Mounting method for air guide sleeve of full-revolving propeller of LNG (liquefied natural gas) filling ship
By cutting the hyperbolic panels in margin and positioning the total station, the installation accuracy of the full-rotary propeller shroud is solved, the accurate connection between the shroud and the outer plate of the hull is achieved, and the propulsion performance of the LNG filling ship is improved. and efficiency.
Patent Information
- Application Number
- CN202411221886.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-09-02
AI Technical Summary
The installation of the full-rotary thruster shroud requires extremely high accuracy, and the prior art is difficult to ensure the accurate connection and parallelism between the hyperbolic panel and the outer hull plate, affecting fluid performance.
By cutting the hyperbolic panels in margin and positioning the diffuser installation position using the total station, the "reference surface" function of the total station is used to accurately control the installation of the diffuser to ensure the three-dimensionality of the diffuser and the outer hull plate of the hull Coordinate matching.
The precise installation of the flow conduit is achieved, the fluid performance and flexibility of the propulsion system are improved, and the propulsion performance and efficiency requirements of the LNG filling ship are met.
Smart Images

Figure CN118977823A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of ship construction, and in particular relates to a method for installing a fulcrum propeller of an LNG bunkering ship. Background Art
[0002] In recent years, under the high-quality development and "dual carbon" policies, LNG as a clean energy and its related ship products have developed rapidly. LNG bunkering ships have also been built in large quantities under this background. However, due to the relatively small main dimensions of this type of ship and the wide range of operating routes, the propulsion system needs to have good propulsion performance, efficiency and flexibility requirements.
[0003] After years of technological development and update, the azimuth thruster has become the first choice of propulsion system for LNG bunkering ships due to its superior energy-saving performance, operational performance and maneuverability. However, due to its special structure, it is necessary to install a hyperbolic guide cover between the hull and the outer plate after its installation to meet the fluid performance requirements.
[0004] The azimuth thruster fairing is a hyperbolic shape, which places extremely high demands on its installation. Not only does the connection position with the hull need to meet the design requirements, but its plane also needs to be at a specified distance and be parallel to the azimuth thruster body. Summary of the invention
[0005] The purpose of the present invention is to overcome the deficiencies in the above-mentioned prior art and to provide a method for installing a fulcrum of an LNG bunkering ship's fully rotating thruster. The present invention performs excess cutting on the hyperbolic panel, uses a total station to locate the installation position of the shroud, and accurately controls the installation position of the shroud through the "reference surface" function of the total station, thereby ultimately ensuring the accurate installation of the shroud.
[0006] In order to achieve the above invention purpose, the technical solution provided by the present invention is as follows:
[0007] A method for installing a fulcrum thruster of an LNG bunkering ship, wherein the fulcrum is composed of a plurality of hyperbolic panels, and the method specifically comprises the following steps:
[0008] S1, excess processing of the hyperbolic panel, marking the excess line of each hyperbolic panel, and performing excess cutting of the hyperbolic panel according to the marking of the excess line;
[0009] S2, the hyperbolic panels after excess cutting form a complete fairing, and the three-dimensional coordinates of the connection end points between the top edge of the curved panel and the outer plate on the fairing are marked; the measurement coordinate system is determined according to the hull centerline and the hull baseline, and the three-dimensional coordinates of the connection between the hull outer plate and the fairing are determined in the measurement coordinate system by a total station;
[0010] S3, according to the three-dimensional coordinates determined on the fairing and on the hull outer plate, the fairing is installed on the hull outer plate, thereby completing the installation of the fairing.
[0011] Furthermore, the marking of the margin line of the hyperbolic panel is specifically as follows:
[0012] S11, drawing of bow and stern margin lines of the hyperbolic panel. With the bow side line as the baseline, a bow margin line parallel to the bow side line is drawn on the hyperbolic panel. With the stern side line as the baseline, a stern margin line parallel to the stern side line is drawn on the hyperbolic panel.
