Intelligent oil and gas wellhead emergency cut-off protection system and device
Through the intelligent wellhead emergency cutoff protection system, the wellhead operation and power supply are monitored, and the cutting speed and response processing are dynamically adjusted, the cutting speed and response delay problems in the existing technology are solved, and the stability and safety guarantee of wellhead cutoff is achieved. Improves processing efficiency and system reliability.
Patent Information
- Application Number
- CN202411468409.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-21
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-10-21
AI Technical Summary
The existing wellhead cutting protection technology fails to effectively control the cutting speed and respond to the cutting response delay, which may lead to reverse flow, pressure waves and equipment failures, and maintenance measures have limitations, which cannot fundamentally solve the problem, resulting in waste of resources and costs.
Design an intelligent wellhead emergency cutoff protection system, which can analyze abnormal parameter change trends and power supply fluctuations by monitoring the wellhead operation status and power supply fluctuations, dynamically adjust the cutoff speed, and record the cutoff response time to analyze the cause of delay, and carry out targeted processing. , ensure the stability and safety of the cut-off response.
It realizes flexible and dynamic control of the wellhead cutting process, ensures the stability and safety of pipelines and equipment, improves the cutting efficiency and processing effect, avoids waste of resources and costs, and enhances the system's responsiveness and reliability.
Smart Images

Figure CN118979718A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of wellhead cut-off protection, and specifically discloses an intelligent oil and gas wellhead emergency cut-off protection system and device. Background Art
[0002] Oil and gas wells are usually located deep underground, and the pressure in the formation is often very high. If the wellhead is out of control or cannot be effectively sealed, high-pressure oil and gas may spray out from the wellhead, causing serious safety accidents, such as blowouts. In this case, in order to reduce or prevent accidents at the wellhead, it is very necessary to monitor the operating status of the wellhead and use safety valves for emergency cut-off protection.
[0003] There are also technical solutions related to wellhead cut-off protection in the prior art, such as a valve control method and device disclosed in application publication number CN113007417A, which obtains operating parameter information of a controlled valve, generates and displays status information of the controlled valve based on the operating parameter information, and identifies whether it enters a warning threshold range based on the displayed status information. When it is identified that it enters the warning threshold range, a control request (such as an opening control request) is sent to the control valve for cut-off protection, thereby realizing detailed control of the valve, which greatly makes up for the deficiency that the existing control valve has an instant opening and closing mode and has no adjustment function.
[0004] Although the valve control provided in the above application can provide opening control, it does not take into account the cut-off speed control. Generally speaking, when the wellhead is out of control, in order to prevent oil and gas from gushing out, quick cut-off will be chosen. However, in actual control, not all situations are suitable for quick cut-off, such as changes in the operating status of the wellhead and fluctuations in the power supply. When the pressure and flow at the wellhead change rapidly, if the control method of quick valve closing is still adopted, it may cause reverse flow or pressure waves, thereby affecting the stability of the pipeline and even damaging the pipeline or related equipment. In addition, when the power supply fluctuates greatly, if the valve is closed too quickly, it may cause a sudden change in system pressure, thereby affecting the stability and durability of the pipeline or equipment. It can be seen that blindly using quick cut-off not only affects the shut-off effect, but also easily causes pipeline instability and equipment failure.
[0005] In addition, valves often have a delayed cut-off response during the cut-off operation. However, the existing focus on the valve's cut-off response is mostly on the valve itself, such as regular maintenance and inspection of the valve, and replacement of a control system with fast response speed and high accuracy. It does not take into account that the valve's cut-off response delay is not only caused by the valve's own performance degradation, but may also be caused by external interference, such as unstable power supply. Only focusing on the maintenance of the valve itself and replacing the control system to deal with the cut-off response delay has applicability limitations, and there is a hidden danger that the problem cannot be fundamentally solved, which is easy to cause ineffective treatment and unnecessary waste of resources and costs. Summary of the invention
[0006] In view of this, the present invention aims to propose an intelligent oil and gas wellhead emergency cut-off protection system and device, which focuses on the cut-off speed control of the emergency cut-off valve and at the same time pays attention to the relationship between the cut-off response time and the power supply stability when performing the cut-off operation, thereby forming a closed-loop adjustment with the wellhead operation status monitoring, and effectively solving the problems raised in the above-mentioned background technology.
[0007] The purpose of the present invention can be achieved through the following technical solutions: In one aspect of the present invention, an intelligent oil and gas wellhead emergency cut-off protection system is proposed, comprising the following modules: a wellhead operation monitoring module, which is used to use an operation monitoring terminal installed on the wellhead to monitor the wellhead operation status in real time to obtain the wellhead operation parameters at each monitoring time.
