Ribbed floor forming structure with high assembly rate and construction method
Through the combined structure of mold shell and steel suspended beam, the floor bearing plate is abolished, and the high assembly rate and low cost construction of dense rib floor slabs are achieved, solving the problems of high cost and low assembly rate in traditional construction, and improving construction efficiency and security.
Patent Information
- Application Number
- CN202411463039.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-20
- Publication Date
- 2024-11-19
AI Technical Summary
In the construction of traditional dense rib floor slabs, several-shaped floor bearing plates need to be used, resulting in higher costs and lower assembly rates.
The combined structure of mold shell and steel suspended beam is adopted, and the rapid splicing and lifting of mold shells is achieved through the flange edges and hoisting grooves of mold shells are abolished. The floor bearing plate is used, and the steel suspended beam is used as support and steel bars, combined with the activity. Parts and pallets are hoisted and supported.
It reduces construction costs, improves assembly rate and construction efficiency, reduces the use of materials, avoids the use of scaffolding in the hall, and improves the safety and installation efficiency of workers.
Smart Images

Figure CN118979580A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building formwork, and in particular to a high-assembly-rate dense-ribbed floor slab forming structure and a construction method. Background Art
[0002] Traditional dense-ribbed slabs are generally used in non-prefabricated buildings, and the entire construction process is carried out on site. Usually, a full-height scaffolding is first built under the construction surface as a basic support, and then the bracket is installed → the primary and secondary wooden slats are installed → the bottom elevation and arch of the dense-ribbed slab are adjusted → the formwork is installed, and finally concrete is poured to complete the construction of the dense-ribbed slab. This method is a typical non-prefabricated building construction process.
[0003] Our company has previously applied for an assembled dense-ribbed floor formwork and a dense-ribbed floor construction method, which uses assembly technology. In this method, the edge of the membrane shell is supported by a steel truss and a "J"-shaped floor decking. The floor decking is removable and reused, but the floor decking and back reinforcement ribs themselves require material costs, so there is still room for cost optimization. For this reason, there is an urgent need for a dense-ribbed floor forming structure and construction method that does not require a floor decking, has a lower cost, and has a high assembly rate. Summary of the invention
[0004] The problem solved by the present invention is that in the prior art, when installing the ribbed floor formwork, an "J"-shaped floor decking plate is required, and there is still room for cost optimization. The present invention provides a ribbed floor forming structure and a construction method with lower cost and higher assembly rate.
[0005] The present invention is implemented through the following technical scheme: a high-assembly-rate multi-ribbed floor forming structure, comprising a plurality of formworks and steel bar suspension beams, The mold shell comprises a mold shell top surface, and a circle around the mold shell top surface is connected to a mold shell side surface extending downward, and the mold shell top surface and the mold shell side surface enclosed therewith form a cavity inside, and the lower edge of the mold shell side surface continues to extend horizontally outward to form a flange edge, and the outer contour of a circle of the flange edge is a rectangle, and the vertical end surface of the free end of the outer edge of the flange edge is a fitting surface between the mold shells. Two, three or four adjacent fitting surfaces of the flange edge are provided with connecting holes, and the connecting holes are horizontally arranged to pass through the cavity to the fitting surface and are perpendicular to the fitting surface. One or two symmetrical fitting surfaces of the flange edge are provided with a hanging groove, the hanging groove is located on the fitting surface and passes through the upper and lower surfaces of the flange edge, the hanging groove and the connecting hole are staggered, and the position where the hanging groove can be provided on the fitting surface includes the middle and edge of the fitting surface, A plurality of mold shells are arranged in an array, the upper and lower surfaces of all the mold shells are coplanar, the fitting surfaces of any two adjacent mold shells fit each other, the adjacent mold shells are connected by first fasteners penetrating the connecting holes, the hanging grooves on the adjacent mold shells are symmetrical along the fitting surfaces, two or four hanging grooves can be combined to form a hanging hole that passes through the upper and lower surfaces of the flange edge, and the hanging hole is located on the longitudinal fitting surfaces or the transverse fitting surfaces of the two fitting surfaces of all the mold shells. The steel bar suspension beam comprises a supporting part for supporting, a steel bar truss formed by welding steel bars, a movable part, a second fastener threadedly connected to the bottom of the movable part, and a support plate sleeved on the second fastener. In the formwork array, both sides of each row of formwork are supported by the main beam side formwork or the steel suspension beam. Each steel suspension beam supports the flange edges of two rows of formwork in the formwork array at the same time. The movable parts and the upper surface of the flange edges are abutted against each other. The fasteners pass through the support plate and the lifting holes and are threadedly connected to the movable parts. The support plate supports the flange edges of the two rows of formwork at the same time.
[0006] Furthermore, the movable part includes an upper connecting rod and a threaded connecting part. The upper connecting rod is movably arranged below the steel reinforcement frame. The bottom end of the upper connecting rod is provided with an external thread. The threaded connecting part is provided with a through internal thread. The upper connecting rod and the threaded connecting part are threadedly engaged and connected.
[0007] Furthermore, a ring-shaped member is fixedly provided on the top of the upper connecting rod, a plurality of cross bars are provided on the bottom of the steel bar truss, and the ring-shaped member is sleeved on the cross bars.
