Power transformation framework foundation
By setting sawtooth mounting grooves in the substation frame foundation and using a combination design of annular hoop and L-shaped angle steel, the bond and shear force between concrete and steel pipe herringbone columns are enhanced, solving the problem of insufficient bond force in existing foundations and achieving higher pull-out bearing capacity and a wider range of applications.
Patent Information
- Application Number
- CN202411344460.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-11-19
AI Technical Summary
In existing substation frame foundations, the bond strength between the frame foundation and the A-frame column is low, which cannot provide sufficient load-bearing capacity. Especially when the horizontal load is large, the weight of the foundation needs to be increased to meet the uplift requirements, and the bond strength at the cup mouth is insufficient.
Serrated mounting slots and grooves are set on the foundation base of the substation frame, and the steel pipe herringbone columns are fixed with ring hoops and L-shaped angle steel. Combined with non-shrink concrete grouting, the bonding and shear force between the concrete and the steel pipe are enhanced.
It significantly improved the pull-out bearing capacity of the substation frame foundation by 1.5 to 2 times, expanded the application range of the frame foundation, and reduced the amount of welding work.
Smart Images

Figure CN118979513A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of frame foundations, and in particular to a substation frame foundation. Background Art
[0002] With the vigorous development of new energy, more and more new substations are being built. The safety of substation structures plays a vital role in the reliable operation of substations. The structures are mainly used to install substation equipment, cables, disconnectors and other facilities, and mainly bear the forces of hanging line loads and wind loads. Among the substation structures, the welded steel pipe herringbone column structure is the most widely used structure type. This structure mainly adopts a straight seam welded steel pipe herringbone structure. The force characteristics of the herringbone column substation structure foundation are relatively large horizontal force and upward pull force. In order to facilitate on-site installation, the frame foundation mostly adopts a cup-shaped concrete foundation. When the herringbone column is mainly subjected to downward pressure When the horizontal load on the frame is large, the upward pull force of the herringbone column will increase accordingly. At this time, the weight of the foundation that meets the design requirements will also increase, and the requirement for the bonding force between the secondary grouting material at the cup mouth and the poured foundation will also increase. However, the cup mouth of the currently used foundation form is a smooth plane, and the bonding force between the secondary grouting and the poured foundation and the herringbone column is low, which cannot provide greater bearing capacity. The existing gravity cup mouth foundation can no longer meet the safety requirements of the frame. Summary of the invention
[0003] The invention provides a substation frame foundation, which solves the problem that the existing substation frame foundation has low bonding force between the frame foundation and the herringbone column and cannot provide greater bearing capacity.
[0004] In order to solve the above technical problems, the technical solution of the present invention is as follows:
[0005] An embodiment of the present invention provides a substation framework foundation, including:
[0006] A first basic base, wherein a first mounting groove for fixing a first structural steel pipe herringbone column is provided on the top of the basic base;
[0007] A second basic base is arranged opposite to the first basic base, and a second mounting groove for fixing a second structural steel pipe herringbone column is arranged on the top of the second basic base;
[0008] The inner wall of the first mounting groove is provided with a plurality of first grooves;
[0009] The inner wall of the second installation slot is provided with a plurality of second grooves.
[0010] Optionally, a first boss is disposed on the top of the first basic base, and the first mounting groove is disposed in the first boss and the first basic base.
[0011] Optionally, a second boss is disposed on the top of the second basic base, and the second mounting groove is disposed in the second boss and the second basic base.
[0012] Optionally, the slot opening diameters of the first mounting slot and the second mounting slot are both larger than the slot bottom diameter.
[0013] Optionally, the substation framework foundation further includes:
[0014] At least one first fixing assembly is disposed at a first end of the first frame steel tube herringbone column, and the first end of the first frame steel tube herringbone column is disposed in the first mounting groove;
[0015] At least one second fixing assembly is arranged on the first end of the second frame steel tube herringbone column, and the first end of the second frame steel tube herringbone column is arranged in the second installation groove.
[0016] Optionally, the first fixing component includes:
[0017] A first annular hoop and a plurality of first L-shaped angle steels integrally formed with the first annular hoop and arranged around the first annular hoop;
[0018] The first annular hoop is fixedly connected to the first end of the first structural steel pipe herringbone column and is disposed in the first groove.
[0019] Optionally, the second fixing component includes:
[0020] A second annular hoop and a plurality of second L-shaped angle steels integrally formed with the second annular hoop and arranged around the second annular hoop;
[0021] The second annular hoop is fixedly connected to the first end of the second structural steel pipe herringbone column and is disposed in the second groove.
[0022] Optionally, a concrete cushion layer is provided at the bottom of the first basic base and the bottom of the second basic base.