[0008] The power supply fluctuation monitoring module is used to monitor the power supply fluctuation at the power supply end using the power monitoring equipment to obtain the power supply fluctuation degree at each monitoring moment.
[0009] The anomaly identification module is used to compare the wellhead operating parameters at each monitoring moment with the set operating parameter warning threshold. If the wellhead operating parameters at a certain monitoring moment exceed the warning threshold, an anomaly is identified and the abnormal monitoring moment and abnormal operating parameters are recorded.
[0010] The demand closing speed analysis module is used to compare the abnormal operating parameters between the start monitoring time and the abnormal monitoring time to analyze the change trend of the abnormal operating parameters, and combine it with the power supply fluctuation at the abnormal monitoring time to analyze the demand closing speed of the emergency shut-off valve.
[0011] The cut-off trigger execution module is used to trigger the emergency cut-off valve to perform a closing operation at the required closing speed at the moment of abnormal detection, and record the cut-off response time.
[0012] The closing speed dynamic adjustment module is used to monitor the oil and gas concentration at the wellhead in real time when the emergency shut-off valve is closed at the required closing speed, thereby dynamically adjusting the closing speed.
[0013] The cut-off response correlation analysis module is used to set the analysis period, thereby retrieving the emergency cut-off valve trigger operation records within the analysis period, and extracting the cut-off response duration and power supply fluctuation from the records. At the same time, the records of cut-off response delay are screened out from the retrieved records and recorded as valid trigger operation records, and then the correlation between the cut-off response delay and the power supply fluctuation is analyzed based on the cut-off response duration and power supply fluctuation of the valid trigger operation records.
[0014] The feedback adjustment module is used to judge whether the cut-off response delay is related to the power supply fluctuation based on the correlation between the cut-off response delay and the power supply fluctuation. If so, the power supply fluctuation monitoring adjustment is performed; if not, the operating parameter warning threshold is adjusted.
[0015] In another aspect of the present invention, an intelligent oil and gas wellhead emergency cut-off protection device is provided, and the device comprises the intelligent oil and gas wellhead emergency cut-off protection system of the present invention.
[0016] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. The present invention monitors the operating status of the wellhead and the power supply fluctuation in real time, and when an abnormality is identified based on the operating status of the wellhead, determines the required closing speed of the emergency shut-off valve according to the changing trend of the abnormal operating parameters and the power supply fluctuation, thereby performing the closing operation according to the required closing speed, thereby realizing the closing speed control of the emergency shut-off valve, breaking the traditional mode of single rapid closing, which is beneficial to ensuring the stability and safety of pipeline and equipment operation during the shut-off process.
[0017] 2. The present invention dynamically adjusts the closing speed according to the oil and gas concentration at the wellhead during the operation according to the required closing speed of the emergency shut-off valve, and then adjusts the closing speed to achieve rapid closing when the oil and gas are released too quickly, thereby avoiding possible safety risks to the greatest extent. It embodies the flexibility and dynamic adjustment of the closing speed, which is conducive to achieving dual guarantees of shut-off effect and shut-off safety.
[0018] 3. During the operation of the emergency shut-off valve, the present invention records the duration of each shut-off response and the power supply fluctuation, thereby establishing a correlation between the shut-off response delay and the power supply fluctuation, and then performs targeted processing of the shut-off response delay based on the correlation. Compared with relying solely on the maintenance of the valve itself and replacing the control system to deal with the shut-off response delay, this method is more in line with the actual situation, and the response to the shut-off response delay is more reasonable and efficient, which can not only improve the processing efficiency and processing effect, but also avoid the waste of processing resources and costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0020] Figure 1 It is a schematic diagram of the connection of each module of the system of the present invention. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] Example 1 See also Figure 1 As shown, the present invention proposes an intelligent oil and gas wellhead emergency cut-off protection system, including a wellhead operation monitoring module, a power supply fluctuation monitoring module, an abnormality identification module, a demand closing speed parsing module, a cut-off trigger execution module, a closing speed dynamic adjustment module, a cut-off response association analysis module and a feedback adjustment module, wherein the wellhead operation monitoring module is connected to the abnormality identification module, the power supply fluctuation monitoring module and the abnormality identification module are both connected to the demand closing speed parsing module, the demand closing speed parsing module is connected to the cut-off trigger execution module, the cut-off trigger execution module is respectively connected to the closing speed dynamic adjustment module and the cut-off response association analysis module, the cut-off response association analysis module is connected to the feedback adjustment module, and the feedback adjustment module is connected to the power supply fluctuation monitoring module.
[0023] The wellhead operation monitoring module is used to monitor the wellhead operation parameters in real time using a monitoring terminal installed on the wellhead equipment, wherein the monitoring equipment may be a pressure sensor or a flow meter, to obtain the wellhead operation parameters at each monitoring moment, specifically including pressure and flow.