[0008] Furthermore, the support plate is rectangular.
[0009] Furthermore, a support member is provided at the bottom of the mold shell array.
[0010] Another aspect of the present invention provides a construction method of a ribbed floor with a high assembly rate, comprising: Preparation before construction: Complete the prefabrication of formwork and steel suspension beam fasteners according to construction requirements, and set up the main beam side formwork according to the drawings to determine the installation height of the bottom surface of the ribbed floor; Construction process: First install multiple sets of steel suspension beams, start from one corner of the main beam around the perimeter and set up the formwork along one side of the main beam, and then set up the remaining formwork along the set up formwork until all formworks are installed. The detailed steps are as follows: Step 1: Install the suspension beam. Set up the steel suspension beam at a fixed point according to the drawing requirements, and place the support part on the main beam template; Step 2: Install the formwork. Start from one corner of the main beams around the periphery and sequentially erect the formwork along one side of the main beam. Subsequently, erect the remaining formworks in sequence along the erected formworks until all the formworks are installed. Adjacent formworks are fastened and connected by first fasteners penetrating the connecting holes. Two or four lifting grooves are combined into one lifting hole. The rod of the second fastener is located in the lifting hole. Tighten the second fastener. The flange edge of the formwork and the movable part are against each other to form an upper limit. Each support plate supports two or four formworks at the same time. Step 3: Tie the steel bars, including the ribbed floor steel bars perpendicular to the steel suspension beam and the surface bars above the formwork, to connect the steel suspension beam and the main beam steel bars; Step 4: pouring concrete and curing; Step 5: After curing and molding, remove the second fastener, the support plate, the first fastener, and the mold shell for repeated use.
[0011] Furthermore, in step 2, the specific steps of installing the formwork include: Install the first mold shell: before installing the first mold shell, move the movable part to the side away from the first mold shell. When installing the first mold shell, place the two sides of the mold shell on the side mold of the main beam, move the movable part, embed the second fastener into the hoisting groove of the mold shell, slightly tighten the second fastener, so that the flange edge of the mold shell and the movable part are against each other to form an upper limit, and at this time, the support plate plays a supporting role on the edge of the mold shell; Install the remaining formworks in the first row: Install the first row of formworks along the length direction of the steel suspension beam. The installation method is the same as that of the first formwork. Starting from the second formwork, each time a formwork is installed, the mating surface of the newly installed formwork and the installed formwork are pressed tightly together, and the two formworks are fastened together by fasteners penetrating the connection holes; Install the second row of formwork: Move the movable part of the second steel suspension beam to the side away from the second row of formwork, tilt the formwork from bottom to top, place one side of the formwork on the support plate of the first steel suspension beam, align the lifting groove of the second row of formwork with the lifting groove of the first row of formwork, then lift the other side of the second row of formwork until it is horizontal, move the movable part of the second steel suspension beam, embed the second fastener into the lifting groove of the second row of formwork, slightly tighten the second fastener of the second steel suspension beam, and make the upper surface of the flange edge of the formwork The second fastener of the first steel bar suspension beam is tightened; during this process, each time a formwork is installed, the mating surfaces of the newly installed formwork and the installed formwork are pressed tightly together, and the two formworks are fastened and connected by the fasteners penetrating the connecting holes. The hoisting grooves of the first and second rows of formworks are combined into one hoisting hole, and the second fasteners pass through the hoisting holes. The support plate supports the two rows of formworks at the same time. Install the remaining formwork: The installation method is the same as that for the second row of formwork until all formwork is installed.
[0012] Furthermore, the pallet is rectangular. Before installing the mold shell, the pallet is rotated so that the long side of the pallet is facing the mold shell to be installed. After installing the mold shell, the pallet is rotated so that the short side of the pallet is facing the installed mold shell, so as to reduce the interference of the pallet on the installation of the mold shell.
[0013] Furthermore, the movable part includes an upper connecting rod and a threaded connecting part. The upper connecting rod is movably arranged under the steel frame. The bottom end of the upper connecting rod is provided with an external thread, and the threaded connecting part is provided with a through internal thread. The upper connecting rod and the threaded connecting part are threadedly engaged and connected. After removing the formwork, the threaded connecting part is rotated by a tool, the threaded connecting part is removed, and it is reused in a turnover manner, and the pits in the concrete protective layer are filled, thereby improving the material turnover rate and reducing costs.
[0014] Furthermore, after the formwork is installed, a support member is arranged at the bottom of the formwork array, and the support member is used to support the edges or corners of some of the formwork.
[0015] The beneficial effects of the present invention are: 1. The present invention eliminates the floor decking plate, and directly realizes the hoisting under the steel truss through the movable parts, the supporting plate, and the second fastener. The floor decking plate is not required, the use of materials is reduced, and the cost is reduced.
[0016] 2. The steel suspension beam of the present invention is prefabricated in the factory and can be directly installed after being transported to the construction site. The steel trusses and the supporting parts are directly used as the steel bars of the dense-ribbed floor during the construction process. After the formwork is installed, other steel bars are tied, including the dense-ribbed floor steel bars perpendicular to the steel suspension beam and the surface bars above the formwork. The steel suspension beam and the main beam are connected, and then the concrete can be poured. The steel suspension beam is used as a hoisting tool for the formwork and as the steel bar of the dense-ribbed floor, which improves the assembly rate and the construction efficiency.
