Super-thick waterside outer wall structure in artificial island building environment and construction method
By using high-rise and ring beams to fix the steel bars in an artificial island building environment, combining the combined plate and pressing block to clamp the steel mesh components, and spraying concrete layer by layer, the problems of difficult and high cost of water-facing exterior wall construction are solved, and the problem of water-facing exterior wall construction is achieved. More efficient construction and structural strength improvement.
Patent Information
- Application Number
- CN202411237566.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-09-05
AI Technical Summary
In the artificial island building environment, the water-facing exterior wall cannot be fixed by using crown beams and slopes, which makes it difficult to construct, costly and cannot set up water-stop screws, and prefabricated arc formwork, which has a long construction period and is difficult to make Meet anti-seepage and compressive requirements.
The first steel bar is fixed by combining the upper layer and the ring beam, and the steel bar mesh assembly is clamped by combining the plate and the pressing block, and the spacer support assembly is used to cross-section in the concrete layer, and the concrete is sprayed layered to improve the structural strength, and through Monitor the thickness and strength parameters of the spray anchor in real time to ensure construction quality.
It reduces construction costs, shortens construction period, avoids the problem of water-stop screws being unable to be set, improves the water-resistant and compressive resistance of the wall, and achieves a more efficient construction process.
Smart Images

Figure CN118979515A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to an ultra-thick water-facing exterior wall structure and a construction method in an artificial island construction environment. Background Art
[0002] In a specific artificial island environment, there are cofferdams around the construction stage to facilitate the flow of people and vehicles in and out. The cofferdams will be removed in the later stage, and the outer wall of the basement will be directly in contact with the river, with a soaking height of four meters or more;
[0003] Because the water-facing exterior wall needs to have strong anti-seepage and anti-erosion functions, the exterior wall is far away from the crown beam and the slope, so the crown beam and the slope cannot be used to support and fix the concrete formwork of the exterior wall protective layer. Only one-sided formwork can be formed. However, since the outline of the exterior wall is basically arc-shaped and the height of the exterior wall is 12-15m, the formwork is difficult to support and prefabricated arc formwork is required, which is costly and takes a long time to complete. In addition, in order to achieve excellent anti-seepage and pressure resistance, it is impossible to install water-stop screws through the wall, which makes construction inconvenient. Summary of the invention
[0004] The object of the present invention is to provide an ultra-thick waterfront exterior wall structure and a construction method in an artificial island environment to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above object, the present invention provides the following technical solution: an ultra-thick waterfront exterior wall structure in an artificial island environment, the exterior wall structure comprising:
[0006] The outer wall of the building, wherein the upper end of the outer wall of the building is provided with a heightened layer, the outer wall of the building and the heightened layer are provided with a waterproof layer on the side close to the water body, and the outer wall of the building is provided with a first concrete layer, a second concrete layer and a third concrete layer sprayed in sequence vertically on the side of the heightened layer;
[0007] A steel mesh assembly, wherein the steel mesh assembly comprises a plurality of first steel bars and a plurality of second steel bars, wherein the plurality of first steel bars and a plurality of spacers are cross-staggered and placed in the first concrete layer, the second concrete layer and the third concrete layer;
[0008] The spacing support assembly is arranged at the staggered position of the first steel bar and the second steel bar. The spacing support assembly includes a composite plate, a spacing rod and a clamping block. The first steel bar and the second steel bar are clamped and fixed by the composite plate and the clamping block, and one side of the spacing rod is in contact with the outer wall of the building.
[0009] Preferably, a fertilizer trough is opened on the ground near the outer wall of the building, a ring beam is cast in the fertilizer trough, the lower ends of a plurality of first steel bars are vertically inserted in the ring beam, the upper ends of the first steel bars are arranged in a U-shaped structure, one side of the upper end of the first steel bar passes over the increased layer and is anchored in the outer wall of the building, and a spacer is provided between the side of the first steel bar passing over the increased layer and the waterproof layer.
[0010] Preferably, two side blocks are symmetrically provided on one side of the combined plate, a horizontal combination groove is horizontally opened in the center of the two side blocks, two supporting springs are symmetrically provided at the upper and lower ends of the two side blocks, and the first steel bar is vertically located between the two side blocks.
