Ultrahigh hollow scaffold for indoor decoration and reconstruction and construction method
By using top support and load transfer technology in ultra-high hollow scaffolding, the problems of excessive self-weight and insufficient load of traditional ground scaffolding have been solved, achieving safe and efficient construction results.
Patent Information
- Application Number
- CN202411175550.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-19
AI Technical Summary
In the renovation and reconstruction of large shopping malls, traditional ground-supported scaffolding is too heavy and cannot meet the load requirements of the floor slabs, posing safety hazards. Especially in cases where the atrium structure is irregular, it cannot effectively unload the load, resulting in low construction efficiency.
The ultra-high hollow scaffolding is used to transfer the load to the main and secondary beams of the floor slab through top support and load transfer. Combined with the hollow frame and installation foundation, the load is shared by the inter-layer unloading section and diagonal bracing, which reduces the self-weight and ensures structural safety.
This approach achieves the goal of reducing the self-weight of the scaffolding, improving construction efficiency, meeting load requirements, and ensuring the stability of the building structure while ensuring safety.
Smart Images

Figure CN118979613A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building decoration construction, and in particular to an ultra-high hollow scaffold for indoor decoration and reconstruction and a construction method. Background Art
[0002] When large shopping malls are renovated, since most of the renovated shopping malls are located in commercial areas, large-scale mechanical equipment cannot be used for construction, and the operating radius of small-scale mechanical equipment cannot meet the demand, so generally only scaffolding can be used for manual construction. However, during the reuse and renovation, only the decoration and renovation part is renovated, and the building structure and electromechanical system are kept unchanged. When setting up the scaffolding, it is necessary to take into account the structural safety, construction convenience and construction efficiency. Therefore, the method of setting up scaffolding layer by layer for construction cannot meet the construction convenience and construction efficiency. For large shopping malls with atriums, ground-based scaffolding is used and directly connected to the top floor. However, the overall deadweight of the ground-based scaffolding is too large, which seriously increases the floor load. Secondly, since shopping malls are all equipped with basements, when the ground-based scaffolding is set on the floor, the bearing capacity of the floor cannot meet the safety requirements. Therefore, a ground-based scaffolding is needed that can meet both the support load requirements and the safety requirements. The present invention provides an ultra-high hollow scaffolding and a construction method for indoor decoration and renovation to achieve the above purpose. Summary of the invention
[0003] The invention provides an ultra-high hollow scaffold for indoor decoration and reconstruction and a construction method thereof, which realizes force conversion by means of top return support and load transfer, and satisfies the requirement of safe erection of the ultra-high ground scaffold.
[0004] The technical solution adopted by the present invention to solve the above technical problems is: An ultra-high hollow scaffold for indoor renovation and reconstruction, comprising a top-return support, a mounting base and a frame body, wherein the top-return support is arranged in a basement and supports the basement top plate, the mounting base is arranged on the basement floor plate, the frame body is arranged on the mounting base, the frame body is arranged in a building atrium and connected to the atrium interlayer floor plate; The frame includes a hollow frame and a top frame. The hollow frame is arranged on a mounting base and connected to the atrium interlayer floor. The top frame is arranged on the top of the hollow frame and connected to the atrium top floor.
[0005] Furthermore, the installation base includes a mounting rod and a unloading rod, the unloading rod is arranged at intervals on the basement top plate, the mounting rod is arranged at intervals on the unloading rod, the hollow frame is arranged on the mounting rod, and the mounting rod and the unloading rod are arranged perpendicular to each other.
[0006] Furthermore, the unloading rods are correspondingly arranged above the primary and secondary beams of the basement top plate, and correspond to the axes of the primary and secondary beams up and down.
[0007] Furthermore, the top return support is arranged correspondingly to the installation base seat, and the top of the top return support is supported on the main and secondary beams of the basement top plate and the floor plate just below the unloading rod.
[0008] Furthermore, the hollow frame includes upper and lower straight-through parts and interlayer unloading parts, the upper and lower straight-through parts are arranged on the installation base, the upper and lower straight-through parts are arranged, the interlayer unloading parts are arranged on the atrium interlayer floor, the interlayer unloading parts are located on the outside of the upper and lower straight-through parts, and are connected to the upper and lower straight-through parts.