[0017] 3. The flange edge of the mold shell used in the present invention is provided with a hanging groove, and the hanging grooves of two or four mold shells can be assembled into a hanging hole. When installing, the second fastener can be embedded in the hanging groove without the need for perforating installation, thereby improving the installation efficiency. In addition, two mold shells share one hanging hole, which reduces the number of holes on the mold shells.
[0018] 4. The movable part of the steel bar suspension beam of the present invention can move horizontally in a direction perpendicular to the length of the steel bar truss. The horizontal movement is for the convenience of installation and can avoid the interference of the support plate below with the installation of the formwork.
[0019] 5. The movable parts of the present invention include an upper connecting rod and a threaded connecting piece, which are threadedly engaged with each other. Therefore, after the formwork is removed, the threaded connecting piece can be rotated by a tool, removed and reused, and the pits in the concrete protective layer can be filled, thereby improving the material turnover rate and reducing costs.
[0020] 6. The present invention can set additional support members at the bottom of part of the formwork after the formwork is installed, which can reduce the load of the steel suspension beam, reduce the specifications of the steel suspension beam, and reduce costs.
[0021] 7. The construction of the present invention is very convenient, and there is no need for a full-floor scaffolding. Workers can stand on a self-propelled hydraulic lift to carry out installation work, which can improve the installation efficiency of the installers. There is no need to climb scaffolding, which is safer. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A top three-dimensional view of the mold shell in Example 1; Figure 2 This is a three-dimensional bottom view of the mold shell in Example 1; Figure 3 A structural schematic diagram of a steel bar suspension beam according to an embodiment of the present invention; Figure 4 for Figure 3 A partial enlarged view of the Figure 5 It is a cross-sectional view of the movable member, the support plate, and the second fastener in the first embodiment; Figure 6 This is a schematic diagram of the structure of the mold shell in Example 2; Figure 7 It is a cross-sectional view of the movable member, the support plate, and the second fastener in the third embodiment; Figure 8 The schematic diagram of the main beam formwork, the main beam side formwork and the main beam scaffolding in the fourth embodiment; Fig. 9 This is a schematic diagram of the steel bar suspension beam after installation in the fourth embodiment; Fig.10 This is a schematic diagram of the first mold shell installed in the fourth embodiment; Fig.11 for Fig.10 A partial enlarged view of Fig.12 This is a schematic diagram of the first row of formwork being installed in Embodiment 4; Fig.13 This is a schematic diagram of the fourth embodiment in which all mold shells are installed; Fig.14 This is a schematic diagram of the process of installing the second row of formwork in Embodiment 4 (a tilted view from bottom to top); Fig.15 This is a process diagram of installing the mold shell in Example 4.
[0023] In the figure: 10 mold shell; 11 mold shell top surface; 12 mold shell side surface; 13 cavity; 14 flange edge; 15 fitting surface; 16 connection hole; 17 lifting groove; 20 steel bar suspension beam; 21 steel bar truss; 22 movable part; 221 upper connecting rod; 222 threaded connecting part; 223 annular part; 23 supporting plate; 24 second fastening member; 25 supporting part; 41 main beam formwork; 42 main beam side formwork; 43 main beam scaffolding; 5. Self-propelled hydraulic lift truck. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example
[0025] A high-assembly-rate ribbed floor forming structure includes a plurality of formworks 10 and steel bar suspension beams 20. like Figure 1-2 As shown, the mold shell 10 includes a horizontal mold shell top surface 11, and the mold shell top surface 11 is connected to a downwardly extending mold shell side surface 12 in a circle. The mold shell top surface 11 and the mold shell side surface 12 enclosed therewith form a cavity 13 inside, and the lower edge of the mold shell side surface 12 continues to extend horizontally outward to form a flange edge 14. The outer contour of a circle of flange edges 14 is a rectangle, and the vertical end surface of the free end of the outer edge of the flange edge 14 forms a fitting surface 15 that abuts against each other between the mold shells 10.
[0026] The four fitting surfaces 15 in the flange edge 14 are all provided with connecting holes 16, and the connecting holes 16 are horizontally arranged to pass through the cavity 13 to the fitting surface 15 and are perpendicular to the fitting surface 15. Each fitting surface 15 is provided with four connecting holes 16, and the four connecting holes 16 are symmetrically arranged along the length direction of the fitting surface 15.
[0027] The two symmetrical fitting surfaces 15 in the flange edge 14 are provided with hanging grooves 17, and the hanging grooves 17 are located on the fitting surface 15 and pass through the upper and lower surfaces of the flange edge 14. The hanging grooves 17 and the connecting holes 16 do not interfere with each other. The cross-section of the hanging grooves 17 is semicircular, and the fitting surface 15 where the hanging grooves 17 are located is provided with three hanging grooves 17, and the hanging grooves 17 are symmetrically arranged along the length direction of the fitting surface 15.
