Ventilation cooling method for maintaining thermal stability of building foundation in permafrost region

By setting up ventilation ducts on the building foundation and using wind flow to supplement the cooling capacity, the problem of permafrost heating caused by heat conduction in the building foundation in the frozen soil area is solved, the safety and stability of the building are improved, and energy consumption and construction are reduced Thermal disturbance.

CN118979522APending Publication Date: 2024-11-19GEOLOGICAL & NATURAL DISASTER PREVENTION & CONTROL INST GANSU ACADEMY OF SCI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411286966.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

In permafrost areas, the thermal conductivity of the building foundations causes the permafrost to heat and melt due to the thermal conductivity of concrete, which affects the safety and stability of the building, and the problem of global warming is even more serious.

Method used

Set up a downward ventilation duct on the building foundation, and use wind flow to introduce cold air on the ground below the foundation for heat exchange. When the local surface temperature is lower than the preset value, turn on the air induction device to replenish the cooling capacity to maintain the frozen state of the frozen soil. Unpowered temperature control system and prefabricated infrastructure to reduce thermal disturbances and the formation of heat transfer channels.

Benefits of technology

It effectively avoids the thermal impact of climate warming and summer environmental heating on the building foundation, maintains the safety and stability of buildings in the permafrost area, reduces energy consumption and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979522A_ABST
    Figure CN118979522A_ABST
Patent Text Reader

Abstract

The invention discloses a ventilation cooling method for maintaining thermal stability of a building foundation in a permafrost region, which is characterized in that a downward ventilation duct is arranged at the upper end of the building foundation, and when the ground temperature is detected to be lower than a preset value, cold air on the ground is introduced into the lower part of the building foundation for heat exchange by utilizing air flow; and cold supplementing is conducted on frozen soil below and around the building foundation. The method has the advantages that the influence of climate warming, summer environment temperature rising and concrete heat conduction on frozen soil can be better avoided, and the safety and stability of a building can be better maintained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building safety maintenance, and in particular to a ventilation cooling method for maintaining thermal stability of building foundations in permafrost areas. Background Art

[0002] Permafrost, also known as permanent frozen soil, refers to soil and rock layers that remain frozen for two years or more. Building foundation engineering can enhance the bearing capacity of natural sites and has been widely used in permafrost areas. Shallow foundations such as cone column foundations are shallower than pile foundations and are often constructed using open cut and backfill methods. They are mainly used as tower foundations in power transmission line projects.

[0003] In permafrost areas, the bearing capacity of the foundation mainly depends on the freezing force between the foundation and the surrounding permafrost. Generally speaking, the lower the temperature, the greater the freezing force. However, recently, due to the influence of global warming, the permafrost has shown a trend of gradual degradation. Under such conditions, the permafrost layer shows characteristics such as warming, increased thickness of the active layer, and upward movement of the lower limit of the permafrost. Building foundations are usually made of concrete, which has relatively good thermal conductivity. The upper end of some building foundations (such as tower foundations) will be partially exposed to the air, so the foundation itself will become a heat transfer channel for the lower permafrost. When the surface temperature is high during the day or in summer, the heat will be introduced into the permafrost below the foundation, causing the permafrost to warm up or even melt, which greatly affects the safety and stability of the upper structure.

[0004] Therefore, for those skilled in the art, how to develop a cooling method that can better reduce the thermal impact of climate warming and summer environmental temperature rise on building foundations, improve the thermal stability of the foundation, and better maintain the safety of buildings in frozen soil areas has become a problem to be considered and solved. Summary of the invention

[0005] In view of the above-mentioned deficiencies of the prior art, the technical problem to be solved by the present invention is: how to provide a ventilation and cooling method for maintaining the thermal stability of building foundations in permafrost areas, which can better avoid the thermal impact of climate warming, summer environmental temperature rise and concrete thermal conduction on permafrost and better maintain the safety and stability of buildings.

[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0007] A ventilation and cooling method for maintaining the thermal stability of building foundations in permafrost areas is characterized in that a downward ventilation duct is arranged at the upper end of the building foundation. When the ground air temperature is detected to be lower than a preset value, the wind flow is used to introduce the ground cold air into the interior below the building foundation for heat exchange, thereby supplementing the cooling of the frozen soil below and around the building foundation.

[0008] In this way, this method sets a ventilation duct on the foundation of the building in the frozen soil area. When the surface ambient temperature is lower than the temperature of the lower frozen soil at night or in winter, the wind flow is used to introduce the surface cold air into the deep below the foundation to achieve cold supplement, and compensate for the cold that is exported to the upper part through the foundation during the day or in summer. In this way, the freezing state of the surrounding frozen soil under the building foundation will not change, and the safety and stability of the building will be better maintained.