[0023] The above solution of the present invention includes at least the following beneficial effects:
[0024] The substation frame foundation of the present invention comprises: a first basic base, the top of which is provided with a first mounting groove for fixing a first frame steel pipe herringbone column; a second basic base arranged opposite to the first basic base, the top of which is provided with a second mounting groove for fixing a second frame steel pipe herringbone column; the inner wall of the first mounting groove is provided with a plurality of first grooves; the inner wall of the second mounting groove is provided with a plurality of second grooves. The scheme of the present invention improves the pull-out bearing capacity of the substation frame foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of the transformer substation frame foundation of the present invention;
[0026] Figure 2 It is a structural schematic diagram of the first fixing component of the transformer frame foundation of the present invention.
[0027] Description of reference numerals:
[0028] 1. First basic base; 11. First structural steel pipe herringbone column; 12. First installation groove; 121. First groove; 2. Second basic base; 21. Second structural steel pipe herringbone column; 22. Second installation groove; 221. Second groove; 3. Concrete cushion; 41. First boss; 42. Second boss; 5. First fixing assembly; 50. Second fixing assembly; 51. First annular hoop; 52. First L-shaped angle steel; 6. Outdoor design floor; 7. Shrinkage-free concrete. DETAILED DESCRIPTION
[0029] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to enable the scope of the present invention to be fully communicated to those skilled in the art.
[0030] like Figure 1 to Figure 2 As shown, an embodiment of the present invention provides a substation architecture foundation, including:
[0031] A first basic base 1, wherein a first mounting groove 12 for fixing a first structural steel pipe herringbone column 11 is provided on the top of the basic base 1;
[0032] A second basic base 2 is arranged opposite to the first basic base 1, and a second mounting groove 22 for fixing a second structural steel pipe herringbone column 21 is arranged on the top of the second basic base 2;
[0033] The inner wall of the first installation slot 12 is provided with a plurality of first grooves 121;
[0034] The inner wall of the second mounting slot 22 is provided with a plurality of second grooves 221 .
[0035] In this embodiment, a plurality of first grooves 121 form a first serrated groove in the inner wall of the first installation groove 12; a plurality of second grooves 221 form a second serrated groove in the inner wall of the second installation groove 22; in this embodiment, according to the upward pull-out force borne by the structural steel pipe herringbone column (the first structural steel pipe herringbone column 11 and the second structural steel pipe herringbone column 21), the size of the first serrated groove and the second serrated groove and the required concrete grade can be determined by calculation to ensure that the pull-out bearing capacity at the cup mouth is greater than the foundation gravity, the foundation gravity is greater than the upward pull-out force, and a certain safety reserve is reserved; Figure 1 As shown, when in use, first, at a preset position below the outdoor design floor 6 at the preset position, a foundation base (a first foundation base 1 and a second foundation base 2) is poured for the first time by using preset concrete, and then the first frame steel pipe herringbone column 11 and the second frame steel pipe herringbone column 21 are respectively placed in the corresponding installation grooves of the foundation bases, and a second grouting is performed to fix the frame steel pipe herringbone column in the corresponding installation groove, and at the same time, the secondary grouting material is embedded in the groove of the installation groove during grouting (the secondary grouting material uses shrinkage-free concrete 7 and is vibrated and compacted), so that the concrete after the second grouting is in a bite-like state with the side wall of the installation groove, and the bonding force between the concretes is converted into a shear force and a bonding force to be borne together, thereby increasing the bearing capacity of the substation frame foundation by 1.5 times and improving the pull-out bearing capacity of the foundation; the substation frame foundation described in the present invention realizes the conversion of the bonding force between the concretes into a shear force and a bonding force to be borne together by the cup mouth of the foundation from a flat shape to a serrated design, thereby improving the pull-out bearing capacity of the substation frame foundation.
[0036] In an optional embodiment of the present invention, a first boss 41 is disposed on the top of the first basic base 1 , and the first mounting groove 12 is disposed in the first boss 41 and the first basic base 1 .
[0037] A second boss 42 is disposed on the top of the second basic base 2 , and the second mounting groove 22 is disposed in the second boss 42 and the second basic base 2 .
[0038] The diameters of the first installation groove 12 and the second installation groove 22 are both larger than the groove bottom diameter.
[0039] In this embodiment, the basic base is of cup-shaped design, which further improves the bearing capacity of the substation frame foundation.
[0040] In an optional embodiment of the present invention, the substation framework foundation further includes:
[0041] At least one first fixing assembly 5 is arranged at a first end of the first frame steel tube herringbone column 11, and the first end of the first frame steel tube herringbone column 11 is arranged in the first installation groove 12;
[0042] At least one second fixing assembly 50 is disposed on a first end of the second frame steel tube herringbone column 21 , and the first end of the second frame steel tube herringbone column 21 is disposed in the second mounting groove 22 .