[0011] Preferably, the second steel bar is horizontally placed on one side of the clamping block, one side of the second steel bar is in contact with the first steel bar, and both sides of the clamping block are horizontally inserted into the horizontal combination grooves of the two side blocks.
[0012] Preferably, the side stopper is located in the horizontal combination groove and has a plurality of constraint grooves symmetrically provided at both upper and lower ends, and the clamping block has a plurality of constraint strips symmetrically provided at both upper and lower ends, and one side of the constraint groove is inserted into the constraint strip.
[0013] Preferably, the clamping block is provided with an L-shaped adapter plate on one side in the horizontal combination groove, and a combination plug rod is horizontally provided on one side of the L-shaped adapter plate, and one side of the two combination plug rods are movably penetrated through the combination plate respectively.
[0014] Preferably, one side of the spacer rod is provided with an external thread, the spacer rod is provided with a control nut through an external thread movable sleeve, a side of the control nut close to the combined plate is provided with an anti-slip ring, and a self-rotating sleeve is rotatably sleeved on the anti-slip ring.
[0015] Preferably, a pull rod is horizontally provided on one side of the self-rotating sleeve close to the combined insertion rod, and the two combined insertion rods and the two pull rods are arranged in a horizontally staggered manner relative to each other.
[0016] Preferably, a hanging rod is horizontally provided on one side of the pull rod close to the combined insertion rod, a hanging groove is opened on one side of the combined insertion rod, and the hanging rod of the pull rod is inserted into the hanging groove of the combined insertion rod.
[0017] A construction method for an ultra-thick waterfront exterior wall structure in an artificial island environment comprises the following steps:
[0018] Step 1: Build a raised layer on the upper end of the building's exterior wall, so that the raised layer is higher than the lower edge of the planting top plate above the building's exterior wall, and apply a waterproof layer on the water-facing surface of the building's exterior wall and the raised layer;
[0019] Step 2: After the waterproof layer is constructed, a fertilizer trough is set inside the height-added layer, the lower end of the first steel bar is inserted into the ring beam, and the upper end of the first steel bar is anchored into the inner side of the building outer wall;
[0020] Step 3: Carry out the construction of the first steel bar and the second steel bar, and use the combination plate and the clamping block to clamp and fix the first steel bar and the second steel bar in the place where the risk of deformation of the first steel bar is relatively large. At the same time, the combination plate is in contact with the outer wall of the building to maintain the gap between the first steel bar and the outer wall of the building. When the first concrete layer, the second concrete layer and the third concrete layer are sprayed in the later stage, the wall structure strength is improved. During operation, the spacer rod is in contact with the outer wall of the building, and the first steel bar is placed between the two side blocks of the combination plate. The clamping block is taken and inserted horizontally into the horizontal combination grooves of the two side blocks. At this time, the two combination plug rods penetrate the combination plate and are connected to the hanging rod on one side of the pull rod of the self-rotating sleeve through the hanging groove. Then the control nut is threadedly rotated to make the control nut pull the self-rotating sleeve, the combination plug rod and the clamping block to move, thereby clamping and fixing the first steel bar and the second steel bar;
[0021] Step 4: Spray the first concrete layer, the second concrete layer and the third concrete layer in sequence. The base surface is waterproof material. The first concrete layer is sprayed with special cement mortar, the second concrete layer is sprayed with 05 stone concrete, and the third concrete layer is sprayed with fine aggregate concrete.
[0022] Step 5: Monitor and adjust the spraying process: monitor the thickness and strength parameters of the sprayed anchor in real time, and regularly inspect the quality of the sprayed anchor, including spot checks on the quality of raw materials, the strength of the sprayed anchor samples, adhesion and other indicators; record and process abnormal data and unqualified raw materials to ensure that problems are resolved in a timely manner.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] By setting a ring beam in the fat trough on one side of the bottom of the building's exterior wall and raising the top of the building's exterior wall to set a height increase layer, during concrete construction, the first steel bar is positioned and fixed by the ring beam and the height increase layer, avoiding the problem of being unable to set water-stop screws and being unable to construct due to the far formwork fixing point. Then, the water-facing wall is constructed by layered spraying concrete. In addition, during the construction of the first steel bar, a support member far away from the building's exterior wall can be set at a position where the first steel bar is easily deformed by using an interval support assembly, thereby improving the strength of the temporary concrete structure, reducing the cost and shortening the construction period. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a schematic diagram of the wall structure of the present invention;
[0026] Figure 2 This is a schematic diagram of the layered structure of the wall of the present invention;
[0027] Figure 3 This is a schematic diagram of a spacing support assembly of the present invention from a first viewing angle;
[0028] Figure 4This is a schematic diagram of the spacing support assembly of the present invention from a second viewing angle;
[0029] Figure 5 This is a schematic diagram of the connection structure between the first steel bar and the composite plate of the present invention;
[0030] Figure 6 This is a schematic diagram of the matching structure of the compression block and the second steel bar of the present invention;
[0031] Figure 7 This is a cross-sectional view of the matching structure of the pressing block and the combined plate of the present invention.