[0009] Furthermore, the present method is implemented by means of a building foundation device, the building foundation device comprising a foundation body, the foundation body (backfilled with soil) being buried in a foundation pit and the upper end thereof being above the ground surface, a U-shaped ventilation duct being arranged inside the foundation body, two openings at the upper end of the ventilation duct being located on both sides of a support device installation position on the upper end surface of the foundation body, one opening of the ventilation duct being an air inlet and the other opening being an air outlet, and an air induced draft device for drawing air into the ventilation duct being arranged at any opening position at the upper end of the ventilation duct.

[0010] In this way, when the transmission line towers and other projects in permafrost areas are constructed with the above-mentioned foundation device for support, when the temperature at night or in winter is lower than the preset temperature (the preset temperature is generally equal to or lower than the temperature at the lower end of the foundation body), the wind device can be turned on to draw air into the ventilation duct, and the cold air on the ground surface is introduced into the foundation body to supplement the cold air that is exported to the environment by the foundation body during the day, so as to better maintain the frozen state of the lower end of the foundation body and maintain the stability of the upper structure. During implementation, a layer of coarse-grained soil cushion is set at the bottom of the foundation pit, and its thickness should not be less than 20cm, in order to facilitate the leveling of the base and prevent the accumulation of moisture in the base from causing uneven frost heave deformation.

[0011] Furthermore, the ventilation duct is a U-shaped PVC pipe prefabricated and cast in the base body, making it convenient to produce.

[0012] Furthermore, the induced draft device comprises an induced draft impeller mounted on an impeller shaft, the impeller shaft can be horizontally rotatably mounted in the middle of the air outlet so that the induced draft impeller is located above the air outlet, the induced draft impeller is rotated by the horizontal wind flow and can induce the air below to flow upward, the impeller shaft is connected to an automatic rotation and stop temperature control device mounted at the air outlet, the automatic rotation and stop temperature control device comprises a rotation and stop control rod, the rotation and stop control rod is horizontally fixed on an extension section downward from the lower end of the impeller shaft, and the automatic rotation and stop temperature control device also comprises a vertically arranged impeller control memory alloy spring Spring, one end of the memory alloy spring for impeller control is fixed on the inner wall of the air outlet, and the other end is a free end and is fixedly provided with a start-stop latch, the start-stop latch can be slidably installed in a vertical directional groove, the directional groove is used to limit the horizontal movement of the start-stop latch, when the surface air temperature is higher than the transformation temperature (i.e., the preset value) of the memory alloy spring for impeller control, the start-stop latch is located on the rotation path of the stop control rod, when the surface air temperature is lower than the transformation temperature of the memory alloy spring for impeller control, the memory alloy spring for impeller control is deformed to make the start-stop latch disengage from the rotation path of the stop control rod.

[0013] In this way, when the temperature drops to a preset value at night or in winter (the preset value can usually be set to -3°C during implementation), the memory alloy spring for impeller control is deformed and drives the start-stop latch to disengage from the rotation path of the stop control lever, releasing the lock on the impeller shaft. At this time, the induced draft impeller can rotate and produce a suction effect under the blowing of natural wind flow, driving the airflow in the ventilation duct below to flow upward from the air outlet, so that a wind flow is naturally formed in the ventilation duct, and the cold air on the ground surface is introduced into the lower end of the basic body for supplementary cooling. The induced draft impeller structure itself is a prior art, and the function of drawing air upward while the wind blows and rotates can be realized by simply setting the blades to a vortex shape inclined in the same direction. The memory alloy spring itself is also a prior art, which can deform when the temperature drops to the transition temperature, elongate or shorten, and recover after the temperature rises. In this way, the induced draft device can automatically detect the surface temperature to control the wind flow in the ventilation duct, so that the entire device does not need to consume additional power energy, and achieves energy saving, environmental protection, automatic control and long-lasting use. As another method during implementation, an electric fan can be directly installed at the opening to achieve air induction. This is simpler to implement but has the disadvantage of relying on electricity.

[0014] Furthermore, the air induction device also includes an air outlet tube, the impeller shaft, the memory alloy spring for impeller control, the directional groove and the start-stop latch are all installed in the air outlet tube, and the air outlet tube is pre-cast and fixed at the air outlet.

[0015] In this way, the induced draft device can be produced separately and directly embedded and fixed at the air outlet when the foundation body is cast, which is convenient for production implementation.

[0016] Furthermore, a horizontal support frame is arranged in the air outlet cylinder, and the extension section of the impeller shaft is rotatably mounted on the support frame by means of a bearing.

[0017] This makes it easier to install and fix the impeller shaft.

[0018] Furthermore, an air outlet valve device is installed in the air outlet duct, and the air outlet valve device includes a horizontally arranged air outlet valve, one end of the air outlet valve is vertically rotatably installed on a horizontally arranged air outlet valve shaft, and the other end of the air outlet valve is placed on an air outlet valve limit block provided on the corresponding inner wall of the air outlet duct and is in a closed state. The air outlet valve device also includes a memory alloy spring for air outlet control, one end of the memory alloy spring for air outlet control is fixed to the inner wall of the air outlet duct, and the other end is connected to the air outlet valve. When the surface temperature is lower than the transition temperature of the memory alloy spring for air outlet control (i.e., the preset value), the memory alloy spring for air outlet control is deformed to cause the air outlet valve to rotate to a vertical state.

