Hook load test method for well drilling system
Through hydraulic cylinder simulation load and detection, the problem of large hook load testing of drilling system caused by limited space in the drilling ship is solved, and the effectiveness of load tests and simple operation are achieved, ensuring that the large hook load meets the design requirements.
Patent Information
- Application Number
- CN202411136661.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-19
AI Technical Summary
In the limited space of the drilling ship, large hook load tests for drilling system cannot be effectively carried out, resulting in the inability to determine whether the large hook meets the design requirements.
Different lifting load conditions are simulated by hydraulic cylinders, and connected to the large hook of the drilling system using jointless steel wire rope, alloy steel shackle, dynamometer and lifting ring. The load is gradually increased and whether it is damaged is detected to achieve different load ratios, including 20%, 50 %, 80% and 100%.
Effective tests on the load of the large hook in the drilling system in the limited space of the drilling ship, ensuring that the load of the large hook meets the design requirements, and no fire operation is required throughout the process, which is highly operable and shortens the construction cycle.
Smart Images

Figure CN118980533A_ABST
Abstract
Description
Technical field:
[0001] The invention relates to the field of large hook load test methods, in particular to a large hook load test method for a drilling system. Background technology:
[0002] Common drilling systems are generally assembled on drilling platforms, and crude oil is drilled and produced through platform operations. Since drilling platforms are only suitable for shallow water areas (currently generally less than 500 feet deep), the world's maritime powers are now developing drilling ships, integrating complex systems such as drilling systems and exploration systems on ships, and making better use of each integrated system through the unique performance of the ship.
[0003] Conventional drilling platforms are designed with cantilever beams in their drilling systems, which can slide to the rear outboard. The load of the big hook of the drilling system can be verified by hanging heavy objects or water bags. However, the derrick of the drilling ship is fixed in the middle of the ship, with the moon pool at the bottom. Limited by the size of the moon pool and the derrick, there is no space to suspend the load of the big hook of the drilling system. It is difficult to complete the load test of the big hook using traditional test methods. After the installation and commissioning of the derrick is completed, it is impossible to determine whether the load of the big hook can meet the design requirements. Therefore, it is necessary to design a load test method for the big hook of the drilling system.
[0004] Therefore, a method for testing the load of a large hook of a drilling system is urgently needed, which is helpful to solve the technical problem that the existing technology lacks a method for testing the load of a large hook of a drilling system within a limited range. Summary of the invention:
[0005] In one embodiment, the present invention provides a method for testing the load of a large hook of a drilling system, which provides a method for simulating the load conditions of the large hook of a drilling system under different lifting load conditions through a hydraulic cylinder, thereby helping to solve the technical problem in the prior art that a load test of a large hook of a drilling system cannot be performed within a limited range.
[0006] The drilling system hook load test method comprises:
[0007] Adjust the working condition of the drilling system to meet the test requirements;
[0008] Connecting the endless steel wire rope, alloy steel shackle, dynamometer, lifting ring and drilling system hook to the lifting equipment of the drilling system in sequence, wherein the hull is connected to the pulling tool, and the pulling tool pulls the drilling system hook through the hydraulic cylinder;
[0009] Loading the drilling system hook with a load and releasing the tension through the hydraulic cylinder so that the weight of the load is gradually carried by the system hook;
[0010] The endless steel wire rope, the alloy steel shackle, the lifting ring and the drilling system hook are inspected to determine whether they are damaged to implement the test.
[0011] In one embodiment, after the endless wire rope, the alloy steel shackle, the lifting ring and the drilling system hook are inspected to determine whether they are damaged to implement the test step, the method further comprises:
[0012] Continue to increase the load of the hydraulic cylinder to reach different load ratios to determine whether the endless wire rope, the alloy steel shackle, the lifting ring and the drilling system hook are damaged.
[0013] In one embodiment, the load ratio is 20%, 50%, 80% and 100%.
[0014] In one embodiment, the operating conditions include ballast water, the drilling vessel reaching the designed load test operating draft, and ensuring that the vessel is level front, back, left, and right.
[0015] In one embodiment, the dynamometer data is displayed as load on a tension display.