[0032] In the figure: building exterior wall 1, height increase layer 2, fertilizer trough 3, ring beam 4, waterproof layer 5, first steel bar 6, spacer 7, first concrete layer 9, second concrete layer 9, third concrete layer 10, combined plate 11, spacer rod 12, side block 13, supporting spring piece 14, horizontal combined groove 15, clamping block 16, second steel bar 17, restraining strip 18, restraining groove 19, L-shaped adapter plate 20, combined plug rod 21, hanging groove 22, control nut 23, self-rotating sleeve 24, pull rod 25, hanging rod 26. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] Please refer to the attached Figure 1-7 , this application provides the following technical solutions.
[0035] Embodiment 1: An ultra-thick water-facing exterior wall structure in an artificial island environment comprises a building exterior wall 1, wherein a raised layer 2 is provided at the upper end of the building exterior wall 1, a waterproof layer 5 is laid on the side of the building exterior wall 1 and the raised layer 2 close to the water body, and a first concrete layer 9, a second concrete layer 9 and a third concrete layer 10 are vertically provided in sequence on one side of the building exterior wall 1 located at the raised layer 2. The setting of the raised layer 2 facilitates the subsequent concrete construction and can be used as a barrier for the planting top plate.
[0036] A steel mesh assembly is provided to improve the strength of the water-facing concrete structure. The steel mesh assembly includes a plurality of first steel bars 6 and a plurality of second steel bars 17. The plurality of first steel bars 6 and a plurality of spacers 7 are cross-staggered and placed in the first concrete layer 9, the second concrete layer 9 and the third concrete layer 10. A fertilizer trough 3 is provided on the ground near the building exterior wall 1. A ring beam 4 is cast in the fertilizer trough 3. The lower ends of the plurality of first steel bars 6 are vertically inserted and placed in the ring beam 4 respectively. The upper end of the first steel bar 6 is provided in a U-shaped structure. One side of the upper end of the first steel bar 6 passes over the increased layer 2 and is anchored in the building exterior wall 1. A spacer 7 is provided between the side of the first steel bar 6 passing over the increased layer 2 and the waterproof layer 5. The provision of the spacer 7 prevents the first steel bar 6 from wearing and damaging the waterproof layer 5 during the construction process. The cooperation of the increased layer 2 and the ring beam 4 can provide fixed support for the first steel bar 6. The first steel bar 6 needs to be straightened and derusted when it is constructed.
[0037] In this embodiment:
[0038] Embodiment 2: On the basis of embodiment 1, a spacing support assembly is provided to prevent the first steel bar 6 from being deformed and affecting the strength of the concrete layer after being close to the building exterior wall 1. The spacing support assembly is arranged at the staggered position of the first steel bar 6 and the second steel bar 17. The spacing support assembly includes a composite plate 11, a spacing rod 12 and a clamping block 16. The first steel bar 6 and the second steel bar 17 are clamped and fixed by the composite plate 11 and the clamping block 16, and one side of the spacing rod 12 is in contact with the building exterior wall 1. Two side blocks 13 are symmetrically provided on one side of the composite plate 11. Horizontal combination grooves 15 are horizontally opened in the centers of the two side blocks 13. Two supporting springs 14 are symmetrically provided at the upper and lower ends of the two side blocks 13. The first steel bar 6 is vertically located between the two side blocks 13. The distance between the two side blocks 13 is the same as the diameter of the first steel bar 6, so as to facilitate the combination of the first steel bar 6 and the composite plate 11.