[0019] In this way, when the surface temperature is higher than the preset value, the air outlet valve is placed on the air outlet valve limit block and is in a closed state; when the surface temperature is lower than the preset value, the air outlet control memory alloy spring is deformed, so that when the air induction device is turned on, the air outlet valve is also opened for ventilation, and the cold air on the ground surface is introduced into the lower end of the foundation body for supplementary cooling. Therefore, the structure of the air outlet valve device ensures that when the surface temperature does not drop to the preset value, the wind flow can be completely blocked from entering the ventilation duct.

[0020] Furthermore, a reset torsion spring acting on the air outlet valve is also arranged on the air outlet valve rotating shaft.

[0021] In this way, relying on the reset torsion spring can better ensure that after the temperature rises above the preset value, the air outlet valve can be better reset and restored to the closed state.

[0022] Furthermore, an air inlet valve device is provided at the air inlet, and the structure of the air inlet valve device is the same as that of the air outlet valve device, so as to ensure that when the surface temperature does not drop to a preset value, the wind flow can be completely shielded from entering the ventilation duct.

[0023] Furthermore, an air inlet cylinder is provided at the air inlet, the air inlet cylinder is prefabricated and fixed at the air inlet, and the air inlet valve device is installed in the air inlet cylinder, which is more conducive to installation.

[0024] Furthermore, a drainage top in the shape of a cone cover facing upward is suspended and supported above the air inlet to prevent rainwater from entering the ventilation duct.

[0025] Furthermore, the foundation body is a prefabricated concrete component, and the lower part of the foundation body has a base with a diameter expanding outward in the horizontal direction. Anchor holes are vertically arranged on the base. The anchor holes and the anchor holes vertically arranged in the soil below the base are directly connected to each other. Anchor rods are vertically arranged in the anchor holes. Mortar materials mixed with sand and water are frozen and fixed in the anchor holes. High-strength cement mortar is poured in the anchor holes to fix the upper end of the anchor rods.

[0026] This is because when anchoring the traditional foundation, cement mortar is directly poured into the anchor hole after the anchor rod is inserted to achieve fixation. However, when this method is used in permafrost areas, the hydration heat generated during the solidification of concrete will cause thermal disturbance to the frozen soil, thereby affecting the safety of the foundation. At the same time, the heat conductivity of the concrete after solidification will be much higher than that of the frozen soil, and a heat transfer channel will be formed further downward along the foundation body, affecting the freezing of the frozen soil below, thereby threatening the stability of the foundation. Therefore, the applicant creatively changed the anchor hole below the foundation to a mortar material mixed only with sand and water, which can be well integrated with the frozen soil after freezing, and the anchor rod hole inside the foundation uses high-strength cement mortar to achieve reliable fixation of the upper end of the anchor rod. In this way, neither hydration heat will be generated during construction to cause thermal disturbance, nor will a downward heat transfer channel be formed in the future to affect the stability of the foundation; therefore, the safety and stability of the foundation are greatly improved. In addition, the foundation body itself uses prefabricated concrete components, which can also minimize the thermal disturbance of the permafrost during the construction of the foundation project and improve the construction efficiency.

[0027] Among them, the mortar material composed only of sand and water is generally mixed in a ratio of sand: ratio = (3.5~6.5): 1. The specific ratio can be determined according to the engineering requirements and the construction environment to ensure that the slurry has good fluidity and there is no obvious stratification after standing for 10 minutes after grouting. If a small amount of stratification occurs, dry sand is added to the designed elevation to ensure that the anchor rod is wrapped with saturated medium and coarse sand.

[0028] Furthermore, the basic body includes a prefabricated base at the bottom and a prefabricated conical column at the top. The prefabricated base includes a lower base and a straight arm section of a cylindrical structure located in the middle position above the base. The prefabricated conical column is truncated cone-shaped and the lower end has the same diameter as the straight arm section and is fixedly connected by a docking structure.

[0029] In this way, the foundation body is divided into two parts for prefabrication, which is convenient for transportation and construction and installation. In specific implementation, the prefabricated cone column is a truncated cone structure, and its main function is to slow down the tangential frost heave force generated during the freezing of the active layer. The buried depth of the cone column needs to be greater than the upper limit of the natural frozen soil, and its length ,in The upper limit of natural permafrost burial depth, is a coefficient that needs to be determined according to specifications or numerical simulation calculations. The value should not be too large or too small. If it is too large, the base part will be too large, and if it is too small, it will not be able to play its anti-freeze heave effect well. It is usually recommended to take a value of 7.2°. The prefabricated base is an extended base (i.e., base) and a straight arm section cast in one piece. The extended base is a prism shape, which is designed to form a slope to prevent moisture from gathering on the side surface of the foundation. Symmetrical anchor holes are reserved around the base.