[0028] like Fig.13 As shown, there are 36 mold shells 10 in total, which are arranged in a 6×6 array. The flange edge 14 of a single mold shell 10 is 1200 mm wide, and the upper and lower surfaces of all the mold shells 10 are coplanar. The fitting surfaces 15 of any two adjacent mold shells 10 fit together, and the adjacent mold shells 10 are connected by first fasteners passing through the connecting holes 16. The lifting grooves 17 on the adjacent mold shells 10 are symmetrical along the fitting surfaces 15, and two of them can be combined to form a lifting hole that passes through the upper and lower surfaces of the flange edge 14. The lifting holes are located on the longitudinal fitting surfaces 15 of all the mold shells 10 that fit together. There are 18 lifting holes in each row, and there are 5 rows in total.
[0029] like Fig.13 As shown, there are 5 sets of steel bar suspension beams 20, such as Figure 3-5 As shown, the steel suspension beam 20 includes a support portion 25, a steel truss 21, a movable part 22, a second fastener 24, and a support plate 23. The steel truss 21 includes an upper chord steel bar, a lower chord steel bar, a web steel bar, a transverse steel bar, etc., which are welded together. The width and height of the steel truss 21 are determined by the design requirements of the ribbed floor slab, and its cross-section can be trapezoidal, rectangular, etc. The length of the steel truss 21 is 7500mm, which is slightly larger than the width of the formwork 10 array 7200 and slightly larger than the width of the floor slab. Support portions 25 are provided at both ends of the steel truss 21. The support portions 25 are also welded with steel bars, and their height is determined according to the design requirements. When working, the support portions 25 at both ends are placed on the main beam formwork 41 to ensure that the steel truss 21 does not move or overturn.
[0030] The movable part 22 is movably arranged at the bottom of the steel truss 21, and can at least move horizontally along a direction perpendicular to the length of the steel truss 21. The horizontal movement is for the convenience of installation to avoid interference of the support plate 23 below with the installation of the formwork 10. The movable part 22 is provided with an internal thread; when working, the movable part 22 and the upper surface of the flange edge 14 of the formwork 10 are abutted against each other to form an upper limit position for the formwork 10.
[0031] The support plate 23 is rectangular, 200 mm long and 100 mm wide, with a through hole in the middle. When working, the support plate 23 can support the flange edges 14 of the two mold shells 10 at the same time, and the supporting area is up to 100 mm×100 mm.
[0032] The second fastener 24 is made of bolts and washers. The bolts pass through the washers and through holes of the support plate 23 and are threadedly connected to the movable part 22. After the concrete curing is completed, the fasteners and the support plate 23 can be disassembled and reused.
[0033] There are 18 groups of movable parts 22 , fasteners and supporting plates 23 on each set of steel bar suspension beams 20 , which are arranged at intervals along the length direction of the steel bar truss 21 .
[0034] like Fig.13 and 14 As shown, in the formwork 10 array, both sides of each row of formwork 10 are supported by the main beam side formwork 42 or the steel suspension beam 20, and each steel suspension beam 20 simultaneously supports the flange edges 14 of two rows of formwork 10 in the formwork 10 array, the movable part 22 abuts against the upper surface of the flange edge 14, and the fastener passes through the support plate 23 and the lifting hole and is threadedly connected to the movable part 22, and the support plate 23 simultaneously supports the flange edges 14 of the two rows of formwork 10.
[0035] In this solution, the floor deck is eliminated, and the formwork 10 is hoisted by the steel suspension beam 20, which reduces the use of materials and reduces costs. The steel suspension beam 20 is prefabricated in the factory and can be directly installed after being transported to the construction site. The steel truss 21 and the support part 25 are directly used as the steel bars of the multi-ribbed floor during the construction process, which improves the assembly rate and construction efficiency. The flange 14 of the formwork 10 is provided with a hoisting groove 17. The hoisting grooves 17 of two or four formworks 10 can be assembled into a hoisting hole. When installing, the second fastener 24 can be embedded in the hoisting groove 17 without the need for perforation installation, which improves the installation efficiency. In addition, the two formworks 10 share a hoisting hole, which reduces the number of holes on the formwork 10. The support plate 23 and the second fastener 24 can be disassembled and reused, which improves the material turnover rate and reduces costs. The steel suspension beam is used as both a hoisting tool for the formwork and as a steel bar for the multi-ribbed floor, which improves the assembly rate and construction efficiency. Example
[0036] like Figure 6 As shown, the difference from Example 1 is that there are three lifting grooves 17 on each fitting surface 15, one of which is located in the middle of the fitting surface 15, and the cross-section of the lifting groove 17 there is a semicircular shape, and the other two lifting grooves 17 are located at the edge of the fitting surface 15, namely, at the four corners of the mold shell 10, and the cross-section of the lifting groove 17 there is a quarter circle. The middle lifting groove 17 can be assembled with the lifting groove 17 of another mold shell 10 to form a lifting hole, and the lifting groove 17 on the corner can be assembled with the lifting grooves 17 of the other three mold shells 10 to form a lifting hole. The steel suspension beam 20 used only needs to modify the position of the movable part 22, the fastener, and the support plate 23. The scheme can also realize the lifting of the mold shell 10, and some of the support plates 23 can support the corner positions of the four mold shells 10 at the same time. Example
[0037] like Figure 7As shown, the difference from the first embodiment is that the movable part 22 includes an upper connecting rod 221 and a threaded connector 222. The upper connecting rod 221 is movably arranged below the steel reinforcement frame. The bottom end of the upper connecting rod 221 is provided with an external thread, and the threaded connector 222 is provided with a through internal thread. The upper connecting rod 221 and the threaded connector 222 are threadedly engaged and connected. Therefore, after removing the formwork 10, the threaded connector 222 can be rotated by a tool, the threaded connector 222 can be removed, and the threaded connector 222 can be reused, and the pits in the concrete protective layer can be filled, thereby improving the material turnover rate and reducing costs. A ring member 223 is fixedly arranged on the top of the upper connecting rod 221, and a plurality of cross bars are arranged at the bottom of the steel reinforcement truss 21. The ring member 223 is sleeved on the cross bar, and a certain gap can be set between the ring member 223 and the cross bar to improve fault tolerance.