[0024] It should be understood that the reason why pressure and flow are selected as wellhead operating parameters is that the pressure and flow at the wellhead are two important parameters at the wellhead, and they are usually used to describe and monitor the production status and operating conditions of oil wells or gas wells. Wellhead pressure refers to the pressure at the outlet of an oil well or gas well. Wellhead pressure refers to the pressure value when the bottom hole pressure is transported to the wellhead through a pipeline. The change in pressure value can reflect the change in the bottom hole formation, the change in production pressure, and the performance status of the wellhead equipment. Wellhead flow refers to the amount of oil and gas or liquid flow flowing out of the outlet of an oil well or gas well. Wellhead pressure and flow are important indicators that directly reflect the state in the well and the fluid dynamics characteristics. In the event of an emergency, accurate monitoring and control of wellhead pressure and flow can detect abnormal conditions in a timely manner, respond quickly and take measures, thereby minimizing the possibility of accidents and ensuring production safety.
[0025] The power supply fluctuation monitoring module is used to monitor the power supply fluctuation at the power supply end by using the power monitoring equipment to obtain the power supply fluctuation degree at each monitoring moment.
[0026] Applied to the above embodiment, the power supply fluctuation monitoring process is as follows: the voltage waveform and current waveform of the power supply are measured by using a power monitoring device. For example, the power monitoring device can be a power quality analyzer, from which the voltage peak-to-peak value and the current peak-to-peak value are extracted, wherein the voltage peak-to-peak value refers to the difference between the maximum positive value and the minimum negative value of the voltage waveform, which represents the maximum amplitude difference of the voltage waveform within one cycle, and the current peak-to-peak value refers to the difference between the maximum positive value and the minimum negative value of the current waveform, which represents the maximum amplitude difference of the current waveform within one cycle, and the voltage peak-to-peak value and the current peak-to-peak value are compared with the corresponding effective voltage and effective current respectively, and then the comparison results are added and divided by 2 to obtain the power supply fluctuation.
[0027] The effective voltage in the above effective voltage and effective current refers to the equivalent DC voltage value generated by the AC voltage waveform in one complete cycle. In the case of a sine waveform, the effective voltage is equal to its peak voltage divided by the square root of 2.
[0028] Effective current is the equivalent DC current value produced by an AC current waveform during one complete cycle. Similar to effective voltage, in the case of a sinusoidal waveform, effective current is equal to its peak current divided by the square root of 2.
[0029] It is important to understand that oil and gas wellheads usually involve the start-up and stop of a variety of equipment, such as pumps, compressors, etc. The start-up process of these equipment requires a lot of electrical energy, which can easily cause power supply fluctuations. In addition, power supply fluctuations are also prone to occur when the main power supply is abnormal or fails and the power supply is switched.
[0030] The present invention uses the fluctuations of the voltage waveform and the current waveform as monitoring indicators when monitoring power supply fluctuations because the voltage waveform and the current waveform can intuitively reflect the actual fluctuations in the power system. By monitoring the fluctuations of these waveforms, various aspects of power quality can be comprehensively evaluated, rather than being limited to a single voltage value or current value.
[0031] The abnormality identification module is used to compare the wellhead operating parameters at each monitoring moment with the set safety threshold. If the wellhead pressure or wellhead flow at a certain monitoring moment exceeds the safety threshold, the abnormality is identified and the abnormal monitoring moment and abnormal operating parameters are recorded, where the abnormal operating parameters refer to the wellhead operating parameters that exceed the safety threshold.
[0032] The required closing speed analysis module is used to compare the abnormal operating parameters between the start monitoring time and the abnormal monitoring time, analyze the change trend of the abnormal operating parameters, and combine it with the power supply fluctuation at the abnormal monitoring time to analyze the required closing speed of the emergency shut-off valve.
[0033] It should be added that the abnormal operating parameters between the initial monitoring time and the abnormal monitoring time mentioned above are for the same operating parameters.
[0034] In the preferred implementation of the above scheme, the changing trend of abnormal operation parameters refers to the following analysis process: the abnormal operation parameters between the starting monitoring time and the abnormal monitoring time are divided into several time windows according to adjacent monitoring times, and each time window is arranged in chronological order.
[0035] As an example of the above scheme, assume that the monitoring times between the start monitoring time and the abnormal monitoring time are t1, t2, t3, t4, t5, t6, and t7, and the divided time windows are , , , , , . By using adjacent monitoring moments to divide the time window, the data in each window can have a certain degree of continuity and integrity. This can better analyze the time series data, so as to more accurately understand the changing trend of abnormal operation parameters, and will not cause misjudgment or omission of important information due to data discontinuity. In addition, using adjacent monitoring moments to divide the time window makes data analysis more real-time and dynamic. By continuously dividing the time window, the real-time changes of abnormal operation parameters can be captured more sensitively.