[0030] Furthermore, the docking structure includes a steel embedded connector, the lower half of which is pre-cast and fixed vertically in the middle of the upper end surface of the straight arm section, the embedded connector is a columnar structure as a whole and a transverse connection hole is arranged at the upper end, and the upper end surface of the straight arm section around the embedded connector is also pre-cast and fixed with a plurality of longitudinal ribs extending vertically upward; the docking structure also includes a connector installation cavity located in the middle of the lower end of the prefabricated cone column and corresponding to the embedded connector, the diameter of the connector installation cavity is larger than the diameter of the embedded connector, and the connector installation cavity A bolt hole is provided at the upper end corresponding to the connecting hole of the embedded connecting piece, and a longitudinal reinforcement installing cavity is vertically provided around the connecting piece installing cavity corresponding to the longitudinal reinforcement position, and a grouting port is provided at the lower part and the upper end of the connecting piece installing cavity and each longitudinal reinforcement installing cavity; the upper end of the embedded connecting piece is inserted into the connecting piece installing cavity and the gap is filled with (micro-expansion high-strength) cement mortar, and connecting bolts are correspondingly installed and fixed in the bolt hole and the connecting hole, and the upper end of the longitudinal reinforcement is inserted into the longitudinal reinforcement installing cavity and the gap is filled with (micro-expansion high-strength) cement mortar.

[0031] In this way, the embedded connectors and longitudinal reinforcements are precast and fixed on the upper end of the straight arm section of the prefabricated base. When docking, it is only necessary to insert the embedded connectors and the upper end of the longitudinal reinforcement into the corresponding connector installation cavity and the longitudinal reinforcement installation cavity, and fix the bolts to the bolt holes and the connection holes therein, and then inject grouting into the connector installation cavity and the longitudinal reinforcement installation cavity through the grouting port below respectively until mortar flows out of the grouting port above, and the grouting is completed. Therefore, docking is convenient, and multiple docking strength guarantees are formed by relying on longitudinal reinforcement, embedded connectors, connecting bolts and injected cement mortar, which greatly improves the docking strength and ensures the reliability of the foundation.

[0032] Furthermore, a sink is provided on the upper end surface of the straight arm section at the opening of the ventilation channel and a sealing ring is installed to ensure the sealing effect during grouting.

[0033] Furthermore, the longitudinal reinforcement is obtained by using threaded steel bars, which can better improve the fixing effect.

[0034] The above scheme has the following characteristics. 1 The foundation body is divided into two sections, the upper cone column section mainly plays the role of reducing the tangential frost heave force, and the lower section mainly plays the role of enhancing the vertical bearing capacity and anchoring of the foundation. 2 The use of a non-powered temperature control ventilation structure can actively cool the foundation. 3 The prefabricated foundation bottom anchor structure can make full use of the freezing force between the frozen soil under the foundation and the anchor rod to improve the foundation's resistance to frost heave and uplift loads. At the same time, the anchor rod filling material adopts a cement-free configuration, that is, a medium-coarse sand mortar with good fluidity is used. Without introducing hydration heat, it fully utilizes the freezing effect of the low temperature environment of permafrost on the surrounding soil-filling material-anchor rod to improve the anchoring capacity.

[0035] In summary, the present invention has the advantages of being able to better avoid the impact of climate warming, summer environmental temperature rise and concrete heat conduction on frozen soil, and being able to better maintain the safety and stability of the building. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 This is a schematic diagram of the structure of the building foundation device used in the present invention, and detailed structures such as the air induction device are not shown in the figure.

[0037] Figure 2 for Figure 1 Top view of the separate foundation body and coarse-grained soil cushion layer.

[0038] Figure 3 for Figure 1 Schematic diagram of the docking structure at the upper end of the separately prefabricated base.

[0039] Figure 4 for Figure 1 Schematic diagram of the lower end docking structure of the separately prefabricated conical column.

[0040] Figure 5 It is a structural schematic diagram of a separate air induced device and an air outlet valve device.

[0041] Figure 6 It is a top view of the cooperation point of the separate directional slot and the start-stop latch in the induced draft device.

[0042] Figure 7 It is a structural schematic diagram of a separate air inlet valve device. DETAILED DESCRIPTION

[0043] The present invention is further described in detail below in conjunction with specific implementation modes.

[0044] Optimal implementation method: A ventilation cooling method for maintaining the thermal stability of building foundations in permafrost areas, which is characterized in that a downward ventilation duct is set at the upper end of the building foundation. When the ground temperature is detected to be lower than a preset value, the wind flow is used to introduce the ground cold air into the interior under the building foundation for heat exchange, thereby supplementing the cooling of the frozen soil under the building foundation and its surroundings.

