template (501) and an angle steel-based spliced side template (502), the combined steel plane templates (501) are connected by U-shaped clips (504), and the spliced square tubes (505) are inserted into the inner main load-bearing steel ribs of adjacent combined steel plane templates (501); The angle steel base can be spliced with the side formwork (502) installed on both sides of the length direction of the combined steel plane formwork (501), which includes a head side formwork (5021), a trunk short side formwork (5022), a trunk middle side formwork (5023), a trunk long side formwork (5024) and a tail short side formwork (5025). The trunk short side formwork (5022), the trunk middle side formwork (5023) and the trunk long side formwork (5024) are similar in structure, and only differ in length. The structures all include a head side tenon (5031), a head bottom tenon (5032), and a tail side tenon (5033), the tail bottom tenon (5034) and the magnet installation groove (5035), the head side tenon (5031) and the tail side tenon (5033) are complementary in structure and size; the head bottom tenon (5032) and the tail bottom tenon (5034) are complementary in structure and size; the magnet installation groove (5035) is provided on the upper surface of the bottom edge of the short side template (5022) of the trunk, the middle side template (5023) of the trunk and the long side template (5024) of the trunk, and a magnet (516) of corresponding size is installed inside the magnet installation groove (5035); The head side template (5021) and the tail short side template (5025) are similar in structure, wherein one end of one side template is provided with a head side tenon (5031) and a head bottom tenon (5032), and a lifting eye screw installation key (5036) is fixedly provided on the vertical outer side surface of the other end; the other side template is provided with a tail side tenon (5033) and a tail bottom tenon (5034) at one end, and a lifting eye screw installation key (5036) is fixedly provided on the vertical outer side surface of the other end; the upper surface of the bottom edge of the head side template (5021) and the tail short side template (5025) are both provided with a magnet installation groove (5035), and a magnet (516) is installed in the magnet installation groove (5035); The upper part of the combined steel plane template (501) is provided with overlapping pieces (506) perpendicular to the angle steel base splicable side formwork (502) at both ends of the angle steel base splicable side formwork, and the overlapping pieces (506) are located at the bottom of the eye screw installation key (5036) and fixed by the eye screw (507).
10. The manufacturing device of the prestressed fiber braided mesh reinforced concrete slab according to claim 9, characterized in that: It also includes a horizontal device, which is arranged at the bottom surface of both ends of the integral combined steel plane template (501), and includes a square groove tube (508) with a groove on the top, and the two ends of the square groove tube (508) are sleeved with square groove tube end sleeves (509), and the outer sides of the square groove tube end sleeves (509) are each provided with a manual tightening wire winding rod (511), and two movable sliding bite claws (510) are provided in the square groove tube (508), and a hole for a tensioning rope (515) to pass through is opened in the center of the square groove tube end sleeve (509), one end of the tensioning rope (515) is connected to the middle of the manual tightening wire winding rod (511), and the other end is connected to the sliding bite claw (510) far away from the manual tightening wire winding rod, and the sliding bite claw bites on the combined steel plane template (501); the manual tightening wire winding rod (511) is installed with a regular triangle anti-rotation key (5113); The bottom of the square slot tube (508) is provided with two connection keys with holes, namely, a tube bottom hole connection block (5082) and a tube bottom groove connection block (5083). The tube bottom hole connection block (5082) and the tube bottom groove connection block (5083) are respectively connected with lifting threaded columns through connecting bolts and nuts. The lifting threaded columns are hinged with the square slot tube (508) through the tube bottom hole connection block (5082) and the tube bottom groove connection block (5083). A horizontal module mounting block (1018) is installed on the cage-type variable-distance force-bearing frame structure (1). Each lifting threaded column (512) passes through the corresponding horizontal module mounting block (1018) and is fixed by height control nuts (513) arranged on the upper and lower sides of the horizontal module mounting block (1018).
Citation Information
Patent Citations
Manufacturing device for prestressed fiber woven mesh reinforced concrete composite board
CN113442285A
Method for applying prestressing force on concrete enhanced by fiber weaved net
CN1760154A
