By designing a pipeline sealing device with an inclined inner wall and cavity structure, and filling the cavity with glue to ensure sealing, the problems of insufficient sealing and easy device damage in the prior art are solved, and efficient sewage prevention and convenient Construction operation.

CN118980010APending Publication Date: 2024-11-19TIANJIN PIPELINE ENG GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411010904.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The existing pipeline sealing device is difficult to ensure sealing during construction, and the sealing device is easily damaged or dropped during transportation and operation, causing sewage to invade the pipeline and contaminate drinking water.

Method used

A pipe sealing device including a sealing ring and a shield is designed. The sealing ring has an inclined inner wall, an annular sealing lip and a cavity structure. The cavity is filled with glue to ensure sealing. It uses rubber vulcanization molding material and can be used. The disassembly design simplifies the installation and disassembly process.

Benefits of technology

It achieves high sealing when pipe docking, avoids sewage intrusion, is simple to operate, and is easy to install and remove, reducing the risk of pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118980010A_ABST
    Figure CN118980010A_ABST
Patent Text Reader

Abstract

The invention provides a pipeline plugging device and a pipeline butt joint construction method applying the plugging device, the pipeline plugging device comprises a sealing ring and a blocking cover at the outer end of the sealing ring, the blocking cover comprises a connecting ring and a sealing plate, the outer edge of the sealing plate is provided with a blocking part protruding out of the connecting ring, and the connecting ring is connected with the sealing ring; the sealing ring comprises a base body, the base body is provided with an inclined inner wall, a first sealing lip is arranged at the end, close to the blocking cover, of the inner wall, a second sealing lip is arranged at the end, away from the blocking cover, of the inner wall, the first sealing lip is of an annular structure, a deformation groove is formed between the first sealing lip and the inclined inner wall, and the second sealing lip and the inclined inner wall are in smooth transition. An annular cavity is formed in the base body, the position, corresponding to the second sealing lip, of the cavity is provided with an inner concave part facing one side of the second sealing lip, and a glue injection one-way valve is arranged on the outer wall, corresponding to the cavity, of the sealing ring. The sealing device can be conveniently installed on a pipe opening, the sealing performance is guaranteed, and meanwhile dismounting is very convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of pipeline engineering construction, and in particular relates to a pipeline plugging device and a pipeline butt joint construction method using the plugging device. Background Art

[0002] Municipal water supply pipelines usually include main water supply pipelines and branch pipes connected to the main water supply pipelines. Each branch pipe can supply water to the water-using side. Therefore, according to the water supply demand, the branch pipe is connected to the opening of the side wall of the main water supply pipeline to achieve the purpose of water supply. Pipeline engineering construction usually uses PE pipes, steel pipes, ball pipes, etc., and the pipe diameter is roughly in the range of 300mm-1200mm. In the early stage of construction of connecting the branch pipe with the main water supply pipeline, a trench is usually excavated first, and then the branch pipe is transported to the vicinity of the trench by an engineering vehicle or directly placed in the trench to save land and prevent accidental damage. Then, according to the construction arrangement, the branch pipe is connected to the main water supply pipeline. Although it is more convenient for the later pipeline connection operation to place the branch pipe in the excavated trench, since there is often water in the trench, sewage mixed with mud and sand can easily flow into the branch pipe from the pipe mouth of the branch pipe. Once the inside of the pipeline is contaminated, it is difficult to clean it thoroughly at the construction site. Therefore, during the water delivery process after the pipeline is connected, it will cause pollution of drinking water. Although plugs or covers are used to seal branch pipes in the prior art, the sealing cannot be guaranteed well, and sewage often invades the interior of the pipes. In addition, the plugs or covers used to seal the branch pipe openings are easily knocked and fallen off during transportation or operation. Therefore, it is necessary to improve the existing sealing devices. Summary of the invention

[0003] In view of this, the present invention aims to overcome the defects in the prior art and proposes a pipeline plugging device and a pipeline docking construction method using the plugging device.