[0013] S12, marking the top edge margin line of the hyperbolic panel, measuring the distance between the intersection of the bow edge margin line and the bottom edge margin and the intersection of the stern edge margin line and the bottom edge margin on the hyperbolic panel, dividing the measured distance into 10 equal parts, and marking the bottom edge margin dividing points; measuring the distance between the intersection of the bow edge margin line and the top edge margin and the intersection of the stern edge margin line and the top edge margin on the hyperbolic panel, dividing the measured distance into 10 equal parts, and marking the top edge margin dividing points; correspondingly connecting the top edge margin dividing points on the top edge margin with the bottom edge margin dividing points on the bottom edge margin to form a plurality of equal edge lines;
[0014] S13, drawing a margin circle with the top edge line equally divided point as the center, connecting the intersection points of the margin circle and the equilateral line in sequence to obtain the top edge line margin line; and completing the cutting of the hyperbolic panel according to the drawn margin line.
[0015] Furthermore, the distance between the bow margin line and the bow side line is 50 mm, and the distance between the stern margin line and the stern side line is 50 mm.
[0016] Furthermore, the radius of the margin circle is 50 mm.
[0017] Furthermore, the outer side of the connection of each hyperbolic panel in the deflector is a three-dimensional coordinate marking point at the connection end point between the top edge of the curved panel and the outer panel, which is marked according to the coordinates of the installation drawing.
[0018] Furthermore, the measurement coordinate system is determined specifically as follows: two points are selected on the centerline of the hull on the ground, and the points on the centerline of the hull are measured by a total station to determine the x-axis direction of the hull coordinates, measurement points are selected on the hull baseline, and the hull coordinate height is determined by measuring the selected measurement points with a total station, and the centerline of the azimuth propeller shaft system is measured to determine the front and rear zero points of the hull coordinates, thereby completing the determination of the measurement coordinate system.
[0019] Furthermore, when installing the fairing, the three-dimensional coordinates marked on the fairing are connected correspondingly with the three-dimensional coordinates marked on the outer plate of the hull, and the fairing is installed. After installation, the distance between the lower end surface of the fairing and the upper end surface of the azimuth thruster is measured, and the installation of the fairing is completed when it meets the requirements.
[0020] Furthermore, the spacing between the lower end surface of the fairing and the upper end surface of the azimuth propeller is in the range of 20-30 mm.
[0021] Based on the above technical solution, the installation method of the full-rotation thruster guide cover of the LNG bunkering ship patented by the present invention has achieved the following technical advantages through practical application:
[0022] 1. The present invention provides a method for installing a LNG bunkering ship's full-rotation propeller shroud by performing excess cutting on a hyperbolic panel, using a total station to locate the shroud installation position, and accurately controlling the shroud installation position through the "reference surface" function of the total station, thereby ultimately ensuring accurate installation of the shroud. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 The invention discloses a residual line structure diagram of a hyperbolic panel of a shroud in a method for installing a shroud of an LNG bunkering ship's fully rotating thruster.
[0024] Figure 2 It is a schematic diagram of a measurement coordinate system in a method for installing a fulcrum of an LNG bunkering ship according to the present invention.
[0025] Figure 3 The present invention is a structural diagram of a shroud installation in a method for installing a shroud of an LNG bunkering ship's fully rotating thruster. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is described below by the specific examples shown in the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.
[0027] like Figure 1-3 The present invention relates to a method for installing a LNG bunkering ship's full-rotation propeller fairing, wherein the fairing 7 is composed of a plurality of hyperbolic panels, and the method specifically comprises the following steps:
[0028] S1, excess processing of the hyperbolic panel, marking the excess line of each hyperbolic panel, and performing excess cutting of the hyperbolic panel according to the marking of the excess line;
[0029] S2, the hyperbolic panels after the excess cutting form a complete fairing 7, and the three-dimensional coordinates of the connection end points between the top edge of the curved panel and the outer plate on the fairing 7 are marked; the measurement coordinate system is determined according to the hull centerline 5 and the hull baseline 6, and the three-dimensional coordinates of the connection between the hull outer plate and the fairing 7 are determined in the measurement coordinate system by a total station;
[0030] S3, according to the three-dimensional coordinates determined on the fairing 7 and on the outer plate of the hull, the fairing 7 is installed on the outer plate of the hull, and the installation of the fairing 7 is completed.