[0036] In each time window, the difference between the next abnormal operation parameter and the previous abnormal operation parameter is calculated, and the difference value is divided by the previous abnormal operation parameter to obtain the abnormal operation parameter change rate corresponding to each time window.
[0037] The standard deviation of the change rate of abnormal operation parameters corresponding to each time window is statistically analyzed, and the statistical results are compared with the limit value set by the system. If the standard deviation of the change is less than or equal to the limit value set by the system, it means that the data changes in each time window are relatively average and stable, and the average value in each time window can be trusted as the change trend of the abnormal operation parameters. In this way, the occurrence and trend of abnormalities can be captured more accurately. The mean of the change rate of abnormal operation parameters corresponding to each time window is taken as the change trend of abnormal operation parameters. Otherwise, it means that the change rate of abnormal operation parameters corresponding to each time window is more dispersed and fluctuates greatly. At this time, the mean of the change rate of abnormal operation parameters corresponding to each time window cannot effectively reflect the real change of sudden or abnormal conditions. The change rate of abnormal operation parameters corresponding to the last time window is closest to the current change trend in the overall time series, which can capture abnormal conditions more sensitively and improve the accuracy of anomaly detection. The change rate of abnormal operation parameters corresponding to the last time window is selected from the arrangement results of each time window as the change trend of abnormal operation parameters.
[0038] The present invention adopts a sliding window technology based on time series when analyzing the changing trend of abnormal operation parameters, which can effectively capture the changing trend and volatility of data.
[0039] In a further preferred implementation of the above scheme, the required closing speed of the emergency shut-off valve is analyzed as follows: the changing trend of the abnormal operating parameters and the power supply fluctuation corresponding to the abnormal monitoring time are compared with the normal changing trend and normal fluctuation set by the system, wherein the normal changing trend and normal fluctuation are set to assist in the analysis of the required closing speed of the emergency shut-off valve, and at the same time help to reduce interference with unimportant changes, thereby reducing unnecessary alarms and false alarms in the system, allowing the system to focus more on truly important abnormal situations. If the changing trend of the abnormal operating parameters and the power supply fluctuation corresponding to the abnormal monitoring time are less than or equal to the normal changing trend and normal fluctuation, it indicates that there is no interference with the shutdown at this time, and the default closing speed of the emergency shut-off valve is used as the required closing speed. Otherwise, it indicates that there is an interference with the shutdown at this time, and it is not suitable for rapid shut-off. Then, the analytical formula is used. , get the required closing speed of the emergency shut-off valve , where , They respectively represent the changing trend of abnormal operating parameters and power supply fluctuation corresponding to the abnormal monitoring time. , They represent normal change trend and normal fluctuation respectively. Indicates the default closing speed of the emergency shut-off valve.
[0040] It should be added that the default closing speed mentioned above generally tends to be quickly cut off based on safety considerations, which can be understood as the ideal closing speed that can be achieved and can be obtained from the instructions for use of the emergency shut-off valve.
[0041] The cut-off trigger execution module is used to trigger the emergency cut-off valve to perform a closing operation according to the required closing speed at the time of abnormality detection, and record the cut-off response time.
[0042] It should be noted that the shut-off response time mentioned above refers to the time between triggering the emergency shut-off valve and the emergency shut-off valve performing the closing operation.
[0043] The closing speed dynamic adjustment module is used to monitor the oil and gas concentration at the wellhead in real time when the emergency shut-off valve is closed at the required closing speed, thereby dynamically adjusting the closing speed. The specific implementation is as follows: when the emergency shut-off valve is closed at the required closing speed, the oil and gas concentration at the wellhead is monitored in real time using the oil and gas monitoring equipment, and the oil and gas release increment is calculated by comparing it with the oil and gas concentration monitored at the previous moment, wherein the oil and gas release increment can be obtained by subtracting the currently monitored oil and gas concentration from the oil and gas concentration monitored at the previous moment, and compared with the safe oil and gas release increment set by the system. If the oil and gas release increment at a certain moment is less than or equal to the safe oil and gas release increment, indicating that the current oil and gas release level is within a controllable range, the operation continues to be performed at the required closing speed. If the oil and gas release increment at a certain moment is greater than the safe oil and gas release increment, it may mean that an abnormal situation has occurred. At this time, it is necessary to consider accelerating the closing speed to the default speed to cut off the outflow of oil and gas as soon as possible. At this moment, the emergency shut-off valve is operated at the default closing speed.