[0004] To achieve the above object, the technical solution created by the present invention is implemented as follows:

[0005] A pipeline plugging device and a pipeline docking construction method using the plugging device, comprising a sealing ring and a baffle at the outer end of the sealing ring, the baffle comprising a connecting ring and a sealing plate, the outer edge of the sealing plate having a baffle protruding from the connecting ring, the connecting ring being connected to the sealing ring; the sealing ring comprising a base body, the base body having an inclined inner wall, and a first sealing lip is provided at one end of the inner wall close to the baffle, and a second sealing lip is provided at the end away from the baffle, wherein the first sealing lip is an annular structure, and a deformation groove is formed between the first sealing lip and the inclined inner wall, and the second sealing lip has a smooth transition to the inclined inner wall; an annular cavity is provided inside the base body, the cavity is provided with an inner recessed portion facing the second sealing lip at a position corresponding to the second sealing lip, and a glue injection one-way valve is provided on the outer wall of the sealing ring corresponding to the cavity.

[0006] Furthermore, the connecting ring and the sealing plate are an integrally formed structure.

[0007] Furthermore, the baffle cover is formed by rubber vulcanization.

[0008] Furthermore, a rounded structure is provided between the second sealing lip and the end surface of the sealing ring.

[0009] Furthermore, the blocking portion protrudes from the connecting ring by 2-5 mm.

[0010] Furthermore, the sealing ring is made of plastic or rubber material.

[0011] Furthermore, the length of the connecting ring in the axial direction is 5-15 mm.

[0012] Furthermore, the connecting ring of the baffle cover is provided with a transition portion connected with the sealing ring.

[0013] A pipeline butt joint construction method using the above pipeline plugging device comprises the following steps:

[0014] Align the branch pipe equipped with the sealing device and gradually move it closer to the main water supply pipe until it is close to the side wall of the main water supply pipe. Cut or score the wrinkled part of the sealing ring, and then pry the sealing ring apart to both sides. Use the barrier part of the baffle to scrape off the impurities on the surface of the main water supply pipe, and use the barrier part to prevent the fallen impurities from invading the pipe mouth of the branch pipe. After the sealing device is taken out, bring the branch pipe close to the main water supply pipe and fix them by welding.

[0015] Compared with the prior art, the present invention has the following advantages:

[0016] The invention has a simple structure and reasonable design. By setting a cavity inside the sealing ring, and the cavity is provided with an inner concave portion facing the second sealing lip at the position corresponding to the second sealing lip, the second sealing lip can be effectively pressed against the outer wall of the pipe by injecting glue or wax into the cavity of the sealing ring that has been mounted on the pipe mouth until the cavity is filled. At the same time, the buffer groove at the first sealing lip will also be adaptively deformed due to the filling of the cavity, thereby ensuring that the first sealing lip is effectively squeezed and closely fits with the outer wall of the pipe, so that the sealing performance is reliably guaranteed under normal conditions. When the pipes are docked, the pipe with the plugging device installed can be directly aligned and close to the opening position of the main water supply pipe, and even the sealing plate can be directly gently attached to the main water supply pipe, and then the folded part of the plugging device can be cut or cut, and then the plugging device can be opened to both sides, and the plugging device can be pulled outward to achieve removal, which is very convenient to operate. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings constituting part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0018] Figure 1 A schematic diagram of the structure created by the present invention;

[0019] Figure 2 A cross-sectional view of the structure created by the present invention;

[0020] Figure 3 A schematic diagram of the local structure created by the present invention;

[0021] Figure 4 A schematic diagram of the three-dimensional structure created by the present invention;

[0022] Figure 5 A schematic diagram of the invention when a pleated portion is provided;

[0023] Figure 6 This is a schematic diagram of the three-dimensional structure of the present invention when a pleated portion is provided;

[0024] Figure 7 This is a schematic diagram of the front structure of the present invention when a reinforcing rod is provided;

[0025] Figure 8 This is a schematic diagram of the three-dimensional structure of the present invention when a reinforcing rod is provided;

[0026] Fig. 9 This is a schematic diagram of the invention after the two halves are separated when a reinforcing rod is provided;

[0027] Fig.10 A top view of the invention when a pulling handle is provided. DETAILED DESCRIPTION

[0028] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0029] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0030] In the description of the invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to specific circumstances.

