Prefabricated box girder segment structure and construction method thereof
By introducing end splicing plates and metal corrugated pipes into the prefabricated box girder section, combining bolt connections and waterproof coating filling, the problems of easy damage to epoxy resin bonds and concave and convex shear bond stress concentration are solved, and the small span box is improved The shear bearing capacity and connection reliability of the beam reduce transportation costs.
Patent Information
- Application Number
- CN202411136288.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-19
AI Technical Summary
The epoxy resin bonding of existing prefabricated segment beams at the joints is easy to be damaged, and the concave and convex shear bonds are prone to stress concentration and material damage during construction, which affects the overall bearing performance of prefabricated segment splicing bridges, especially in small spans. The effect in the diameter box girder is not obvious, resulting in the connection being unreliable.
Using a prefabricated box girder segment structure including segment frame and concrete layer, a reliable sensor is formed by installing end splicing plates and metal corrugated pipes in the box girder steel cage, and bolted connections and waterproof coatings and epoxy resin filling. The overall force increases the reinforcement rate of the steel cage and reduces the use of shear stirrups.
The shear bearing capacity of the prefabricated segment box girder is improved, the temperature stress is reduced, the connection characteristics at the joints are enhanced, the transportation costs are reduced, and the problem of insufficient shear strength of traditional concave and convex shear bond connections is improved.
Smart Images

Figure CN118979432A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of segment prefabricated bridge construction, in particular to a prefabricated box beam segment structure. Background Art
[0002] In recent years, my country's bridge infrastructure construction has made rapid progress, adhering to the sustainable, low-carbon, green and environmentally friendly development path, reflecting the overall trend and development direction of infrastructure construction in today's society. The segmental prefabricated spliced bridge technology is to divide the bridge beam into several segments along the longitudinal direction, cast it in the factory for prefabrication, then transport it to the bridge site for splicing, and apply prestressing technology to make it a whole. In terms of construction technology, it has the advantages of high engineering quality, fast construction cycle, good economic and environmental benefits, etc.
[0003] The existing prefabricated segmental beams are usually treated by gluing at the joints, epoxy resin is applied on the matching surface, and temporary prestressing is applied before the epoxy resin splicing is cured to ensure that the prefabricated segmental beam does not have tensile stress at the joints of the entire construction segment. The prior art discloses a bridge segment assembly joint structure and a construction method thereof (publication number CN114990983A), which improves the shear bearing capacity and crack resistance of the joints during the assembly of the prefabricated segmental beams by respectively setting a concave and convex shear key group on the matching surface of the prefabricated segment. However, in the actual implementation process, the epoxy resin bonding is prone to material brittle failure under the action of the bridge cyclic load, and the concave and convex shear keys on the matching surface of the segmental beam are prone to stress concentration and material damage during the construction process, which will affect the overall bearing capacity of the prefabricated segmental spliced bridge, restricting the promotion and implementation of the segmental prefabricated spliced bridge technology.
[0004] Small-span box girder bridges are widely used in highway traffic because of their advantages of light weight and strong stability. However, compared with large box girders, the cross-sectional size of small box girders is relatively small, and the effect of traditional adhesive bonding and concave-convex shear keys is not obvious. Therefore, it is necessary to propose a splicing construction technology for small-span prefabricated segmental box girders to enhance the reliability of splicing at the joints of prefabricated segmental box girders and improve the connection characteristics at the joints. Summary of the invention
[0005] In view of the shortcomings of the background technology, the technical problem to be solved by the present invention is to provide a prefabricated box girder segment structure, which effectively improves the shear bearing capacity of the prefabricated segment box girder and forms a reliable force-bearing whole.