[0044] It should be pointed out that when setting the safe oil and gas release increment threshold, it is necessary to ensure that this value is small enough to avoid potential safety risks and environmental impacts. This threshold should be set based on specific circumstances and safety standards.
[0045] The present invention can effectively help decide whether it is necessary to adjust the closing speed of the emergency shut-off valve to the default speed by real-time monitoring of the oil and gas concentration and calculating the oil and gas release increment. This method can enhance the system's responsiveness to potential risks and ensure safety and reliability under various working conditions.
[0046] The cut-off response association analysis module is used to set an analysis period, thereby retrieving the emergency cut-off valve trigger operation records within the analysis period, and extracting the cut-off response duration and power supply fluctuation from the records. At the same time, based on the cut-off response duration, the records of cut-off response delay are screened out from the retrieved records and recorded as valid trigger operation records. Then, based on the cut-off response duration and power supply fluctuation of the valid trigger operation records, the correlation between the cut-off response delay and the power supply fluctuation is analyzed.
[0047] It should be understood that the analysis cycle is set to limit the retrieved emergency shut-off valve trigger operation records to the current time, which can ensure that the analyzed operation records are concentrated in the most recent period of time. This can more accurately reflect the emergency shut-off response under the current system operation status, and avoid the impact of operations that have been resolved or are no longer applicable in the past time period on the analysis results. At the same time, focusing on analyzing recent operation records can more effectively extract key information, reduce unnecessary historical data processing and storage pressure, and more importantly, form periodic dynamic feedback adjustments.
[0048] Applied to the above supplementary instructions, the analysis period may be 6 months.
[0049] Applied to the above scheme, the records of cut-off response delay are screened out as follows: the cut-off response duration of each emergency cut-off valve trigger operation record is compared with the expected cut-off response duration, and the emergency cut-off valve trigger operation records that are longer than the expected cut-off response duration are screened out as the records of cut-off response delay.
[0050] The expected cut-off response time mentioned above is set based on the data transmission bandwidth and data processing capability when the emergency cut-off valve is initially designed. For example, the expected cut-off response time is 2s. However, as the emergency cut-off valve is continuously put into use, its data processing capability decreases, causing the cut-off response time to show a trend of being higher than the expected cut-off response time.
[0051] Further applied to the above embodiment, the correlation analysis between the cut-off response delay and the power supply fluctuation is as follows: a coordinate system is constructed with the power supply fluctuation as the horizontal axis and the cut-off response time as the vertical axis, thereby marking several points in the constructed coordinate system for the cut-off response time and the power supply fluctuation recorded in the effective trigger operation to form a correlation curve, and the slope of each point on the correlation curve is obtained.
[0052] The correlation between the cut-off response delay and the power supply fluctuation is calculated by taking the reciprocal of the natural constant as the base and the result of processing the absolute value of the slope of each point on the correlation curve as the index.
[0053] It should be noted that, in the correlation curve formed based on the cut-off response time and the power supply fluctuation, if the curve remains horizontal, it means that the cut-off response does not change with the power supply fluctuation, which means that the cut-off response delay is not related to the power supply fluctuation. If the curve remains rising, it means that the cut-off response also rises with the power supply fluctuation, which means that the cut-off response delay is related to the power supply fluctuation. Therefore, the correlation between the cut-off response delay and the power supply fluctuation can be analyzed by the slope of each point on the correlation curve.
[0054] The feedback adjustment module is used to judge whether the cut-off response delay is related to the power supply fluctuation based on the correlation between the cut-off response delay and the power supply fluctuation. If so, the power supply monitoring adjustment is performed. If not, it means that it is caused by the emergency cut-off valve itself, and the operating parameter safety threshold is adjusted at this time.
[0055] In the specific implementation of the above scheme, to judge whether the cut-off response delay is related to the power supply fluctuation, the correlation between the cut-off response delay and the power supply fluctuation can be compared with the preset effective correlation. For example, the effective correlation can be 0.7. If the correlation reaches the effective correlation, it is judged that the cut-off response delay is related to the power supply fluctuation. Otherwise, it is judged that the cut-off response delay is not related to the power supply fluctuation.
[0056] In further implementation, the power supply fluctuation monitoring adjustment is implemented as follows: the power supply fluctuation monitoring records within the analysis period are retrieved, and the monitoring records in which the power supply fluctuation is greater than the normal fluctuation are extracted from the monitoring records as alternative monitoring records, wherein the normal fluctuation generally refers to the allowable value of the voltage or current fluctuation of the power supply, and this fluctuation can be obtained from the technical manual for use of the power supply end.
[0057] The monitoring moments of the candidate monitoring records are clustered to obtain several clusters, and the number of candidate monitoring records contained in each cluster is counted.