[0039] The second steel bar 17 is horizontally placed on one side of the clamping block 16, and one side of the second steel bar 17 is in contact with the first steel bar 6. The two sides of the clamping block 16 are horizontally inserted into the horizontal combination grooves 15 of the two side blocks 13, and the side blocks 13 are located in the horizontal combination grooves 15. A plurality of constraint grooves 19 are symmetrically provided at both ends, and a plurality of constraint strips 18 are symmetrically provided at both ends. One side of the constraint groove 19 is inserted into the constraint strip 18. When the clamping block 16 is inserted into the two side blocks 13, the second steel bar 17 is cross-staggered with the first steel bar 6. At this time, the constraint groove 19 is inserted into the constraint strip 18. Under the elastic downward pressure of the supporting spring sheet 14, the clamping block 16 can be prevented from arbitrarily detaching from the horizontal combination groove 15. The sides of the constraint strip 18 and the constraint groove 19 are both inclined surfaces, which facilitates the insertion of the clamping block 16 into the pre-positioning.
[0040] The clamping block 16 is located in the horizontal combination groove 15, and one side thereof is provided with an L-shaped adapter plate 20. One side of the L-shaped adapter plate 20 is horizontally provided with a combination plug rod 21, and one side of the two combination plug rods 21 is movably penetrated through the combination plate 11, and one side of the spacer rod 12 is provided with an external thread, and the spacer rod 12 is movably sleeved with a control nut 23 through the external thread, and the control nut 23 is provided with an anti-slip ring on the side close to the combination plate 11, and a self-rotating sleeve 24 is rotatably sleeved on the anti-slip ring, and a pull rod 25 is horizontally provided on the side of the self-rotating sleeve 24 close to the combination plug rod 21, and the two combination plug rods 21 and the two pull rods 25 are arranged relative to and horizontally staggered, and the pull rod 25 is horizontally provided with a hanging rod 26 on the side close to the combination plug rod 21, and a hanging groove 22 is opened on one side of the combination plug rod 21, and the hanging rod 26 of the pull rod 25 is inserted into the combination plug rod 21. When the combined plate 11 and the clamping block 16 are not used together, they are both independent structures. When the two need to be installed on the side of the first steel bar 6 that may be deformed, the two combined rods 21 are passed through the combined plate 11, and the clamping block 16 pushes the second steel bar 17 to abut against the first steel bar 6, and then the hanging rod 26 is hung with the hanging groove 22. When the control nut 23 is away from the combined plate 11 through the thread, the clamping block 16 is pulled to clamp and fix the second steel bar 17 and the first steel bar 6, and the spacer rod 12 is kept in contact with the building exterior wall 1 to avoid the spacing between the first steel bar 6 and the building exterior wall 1 being too small. The side of the spacer rod 12 in contact with the building exterior wall 1 needs to squeeze the waterproof layer 5, so the end of the spacer rod 12 should be an elastic structure or a contact plate with an enlarged area to avoid damage to the waterproof layer 5.
[0041] A construction method for an ultra-thick waterfront exterior wall structure in an artificial island environment comprises the following steps:
[0042] Step 1: Build a raised floor 2 at the upper end of the building exterior wall 1. The height of the raised floor 2 is 1.5-2.3m so that the raised floor 2 is higher than the lower edge of the planting top plate above the building exterior wall 1. Apply a waterproof layer 5 on the water-facing surface of the building exterior wall 1 and the raised floor 2. The waterproof layer 5 includes a waterproof coating layer and a waterproof membrane layer. The waterproof coating is constructed with 2 thick high-viscosity anti-slip rubber asphalt coating. The outer layer of the coating is additionally coated with 1.5 thick self-adhesive polymer modified asphalt waterproof membrane (without tire). The asphalt coating spraying should adopt a "cross" spraying method. The wet film thickness of each spraying should not exceed 1.0mm. Spray three times to ensure a thickness of 2mm. The spraying should be uniform and there should be no exposed bottom or accumulation.
[0043] During spraying, the spraying pressure and the frequency of the reciprocating swing of the spray gun should be fixed to effectively control the coating thickness and ensure that the waterproof layer is formed in one go. The thin coating and multiple coats construction method should be adopted to ensure uniform spraying and reduce the fluidity of the coating on the facade due to its own weight.
[0044] After spraying a certain area, use a coating thickness gauge to test the coating thickness before laying the coil. If the thickness does not meet the standard or needs to be strengthened locally, use a trowel to take some paint and apply it manually. Spraying construction should be completed in sections or areas, with 500 to 1,000 square meters as one area.