[0016] In one embodiment, after the step of continuing to increase the load of the hydraulic cylinder to achieve different load ratios and determining whether the endless wire rope, the alloy steel shackle, the lifting ring and the drilling system hook are damaged, the method further comprises:
[0017] After the load reaches 100%, the main winch is braked and kept stationary for 10 minutes to check the stress conditions of various parts. After no defects are found, the enlarged hook is slowly lowered until the wire rope is completely relaxed.
[0018] In one embodiment, the tension tooling is hooked below the large hook of the drilling system;
[0019] The top of the tension tooling is connected to one end of the hydraulic cylinder through an eye plate, and the other end of the hydraulic cylinder is connected to the drilling platform structure through another eye plate.
[0020] In one embodiment, the eye plate is connected to the hydraulic cylinder via a shackle.
[0021] In one embodiment, the tension tooling is a frame structure formed by welding two cross beams and two longitudinal beams end to end, and a cylindrical structure is provided at the bottom of the tension tooling.
[0022] In one embodiment, after the load reaches 100%, the main winch is braked and kept stationary for 10 minutes, and the stress conditions of various parts are checked. After no defects are found, the enlarged hook is slowly lowered, and finally the wire rope is in a completely relaxed state, the method further includes:
[0023] Read the deformation value at each position and remove the tooling after verification. Description of the drawings:
[0024] Figure 1 It is a schematic flow chart of a method for testing a large hook load of a drilling system in one embodiment of the present invention;
[0025] Figure 2 This is a schematic diagram of the overall structure of a drilling ship in another embodiment of the present invention;
[0026] Figure 3 It is a schematic diagram of the structure of a drilling ship in which a large hook of a drilling system is included in another embodiment of the present invention;
[0027] Figure 4 It is a schematic diagram of the side view of the structure of the drilling ship in which the big hook of the drilling system is located in another embodiment of the present invention;
[0028] Figure 5 It is a schematic structural diagram of a large hook portion of a drilling system in another embodiment of the present invention;
[0029] Figure 6 This is a schematic diagram of the connection structure between the large hook and the tooling in another embodiment of the present invention;
[0030] Figure 7 It is a schematic diagram of the side view of the connection structure between the large hook and the tooling in another embodiment of the present invention;
[0031] Figure 8 It is a schematic diagram of a top view of a connecting structure of a large hook and a tooling in another embodiment of the present invention;
[0032] Fig. 9 It is a schematic cross-sectional view of a workpiece of a large hook and a tooling connection structure in another embodiment of the present invention.
[0033] Reference numerals:
[0034] Endless wire rope 1
[0035] Alloy steel shackle 2
[0036] Dynamometer 3
[0037] Rings 4
[0038] Drilling system big hook 5
[0039] Tension tooling 6
[0040] Hydraulic cylinder 7
[0041] Eye Plate 8
[0042] Shackle 9 Specific implementation method:
[0043] The purpose of the present invention is to provide a method for testing the load of a large hook of a drilling system of a drilling ship, taking into account that the load of the large hook cannot be tested according to conventional design methods in a limited space of a drilling ship, so as to solve the problem that the small space of the derrick and the moon pool limits the load size.
[0044] Figure 1 It is a schematic flow chart of a method for testing a large hook load of a drilling system in one embodiment of the present invention; Figure 2 This is a schematic diagram of the overall structure of a drilling ship in another embodiment of the present invention; Figure 3 It is a schematic diagram of the structure of a drilling ship in which a large hook of a drilling system is included in another embodiment of the present invention; Figure 4 It is a schematic diagram of the side view of the structure of the drilling ship in which the big hook of the drilling system is located in another embodiment of the present invention; Figure 5 It is a schematic structural diagram of a large hook portion of a drilling system in another embodiment of the present invention; Figure 6 This is a schematic diagram of the connection structure between the large hook and the tooling in another embodiment of the present invention; Figure 7 It is a schematic diagram of the side view of the connection structure between the large hook and the tooling in another embodiment of the present invention;
[0045] Figure 8 It is a schematic diagram of a top view of a connecting structure of a large hook and a tooling in another embodiment of the present invention; Fig. 9 It is a schematic cross-sectional view of a workpiece of a large hook and a tooling connection structure in another embodiment of the present invention.
[0046] like Figures 1 to 9 As shown, in one embodiment, the present invention provides a method for testing the load of a large hook of a drilling system, and the method for testing the load of a large hook of a drilling system comprises:
[0047] S101, adjusting the working state of the drilling system to meet the test requirements.