[0006] The present invention is completed by adopting the following technical scheme: a prefabricated box girder segment structure, characterized in that it includes a segment frame and a concrete layer, the segment frame includes a box girder reinforcement cage and two end splicing plates, the two end splicing plates are respectively welded and fixed on both sides of the box girder reinforcement cage, the end splicing plates are provided with multiple bolt holes and multiple prestressed tensioning holes, multiple metal corrugated pipes are arranged in the box girder reinforcement cage, the prestressed tensioning holes are matched with the metal corrugated pipes, and the two ends of the metal corrugated pipes are respectively fixed on the prestressed tensioning holes of the front end splicing plate and the rear end splicing plate, the concrete layer is cast on the box girder reinforcement cage, and the end splicing plates on both sides are exposed in the concrete layer. When splicing, the end splicing plates of adjacent prefabricated box girder segments are spliced, the bolt holes of the spliced end splicing plates are aligned and fixed by bolts and nuts, and after the bolts are installed, the splicing grooves are filled with waterproof coating and epoxy resin.
[0007] Furthermore, the cross-section of the prefabricated box girder segment is a single-box single-chamber.
[0008] Furthermore, a hollow hole is provided in the middle of the end splicing plate, and bolt holes are distributed at the edge of the hollow hole. The edge of the end splicing plate close to the hollow hole extends toward the center of the end splicing plate, so that the bolt holes are exposed.
[0009] Furthermore, the box girder reinforcement cage is composed of a plurality of longitudinal reinforcements and segmental stirrups, and the longitudinal reinforcements are fixed by welding the segmental stirrups.
[0010] Beneficial effects of the present invention:
[0011] (1) By setting end splicing plates on the prefabricated box girder segments and connecting the front and rear prefabricated box girder segments with bolts to form a reliable force-bearing whole, the problem of insufficient shear strength of traditional concave and convex shear key connections can be improved.
[0012] (2) By applying waterproof coating and epoxy resin to the outside of the bolted connection for filling, its function is equivalent to the expansion joint in bridge engineering, which can reduce the temperature stress caused by temperature changes in the concrete of the precast box girder segment and reduce the stress concentration caused by temperature gradient changes at the splicing position of the precast box girder segment.
[0013] (3) By introducing the end splicing plate into the steel cage of the precast box girder segment, the reinforcement ratio of the steel cage in the cross section of the precast box girder segment is increased, which can effectively improve the shear bearing capacity of the precast segment box girder, thereby reducing the use of shear stirrups in the precast box girder segment.
[0014] (4) By casting and curing the box girder segments in the prefabrication plant and transporting them to the bridge construction site for splicing after they reach the required age, the concrete casting quality of the prefabricated box girder segments can be ensured. At the same time, the small-span box girder segments are easy to transport, which can reduce the transportation cost during the construction process. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The present invention has the following accompanying drawings:
[0016] Figure 1 A schematic diagram of the structure of adjacent segments spliced in the first embodiment of the prefabricated box girder segment construction;
[0017] Figure 2 A schematic diagram of the structure of the box girder reinforcement cage in the first embodiment of the prefabricated box girder segment construction;
[0018] Figure 3 It is a schematic diagram of the cross-sectional structure of the adjacent segments spliced together in the first embodiment;
[0019] Figure 4 A schematic diagram of the structure of the box girder reinforcement cage in the second embodiment of the prefabricated box girder segment construction;
[0020] Figure 5 It is a schematic diagram of the cross-sectional structure of the splicing of adjacent segments in the second embodiment;
[0021] Figure 6 for Figure 5 Schematic diagram of the structure at A in the middle. DETAILED DESCRIPTION
[0022] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] Reference Figure 1-Figure 3 As shown, the first embodiment of the present invention provides a prefabricated box girder segment structure, the cross-section of the prefabricated box girder segment is a single-box single-chamber, and the number of prefabricated segments is at least 3 or more according to the design line shape of the box girder bridge, and the applicable bridge and culvert object span is 50m and below.
[0024] The prefabricated box girder segment is composed of a segment frame and a concrete layer 1. The segment frame includes two end splicing plates 2 and a box girder steel cage 3. The two end splicing plates are welded and fixed on both sides of the box girder steel cage. The concrete layer 1 is cast on the box girder steel cage. The front end splicing plates 21 and the rear end splicing plates 22 on both sides are exposed from the concrete layer 1. The box girder steel cage 3 is composed of a plurality of longitudinal steel bars 31 and segment stirrups 32. The longitudinal steel bars 31 are welded and fixed by the segment stirrups 32. The end splicing plates 2 are introduced into the steel cage 1 of the prefabricated box girder segment, which increases the reinforcement ratio of the steel cage on the cross section of the prefabricated box girder segment, and can effectively improve the shear bearing capacity of the prefabricated segment box girder, thereby reducing the use of shear stirrups in the prefabricated box girder segment.