[0009] Furthermore, an oblique support rod is provided between the upper and lower straight-through parts and the interlayer unloading part.
[0010] Furthermore, a cavity is provided in the middle of the hollow frame, the top frame is a full-floor scaffolding, and diagonal braces are provided in the top frame, and the diagonal braces are located above the cavity of the hollow frame.
[0011] Preferably, the mounting rod and the unloading rod are I-beams.
[0012] Preferably, the top return support is a scaffolding.
[0013] A construction method for an ultra-high hollow scaffold for indoor decoration and renovation comprises the following steps: S1, force analysis: conduct force simulation analysis on the building structure and scaffolding structure to determine the specific structure of the scaffolding to meet the force requirements of the building structure; S2, installation of the foundation seat: the construction of the installation of the foundation seat is carried out on the basement floor slab, firstly, the unloading rod is set on the basement top plate and corresponds to the primary and secondary beams of the basement top plate, and then the installation rod is set on the unloading rod; S3, hollow frame construction: The hollow frame is erected layer by layer from bottom to top. When the upper and lower straight parts are erected to the atrium interlayer floor, they are erected outward on the interlayer floor to form an interlayer unloading part, and diagonal braces are set between the upper and lower straight parts and the interlayer unloading part; S4, top frame construction: after the hollow frame is erected to the top, the top frame is erected. The top frame adopts a full-height scaffolding, and diagonal braces are set in the cavity position of the hollow frame; S5, top return support construction: construct the top return support in the basement, and support the top of the top return support on the primary and secondary beams of the basement top plate and the floor plate just below the unloading rod, and perform top return support on the installation base above it to complete the construction.
[0014] The beneficial effects of the present invention are as follows: The hollow scaffolding has a smaller deadweight while ensuring that the scaffolding is on the ground, meeting the load requirements of the building floor, and using the installation base to transfer the load, the load of the ground scaffolding is transferred to the main and secondary beams of the floor, and the main and secondary beams of the floor are supported by the return support, thereby ensuring the stability of the scaffolding and the safety of the building structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the scaffold load transfer and conversion structure of the present invention; Figure 3 It is a schematic diagram of the top-return support plane of the present invention; Figure 4 It is a schematic plan view of the bottom structure of the frame of the present invention; Figure 5 It is a schematic plan view of the middle structure of the frame of the present invention; Figure 6 It is a schematic plan view of the top structure of the frame of the present invention; Figure 7 It is a schematic diagram of the connection structure between the top frame and the hollow frame of the present invention.
[0016] Figure numerals: 1, return top support; 2, installation base; 21, installation rod; 22, unloading rod; 3, frame; 31, hollow frame; 311, upper and lower straight-through parts; 312, interlayer unloading part; 32, top frame. DETAILED DESCRIPTION
[0017] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings of the specification. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0018] In the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0019] like Figure 1 , 4As shown in Figures 5 and 6, the specific object of the application of the present invention is the renovation and reuse of a large shopping mall. The mall has an indoor clearance of 50m and seven floors above ground. The atrium goes straight from the basement ceiling to the top lighting ceiling. The atrium is irregular in shape, and the floors between the atrium floors are staggered up and down. When setting up the ground scaffolding, the scaffolding needs to be set on the basement ceiling. However, the load requirement of the scaffolding cannot be met by relying solely on the basement ceiling. In addition, due to the irregular shape of the atrium, the floors between the atrium floors are staggered up and down, and the scaffolding cannot be effectively unloaded by using the atrium floors, resulting in the main load of the scaffolding still The load is borne by the basement roof, so the traditional full-height ground scaffolding cannot meet the structural safety requirements. Therefore, the present invention adopts a hollow structure for the ground scaffolding to effectively reduce the load falling on the basement roof, and according to the specific shape and structure of the atrium interlayer, an adaptive arrangement is made on the atrium interlayer floor slab, and the interlayer floor slab is used for auxiliary unloading to further share the load falling on the basement roof. At the same time, the installation base is used to perform force conversion, so that the load of the scaffolding is mainly borne by the primary and secondary beams of the top plate, and then the primary and secondary beams of the top plate are returned to the top through the return support 1 to further ensure the structural safety.