[0038] In other embodiments, the number, position, and shape of the connecting holes 16 and the hoisting slots 17 can be adjusted according to actual conditions to meet the hoisting requirements. In other embodiments, a support member is provided at the bottom of the array of formwork 10. After the formwork 10 is installed, an additional support member is provided at the bottom of some of the formwork 10, which can reduce the load of the steel suspension beam 20, reduce the specifications of the steel suspension beam 20, and reduce the cost.
[0039] In other embodiments, the movable member 22 may also adopt other structures, such as a sleeve, a slider, etc., as long as the movable member 22 can move horizontally in a direction perpendicular to the length of the steel truss 21. Example
[0040] Another aspect of the present invention provides a construction method of a multi-ribbed floor with a high assembly rate, such as Figure 8-15 As shown, the structure of the formwork 10 and the steel bar suspension beam 20 in the first embodiment is adopted, and the construction method includes: Preparation before construction: Prefabricate the formwork 10 and the fasteners of the steel bar suspension beam 20 according to the construction requirements, and set up the side formwork 42 of the main beam according to the drawings to determine the installation height of the bottom surface of the multi-ribbed floor slab, such as Figure 8 As shown, the main beam scaffolding 43, the main beam template 41, and the main beam side template 42 of the surrounding main beams have been erected; Construction process: First install multiple sets of steel suspension beams 20, and then set up formwork 10 along one side of the main beam from one corner of the surrounding main beams, and then set up the remaining formwork 10 along the set formwork 10 in sequence until all formwork 10 are installed. The detailed steps are as follows: Step 1: Install the suspension beam. Set up the steel suspension beam 20 at a fixed point according to the drawing requirements. Place the support part 25 on the main beam template 41. Fig. 9As shown, there are five steel suspension beams 20, which are installed on the wooden beam template by a tower crane or other lifting tools, arranged in parallel, and positioned on site; Step 2: Install the mold shell 10, such as Figure 10-14 As shown, formwork 10 is sequentially erected along one side of the main beam starting from a corner of the surrounding main beams, and then the remaining formwork 10 is sequentially erected along the erected formwork 10 until all the formwork 10 are installed. Adjacent formworks 10 are fastened and connected by first fasteners penetrating the connection holes 16, and two hoisting grooves 17 are combined into a hoisting hole. The rod of the second fastener 24 is located in the hoisting hole. The second fastener 24 is tightened, and the flange edge 14 of the formwork 10 and the movable part 22 are abutted to form an upper limit, and each support plate 23 supports the two formworks 10 at the same time; Step 3: Tie the steel bars, including the ribbed floor steel bars perpendicular to the steel suspension beam 20 and the surface bars above the formwork 10, to connect the steel suspension beam 20 and the steel bars of the main beam. The steel bar tying step is a conventional construction method and is not shown in the figure; Step 4: pouring concrete and curing; Step 5: After curing and molding, the second fastener 24, the support plate 23, the first fastener, and the mold shell 10 are removed and reused.
[0041] In this method, the floor deck is eliminated, and the lifting is achieved directly under the steel truss 21 through the movable part 22, the support plate 23, and the second fastener 24. No floor deck is required, the use of materials is reduced, and the cost is reduced. The steel suspension beam 20 is prefabricated in the factory and can be directly installed after being transported to the construction site. The steel truss 21 and the support part 25 are directly used as the steel bars of the multi-ribbed floor during the construction process. After the formwork 10 is installed, other steel bars are tied, including the multi-ribbed floor steel bars perpendicular to the steel suspension beam 20 and the surface bars above the formwork 10. The steel suspension beam 20 is connected to the steel bars of the main beam, and then the concrete can be poured. The steel suspension beam 20 is used as a lifting tool for the formwork 10 and also as a steel bar for the multi-ribbed floor, which improves the assembly rate and construction efficiency.