[0031] The marking of the margin line of the hyperbolic panel is specifically as follows:
[0032] S11, drawing the bow and stern margin lines of the hyperbolic panel, taking the bow side line 1 as the baseline, drawing a bow margin line 11 parallel to the bow side line 1 on the hyperbolic panel, taking the stern side line 2 as the baseline, drawing a stern margin line 22 parallel to the stern side line 2 on the hyperbolic panel;
[0033] S12, the top edge margin line 44 of the hyperbolic panel is drawn, the distance between the intersection of the bow edge margin line 11 and the bottom edge line 3 and the intersection of the stern edge margin line 22 and the bottom edge line 3 on the hyperbolic panel is measured, and the measured distance is divided into 10 equal parts, and the bottom edge line 3 equal division points are marked; the distance between the intersection of the bow edge margin line 11 and the top edge line 4 and the intersection of the stern edge margin line 22 and the top edge line 4 on the hyperbolic panel is measured, and the measured distance is divided into 10 equal parts, and the top edge line 4 equal division points are marked; the top edge line 4 equal division points on the top edge line 4 and the bottom edge line 3 equal division points on the bottom edge line 3 are connected correspondingly to form a plurality of equal edge lines;
[0034] S13, draw a margin circle with the top edge line divided into four equal parts as the center, and connect the intersection points of the margin circle and the equilateral line in sequence to obtain the top edge line margin line 44; and complete the cutting of the hyperbolic panel according to the drawn margin line.
[0035] The bow and stern edges are translated 50mm toward the center to obtain the bow and stern margin lines 22. The intersection points of the two margin lines with the bottom edge line 3 are P1 and P11. The bottom edge line 3 located in the middle section from P1 to P11 is evenly divided into 10 equal parts. The distances L1, L2...L10 of each section are equal, and the intersection points are P2 to P10. The top edge line 4 located in the middle section from P12 to P22 is divided equally in the same way, and the intersection points are P13 to P21. Connect P1P12, P2P13...P11P22 to obtain 11 bisectors of the curved panel. Then make an R50 circle at the vertices of the bisectors. The intersection points A1 to A11 with the bisectors are the upper points of the top edge margin line. After connecting them with spline curves, the top edge margin line can be accurately and approximately drawn. After drawing in Autocad in the above way, it is fed back to each curved panel according to the measured length, and each curved panel is cut after the margin is determined, and finally the theoretical part of each panel is obtained.
[0036] The distance between the bow margin line 11 and the bow side line 1 is 50 mm, and the distance between the stern margin line 22 and the stern side line 2 is 50 mm.
[0037] The radius of the margin circle is 50 mm.
[0038] The outside of the connection of each hyperbolic panel in the deflector 7 is a three-dimensional coordinate marking point at the connection end point between the top edge of the curved panel and the outer panel, which is marked according to the coordinates of the installation drawing.
[0039] The measurement coordinate system is determined specifically as follows: two points are selected on the centerline of the hull on the ground, and the points on the centerline of the hull are measured by a total station to determine the x-axis direction of the hull coordinates; a measurement point is selected on the hull baseline, and the hull coordinate height is determined by measuring the selected measurement point with a total station; the centerline of the azimuth propeller shaft system is measured to determine the front and rear zero points of the hull coordinates, and the determination of the measurement coordinate system is completed.
[0040] Using the “point detection” function of the total station, two points B1 and B2 on the ground hull centerline 5 are measured to determine the X-axis direction of the hull coordinate, point H on the hull baseline 6 is measured to determine the hull coordinate height, and the centerline of the full-turn propeller shaft system is measured to determine the front and rear zero points of the hull coordinate, so that the measurement coordinate system is finally consistent with the hull coordinate system.
[0041] When installing the fairing 7, the three-dimensional coordinates marked on the fairing 7 are connected correspondingly with the three-dimensional coordinates marked on the outer plate of the hull, and the fairing 7 is installed. After installation, the distance between the lower end surface of the fairing 7 and the upper end surface of the azimuth propeller is measured. When it meets the requirements, the installation of the fairing 7 is completed.
[0042] The spacing between the lower end surface of the deflector 7 and the upper end surface of the full-rotation propeller is in the range of 20-30 mm. Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention and are not intended to limit it; although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the invention can still be modified or some technical features can be replaced by equivalents; without departing from the spirit of the technical solution of the present invention, they should all be included in the scope of the technical solution claimed for protection by the present invention.