[0020] like Figure 1 , 4 As shown in Figures 5 and 6, a specific embodiment of the present invention is an ultra-high hollow scaffold for indoor decoration and renovation, including a return support 1, an installation base 2 and a frame 3, wherein the return support 1 is arranged in the basement and supports the basement roof, the installation base 2 is arranged on the basement floor, the frame 3 is arranged on the installation base 2, the frame 3 is arranged in the atrium of the building, and is connected to the atrium interlayer floor; the frame 3 includes a hollow frame 31 and a top frame 32, the hollow frame 31 is arranged on the installation base 2, and is connected to the atrium interlayer floor, the top frame 32 is arranged on the top of the hollow frame 31, and is connected to the atrium top floor.
[0021] like Figure 1 , 4As shown in Figures 5 and 6, the specific structure and working principle of the present invention are as follows: the scaffolding adopts a ground-based scaffolding, and the bottom is arranged on the bottom plate of the negative first floor, that is, the top plate of the negative second floor basement. Since no supporting columns are arranged under the basement top plate corresponding to the atrium, the top plate cannot effectively support the full-floor scaffolding. Therefore, a hollow structure is adopted when setting up the scaffolding. The hollow frame 31 of the frame 3 is located in the atrium. The center of the hollow frame 31 is provided with a vertically straight cavity for reducing the deadweight of the entire frame 3. The hollow frame 31 includes an upper and lower straight-through portion 311 and an interlayer unloading portion 312. The upper and lower straight-through portion 311 is located in the atrium, and its bottom is arranged on the basement top plate. The upper and lower straight-through arrangement, the interlayer unloading portion 312 is located on the outside of the upper and lower straight-through portion 311, and is arranged on the atrium interlayer floor slab, plays an auxiliary unloading role. And as the construction scaffolding of the atrium side skirt, the top frame 32 is located on the top of the hollow frame 31, and adopts the structure of a full-floor scaffolding. As the construction scaffolding of the skylight roof, the frame 3 formed by the hollow frame 31 and the top frame 32 is an integral structure. The main load of the frame 3 is borne by the basement roof. In order to ensure the stability of the building structure, an installation base 2 is set on the basement roof, and the frame 3 is set on the installation base 2. The load of the frame 3 is first transferred to the installation base 2 to avoid the load of the frame 3 being concentrated at the contact position with the roof, causing the roof to be overloaded. The installation base 2 disperses the load transferred from the frame 3 to the primary and secondary beams of the basement roof, and then a return support 1 is set in the basement to return the primary and secondary beams on the basement roof to further transfer the load. The present application first reduces the dead weight of the frame 3 by setting it as a hollow structure, and then unloads the load in sequence by setting inter-layer auxiliary unloading, setting an installation base 2 for load conversion, and setting a return support 1 for return operations, thereby finally achieving the purpose of setting a ground scaffolding on the top plate of the basement and ensuring the safety of the building structure.
[0022] Furthermore, the mounting base 2 includes a mounting rod 21 and a unloading rod 22, the unloading rod 22 is arranged at intervals on the basement roof, the mounting rod 21 is arranged at intervals on the unloading rod 22, the hollow frame 31 is arranged on the mounting rod 21, directly bears the load of the frame 3, and then disperses the load to the unloading rod 22, and the unloading rod 22 then transfers the load to the primary and secondary beams of the basement roof, and the load is borne by the primary and secondary beams of the basement roof to ensure structural safety, and the mounting rod 21 and the unloading rod 22 are arranged perpendicular to each other.
[0023] like Figure 2 , 3As shown, further, the unloading rod 22 is correspondingly arranged above the primary and secondary beams of the basement top plate, and corresponds to the axis of the primary and secondary beams up and down. Through the above arrangement, the load of the frame 3 is mainly borne by the primary and secondary beams. The primary and secondary beams have a higher bearing capacity and can achieve return support, which can effectively improve construction safety and ensure the safety and stability of the building structure.