[0048] In this step, a specific procedure for adjusting the working state of the drilling system to meet the test requirements is provided, which needs to be as close to the actual usage scenario as possible.
[0049] S102, connecting the endless steel wire rope, alloy steel shackle, dynamometer, lifting ring and drilling system hook to the lifting equipment of the drilling system in sequence, wherein the hull is connected to the tensioning tooling, and the tensioning tooling pulls the drilling system hook through a hydraulic cylinder.
[0050] In this embodiment, a specific implementation method for connecting specific components together during use is provided.
[0051] S103, loading the drilling system hook with a load, and releasing the tension through the hydraulic cylinder, so that the weight of the load is gradually borne by the system hook.
[0052] In this step, a specific step of releasing the pressure of the hydraulic cylinder to reduce its load is provided. The hydraulic cylinder is an upward force, which is opposite to the gravity direction of the load on the drilling system, and in this way, the load is gradually increased.
[0053] S104, inspecting the endless steel wire rope, the alloy steel shackle, the lifting ring and the drilling system hook to determine whether they are damaged to implement the test.
[0054] The specific steps that determine whether or not this step is ultimately damaged.
[0055] In this embodiment, a specific implementation method of a large hook load test method for a drilling system is provided. In combination with the drilling platform structure diagram of the drilling ship, the test tooling drawings are designed, and the tooling can better match the drilling platform structure; the test tooling is manufactured and accepted; the drilling system is installed and debugged, and the conditions for the large hook test of the drilling system are met. The test tooling is transferred to the bottom of the derrick, and the test tooling is lifted to the bottom of the drilling platform structure through the oil cylinder, eye plate and shackle; the jointless wire rope, alloy steel shackle, dynamometer, lifting ring are connected to the large hook of the drilling system; the oil cylinder is slowly operated to slowly lower the test tooling, and at the same time, the rigging connected to the large hook is stressed. After all the rigging is stressed, check whether there is any abnormality in the connection part. If there is no abnormality, start the test. By slowly operating the drilling system, lift the test tooling so that the upper surface of the test tooling is against the lower end structure of the drilling platform structure, and the drilling platform structure begins to be stressed.
[0056] Figure 2 The dotted part of the drilling system is the location of the big hook. Figure 3 It is the installation part of the drilling system related to the big hook. Figure 4 A side view of the structural diagram of the drilling system installation components related to the big hook, Figure 5 is the specific device to be tested.
[0057] In one embodiment, after the endless wire rope, the alloy steel shackle, the lifting ring and the drilling system hook are inspected to determine whether they are damaged to implement the test step, the method further comprises:
[0058] Continue to increase the load of the hydraulic cylinder to reach different load ratios to determine whether the endless wire rope, the alloy steel shackle, the lifting ring and the drilling system hook are damaged.
[0059] In this embodiment, a method for continuing the test is provided. The drilling system is continued to be operated to slowly increase the load on the dynamometer, and a load observation point is set. When the load reaches the corresponding value, the stress conditions of various parts are stopped and checked, such as whether there are cracks in the structure, whether the wire rope is broken, etc. The test is continued after checking that there are no defects.
[0060] In one embodiment, the load ratio is 20%, 50%, 80% and 100%.
[0061] In this embodiment, a specific implementation of the load ratio is provided.
[0062] In one embodiment, the operating conditions include ballast water, the drilling vessel reaching the designed load test operating draft, and ensuring that the vessel is level front, back, left, and right.
[0063] In this embodiment, a specific implementation of the operating state is provided.
[0064] In one embodiment, the dynamometer data is displayed as load on a tension display.
[0065] In this embodiment, a specific implementation method is provided in which the dynamometer data is displayed on a tension force display. The load display is the load displayed on a tension force display in a driller's room in a drilling system.
[0066] In one embodiment, after the step of continuing to increase the load of the hydraulic cylinder to achieve different load ratios and determining whether the endless wire rope, the alloy steel shackle, the lifting ring and the drilling system hook are damaged, the method further comprises:
[0067] After the load reaches 100%, the main winch is braked and kept stationary for 10 minutes to check the stress conditions of various parts. After no defects are found, the enlarged hook is slowly lowered until the wire rope is completely relaxed.