[0025] Furthermore, a plurality of metal corrugated tubes 4 are arranged in the box girder reinforcement cage 3, and both end splicing plates are provided with prestressed tensioning holes 23 adapted to the metal corrugated tubes, and both ends of the metal corrugated tubes are respectively fixed on the prestressed tensioning holes 23 of the front end splicing plate 21 and the rear end splicing plate 22.
[0026] The end splicing plate 2 is provided with a plurality of bolt holes 24, and a hollow hole 25 is provided in the middle of the end splicing plate. The bolt holes 24 are distributed at the edge of the hollow hole, and the edge of the end splicing plate close to the hollow hole extends toward the hollow hole, so that the bolt holes 24 are exposed. The end splicing plate adopts a middle hollow design to facilitate the positioning and fixing of the bolt connection.
[0027] During splicing, the end splicing plates of adjacent prefabricated box girder segments are spliced together, the bolt holes of the two adjacent end splicing plates are aligned and fixed by bolts 5 and nuts 6. After the bolts are installed, the splicing grooves are filled with waterproof coating and epoxy resin.
[0028] The construction method of the above-mentioned prefabricated box girder segment structure comprises the following specific steps:
[0029] S1. The prefabricated box girder segments are cast and cured using standardized formwork in the concrete prefabricated beam factory, and then the prefabricated box girder segments are transported to the bridge construction site, and the position of the prefabricated box girder segments is adjusted by designing the overall box girder situation. The box girder segments are cast and cured in the prefabrication factory, and then transported to the bridge construction site for splicing after reaching the age, which can ensure the concrete casting quality of the prefabricated box girder segments. At the same time, the small-span box girder segments are easy to transport, which can reduce the transportation cost during the construction process.
[0030] S2. Splicing precast box girder segments,
[0031] According to the exposed end splicing plates 2 of the front prefabricated box girder segment 11 and the rear prefabricated box girder segment 12, the bolt holes 24 of the adjacent end splicing plates are aligned one by one, and the bolts 5 are passed through the corresponding bolt holes of the adjacent end splicing plates in turn and fixed by nuts 6. The front and rear prefabricated box girder segments are connected by bolts 5 to form a reliable force-bearing whole, which can improve the problem of insufficient shear strength of the traditional concave and convex shear key connection. Specifically, the construction technicians check the alignment of the bolt connection holes on the end splicing plates of the front prefabricated box girder segment and the rear prefabricated box girder segment overlapped together, correct the warping and deformation at the joint, and initially tighten the nuts with 50% of the final tightening torque value, and then re-tighten them after all the nuts are tightened to ensure that the bolt connection nodes are evenly and stably stressed. The whole process needs to ensure that the bolt connection is not loose or damaged, and replace it if it is defective.
[0032] After the bolts 5 between the front prefabricated box girder segment and the rear prefabricated box girder segment are tightened, waterproof coating and epoxy resin 7 are applied to the outside of the joint of the lap joint to fill the joint groove. The waterproof coating and epoxy resin 7 are applied to the outside of the bolt connection for filling, which is equivalent to the expansion joint in the bridge project, and can reduce the temperature stress caused by the temperature change of the concrete of the prefabricated box girder segment, and reduce the stress concentration caused by the temperature gradient change at the splicing position of the prefabricated box girder segment.
[0033] S3. Tension anchoring
[0034] After all prefabricated segments of the designed box girder are spliced by the S2 method, prestressed tendons are passed through the reserved metal corrugated tube 4 and prestressed anchorage is applied at both ends of the designed box girder to form an overall force system of the small-span prefabricated segment box girder.
[0035] S4. Use the bridge erection machine to lift the integral prefabricated segmental box girder to the bridge pier position.