[0043] The first fixing assembly 5 comprises:
[0044] A first annular hoop 51 and a plurality of first L-shaped angle steels 52 integrally formed with the first annular hoop 51 and arranged around the first annular hoop 51;
[0045] The first annular hoop 51 is fixedly connected to the first end of the first structural steel pipe herringbone column 11 and is disposed in the first groove 121 .
[0046] The second fixing assembly 50 includes:
[0047] A second annular hoop and a plurality of second L-shaped angle steels integrally formed with the second annular hoop and arranged around the second annular hoop;
[0048] The second annular hoop is fixedly connected to the first end of the second structural steel pipe herringbone column 21 and is disposed in the second groove 221 .
[0049] In this embodiment, the annular hoop is sleeved on the structural steel pipe herringbone column and welded to the structural steel pipe herringbone column. Two L-shaped angle steels are arranged on the annular hoop, and the two L-shaped angle steels are relatively arranged on the annular hoop; when the annular hoop is fixed to the structural steel pipe herringbone column, one side flange of the L-shaped angle steel is close to the herringbone column, and the other side flange is deep into the concrete. Through this design, the bearing capacity provided by the bonding strength between the concrete and the structural steel pipe herringbone column can be changed to the bearing capacity provided by the shear strength of the concrete. This design can increase the bearing capacity of the substation frame foundation by 2 times; in a preferred embodiment, the first fixing component 5 and the second fixing component 50 are both arranged in two groups. This design can change the bearing capacity provided by the bonding strength into the bearing capacity provided by the shear strength of the concrete, and the pull-out bearing capacity is further improved. At the same time, the welding workload is reduced, the pull-out bearing capacity of the substation frame foundation is improved, and the application scope of the cup-mouth foundation in the structural herringbone column is further expanded.
[0050] In an optional embodiment of the present invention, a concrete cushion layer 3 is provided at the bottom of the first basic base 1 and the bottom of the second basic base 2. The design of the concrete cushion layer 3 can enhance the adhesion between the basic base and the ground, and prevent the basic base from sinking.
[0051] The transformer frame foundation of the present invention improves the pull-out bearing capacity between the secondary grouting and the foundation by adopting a serrated shape on the side wall of the cup mouth; and improves the pull-out bearing capacity between the herringbone column and the secondary grouting by welding two L50×5 angle steel hoops on the herringbone column.
[0052] The above is a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A substation frame foundation, characterized in that: include: A first basic base (1), wherein the top of the basic base (1) is provided with a first mounting groove (12) for fixing a first structural steel pipe herringbone column (11); A second basic base (2) is arranged opposite to the first basic base (1), and a second mounting groove (22) for fixing a second structural steel pipe herringbone column (21) is arranged on the top of the second basic base (2); The inner wall of the first installation groove (12) is provided with a plurality of first grooves (121); The inner wall of the second installation groove (22) is provided with a plurality of second grooves (221).
2. The substation frame foundation according to claim 1, characterized in that: A first boss (41) is provided on the top of the first basic base (1), and the first mounting groove (12) is provided in the first boss (41) and the first basic base (1).
3. The substation frame foundation according to claim 1, characterized in that: A second boss (42) is provided on the top of the second basic base (2), and the second mounting groove (22) is provided in the second boss (42) and the second basic base (2).
4. The substation frame foundation according to claim 1, characterized in that: The diameters of the slot openings of the first installation slot (12) and the second installation slot (22) are both larger than the diameter of the slot bottom.
5. The substation frame foundation according to claim 1, characterized in that: Also includes: At least one first fixing assembly (5) is arranged at a first end of the first frame steel tube herringbone column (11), and the first end of the first frame steel tube herringbone column (11) is arranged in the first installation groove (12); At least one second fixing assembly (50) is arranged at the first end of the second frame steel tube herringbone column (21); the first end of the second frame steel tube herringbone column (21) is arranged in the second installation groove (22).
6. The substation frame foundation according to claim 5, characterized in that: The first fixing assembly (5) comprises: A first annular hoop (51) and a plurality of first L-shaped angle steels (52) formed integrally with the first annular hoop (51) and arranged around the first annular hoop (51); The first annular hoop (51) is fixedly connected to the first end of the first structural steel pipe herringbone column (11) and is arranged in the first groove (121).
7. The substation frame foundation according to claim 5, characterized in that: The second fixing assembly (50) comprises: A second annular hoop and a plurality of second L-shaped angle steels integrally formed with the second annular hoop and arranged around the second annular hoop; The second annular hoop is fixedly connected to the first end of the second structural steel pipe herringbone column (21) and is arranged in the second groove (221).
8. The substation frame foundation according to claim 1, characterized in that: A concrete cushion layer (3) is provided at the bottom of the first basic base (1) and the bottom of the second basic base (2).