[0042] In practical applications, the specific steps of installing the mold shell 10 include: Install the first mold shell 10: Before installing the first mold shell 10, move the movable part 22 to a side away from the first mold shell 10. When installing the first mold shell 10, place the two sides of the mold shell 10 on the main beam side mold 42, move the movable part 22, and embed the second fastener 24 into the hoisting groove 17 of the mold shell 10. Slightly tighten the second fastener 24 so that the flange edge 14 of the mold shell 10 and the movable part 22 are against each other to form an upper limit. At this time, the support plate 23 supports the edge of the mold shell 10. Figure 10-11 As shown, the first mold shell 10 is installed; Install the remaining formworks 10 in the first row: Install the first row of formworks 10 along the length direction of the steel suspension beam 20. The installation method is the same as that of the first formwork 10. Starting from the second formwork 10, each time a formwork 10 is installed, the mating surface 15 of the newly installed formwork 10 and the installed formwork 10 are tightly attached, and the two formworks 10 are fastened and connected by fasteners penetrating the connection holes 16; Fig.12 As shown, the first row of mold shells 10 are installed; Install the second row of formwork 10: Fig.15 As shown, the installation process of the second row of formwork 10 is from top to bottom. Move the movable part 22 of the second steel suspension beam 20 to the side away from the second row of formwork 10, and the formwork 10 is tilted and moved from bottom to top. Place one side of the formwork 10 on the support plate 23 of the first steel suspension beam 20, align the lifting groove 17 of the second row of formwork 10 with the lifting groove 17 of the first row of formwork 10, and then lift the other side of the second row of formwork 10 until it is horizontal, move the movable part 22 of the second steel suspension beam 20, and embed the second fastener 24 into the lifting groove 17 of the second row of formwork 10, and slightly tighten the second fastener 24 of the second steel suspension beam 20 to align the upper surface of the flange edge 14 of the formwork 10 with the upper surface of the flange edge 14 of the formwork 10. The lower surfaces of the movable parts 22 are abutted against each other to form a positioning, and at this time, the support plate 23 of the second steel suspension beam 20 supports the second row of formwork 10; tighten the second fastener 24 of the first steel suspension beam 20; in this process, each time a formwork 10 is installed, the fitting surface 15 of the newly installed formwork 10 and the installed formwork 10 are pressed tightly, and the two formworks 10 are fastened and connected by fasteners passing through the connecting holes 16, the lifting grooves 17 of the first row of formworks 10 and the second row of formworks 10 are spliced into a lifting hole, the second fastener 24 passes through the lifting hole, and the support plate 23 supports the two rows of formworks 10 at the same time.
[0043] Install the remaining formwork 10: The installation method is the same as that of the second row of formwork 10, until all the formwork 10 are installed. Fig.13 As shown, all the mold shells 10 are installed successfully.
[0044] In this solution, formwork 10 is sequentially erected along one side of the main beam starting from a corner of the surrounding main beams, and then the remaining formwork 10 is sequentially erected along the erected formwork 10 until all formwork 10 are installed. Each time a formwork 10 is installed, the fitting surface 15 of the newly installed formwork 10 and the installed formwork 10 are pressed tightly together, and the two formworks 10 are fastened and connected by fasteners penetrating the connecting holes 16; timely tightening the installed formwork 10 can improve the installation accuracy and avoid the cumulative error causing the misalignment of the hoisting slot 17 and the second fastener 24 of the subsequent formwork 10. The movable part 22 of the steel suspension beam 20 can move horizontally in a direction perpendicular to the length of the steel truss 21. The horizontal movement is for the convenience of installation and can avoid the interference of the support plate 23 below with the installation of the formwork 10.
[0045] In practical applications, in step five, the threaded connector 222 can also be removed, and the movable member 22 can adopt the structure of embodiment three, such as Figure 7 As shown, the movable part 22 includes an upper connecting rod 221 and a threaded connector 222. The upper connecting rod 221 is movably arranged below the steel reinforcement frame. The bottom end of the upper connecting rod 221 is provided with an external thread, and the threaded connector 222 is provided with a through internal thread. The upper connecting rod 221 and the threaded connector 222 are threadedly engaged and connected. Therefore, after removing the formwork 10, the threaded connector 222 can be rotated with a tool, the threaded connector 222 can be removed, and the threaded connector 222 can be used repeatedly, and the pits of the concrete protective layer can be filled, thereby improving the material turnover rate and reducing costs.
[0046] In practical applications, the support plate 23 is rectangular. Before installing the mold shell 10, the support plate 23 is rotated so that the long side of the support plate 23 is facing the mold shell 10 to be installed. After installing the mold shell 10, the support plate 23 is rotated so that the short side of the support plate 23 is facing the installed mold shell 10, so as to reduce the interference of the support plate 23 with the installation of the mold shell 10. Fig.15 As shown, before and after installation, the support plate 23 is rotated to reduce interference.
[0047] In practical applications, after the formwork 10 is installed, additional supports are provided at the bottom of part of the formwork 10, so that the load on the steel suspension beam 20 can be reduced, the specifications of the steel suspension beam 20 can be reduced, and the cost can be reduced. Generally, when the span of the multi-ribbed floor is small, no additional supports are required. When the span of the multi-ribbed floor is large, the material selection of the steel suspension beam 20 can be increased, thicker steel bars can be selected, and the number of steel bars can be increased to meet the load requirements after pouring concrete. Alternatively, additional supports can be provided, and horizontal braces, diagonal braces, etc. can be installed according to actual needs to reduce the load on the steel suspension beam 20 to save costs. The support can be a customized column, or a scaffolding can be used for construction. A top support is provided on the top of the scaffolding to provide local support for the edges or corners of the formwork 10.