[0045] In this way, this method sets a ventilation duct on the foundation of the building in the frozen soil area. When the surface ambient temperature is lower than the temperature of the lower frozen soil at night or in winter, the wind flow is used to introduce the surface cold air into the deep below the foundation to achieve cold supplement, and compensate for the cold that is exported to the upper part through the foundation during the day or in summer. In this way, the freezing state of the surrounding frozen soil under the building foundation will not change, and the safety and stability of the building will be better maintained.

[0046] Specifically, the method is implemented by a building foundation device, the building foundation device, see Figure 1-7 As shown, it includes a foundation body 1, which is buried in a foundation pit 2 (backfilled with soil) and the upper end of which is above the ground surface. A U-shaped ventilation duct 3 is arranged inside the foundation body 1. Two openings at the upper end of the ventilation duct 3 are located on both sides of the supporting device installation position on the upper end surface of the foundation body. One opening of the ventilation duct 3 is an air inlet, and the other opening is an air outlet. An air induction device for inducing air into the ventilation duct is arranged at any opening position at the upper end of the ventilation duct 3.

[0047] In this way, when the transmission line towers and other projects in permafrost areas are constructed with the above-mentioned foundation device for support, when the temperature at night or in winter is lower than the preset temperature (the preset temperature is generally equal to or lower than the temperature at the lower end of the foundation body), the wind device can be turned on to draw air into the ventilation duct, and the cold air on the ground surface is introduced into the foundation body to supplement the cold air that is exported to the environment by the foundation body during the day, so as to better maintain the frozen state of the lower end of the foundation body and maintain the stability of the upper structure. During implementation, a layer of coarse-grained soil cushion is set at the bottom of the foundation pit, and its thickness should not be less than 20cm, in order to facilitate the leveling of the base and prevent the accumulation of moisture in the base from causing uneven frost heave deformation.

[0048] The ventilation duct 3 is a U-shaped PVC pipe prefabricated and cast in the base body, making it convenient to produce.

[0049] Wherein, the wind inducing device, see Figure 5-Figure 6, including an induced draft impeller 4 installed on an impeller shaft 5, the impeller shaft 5 can be horizontally rotatably installed in the middle of the air outlet so that the induced draft impeller 4 is located above the air outlet, and the induced draft impeller is rotated by the horizontal wind flow to induce the air below to flow upward, the impeller shaft 5 is connected to an automatic rotation and stop temperature control device installed at the air outlet, the automatic rotation and stop temperature control device includes a rotation and stop control rod 6, the rotation and stop control rod 6 is horizontally fixed on an extension section 7 at the lower end of the impeller shaft downward, the automatic rotation and stop temperature control device also includes a vertically arranged impeller control memory alloy spring 8, the impeller control One end of the memory alloy spring 8 is fixed to the inner wall of the air outlet, and the other end is a free end and is fixedly provided with a start-stop latch 9. The start-stop latch 9 can be slidably installed in a vertical directional groove 10. The directional groove 10 is used to limit the horizontal movement of the start-stop latch 9. When the surface air temperature is higher than the transformation temperature of the memory alloy spring for impeller control (i.e., the preset value), the start-stop latch 9 is located on the rotation path of the stop control rod 6. When the surface air temperature is lower than the transformation temperature of the memory alloy spring for impeller control, the memory alloy spring 8 for impeller control is deformed so that the start-stop latch is separated from the rotation path of the stop control rod.

[0050] In this way, when the temperature drops to a preset value at night or in winter (the preset value can usually be set to -3°C during implementation), the memory alloy spring for impeller control is deformed and drives the start-stop latch to disengage from the rotation path of the stop control lever, releasing the lock on the impeller shaft. At this time, the induced draft impeller can rotate and produce a suction effect under the blowing of natural wind flow, driving the airflow in the ventilation duct below to flow upward from the air outlet, so that a wind flow is naturally formed in the ventilation duct, and the cold air on the ground surface is introduced into the lower end of the basic body for supplementary cooling. The induced draft impeller structure itself is a prior art, and the function of drawing air upward while the wind blows and rotates can be realized by simply setting the blades to a vortex shape inclined in the same direction. The memory alloy spring itself is also a prior art, which can deform when the temperature drops to the transition temperature, elongate or shorten, and recover after the temperature rises. In this way, the induced draft device can automatically detect the surface temperature to control the wind flow in the ventilation duct, so that the entire device does not need to consume additional power energy, and achieves energy saving, environmental protection, automatic control and long-lasting use. As another method during implementation, an electric fan can be directly installed at the opening to achieve air induction. This is simpler to implement but has the disadvantage of relying on electricity.

[0051] The air induction device further comprises an air outlet 11, wherein the impeller shaft, the memory alloy spring for impeller control, the directional groove and the start-stop latch are all installed in the air outlet 11, and the air outlet 11 is pre-cast and fixed at the air outlet.