[0045] After spraying, cover the waterproofing coiled material in time to prevent excessive dust from adhering to the coating surface and reducing the adhesion between the coating and the waterproofing coiled material. Draw the reference line according to the shape, size and specifications of the working surface. Before laying the coiled material, carefully correct the position of the coiled material according to the already drawn reference line. Open the coiled material and align the long and short sides and the overlapping sides according to the reference line. When laying the first coiled material and laying the second coiled material, the overlap of the long side with the first coiled material shall be laid according to the overlapping guide line on the coiled material. The overlap shall be overlapped according to the width requirement of not less than 100mm. When overlapping, ensure that the overlap is clean and dust-free. Use a roller to compact the overlapping edge of the coiled material, expel the bubbles on the overlapping edge, and compact and stick it tightly. The coiled material should be rolled while laying to remove the air on the lower surface of the coiled material. Repeat the above operation until the laying operation is completed.
[0046] The waterproof membrane is made to 500mm from the corner of the top plate, and the joints of the membrane are fully coated with rubber asphalt waterproof coating to seal the interface. The top plate corners need to be fixed with fixing nails, and the fixing nails are sealed with waterproof coating.
[0047] Step 2: After the construction of the waterproof layer 5 is completed, a fertilizer trough 3 is set inside the height-increasing layer 2, the lower end of the first steel bar 6 is inserted into the ring beam 4, and the upper end of the first steel bar 6 is anchored into the inner side of the building outer wall 1.
[0048] Step three: construct the first steel bar 6 and the second steel bar 17, and compress and fix the first steel bar 6 and the second steel bar 17 by means of the combination plate 11 and the clamping block 16 at the place where the deformation risk of the first steel bar 6 is relatively large. At the same time, the combination plate 11 contacts the building outer wall 1 to maintain the gap between the first steel bar 6 and the building outer wall 1. When the first concrete layer 9, the second concrete layer 9 and the third concrete layer 10 are sprayed in the later stage, the wall structure strength is improved. During operation, the spacer rod 12 contacts the building outer wall 1, and the first steel bar 6 is placed between the two side blocks 13 of the combination plate 11. The clamping block 16 is taken and horizontally inserted into the horizontal combination groove 15 of the two side blocks 13. At this time, the two combination plug rods 21 penetrate the combination plate 11 and are hung with the hanging rod 26 on one side of the pull rod 25 of the self-rotating sleeve 24 through the hanging groove 22. Then the control nut 23 is threadedly rotated to make the control nut 23 pull the self-rotating sleeve 24, the combination plug rod 21 and the clamping block 16 to move, thereby compressing and fixing the first steel bar 6 and the second steel bar 17.
[0049] Step 4: spray the first concrete layer 9, the second concrete layer 9 and the third concrete layer 10 in sequence. The base surface is waterproof material. The first steel bar 6 is sprayed with mortar to prevent the sprayed concrete stones from damaging the waterproof material. The latter layer of spraying should be carried out after the previous layer of concrete has finally set, but the interval should not be too long. If spraying is carried out 1 to 2 hours after final setting, the concrete surface should be cleaned with Feng Shui to facilitate interlayer bonding, control the level and uniformity of the sprayed anchor, and ensure that the construction effect meets the design requirements. The first concrete layer 9 is sprayed with special cement mortar to ensure that the exterior wall membrane is not damaged. The second concrete layer 9 uses 05 stone concrete to ensure the strength of the sprayed concrete. The third concrete layer 10 is sprayed with fine aggregate concrete to ensure the flatness of the exterior wall.
[0050] Raw materials for shotcrete: To ensure the construction quality of shotcrete, the procurement, purchase, inspection and acceptance of raw materials and their inventory must be carried out in accordance with standard procedures, and the concrete must be mixed strictly according to the mix ratio requirements. The measuring instruments of the mixing system must be complete and accurate, and the laboratory must monitor at the frequency required by the test procedures. The mix ratio and slump index of shotcrete should be controlled to ensure that the concrete is quickly attached to the slope surface, with less rebound, no flow, and a flat and dense surface. The aggregate particle size of shotcrete is controlled below 20mm, and the water-cement ratio should be 0.40-0.50. The mix ratio of shotcrete can be: cement 460: sand 807: stone 948: water 165: early strength agent 50.