[0048] In practical applications, the construction of the present invention is very convenient, and there is no need for a full-floor scaffolding. Workers can stand on the self-propelled hydraulic lift 5 to perform installation work, which can improve the installation efficiency of the installers. There is no need to climb scaffolding, which is safer.
[0049] In summary, the high-assembly-rate multi-ribbed floor forming structure and construction method described in the present invention eliminates the floor decking, reduces the use of materials, and reduces costs. The steel suspension beam 20 is used not only as a lifting tool for the formwork 10, but also as a steel bar for the multi-ribbed floor, which improves the assembly rate and construction efficiency.
[0050] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the above implementation is only to illustrate the technical concept and features of the present invention, and its purpose is to enable people familiar with this technology to understand the content of the present invention and implement it, and it cannot be used to limit the protection scope of the present invention. All equivalent changes or modifications made according to the spirit of the present invention should be covered by the protection scope of the present invention.
Claims
1. A high assembly rate ribbed floor forming structure, Features: It comprises a plurality of formworks (10) and steel bar suspension beams (20). The mold shell (10) comprises a mold shell top surface (11), and a mold shell side surface (12) extending downward is connected to the mold shell top surface (11) in a circle around it. The mold shell top surface (11) and the mold shell side surface (12) enclosed therewith form a cavity (13) inside. The lower edge of the mold shell side surface (12) continues to extend horizontally outward to form a flange edge (14). The outer contour of the circle of the flange edge (14) is a rectangle. The vertical end surface of the free end of the outer edge of the flange edge (14) is a fitting surface (15) that abuts against each other between the mold shells (10). Two, three or four adjacent fitting surfaces (15) in the flange edge (14) are provided with connection holes (16), and the connection holes (16) are horizontally arranged to pass through the cavity (13) to the fitting surface (15) and are perpendicular to the fitting surface (15). One or two symmetrical fitting surfaces (15) of the flange edge (14) are provided with a hanging groove (17), the hanging groove (17) is located on the fitting surface (15) and passes through the upper and lower surfaces of the flange edge (14), the hanging groove (17) and the connecting hole (16) are staggered, and the positions on the fitting surface (15) where the hanging groove (17) can be provided include the middle and the edge of the fitting surface (15), A plurality of mold shells (10) are arranged in an array, the upper and lower surfaces of all the mold shells (10) are coplanar, the fitting surfaces (15) of any two adjacent mold shells (10) fit each other, the adjacent mold shells (10) are connected by first fasteners penetrating the connection holes (16), the hanging grooves (17) on the adjacent mold shells (10) are symmetrical along the fitting surfaces (15), two or four hanging grooves (17) can be combined to form a hanging hole that passes through the upper and lower surfaces of the flange edge (14), and the hanging hole is located on the longitudinal fitting surfaces (15) or the transverse fitting surfaces (15) of all the mold shells (10) that fit each other. The steel bar suspension beam (20) comprises a supporting portion (25) for supporting, a steel bar truss (21) formed by welding steel bars, a movable movable part (22), a second fastener (24) threadedly connected to the bottom of the movable part (22), and a support plate (23) sleeved on the second fastener (24). In the formwork (10) array, both sides of each row of formwork (10) are supported by the main beam side formwork (42) or the steel bar suspension beam (20), and each steel bar suspension beam (20) simultaneously supports the flange edges (14) of two rows of formwork (10) in the formwork (10) array, the movable part (22) and the upper surface of the flange edge (14) are abutted against each other, and the fasteners are threadedly connected to the movable part (22) after passing through the support plate (23) and the lifting hole, and the support plate (23) simultaneously supports the flange edges (14) of the two rows of formwork (10).
2. A ribbed floor slab forming structure that can be efficiently installed according to claim 1, Features: The movable member (22) comprises an upper connecting rod (221) and a threaded connecting member (222); the upper connecting rod (221) is movably arranged below the steel reinforcement frame; the bottom end of the upper connecting rod (221) is provided with an external thread; the threaded connecting member (222) is provided with a through internal thread; the upper connecting rod (221) and the threaded connecting member (222) are threadedly engaged and connected.
3. A ribbed floor forming structure that can be efficiently installed according to claim 2, Features: A ring member (223) is fixedly provided on the top of the upper connecting rod (221), a plurality of cross bars are provided on the bottom of the steel bar truss (21), and the ring member (223) is sleeved on the cross bars.
4. The ribbed floor forming structure that can be efficiently installed according to claim 1, Features: The support plate (23) is rectangular.
5. The ribbed floor forming structure that can be efficiently installed according to claim 1, Features: A support member is provided at the bottom of the mold shell (10) array.