[0052] In this way, the induced draft device can be produced separately and directly embedded and fixed at the air outlet when the foundation body is cast, which is convenient for production implementation.

[0053] A horizontal support frame 12 is provided in the air outlet tube 11, and the extension section 7 of the impeller shaft is rotatably mounted on the support frame 12 by means of a bearing.

[0054] This makes it easier to install and fix the impeller shaft.

[0055] Among them, the air outlet cylinder 11 is also equipped with an air outlet valve device, see Figure 5 The air outlet valve device includes a horizontally arranged air outlet valve 13, one end of the air outlet valve 13 is vertically rotatably mounted on a horizontally arranged air outlet valve shaft 14, the other end of the air outlet valve 13 is placed on an air outlet valve limit block 15 arranged on the inner wall of the corresponding air outlet cylinder and is in a closed state, the air outlet valve device also includes a memory alloy spring 16 for air outlet control, one end of the air outlet control memory alloy spring 16 is fixed to the inner wall of the air outlet cylinder 11, and the other end is connected to the air outlet valve 13, when the surface temperature is lower than the transformation temperature (i.e., the preset value) of the air outlet control memory alloy spring, the air outlet control memory alloy spring is deformed so that the air outlet valve rotates to a vertical state.

[0056] In this way, when the surface temperature is higher than the preset value, the air outlet valve is placed on the air outlet valve limit block and is in a closed state; when the surface temperature is lower than the preset value, the air outlet control memory alloy spring is deformed, so that when the air induction device is turned on, the air outlet valve is also opened for ventilation, and the cold air on the ground surface is introduced into the lower end of the foundation body for supplementary cooling. Therefore, the structure of the air outlet valve device ensures that when the surface temperature does not drop to the preset value, the wind flow can be completely blocked from entering the ventilation duct.

[0057] The air outlet valve shaft 14 is also provided with a reset torsion spring (not shown in the figure) acting on the air outlet valve.

[0058] In this way, relying on the reset torsion spring can better ensure that after the temperature rises above the preset value, the air outlet valve can be better reset and restored to the closed state.

[0059] Among them, an air inlet valve device 17 is also provided at the air inlet, see Figure 7 The structure of the air inlet valve device 17 is the same as that of the air outlet valve device, which will not be described in detail. It is used to ensure that when the surface temperature does not drop to a preset value, the wind flow can be completely shielded from entering the ventilation duct.

[0060] Among them, an air inlet cylinder is also arranged at the air inlet, the air inlet cylinder is prefabricated and fixed at the air inlet, and the air inlet valve device is installed in the air inlet cylinder. This is more conducive to installation.

[0061] Among them, a drainage top 18 with a cone cover shape upward is suspended and supported above the air inlet to prevent rainwater from entering the ventilation duct.

[0062] Among them, the foundation body is a prefabricated concrete component, and the lower part of the foundation body 1 has a base 21 with a diameter expanding outward in the horizontal direction. An anchor hole 22 is vertically arranged on the base 21. The anchor hole 22 and the anchor hole 23 vertically arranged in the soil below the base are directly connected to each other. An anchor 24 is vertically connected between the anchor hole and the anchor hole. A mortar material mixed with sand and water is frozen and fixed in the anchor hole 23, and a high-strength cement mortar is poured in the anchor hole 22 to fix the upper end of the anchor 24.

[0063] This is because when anchoring the traditional foundation, cement mortar is directly poured into the anchor hole after the anchor rod is inserted to achieve fixation. However, when this method is used in permafrost areas, the hydration heat generated during the solidification of concrete will cause thermal disturbance to the frozen soil, thereby affecting the safety of the foundation. At the same time, the heat conductivity of the concrete after solidification will be much higher than that of the frozen soil, and a heat transfer channel will be formed further downward along the foundation body, affecting the freezing of the frozen soil below, thereby threatening the stability of the foundation. Therefore, the applicant creatively changed the anchor hole below the foundation to a mortar material mixed only with sand and water, which can be well integrated with the frozen soil after freezing, and the anchor rod hole inside the foundation uses high-strength cement mortar to achieve reliable fixation of the upper end of the anchor rod. In this way, neither hydration heat will be generated during construction to cause thermal disturbance, nor will a downward heat transfer channel be formed in the future to affect the stability of the foundation; therefore, the safety and stability of the foundation are greatly improved. In addition, the foundation body itself uses prefabricated concrete components, which can also minimize the thermal disturbance of the permafrost during the construction of the foundation project and improve the construction efficiency.

[0064] Among them, the mortar material composed only of sand and water is generally mixed in a ratio of sand: ratio = (3.5~6.5): 1. The specific ratio can be determined according to the engineering requirements and the construction environment to ensure that the slurry has good fluidity and there is no obvious stratification after standing for 10 minutes after grouting. If a small amount of stratification occurs, dry sand is added to the designed elevation to ensure that the anchor rod is wrapped with saturated medium and coarse sand.