[0051] Wind pressure: It should be the wind pressure when the spray machine is working normally. If the wind pressure is too high, the spraying speed will be too high, the concrete will rebound greatly, and the cement consumption will be high. If the wind pressure is too low, the concrete will not be dense.
[0052] Spraying direction and distance: The nozzle should be as perpendicular to the sprayed surface as possible, and the deflection angle should be controlled within 20°. Use the spray material to suppress the rebound of the aggregate to reduce the rebound amount. The distance between the nozzle and the sprayed surface should be controlled at about 1.0m.
[0053] The thickness of shotcrete must meet the design requirements. The surface layer must be smooth without hollows, cracks, or exposed reinforcement.
[0054] Step 5: Monitor and adjust the spraying process: monitor the thickness and strength parameters of the sprayed anchor in real time, and regularly inspect the quality of the sprayed anchor, including spot checks on the quality of raw materials, the strength of the sprayed anchor samples, adhesion and other indicators; record and process abnormal data and unqualified raw materials to ensure that problems are resolved in a timely manner.
[0055] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An ultra-thick waterfront exterior wall structure in an artificial island environment, characterized by: The exterior wall structure includes: A building exterior wall (1), wherein a raised layer (2) is provided at the upper end of the building exterior wall (1), a waterproof layer (5) is laid on the side of the building exterior wall (1) and the raised layer (2) close to the water body, and a first concrete layer (9), a second concrete layer (9) and a third concrete layer (10) are vertically sprayed in sequence on one side of the building exterior wall (1) located at the raised layer (2); A steel mesh assembly, the steel mesh assembly comprising a plurality of first steel bars (6) and a plurality of second steel bars (17), wherein the plurality of first steel bars (6) and the plurality of spacers (7) are cross-staggered and placed in a first concrete layer (9), a second concrete layer (9) and a third concrete layer (10); A spacing support assembly is provided at the staggered position of a first steel bar (6) and a second steel bar (17), the spacing support assembly comprising a composite plate (11), a spacing rod (12) and a clamping block (16), the first steel bar (6) and the second steel bar (17) being clamped and fixed by the composite plate (11) and the clamping block (16), and one side of the spacing rod (12) is in contact with an outer wall (1) of a building.
2. The ultra-thick waterfront exterior wall structure in an artificial island environment according to claim 1, characterized in that: A fertilizer trough (3) is provided on the ground near the building outer wall (1), a ring beam (4) is cast in the fertilizer trough (3), the lower ends of a plurality of first steel bars (6) are respectively vertically inserted in the ring beam (4), the upper ends of the first steel bars (6) are arranged in a U-shaped structure, one side of the upper end of the first steel bars (6) passes over the heightened layer (2) and is anchored in the building outer wall (1), and a spacer (7) is provided between the side of the first steel bars (6) passing over the heightened layer (2) and the waterproof layer (5).
3. The ultra-thick waterfront exterior wall structure in an artificial island environment according to claim 2, characterized in that: Two side blocks (13) are symmetrically arranged on one side of the combined plate (11), a horizontal combination groove (15) is horizontally opened at the center of the two side blocks (13), two supporting spring plates (14) are symmetrically arranged at the upper and lower ends of the two side blocks (13), and the first steel bar (6) is vertically located between the two side blocks (13).
4. The ultra-thick waterfront exterior wall structure in an artificial island environment according to claim 3, characterized in that: The second steel bar (17) is horizontally placed on one side of the clamping block (16), one side of the second steel bar (17) is in contact with the first steel bar (6), and both sides of the clamping block (16) are horizontally inserted into the horizontal combination grooves (15) of the two side blocks (13).
5. The ultra-thick waterfront exterior wall structure in an artificial island environment according to claim 4, characterized in that: The side stopper (13) is located in the horizontal combination groove (15) and has a plurality of restraining grooves (19) symmetrically arranged at both upper and lower ends. The clamping block (16) has a plurality of restraining strips (18) symmetrically arranged at both upper and lower ends. One side of the restraining groove (19) is inserted into the restraining strip (18).