[0058] The clustering mentioned above is to use a clustering algorithm to perform clustering, specifically a K-means algorithm, so that samples in the same cluster are similar to each other.
[0059] The number of candidate monitoring records contained in each cluster is statistically analyzed for distribution differences. The specific statistical formula is: And compare the statistical result with the set limit value. For example, the limit value can be set to 0.6. If the distribution difference statistical result is less than the limit value, it is recognized that there is no regularity in the fluctuation period, otherwise it is recognized that there is regularity in the fluctuation period.
[0060] It should be understood that when using cluster analysis to analyze the regularity of fluctuation periods, since the alternative monitoring records in different clusters contain similar monitoring times, by counting the number of alternative monitoring records contained in each cluster, if the number of alternative monitoring records contained in each cluster is distributed relatively evenly, it means that the fluctuations of power supply in different time periods are similar, that is, there is no obvious regularity of fluctuation periods; if the distribution of the number of alternative monitoring records contained in each cluster is quite different, it means that the frequency of power supply fluctuations in the corresponding time of a certain cluster is significantly higher than that of other clusters, which means that there is regularity of fluctuation periods.
[0061] If regularity of fluctuation periods is identified, the regular fluctuation periods formed by the monitoring times of the alternative monitoring records in the cluster with the largest number of alternative monitoring records are selected from each cluster, and then a voltage stabilizing device is set at the power supply end during the regular fluctuation periods. If no regularity of fluctuation periods is identified, the power supply fluctuation monitoring frequency is adjusted.
[0062] It needs to be explained that when it is identified that there are regular periods of fluctuation in the power supply, by setting up voltage stabilizing equipment during the regular fluctuation periods to reduce fluctuations and ensure that the power supply is stable during these periods, the delay caused by power supply fluctuations on the cut-off response can be greatly reduced. When it is identified that there are no regular periods of fluctuation in the power supply, if the voltage stabilizing equipment is enabled at all times, it will cause a large amount of energy consumption and may introduce unnecessary interference or adjustments, which will lead to unstable performance of the power supply or non-optimal operation. Therefore, when it is identified that there are no regular periods of fluctuation in the power supply, by adjusting the power supply fluctuation monitoring frequency, such as increasing the monitoring frequency, more subtle fluctuation changes can be captured in time, and then using an intelligent control system with power supply fluctuation compensation function can automatically adjust the valve control strategy when the power supply fluctuation is captured, thereby reducing the delay caused by the power supply fluctuation on the cut-off response.
[0063] In another further implementation, the operation parameter warning threshold is adjusted as follows: the proportion of valid trigger operation records within the period is statistically analyzed, and the disconnection response duration of each valid trigger operation record is compared with the expected disconnection response duration to calculate the disconnection response delay amplitude of each valid trigger operation record. The specific calculation formula is: .
[0064] A coordinate system is constructed with the trigger time as the horizontal axis and the cut-off response delay amplitude as the vertical axis, thereby forming a cut-off response delay curve for the trigger time and the cut-off response delay amplitude of each valid trigger operation record, and obtaining the rate of change of the curve, wherein the rate of change can be obtained by taking the slope of each point on the cut-off response delay curve and performing differential calculation.
[0065] The rate of change of the response delay curve will be cut off The ratio of effective trigger operation records By formula Calculate the operating parameter warning threshold adjustment demand factor .
[0066] It should be understood that the proportion of effective trigger operation records in the above represents the triggering frequency of the emergency shut-off valve. Combining it with the changing trend of the shut-off response delay to analyze the adjustment requirements of the operating parameter warning threshold can achieve a comprehensive and dynamic analysis.
[0067] Set the currently set operating parameter warning threshold Adjust demand factor with operating parameter warning threshold Using the formula Calculate the adjusted operating parameter warning threshold From this formula, it can be seen that the larger the adjustment demand factor of the operating parameter warning threshold, the lower the operating parameter warning threshold needs to be. Potential problems can be detected in advance, so that emergency response measures can be initiated more quickly to ensure that necessary operations are taken quickly in an emergency to protect the safety of equipment and personnel. To a certain extent, it can make up for the shortcoming of the cut-off valve's long cut-off response. Compared with valve maintenance and upgrading, this treatment method can reduce processing costs and resources and has good practical value.
[0068] The present invention collects and analyzes the cut-off response time when operating the emergency cut-off valve, and applies the analysis results to the monitoring and collection of the wellhead operation and power supply to form feedback adjustment, thereby realizing closed-loop control. The system can automatically adjust the monitoring parameters of the wellhead operation and power supply to ensure rapid response and accurate cut-off in an emergency. At the same time, automatic feedback adjustment can reduce the risk of human intervention and operational errors. By analyzing the cut-off response time and automatically adjusting the parameters, the system not only improves the response speed, but also reduces the errors and delays caused by human operation, thereby improving the stability and reliability of the system and facilitating the formation of a virtuous circle.