[0036] The steps of factory standardized prefabrication of prefabricated box girder segments in S1 of the construction method of the above-mentioned prefabricated box girder segment structure are as follows:
[0037] S1-1. According to the design requirements of the prefabricated box girder, the segment longitudinal steel bars 31 and segment stirrups 32 are cut by mechanical automation equipment, and the number of segment longitudinal steel bars or the spacing of segment stirrups are adjusted according to the design calculation requirements to meet the normal stress state of the overall structure. The steel cage skeleton is formed by automated resistance spot welding.
[0038] The steel cage of the prefabricated box girder segment is then welded and formed through the end splicing plate 2. Among them, the end splicing plate is preferably a steel plate with a thickness of 5-20 mm, and the strength of the steel plate is not lower than the strength grade of the stirrups used in the segment beam. The end splicing plate is cut as a whole by a laser cutting method controlled by a computer terminal to ensure the accuracy and quality of the steel plate cutting. A certain number of bolt holes 24 and prestressed tensioning holes 23 are reserved on the end splicing plate. The number of bolt holes 24 is determined according to the shear design strength of the spliced section of the prefabricated segment box girder, and the prestressed tensioning holes 23 are determined according to the position of the prestressed tendons arranged in the prefabricated segment box girder. Furthermore, the prestressed tensioning holes 23 are used for the cross-connection of metal corrugated pipes, which facilitates the prestressed tensioning anchoring after the prefabricated segment box girder is spliced.
[0039] S1-2 pouring concrete layer 1, concrete poured in the box girder steel cage 3, and the two end splicing plates exposed in the concrete layer 1, the middle of the concrete layer is a single chamber;
[0040] During the pouring process, a metal corrugated pipe 4 is reserved in the steel cage for the prestressed tendons of the small-span prefabricated segmental box girder. The metal corrugated pipe is adjusted according to the arrangement direction of the prestressed tendons and its two ends are connected to the prestressed tensioning holes 23 of the end splicing plate;
[0041] S1-3. Maintain and remove the formwork, keep the precast box girder segments warm, moisturize them and sprinkle water regularly to ensure that the concrete gradually hardens to reach the design strength requirements, and then remove the standardized formwork of the precast box girder segments.
[0042] Reference Figure 4-Figure 6 As shown, the second embodiment of the present invention provides a prefabricated box girder segment structure, the inner side walls on both sides of the hollow hole of the front end splicing plate are provided with positioning flanges 8 extending outward, the length of the positioning flange is adapted to the hollow hole of the front end splicing plate, the positioning flange is provided with a plurality of openings 81, and positioning fasteners 9 are arranged in the openings.
[0043] The positioning fastener 9 includes a positioning spring piece 91 and a spring seat 92, and the spring seat 92 is installed on the side wall of the positioning convex edge facing the hollow hole 25. The positioning spring piece 91 is formed by a plate body bent outward to extend to form an elastic arm, and the elastic arm includes a guide arm 911 and a resistance arm 912. The fixed end of the guide arm is integrally formed and fixed with one end of the opening, and the free end of the guide arm extends away from the hollow hole. The end of the guide arm is bent toward the opening to form the resistance arm 912. A spring support plate 913 is arranged inside the guide arm, and a return spring 10 is arranged between the spring support plate 913 and the spring seat.
[0044] During splicing, the positioning convex edge 8 on the front end splicing plate of the rear prefabricated box beam segment is clamped on the hollow hole 25 of the rear end splicing plate of the front prefabricated box beam segment, and the initial positioning is quickly achieved. The rear prefabricated box beam segment is continuously pushed forward, and the positioning spring piece 91 is squeezed and contracted in the direction of the opening after being stressed. When the adjacent end splicing plates abut against each other, the positioning spring piece 91 loses stress and pops outward under the action of the reset spring 10, and the contact arm 912 of the positioning spring piece is buckled on the inner wall of the spliced rear end splicing plate, achieving precise positioning, so that the bolt connection hole position is accurately aligned, which is convenient for subsequent construction.