6. The ultra-thick waterfront exterior wall structure in an artificial island environment according to claim 5, characterized in that: The pressing block (16) is provided with an L-shaped adapter plate (20) on one side thereof in the horizontal combination groove (15), and a combination plug rod (21) is horizontally provided on one side of the L-shaped adapter plate (20), and one side of the two combination plug rods (21) are movably penetrated through the combination plate (11) respectively.
7. The ultra-thick waterfront exterior wall structure in an artificial island environment according to claim 6, characterized in that: One side of the spacer rod (12) is provided with an external thread, and the spacer rod (12) is provided with a control nut (23) through an external threaded movable sleeve connection, and the control nut (23) is provided with an anti-slip ring on the side close to the combined plate (11), and a self-rotating sleeve (24) is rotatably sleeved on the anti-slip ring.
8. The ultra-thick waterfront exterior wall structure in an artificial island environment according to claim 7, characterized in that: A pull rod (25) is horizontally arranged on one side of the self-rotating sleeve (24) close to the combined insertion rod (21), and the two combined insertion rods (21) and the two pull rods (25) are arranged relative to each other and horizontally staggered.
9. The ultra-thick waterfront exterior wall structure in an artificial island environment according to claim 8, characterized in that: A hanging rod (26) is horizontally provided on one side of the pull rod (25) close to the combined insertion rod (21), a hanging groove (22) is provided on one side of the combined insertion rod (21), and the hanging rod (26) of the pull rod (25) is inserted into the hanging groove (22) of the combined insertion rod (21).
10. A construction method for an ultra-thick waterfront exterior wall structure in an artificial island environment as claimed in any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1: Building a heightened layer (2) on the upper end of the building outer wall (1) so that the heightened layer (2) is higher than the lower edge of the planting top plate above the building outer wall (1), and applying a waterproof layer (5) on the water-facing surfaces of the building outer wall (1) and the heightened layer (2); Step 2: After the waterproof layer (5) is constructed, a fertilizer trough (3) is provided inside the height-increase layer (2), the lower end of the first steel bar (6) is inserted into the ring beam (4), and the upper end of the first steel bar (6) is anchored into the inner side of the building outer wall (1); Step 3: construct the first steel bar (6) and the second steel bar (17), and use the combination plate (11) and the compression block (16) to compress and fix the first steel bar (6) and the second steel bar (17) at the place where the risk of deformation of the first steel bar (6) is relatively high. At the same time, the combination plate (11) is in contact with the building outer wall (1), and the gap between the first steel bar (6) and the building outer wall (1) is maintained. When the first concrete layer (9), the second concrete layer (9) and the third concrete layer (10) are sprayed later, the wall structure strength is improved. During operation, the spacer rod (12) is in contact with the building outer wall (1). , place the first steel bar (6) between the two side blocks (13) of the combined plate (11), take the clamping block (16), and insert it horizontally into the horizontal combined grooves (15) of the two side blocks (13), at which time the two combined insertion rods (21) penetrate the combined plate (11) and are connected to the hanging rod (26) on one side of the pull rod (25) of the self-rotating sleeve (24) through the hanging groove (22), and then the control nut (23) is threadedly rotated to make the control nut (23) pull the self-rotating sleeve (24), the combined insertion rod (21) and the clamping block (16) to move, thereby clamping and fixing the first steel bar (6) and the second steel bar (17); Step 4: spraying the first concrete layer (9), the second concrete layer (9) and the third concrete layer (10) in sequence, the base surface is a waterproof material, the first concrete layer (9) is sprayed with special cement mortar, the second concrete layer (9) is sprayed with 05 stone concrete, and the third concrete layer (10) is sprayed with fine aggregate concrete; Step 5: Monitor and adjust the spraying process: monitor the thickness and strength parameters of the sprayed anchor in real time, and regularly inspect the quality of the sprayed anchor, including spot checks on the quality of raw materials, the strength of the sprayed anchor samples, adhesion and other indicators; record and process abnormal data and unqualified raw materials to ensure that problems are resolved in a timely manner.
Citation Information
Patent Citations
Integrated steel wire net rack insulation board structure for passive house
CN112796430A
Anti-seepage construction method for windowsill tongue-and-groove prefabricated slab
CN116104209A
Connecting piece for building outer wall
CN216787491U
Connecting piece of building thermal insulation wall structure
CN217924223U
Tie assembly for cast-in-place concrete composite insulation board wall and wall
CN219060407U