6. A construction method for a high-assembly-rate ribbed floor slab. Features: include: Preparation before construction: prefabrication of the formwork (10) and the fasteners of the steel bar suspension beam (20) is completed according to the construction requirements, and the main beam side formwork (42) is set up according to the drawings to determine the installation height of the bottom surface of the multi-ribbed floor slab; Construction process: first install multiple sets of steel suspension beams (20), and then sequentially erect formwork (10) along one side of the main beam from one corner of the surrounding main beams, and then sequentially erect the remaining formwork (10) along the erected formwork (10) until all formworks (10) are installed. The detailed steps are as follows: Step 1: Install the suspension beam. Set up the steel suspension beam (20) at a fixed point according to the drawing requirements, and place the support part (25) on the main beam template (41); Step 2, installing the formwork (10), starting from a corner of the main beams around the periphery, sequentially erecting the formwork (10) along one side of the main beam, and subsequently sequentially erecting the remaining formwork (10) along the erected formwork (10), until all the formwork (10) are installed, the adjacent formworks (10) are fastened and connected by first fasteners penetrating the connection holes (16), two or four hanging grooves (17) are combined into a hanging hole, the rod of the second fastener (24) is located in the hanging hole, the second fastener (24) is tightened, the flange edge (14) of the formwork (10) and the movable part (22) are abutted against each other to form an upper limit, and each support plate (23) simultaneously supports two or four formworks (10); Step 3: tying steel bars, including the ribbed floor steel bars perpendicular to the steel suspension beam (20) and the surface bars above the formwork (10), to connect the steel suspension beam (20) and the steel bars of the main beam; Step 4: pouring concrete and curing; Step 5: After curing and molding, the second fastener (24), the support plate (23), the first fastener, and the mold shell (10) are removed for recycling and reuse.
7. A construction method for a high-assembly-rate ribbed floor according to claim 6, Features: In step 2, the specific steps of installing the mold shell (10) include: Installing the first mold shell (10): before installing the first mold shell (10), move the movable part (22) to a side away from the first mold shell (10); when installing the first mold shell (10), place two sides of the mold shell (10) on the main beam side mold (42); move the movable part (22) so that the second fastener (24) is embedded in the hanging groove (17) of the mold shell (10); slightly tighten the second fastener (24) so that the flange edge (14) of the mold shell (10) and the movable part (22) are abutted against each other to form an upper limit, and at this time, the support plate (23) plays a supporting role on the edge of the mold shell (10); Install the remaining formwork shells (10) of the first row: install the first row of formwork shells (10) along the length direction of the steel reinforcement suspension beam (20), the installation method is the same as the installation of the first formwork shell (10), and starting from the second formwork shell (10), when each formwork shell (10) is installed, the mating surface (15) of the newly installed formwork shell (10) is tightly attached to the installed formwork shell (10), and the two formwork shells (10) are fastened and connected by fasteners penetrating the connection holes (16); Install the second row of formwork (10): move the movable part (22) of the second steel bar suspension beam (20) to the side away from the second row of formwork (10), tilt the formwork (10) from bottom to top, place one side of the formwork (10) on the support plate (23) of the first steel bar suspension beam (20), align the lifting groove (17) of the second row of formwork (10) with the lifting groove (17) of the first row of formwork (10), then lift the other side of the second row of formwork (10) until it is horizontal, move the movable part (22) of the second steel bar suspension beam (20), embed the second fastener (24) into the lifting groove (17) of the second row of formwork (10), slightly tighten the second fastener (24) of the second steel bar suspension beam (20), and make the flange of the formwork (10) The upper surface of the edge (14) and the lower surface of the movable part (22) are abutted against each other to form a positioning, and at this time, the support plate (23) of the second steel bar suspension beam (20) plays a supporting role for the second row of formwork (10); the second fastener (24) of the first steel bar suspension beam (20) is tightened; in this process, each time a formwork (10) is installed, the contact surface (15) of the newly installed formwork (10) and the installed formwork (10) are pressed tightly, and the two formworks (10) are fastened and connected by the fastener passing through the connection hole (16), the lifting grooves (17) of the first row of formwork (10) and the second row of formwork (10) are combined into a lifting hole, the second fastener (24) passes through the lifting hole, and the support plate (23) plays a supporting role for the two rows of formwork (10) at the same time; Install the remaining mold shells (10): The installation method is the same as that of the second row of mold shells (10) until all the mold shells (10) are installed.
8. A construction method for a ribbed floor with a high assembly rate according to claim 6, Features: The support plate (23) is rectangular. Before installing the mold shell (10), the support plate (23) is rotated so that the long side of the support plate (23) faces the mold shell (10) to be installed. After installing the mold shell (10), the support plate (23) is rotated so that the short side of the support plate (23) faces the installed mold shell (10), so as to reduce the interference of the support plate (23) with the installation of the mold shell (10).
9. A construction method for a ribbed floor with a high assembly rate according to claim 6, Features: include: The movable part (22) comprises an upper connecting rod (221) and a threaded connecting part (222); the upper connecting rod (221) is movably arranged below the steel reinforcement frame; the bottom end of the upper connecting rod (221) is provided with an external thread; the threaded connecting part (222) is provided with a through internal thread; the upper connecting rod (221) and the threaded connecting part (222) are threadedly engaged and connected; after the formwork (10) is removed, the threaded connecting part (222) is rotated by a tool, the threaded connecting part (222) is removed, and the threaded connecting part (222) is circulated and reused, and the pits of the concrete protective layer are filled, thereby improving the turnover rate and reducing the cost.
10. A construction method for a ribbed floor with a high assembly rate according to claim 6, Features: include: After the mold shell (10) is installed, a support member is arranged at the bottom of the mold shell (10) array, and the support member is used to support the edge or corner of the mold shell (10) (25).