[0024] Furthermore, the top return support 1 is arranged correspondingly to the installation base 2 up and down, and the top of the top return support 1 is supported on the main and secondary beams of the basement top plate and the floor plate just below the unloading rod 22.
[0025] like Figure 1 , 5 As shown, further, the hollow frame 31 includes an upper and lower straight-through portion 311 and an interlayer unloading portion 312, the upper and lower straight-through portions 311 are arranged on the installation base 2, and the upper and lower straight-through portions 311 are arranged as the supporting structure of the top frame 32, and the interlayer unloading portion 312 is arranged on the atrium interlayer floor, the interlayer unloading portion 312 is located on the outside of the upper and lower straight-through portions 311, and is connected to the upper and lower straight-through portions 311, the upper and lower straight-through portions 311 and the interlayer unloading portion 312 are an integral structure, the interlayer unloading portion 312 not only serves as a construction platform for the side skirt floor, but also can disperse part of the load of the upper and lower straight-through portions 311 to the interlayer floor, thereby reducing the load of the upper and lower straight-through portions 311 on the basement top plate.
[0026] Furthermore, diagonal braces are provided between the upper and lower straight-through portions 311 and the interlayer unloading portions 312 to improve the structural stability of the frame 3 and realize load transfer by using the diagonal braces.
[0027] like Figure 1 , 7 As shown, further, a cavity is provided in the middle of the hollow frame 31, and the top frame 32 is a full-floor scaffolding. A diagonal brace is provided in the top frame 32, and the diagonal brace is located above the cavity of the hollow frame 31. The diagonal brace is utilized to enhance the connection strength between the hollow frame 31 and the top frame 32 to ensure the safety and stability of the structure, and the diagonal brace can transfer the load of the top frame 32 above the cavity to the hollow frame 31.
[0028] Preferably, the installation rod 21 and the unloading rod 22 are I-beams, and during construction, the installation rod 21 and the unloading rod 22 are arranged in a stacked manner.
[0029] Preferably, the return-to-top support 1 is a full-floor scaffolding. During the return-to-top construction, the position that can contact the primary and secondary beams can be directly returned to the top. For the position that cannot be contacted due to the pipeline bridge, wooden planks are arranged on the top of the return-to-top support 1 to form a linear or surface support structure to realize the return to the top of the primary and secondary beams.
[0030] A construction method for an ultra-high hollow scaffold for indoor decoration and renovation comprises the following steps: S1, force analysis: conduct force simulation analysis on the building structure and scaffolding structure to determine the specific structure of the scaffolding to meet the force requirements of the building structure; S2, installation of the foundation base: the construction of the installation base 2 is performed on the basement floor slab, firstly the unloading rod 22 is set on the basement top plate and corresponds to the primary and secondary beams of the basement top plate, and then the installation rod 21 is set on the unloading rod 22; S3, hollow frame construction: the hollow frame 31 is erected layer by layer from bottom to top. When the upper and lower straight-through parts 311 are erected to the atrium interlayer floor, the interlayer unloading parts 312 are erected outward on the interlayer floor, and diagonal braces are arranged between the upper and lower straight-through parts 311 and the interlayer unloading parts 312; S4, top frame construction: after the hollow frame 31 is erected to the top, the top frame 32 is erected. The top frame 32 adopts a full-height scaffolding, and diagonal braces are set at the cavity position of the hollow frame 31; S5, top return support construction: construct the top return support 1 in the basement, and support the top of the top return support 1 on the primary and secondary beams of the basement top plate and the floor plate directly below the unloading rod 22, and perform top return support on the installation base 2 above it to complete the construction.
[0031] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-limiting from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any reference numerals in the claims should not be regarded as limiting the claims involved.