Claims
1. A method for installing a LNG bunkering ship's full-rotation propeller guide cover, the guide cover is composed of multiple hyperbolic panels, characterized in that: The method specifically comprises the following steps: S1, excess processing of the hyperbolic panel, marking the excess line of each hyperbolic panel, and performing excess cutting of the hyperbolic panel according to the marking of the excess line; S2, the hyperbolic panels after excess cutting form a complete fairing, and the three-dimensional coordinates of the connection end points between the top edge of the curved panel and the outer plate on the fairing are marked; the measurement coordinate system is determined according to the hull centerline and the hull baseline, and the three-dimensional coordinates of the connection between the hull outer plate and the fairing are determined in the measurement coordinate system by a total station; S3, according to the three-dimensional coordinates determined on the fairing and on the hull outer plate, the fairing is installed on the hull outer plate, thereby completing the installation of the fairing.
2. The method for installing a LNG bunkering ship azimuth thruster fairing according to claim 1, characterized in that: The marking of the margin line of the hyperbolic panel is specifically as follows: S11, drawing of bow and stern margin lines of the hyperbolic panel. With the bow side line as the baseline, a bow margin line parallel to the bow side line is drawn on the hyperbolic panel. With the stern side line as the baseline, a stern margin line parallel to the stern side line is drawn on the hyperbolic panel. S12, marking the top edge margin line of the hyperbolic panel, measuring the distance between the intersection of the bow edge margin line and the bottom edge margin and the intersection of the stern edge margin line and the bottom edge margin on the hyperbolic panel, dividing the measured distance into 10 equal parts, and marking the bottom edge margin dividing points; measuring the distance between the intersection of the bow edge margin line and the top edge margin and the intersection of the stern edge margin line and the top edge margin on the hyperbolic panel, dividing the measured distance into 10 equal parts, and marking the top edge margin dividing points; correspondingly connecting the top edge margin dividing points on the top edge margin with the bottom edge margin dividing points on the bottom edge margin to form a plurality of equal edge lines; S13, drawing a margin circle with the top edge line equally divided point as the center, connecting the intersection points of the margin circle and the equilateral line in sequence to obtain the top edge line margin line; and completing the cutting of the hyperbolic panel according to the drawn margin line.
3. The method for installing a LNG bunkering ship azimuth thruster fairing according to claim 2, characterized in that: The distance between the bow margin line and the bow side line is 50 mm, and the distance between the stern margin line and the stern side line is 50 mm.
4. The method for installing a LNG bunkering ship azimuth thruster guide cover according to claim 2, characterized in that: The radius of the margin circle is 50 mm.
5. The method for installing a LNG bunkering ship azimuth thruster fairing according to claim 1, characterized in that: The outside of the connection of each hyperbolic panel in the deflector is a three-dimensional coordinate marking point at the connection end point between the top edge of the curved panel and the outer panel, which is marked according to the coordinates of the installation drawing.
6. The method for installing a LNG bunkering ship azimuth thruster fairing according to claim 5, characterized in that: The measurement coordinate system is determined specifically as follows: two points are selected on the centerline of the hull on the ground, and the points on the centerline of the hull are measured by a total station to determine the x-axis direction of the hull coordinates; a measurement point is selected on the hull baseline, and the hull coordinate height is determined by measuring the selected measurement point with a total station; the centerline of the azimuth propeller shaft system is measured to determine the front and rear zero points of the hull coordinates, and the determination of the measurement coordinate system is completed.
7. The method for installing a LNG bunkering ship azimuth thruster fairing according to claim 1, characterized in that: When installing the fairing, the three-dimensional coordinates marked on the fairing are connected correspondingly with the three-dimensional coordinates marked on the outer plate of the hull, and the fairing is installed. After installation, the distance between the lower end surface of the fairing and the upper end surface of the azimuth thruster is measured. When it meets the requirements, the installation of the fairing is completed.
8. The method for installing a LNG bunkering ship azimuth thruster fairing according to claim 7, characterized in that: The spacing between the lower end surface of the fairing and the upper end surface of the azimuth propeller is in the range of 20-30 mm.
Citation Information
Patent Citations
Method for installing dome on full-revolving propeller
CN105129020A
Rapid carrying and linear control method for inclined slipway shipbuilding titanium alloy fairing
CN115556898A
Method for determining allowance of flow guide device
CN116176791A
Installation method of full-revolving propeller
CN117208160A