[0031] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments.

[0032] A pipeline plugging device and a pipeline butt joint construction method using the plugging device, such as Figures 1 to 10 As shown, it includes a sealing ring 1 and a baffle 2 at the outer end of the sealing ring, the baffle includes a connecting ring 3 and a sealing plate 4, the outer edge of the sealing plate has a baffle portion 5 protruding from the connecting ring, and the connecting ring is connected to the sealing ring; the sealing ring includes a base 6, the base has an inclined inner wall 7, and a first sealing lip 8 is provided at one end of the inner wall close to the baffle, and a second sealing lip 9 is provided at the end away from the baffle, wherein the first sealing lip is an annular structure, the first sealing lip has a protrusion 13 on the side facing the second sealing lip, a deformation groove 10 is formed between the first sealing lip and the inclined inner wall, and the second sealing lip has a smooth transition to the inclined inner wall; an annular cavity 11 is provided inside the base, and the cavity is provided with an inner recess 12 facing the second sealing lip at a position corresponding to the second sealing lip, and a glue injection one-way valve 20 is provided on the corresponding cavity on the outer wall of the sealing ring.

[0033] The connecting ring and the sealing plate are an integrally formed structure. For example, the baffle formed by the connecting ring and the sealing plate is vulcanized and formed on the outer end of the sealing ring using rubber material. A rounded structure 14 is provided between the second sealing lip and the end face of the sealing ring. The rounded structure is more conducive to the sealing ring being fitted on the pipeline, and is also conducive to achieving reliable sealing between the second sealing lip and the pipeline when it is pressed. The barrier portion protrudes 2-5mm from the connecting ring. The sealing ring is made of plastic or rubber material. The length of the connecting ring in the axial direction is 5-15mm. The connecting ring of the baffle is provided with a transition portion 15 connected with the sealing ring, and a sealing state is ensured between the transition portion and the sealing ring.

[0034] In an optional embodiment, a flexible pleated portion 16 is provided on one side of the sealing ring, and at the same time, a tear mark 17 corresponding to the pleated portion is provided on the baffle, and the pleated portion gradually gathers at the position of the tear mark from the sealing ring to the baffle. When the sealing ring is partially mounted on the pipe mouth of the pipeline, the pleated portion is allowed to deform. Such a structural design is more conducive to the smooth installation of the device and avoids the sealing ring from being squeezed and damaged, effectively overcoming the defect of the inconvenient removal of the plug or cover in the prior art. It should be pointed out that although the tear mark is a torn structure design, when the sealing ring is mounted or in normal use, the sealing ring protects the tear mark of the sealing plate and will not be subjected to the force of "being torn open". Only when the pleated portion is cut or cut open, the tear mark portion will cause the sealing plate to be divided into two petals under the pulling force.

[0035] In a further improved scheme, a reinforcing rod 18 is provided on one side of the sealing ring symmetrical to the folded portion, both ends of the reinforcing rod do not protrude from the end face of the sealing ring, and a pulling handle 19 is provided on the outside of the reinforcing rod. The pulling handle is used to facilitate pulling the sealing device outward during pipeline docking construction, and the reinforcing rod can ensure that the pulling handle is fixed and stable, and can serve as a rotating shaft for the relative rotation of the two parts of the sealing device.

[0036] A pipeline butt joint construction method using the above pipeline plugging device comprises the following steps:

[0037] Align the branch pipe equipped with the sealing device and gradually move it closer to the main water supply pipe until it is close to the side wall of the main water supply pipe. Cut or score the wrinkled part of the sealing ring, and then pry the sealing ring apart to both sides. Use the barrier part of the baffle to scrape off the impurities on the surface of the main water supply pipe, and use the barrier part to prevent the fallen impurities from invading the pipe mouth of the branch pipe. After the sealing device is taken out, bring the branch pipe close to the main water supply pipe and fix them by welding.