Claims
1. An ultra-high hollow scaffold for indoor decoration and renovation, characterized in that: It comprises a top return support (1), a mounting base (2) and a frame (3), wherein the top return support (1) is arranged in a basement and supports the basement top plate, the mounting base (2) is arranged on the basement floor plate, the frame (3) is arranged on the mounting base (2), and the frame (3) is arranged in the atrium of a building and connected to the atrium interlayer floor plate; The frame (3) comprises a hollow frame (31) and a top frame (32); the hollow frame (31) is arranged on the mounting base (2) and connected to the atrium interlayer floor; the top frame (32) is arranged on the top of the hollow frame (31) and connected to the atrium top floor.
2. The ultra-high hollow scaffold for indoor decoration and renovation according to claim 1 is characterized by: The mounting base (2) comprises a mounting rod (21) and a unloading rod (22), wherein the unloading rod (22) is arranged at intervals on the basement ceiling, the mounting rod (21) is arranged at intervals on the unloading rod (22), the hollow frame (31) is arranged on the mounting rod (21), and the mounting rod (21) and the unloading rod (22) are arranged perpendicular to each other.
3. The ultra-high hollow scaffold for indoor decoration and renovation according to claim 2 is characterized by: The unloading rod (22) is correspondingly arranged above the primary and secondary beams of the basement top plate, and corresponds to the axis lines of the primary and secondary beams in the vertical direction.
4. The ultra-high hollow scaffold for indoor decoration and renovation according to claim 2 is characterized by: The return top support (1) is arranged correspondingly to the installation base (2) up and down, and the top of the return top support (1) is supported on the floor slab directly below the primary and secondary beams and the unloading rod (22) of the basement top slab.
5. The ultra-high hollow scaffold for indoor decoration and renovation according to claim 1 is characterized by: The hollow frame (31) comprises an upper and lower straight-through portion (311) and an interlayer unloading portion (312); the upper and lower straight-through portion (311) is arranged on the mounting base (2) and is arranged in an upper and lower straight-through manner; the interlayer unloading portion (312) is arranged on the atrium interlayer floor; the interlayer unloading portion (312) is located outside the upper and lower straight-through portion (311) and is connected to the upper and lower straight-through portion (311).
6. The ultra-high hollow scaffold for indoor decoration and renovation according to claim 5 is characterized by: An oblique support rod is provided between the upper and lower straight-through portions (311) and the interlayer unloading portion (312).
7. The ultra-high hollow scaffold for indoor decoration and renovation according to claim 1 is characterized by: A cavity is provided in the middle of the hollow frame (31); the top frame (32) is a full-height scaffold; an oblique brace is provided in the top frame (32); the oblique brace is located above the cavity of the hollow frame (31).
8. The ultra-high hollow scaffold for indoor decoration and renovation according to claim 2 is characterized by: The mounting rod (21) and the unloading rod (22) are I-beams.
9. The ultra-high hollow scaffold for indoor decoration and renovation according to claim 1 is characterized by: The top return support (1) is a scaffold.
10. A construction method for an ultra-high hollow scaffold for indoor decoration and renovation, characterized in that: The following steps are involved: S1, force analysis: conduct force simulation analysis on the building structure and scaffolding structure to determine the specific structure of the scaffolding to meet the force requirements of the building structure; S2, installation of the foundation base: the construction of the installation base (2) is performed on the basement floor slab, firstly the unloading rod (22) is arranged on the basement top plate and corresponds to the primary and secondary beams of the basement top plate, and then the installation rod (21) is arranged on the unloading rod (22); S3, hollow frame construction: the hollow frame (31) is erected layer by layer from bottom to top. When the upper and lower straight-through parts (311) are erected to the atrium interlayer floor, an interlayer unloading part (312) is erected outward on the interlayer floor, and a diagonal brace is arranged between the upper and lower straight-through parts (311) and the interlayer unloading part (312); S4, top frame construction: after the hollow frame (31) is erected to the top, the top frame (32) is erected. The top frame (32) adopts a full-height scaffolding, and a diagonal brace is set at the cavity position of the hollow frame (31); S5, top return support construction: construct the top return support (1) in the basement, and support the top of the top return support (1) on the primary and secondary beams of the basement top plate and the floor plate directly below the unloading rod (22), and perform top return support on the installation base (2) above it to complete the construction.