[0065] Among them, the basic body 1 includes a prefabricated base 25 at the bottom and a prefabricated conical column 26 at the top. The prefabricated base 25 includes a lower base 21 and a straight arm section of a cylindrical structure located in the middle position above the base. The prefabricated conical column 26 is truncated cone-shaped and the lower end has the same diameter as the straight arm section and is fixedly connected by a docking structure.

[0066] In this way, the foundation body is divided into two parts for prefabrication, which is convenient for transportation and construction and installation. In specific implementation, the prefabricated cone column is a truncated cone structure, and its main function is to slow down the tangential frost heave force generated during the freezing of the active layer. The buried depth of the cone column needs to be greater than the upper limit of the natural frozen soil, and its length ,in The upper limit of natural permafrost burial depth, is a coefficient that needs to be determined according to specifications or numerical simulation calculations. The value should not be too large or too small. If it is too large, the base part will be too large, and if it is too small, it will not be able to play its anti-freeze heave effect well. It is usually recommended to take a value of 7.2°. The prefabricated base is an extended base (i.e., base) and a straight arm section cast in one piece. The extended base is a prism shape, which is designed to form a slope to prevent moisture from gathering on the side surface of the foundation. Symmetrical anchor holes are reserved around the base.

[0067] The docking structure includes a steel embedded connector 28, the lower half of which is pre-cast and fixed vertically in the middle of the upper end surface of the straight arm section. The embedded connector 28 is a columnar structure as a whole and a transverse connection hole 29 is arranged at the upper end. The upper end surface of the straight arm section around the embedded connector is also pre-cast and fixed with a plurality of longitudinal ribs 30 extending vertically upward. The docking structure also includes a connector installation cavity 31 located in the middle of the lower end of the prefabricated cone column 26 and corresponding to the embedded connector. The diameter of the connector installation cavity 31 is larger than the diameter of the embedded connector 28. A bolt hole 32 is provided at the upper end of 31 corresponding to the connection hole of the embedded connector, and a longitudinal reinforcement installation cavity 33 is vertically provided around the connector installation cavity corresponding to the longitudinal reinforcement position. The connector installation cavity and each longitudinal reinforcement installation cavity are respectively provided with a grouting port 34 at the lower part and the upper end; the upper end of the embedded connector is inserted into the connector installation cavity and the gap is filled with (micro-expansion high-strength) cement mortar, and connecting bolts (not shown in the figure) are correspondingly installed and fixed in the bolt hole and the connection hole, and the upper end of the longitudinal reinforcement is inserted into the longitudinal reinforcement installation cavity and the gap is filled with (micro-expansion high-strength) cement mortar.

[0068] In this way, the embedded connectors and longitudinal reinforcements are precast and fixed on the upper end of the straight arm section of the prefabricated base. When docking, it is only necessary to insert the embedded connectors and the upper end of the longitudinal reinforcement into the corresponding connector installation cavity and the longitudinal reinforcement installation cavity, and fix the bolts to the bolt holes and the connection holes therein, and then inject grouting into the connector installation cavity and the longitudinal reinforcement installation cavity through the grouting port below respectively until mortar flows out of the grouting port above, and the grouting is completed. Therefore, docking is convenient, and multiple docking strength guarantees are formed by relying on longitudinal reinforcement, embedded connectors, connecting bolts and injected cement mortar, which greatly improves the docking strength and ensures the reliability of the foundation.

[0069] Among them, a sink groove is arranged on the upper end surface of the straight arm section at the opening of the ventilation duct and a sealing ring 35 is installed to ensure the sealing effect during grouting.

[0070] Among them, the longitudinal reinforcement is made of threaded steel bars to better improve the fixing effect.

[0071] The above scheme has the following characteristics. 1 The foundation body is divided into two sections, the upper cone column section mainly plays the role of reducing the tangential frost heave force, and the lower section mainly plays the role of enhancing the vertical bearing capacity and anchoring of the foundation. 2 The use of a non-powered temperature control ventilation structure can actively cool the foundation. 3 The prefabricated foundation bottom anchor structure can make full use of the freezing force between the frozen soil under the foundation and the anchor rod to improve the foundation's resistance to frost heave and uplift loads. At the same time, the anchor rod filling material adopts a cement-free configuration, that is, a medium-coarse sand mortar with good fluidity is used. Without introducing hydration heat, it fully utilizes the freezing effect of the low temperature environment of permafrost on the surrounding soil-filling material-anchor rod to improve the anchoring capacity.

Claims

1. A ventilation cooling method for maintaining thermal stability of building foundations in permafrost areas, characterized in that: A downward ventilation duct is set at the upper end of the building foundation. When the ground temperature is detected to be lower than a preset value, the wind flow is used to introduce the cold air from the ground into the interior under the building foundation for heat exchange, thereby supplementing the cooling of the frozen soil under and around the building foundation.