[0045] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A prefabricated box girder segment structure, characterized by: It includes a segment frame and a concrete layer. The segment frame includes a box girder steel cage and two end splicing plates. The two end splicing plates are respectively welded and fixed on both sides of the box girder steel cage. The end splicing plates are provided with multiple bolt holes and multiple prestressed tensioning holes. Multiple metal corrugated pipes are arranged in the box girder steel cage. The prestressed tensioning holes are matched with the metal corrugated pipes. Both ends of the metal corrugated pipes are respectively fixed on the prestressed tensioning holes of the front end splicing plate and the rear end splicing plate. The concrete layer is cast on the box girder steel cage. The end splicing plates on both sides are exposed on the concrete layer. When splicing, the end splicing plates of adjacent prefabricated box girder segments are spliced, and the bolt holes of the spliced end splicing plates are aligned and fixed by bolts and nuts. After the bolts are installed, the splicing grooves are filled with waterproof coating and epoxy resin.
2. The prefabricated box girder segment structure according to claim 1 is characterized in that: The cross section of the prefabricated box beam segment is a single-box single-chamber.
3. The prefabricated box girder segment structure according to claim 1 or 2, characterized in that: A hollow hole is arranged in the middle of the end splicing plate, and bolt holes are distributed at the edge of the hollow hole. The edge of the end splicing plate close to the hollow hole extends toward the center of the end splicing plate, so that the bolt holes are exposed.
4. The prefabricated box girder segment structure according to claim 3 is characterized in that: The box girder reinforcement cage is composed of a plurality of longitudinal reinforcements and segmental stirrups, and the longitudinal reinforcements are fixed by welding the segmental stirrups.
5. The prefabricated box girder segment structure according to claim 4 is characterized in that: The inner side walls on both sides of the hollow hole of the front end splicing plate are provided with positioning protrusions, and the positioning protrusions are provided with a plurality of openings, and positioning fasteners are arranged in the openings.
6. The prefabricated box girder segment structure according to claim 5 is characterized in that: The positioning fastener includes a positioning spring sheet and a spring seat, and the spring seat is installed on the side wall of the positioning protrusion facing the direction of the hollow hole. The positioning spring sheet is bent outward from a plate body to form an elastic arm, and the elastic arm includes a guide arm and a resistance arm. The free end of the guide arm extends away from the hollow hole, and the end of the guide arm is bent toward the opening direction to form a resistance arm. A reset spring is arranged between the inner side of the guide arm and the spring seat.
7. A construction method for a prefabricated box girder segment structure according to claim 1, characterized in that: The steps are as follows, The S1 precast box girder segments are cast and cured using standardized formwork, and then the precast box girder segments are transported to the bridge construction site; S2. Splicing precast box girder segments, According to the exposed end splicing plates of the front prefabricated box girder segment and the rear prefabricated box girder segment, the bolt holes of the adjacent end splicing plates are aligned one by one, the bolts are passed through the corresponding bolt holes of the adjacent end splicing plates in turn, and fixed by nuts, and the splicing seams are filled with waterproof coating and epoxy resin; S3. Tension anchoring After all the box girder segments are spliced, prestressed tendons are passed through the reserved metal corrugated tubes and prestressed anchorage is applied at both ends of the designed box girder to form the overall force system of the small-span prefabricated segmental box girder; S4. Use the bridge erection machine to lift the integral prefabricated segmental box girder to the bridge pier position.
8. The construction method of the prefabricated box girder segment structure according to claim 7 is characterized by: The construction steps of the prefabricated box girder segment in S1 are as follows: S1-1. According to the design requirements of the prefabricated box girder, the segment longitudinal steel bars and segment stirrups are cut, and the steel cage of the prefabricated box girder segment is welded and formed through the end splicing plate; S1-2. Reserve a metal corrugated tube in the steel cage for the prestressing reinforcement layout and tensioning of the small-span prefabricated segmental box girder. Adjust the metal corrugated tube according to the layout of the prestressing reinforcement and make its two ends butt with the prestressing tensioning holes of the end splicing plate; S1-3. Pour the concrete layer. The concrete is poured into the box girder steel cage, and the two end splicing plates are exposed in the concrete layer. The middle of the concrete layer is a single chamber; S1-4. Maintain and remove the formwork, keep the precast box girder segments warm, moisturize them and sprinkle water regularly to ensure that the concrete gradually hardens to reach the design strength requirements, and then remove the standardized formwork of the precast box girder segments.