[0069] Example 2 The present invention provides an intelligent oil and gas wellhead emergency cut-off protection device, which comprises the intelligent oil and gas wellhead emergency cut-off protection system of the present invention.
[0070] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.
Claims
1. An intelligent oil and gas wellhead emergency cut-off protection system, characterized in that , including the following modules: The wellhead operation monitoring module is used to monitor the wellhead operation status in real time using the operation monitoring terminal installed on the wellhead to obtain the wellhead operation parameters at each monitoring time; A power supply fluctuation monitoring module is used to monitor the power supply fluctuation at the power supply end using power monitoring equipment to obtain the power supply fluctuation at each monitoring moment; The abnormality identification module is used to compare the wellhead operating parameters at each monitoring time with the set operating parameter warning threshold. If the wellhead operating parameters at a certain monitoring time exceed the warning threshold, it is identified that there is an abnormality and the abnormal monitoring time and abnormal operating parameters are recorded; The demand closing speed analysis module is used to compare the abnormal operation parameters between the start monitoring time and the abnormal monitoring time to analyze the change trend of the abnormal operation parameters, and combine it with the power supply fluctuation at the abnormal monitoring time to analyze the demand closing speed of the emergency shut-off valve; A cut-off trigger execution module is used to trigger the emergency cut-off valve to close at the required closing speed at the moment of abnormal detection, and record the cut-off response time; A closing speed dynamic adjustment module is used to monitor the oil and gas concentration at the wellhead in real time when the emergency shut-off valve is closed at the required closing speed, thereby dynamically adjusting the closing speed; A cut-off response correlation analysis module is used to set an analysis period, thereby retrieving the emergency cut-off valve trigger operation records within the analysis period, and extracting the cut-off response duration and power supply fluctuation from the records, and at the same time, filtering out the cut-off response delay records from the retrieved records as valid trigger operation records, and then analyzing the correlation between the cut-off response delay and the power supply fluctuation based on the cut-off response duration and power supply fluctuation of the valid trigger operation records; The feedback adjustment module is used to judge whether the cut-off response delay is related to the power supply fluctuation based on the correlation between the cut-off response delay and the power supply fluctuation. If so, the power supply fluctuation monitoring adjustment is performed; if not, the operating parameter warning threshold is adjusted.
2. An intelligent oil and gas wellhead emergency cut-off protection system as claimed in claim 1, characterized in that: The power supply fluctuation monitoring process is as follows: The voltage and current waveforms of the power supply are measured using power monitoring equipment, and the peak-to-peak values of the voltage and current are extracted. The peak-to-peak values of the voltage and current are compared with the corresponding effective voltage and effective current, respectively. The comparison results are then added and divided by 2 to obtain the power supply fluctuation.
3. The intelligent oil and gas wellhead emergency cut-off protection system according to claim 1, characterized in that: The changing trend of the abnormal operating parameters is shown in the following analysis process: The abnormal operation parameters between the start monitoring time and the abnormal monitoring time are divided into a number of time windows according to adjacent monitoring times, and the time windows are arranged in chronological order; In each time window, the difference between the next abnormal operation parameter and the previous abnormal operation parameter is calculated, and the difference value is divided by the previous abnormal operation parameter to obtain the abnormal operation parameter change rate corresponding to each time window; The standard deviation of the change rate of the abnormal operating parameters corresponding to each time window is statistically analyzed, and the statistical results are compared with the limit values set by the system. If the standard deviation is less than or equal to the limit value set by the system, the mean of the change rates of the abnormal operating parameters corresponding to each time window is taken as the change trend of the abnormal operating parameters. Otherwise, the change rate of the abnormal operating parameters corresponding to the last time window is extracted from the arrangement results of each time window as the change trend of the abnormal operating parameters.
4. The intelligent oil and gas wellhead emergency cut-off protection system according to claim 1, characterized in that: The analysis of the required closing speed of the emergency shut-off valve is implemented as follows: The change trend of abnormal operating parameters and power supply fluctuation corresponding to the abnormal monitoring time are compared with the normal change trend and normal fluctuation set by the system. If the change trend of abnormal operating parameters and power supply fluctuation corresponding to the abnormal monitoring time are less than or equal to the normal change trend and normal fluctuation, the default closing speed of the emergency shut-off valve is used as the required closing speed. Otherwise, the analytical formula is used. , get the required closing speed of the emergency shut-off valve , where , They respectively represent the changing trend of abnormal operating parameters and power supply fluctuation corresponding to the abnormal monitoring time. , They represent normal change trend and normal fluctuation respectively. Indicates the default closing speed of the emergency shut-off valve.