2. The ventilation and cooling method for maintaining thermal stability of building foundations in permafrost areas according to claim 1, characterized in that: The method is implemented by means of a building foundation device, which includes a foundation body, the foundation body (backfilled with soil) is buried in a foundation pit and the upper end is above the ground surface, a U-shaped ventilation duct is arranged inside the foundation body, two openings at the upper end of the ventilation duct are located on both sides of the support device installation position on the upper end surface of the foundation body, one opening of the ventilation duct is an air inlet, and the other opening is an air outlet, and an air induction device for inducing air into the ventilation duct is arranged at any opening position at the upper end of the ventilation duct.

3. The ventilation and cooling method for maintaining thermal stability of building foundations in permafrost areas according to claim 2, characterized in that: The induced draft device comprises an induced draft impeller mounted on an impeller shaft, the impeller shaft can be horizontally rotatably mounted in the middle of the air outlet so that the induced draft impeller is located above the air outlet, the induced draft impeller is rotated by the horizontal wind flow and can induce the air below to flow upward, the impeller shaft is connected to an automatic rotation and stop temperature control device mounted at the air outlet, the automatic rotation and stop temperature control device comprises a rotation and stop control rod, the rotation and stop control rod is horizontally fixed on an extension section downward from the lower end of the impeller shaft, and the automatic rotation and stop temperature control device also comprises a vertically arranged impeller control memory alloy spring Spring, one end of the memory alloy spring for impeller control is fixed on the inner wall of the air outlet, and the other end is a free end and is fixedly provided with a start-stop latch, the start-stop latch can be slidably installed in a vertical directional groove, the directional groove is used to limit the horizontal movement of the start-stop latch, when the surface air temperature is higher than the transformation temperature of the memory alloy spring for impeller control, the start-stop latch is located on the rotation path of the stop control rod, when the surface air temperature is lower than the transformation temperature of the memory alloy spring for impeller control, the memory alloy spring for impeller control is deformed to make the start-stop latch disengage from the rotation path of the stop control rod.

4. The ventilation and cooling method for maintaining thermal stability of building foundations in permafrost regions according to claim 3, characterized in that: The air inducing device also includes an air outlet tube, in which the impeller shaft, the memory alloy spring for impeller control, the directional groove and the start-stop latch are all installed, and the air outlet tube is pre-cast and fixed at the air outlet.

5. The ventilation and cooling method for maintaining thermal stability of building foundations in permafrost regions according to claim 4, characterized in that: A horizontal support frame is arranged in the air outlet cylinder, and the extension section of the impeller shaft is rotatably mounted on the support frame by means of a bearing.

6. The ventilation and cooling method for maintaining thermal stability of building foundations in permafrost regions according to claim 4, characterized in that: An air outlet valve device is also installed in the air outlet duct, and the air outlet valve device includes a horizontally arranged air outlet valve, one end of the air outlet valve is vertically rotatably installed on a horizontally arranged air outlet valve shaft, and the other end of the air outlet valve is placed on an air outlet valve limit block provided on the corresponding inner wall of the air outlet duct and is in a closed state. The air outlet valve device also includes a memory alloy spring for air outlet control, one end of the memory alloy spring for air outlet control is fixed to the inner wall of the air outlet duct, and the other end is connected to the air outlet valve. When the surface temperature is lower than the transition temperature of the memory alloy spring for air outlet control, the memory alloy spring for air outlet control is deformed to cause the air outlet valve to rotate to a vertical state.

7. The ventilation and cooling method for maintaining thermal stability of building foundations in permafrost regions according to claim 6, characterized in that: The air outlet valve rotating shaft is also provided with a reset torsion spring acting on the air outlet valve.

8. The ventilation and cooling method for maintaining thermal stability of building foundations in permafrost regions according to claim 6, characterized in that: An air inlet valve device is also provided at the air inlet; An air inlet cylinder is also arranged at the air inlet, the air inlet cylinder is prefabricated and fixed at the air inlet, and an air inlet valve device is installed in the air inlet cylinder.

9. The ventilation and cooling method for maintaining thermal stability of building foundations in permafrost regions according to claim 6, characterized in that: A drainage top with a cone cover shape upward is suspended and supported above the air inlet.

10. The ventilation and cooling method for maintaining thermal stability of building foundations in permafrost regions according to claim 1, characterized in that: The foundation body is a prefabricated concrete component. The lower part of the foundation body has a base with a diameter expanding outward in the horizontal direction. Anchor holes are vertically arranged on the base. The anchor holes and the anchor holes vertically arranged in the soil below the base are directly connected to each other. Anchor rods are vertically arranged in the anchor holes. Mortar materials mixed with sand and water are frozen and fixed in the anchor holes. High-strength cement mortar is poured in the anchor holes to fix the upper end of the anchor rods.