[0038] The invention has a simple structure and reasonable design. By setting a cavity inside the sealing ring, and the cavity is provided with an inner concave portion facing the second sealing lip at the position corresponding to the second sealing lip, the second sealing lip can be effectively pressed against the outer wall of the pipe by injecting glue or wax into the cavity of the sealing ring that has been mounted on the pipe mouth until the cavity is filled. At the same time, the buffer groove at the first sealing lip will also be adaptively deformed due to the filling of the cavity, thereby ensuring that the first sealing lip is effectively squeezed and closely fits with the outer wall of the pipe, so that the sealing performance is reliably guaranteed under normal conditions. When the pipes are docked, the pipe with the plugging device installed can be directly aligned and close to the opening position of the main water supply pipe, and even the sealing plate can be directly gently attached to the main water supply pipe, and then the folded part of the plugging device can be cut or cut, and then the plugging device can be opened to both sides, and the plugging device can be pulled outward to achieve removal, which is very convenient to operate.

[0039] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A pipeline plugging device and a pipeline docking construction method using the plugging device, characterized in that: The invention comprises a sealing ring and a baffle at the outer end of the sealing ring, wherein the baffle comprises a connecting ring and a sealing plate, wherein the outer edge of the sealing plate comprises a baffle protruding from the connecting ring, and the connecting ring is connected with the sealing ring; the sealing ring comprises a base body, wherein the base body has an inclined inner wall, and a first sealing lip is provided at one end of the inner wall close to the baffle, and a second sealing lip is provided at the end away from the baffle, wherein the first sealing lip is an annular structure, and a deformation groove is formed between the first sealing lip and the inclined inner wall, and a smooth transition is formed between the second sealing lip and the inclined inner wall; an annular cavity is provided inside the base body, and an inner recess is provided on the side of the second sealing lip at a position corresponding to the second sealing lip, and a glue injection one-way valve is provided on the outer wall of the sealing ring corresponding to the cavity.

2. A pipeline plugging device and a pipeline butt joint construction method using the plugging device according to claim 1, characterized in that: The connecting ring and the sealing plate are an integrally formed structure.

3. A pipeline plugging device and a pipeline butt joint construction method using the plugging device according to claim 1, characterized in that: The baffle cover is formed by rubber vulcanization.

4. A pipeline plugging device and a pipeline butt joint construction method using the plugging device according to claim 1, characterized in that: A rounded corner structure is provided between the second sealing lip and the end surface of the sealing ring.

5. The pipeline plugging device and the pipeline butt joint construction method using the plugging device according to claim 1 are characterized in that: The baffle protrudes from the connecting ring by 2-5 mm.

6. A pipeline plugging device and a pipeline butt joint construction method using the plugging device according to claim 1, characterized in that: The sealing ring is made of plastic or rubber material.

7. A pipeline plugging device and a pipeline butt joint construction method using the plugging device according to claim 1, characterized in that: The length of the connecting ring in the axial direction is 5-15 mm.

8. The pipeline plugging device and the pipeline butt joint construction method using the plugging device according to claim 1 are characterized in that: The connecting ring of the baffle cover is provided with a transition portion connected with the sealing ring.

9. A pipeline butt joint construction method using the pipeline plugging device according to any one of claims 1 to 8, characterized in that: The steps include: Align the branch pipe equipped with the plugging device and gradually move it closer to the main water supply pipe until it is close to the side wall of the main water supply pipe. Cut or scratch the sealing ring, and then pry the sealing ring apart on both sides. Use the barrier part of the baffle cover to scrape off impurities on the surface of the main water supply pipe, and use the barrier part to prevent fallen impurities from invading the pipe mouth of the branch pipe. After the plugging device is taken out, bring the branch pipe close to the main water supply pipe and fix them by welding.