5. An intelligent oil and gas wellhead emergency cut-off protection system as claimed in claim 4, characterized in that: The dynamic adjustment of closing speed is performed as follows: When the emergency shut-off valve is closed at the required closing speed, the oil and gas concentration at the wellhead is monitored in real time using oil and gas monitoring equipment, and the oil and gas release increment is calculated by comparing it with the oil and gas concentration monitored at the previous moment, and compared with the safe oil and gas release increment set by the system. If the oil and gas release increment at a certain moment is less than or equal to the safe oil and gas release increment, the operation continues to be performed at the required closing speed. If the oil and gas release increment at a certain moment is greater than the safe oil and gas release increment, the emergency shut-off valve is operated at the default closing speed at that moment.
6. The intelligent oil and gas wellhead emergency cut-off protection system according to claim 1, characterized in that: The implementation of filtering out the records of the cut-off response delay is as follows: The shutoff response time of each emergency shutoff valve triggering operation record is compared with the expected shutoff response time, and the emergency shutoff valve triggering operation records with a longer shutoff response time than the expected shutoff response time are selected as the shutoff response delay records.
7. An intelligent oil and gas wellhead emergency cut-off protection system as claimed in claim 1, characterized in that: The correlation between the cut-off response delay and power supply fluctuation is analyzed as follows: A coordinate system is constructed with power supply fluctuation as the horizontal coordinate and cut-off response time as the vertical coordinate, thereby marking a number of points in the constructed coordinate system for the cut-off response time and power supply fluctuation recorded in the effective trigger operation to form a correlation curve, and obtaining the slope of each point on the correlation curve; The correlation between the cut-off response delay and the power supply fluctuation is calculated by taking the reciprocal of the natural constant as the base and the result of processing the absolute value of the slope of each point on the correlation curve as the index.
8. An intelligent oil and gas wellhead emergency cut-off protection system as claimed in claim 1, characterized in that: The power supply fluctuation monitoring and adjustment is implemented as follows: Retrieve the power supply fluctuation monitoring records within the analysis period, and extract the monitoring records with power supply fluctuations greater than normal fluctuations from the monitoring records as candidate monitoring records; Clustering the monitoring moments of the candidate monitoring records to obtain a number of clusters, and counting the number of candidate monitoring records contained in each cluster; The number of candidate monitoring records contained in each cluster is statistically analyzed for distribution differences, and the statistical results are compared with the set limit value. If the statistical results of the distribution differences are less than the limit value, it is identified that there is no regularity in the fluctuation period, otherwise it is identified that there is regularity in the fluctuation period; If regularity of fluctuation periods is identified, the regular fluctuation periods formed by the monitoring times of the alternative monitoring records in the cluster with the largest number of alternative monitoring records are selected from each cluster, and then a voltage stabilizing device is set at the power supply end during the regular fluctuation periods. If no regularity of fluctuation periods is identified, the power supply fluctuation monitoring frequency is adjusted.
9. An intelligent oil and gas wellhead emergency cut-off protection system as claimed in claim 6, characterized in that: The operation parameter warning threshold is adjusted as follows: The percentage of valid trigger operation records within the statistical analysis period is calculated, and the disconnection response duration of each valid trigger operation record is compared with the expected disconnection response duration to calculate the disconnection response delay amplitude of each valid trigger operation record; A coordinate system is constructed with the trigger time as the horizontal axis and the cut-off response delay amplitude as the vertical axis, thereby forming a cut-off response delay curve for the trigger time and the cut-off response delay amplitude of each valid trigger operation record, and obtaining the change rate of the curve; The change rate of the cut-off response delay curve is combined with the proportion of effective trigger operation records to evaluate the operation parameter warning threshold adjustment demand factor; Set the currently set operating parameter warning threshold Adjust demand factor with operating parameter warning threshold Using the formula Calculate the adjusted operating parameter warning threshold .
10. An intelligent oil and gas wellhead emergency cut-off protection device, characterized in that: The device comprises the intelligent oil and gas wellhead emergency cut-off protection system as described in any one of claims 1-9.
Citation Information
Patent Citations
Wellhead pressure control method and device for pressure control drilling well
CN105089528A
Method and device for intelligently opening and closing well
CN107780885A
Opening-degree-adjustable fracturing wellhead capable of being remotely adjusted and adjusting and controlling method thereof
CN117489290A
Natural gas control optimization method and system for salt-cavern natural gas underground gas storage
CN117514080A
Amplifier control method and system and storage medium
CN118694334A
Cited By
Intelligent petroleum and natural gas wellhead emergency cut-off protection device and control system
CN120083503A
An intelligent emergency cut-off protection control system for oil and gas wellheads
CN120083503B