[0068] In one embodiment, the tension tooling is hooked below the large hook of the drilling system;
[0069] The top of the tension tooling is connected to one end of the hydraulic cylinder through an eye plate, and the other end of the hydraulic cylinder is connected to the drilling platform structure through another eye plate.
[0070] In one embodiment, the eye plate is connected to the hydraulic cylinder via a shackle.
[0071] In one embodiment, the tension tooling is a frame structure formed by welding two cross beams and two longitudinal beams end to end, and a cylindrical structure is provided at the bottom of the tension tooling.
[0072] In one embodiment, after the load reaches 100%, the main winch is braked and kept stationary for 10 minutes, and the stress conditions of various parts are checked. After no defects are found, the enlarged hook is slowly lowered, and finally the wire rope is in a completely relaxed state, the method further includes:
[0073] Read the deformation value at each position and remove the tooling after verification.
[0074] Beneficial effects:
[0075] Key points and protection points of the present invention:
[0076] The design of the test fixture needs to match the rig structure design of the hull, and the production of the test fixture is carried out in parallel with the construction of the hull;
[0077] During the entire test process, no hot work is required;
[0078] A more ingenious test method is to use a test fixture to support the fixture and the drilling platform structure to transmit the force.
[0079] The test method is highly operational and relatively easy to implement in construction plants, thus shortening the construction period.
[0080] Solved the problem of small space in the derrick of the drilling system and large load on the hook;
[0081] The entire test process does not require hot work;
[0082] This test method can be extended to all drilling vessels.
[0083] The above-mentioned embodiments only express some embodiments of the present invention, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.
Claims
1. A method for testing the load of a large hook of a drilling system, characterized in that: The drilling system hook load test method comprises: Adjust the working condition of the drilling system to meet the test requirements; Connecting the endless steel wire rope, alloy steel shackle, dynamometer, lifting ring and drilling system hook to the lifting equipment of the drilling system in sequence, wherein the hull is connected to the pulling tool, and the pulling tool pulls the drilling system hook through the hydraulic cylinder; Loading the drilling system hook with a load and releasing the tension through the hydraulic cylinder so that the weight of the load is gradually carried by the system hook; The endless steel wire rope, the alloy steel shackle, the lifting ring and the drilling system hook are inspected to determine whether they are damaged to implement the test.
2. The method for testing the load of a large hook of a drilling system according to claim 1, characterized in that: After the test step of detecting the endless steel wire rope, the alloy steel shackle, the lifting ring and the drilling system hook to determine whether they are damaged, the method further comprises: Continue to increase the load of the hydraulic cylinder to reach different load ratios to determine whether the endless wire rope, the alloy steel shackle, the lifting ring and the drilling system hook are damaged.
3. The method for testing the load of a large hook of a drilling system according to claim 2, characterized in that: The load ratios are 20%, 50%, 80% and 100%.
4. The method for testing the load of a large hook of a drilling system according to claim 3, characterized in that: The working condition includes ballast water, the drilling vessel reaches the designed load test working condition draft, and the ship is ensured to be level front, back, left and right.
5. The method for testing the load of a large hook of a drilling system according to claim 4, characterized in that: The dynamometer data is displayed on the tension display via the load.
6. The method for testing the load of a large hook of a drilling system according to claim 5, characterized in that: After the step of continuing to increase the load of the hydraulic cylinder to achieve different load ratios and determining whether the endless wire rope, the alloy steel shackle, the lifting ring and the drilling system hook are damaged, the method further comprises: After the load reaches 100%, the main winch is braked and kept stationary for 10 minutes to check the stress conditions of various parts. After no defects are found, the enlarged hook is slowly lowered until the wire rope is completely relaxed.
7. The method for testing the load of a large hook of a drilling system according to claim 6, characterized in that: The tension tooling is hooked below the big hook of the drilling system; The top of the tension tooling is connected to one end of the hydraulic cylinder through an eye plate, and the other end of the hydraulic cylinder is connected to the drilling platform structure through another eye plate.
8. The method for testing the load of a large hook of a drilling system according to claim 7, characterized in that: The eye plate is connected to the hydraulic cylinder via a shackle.
9. The method for testing the load of a large hook of a drilling system according to claim 8, characterized in that: The tension tooling is a frame structure formed by welding two cross beams and two longitudinal beams end to end, and a cylindrical structure is arranged at the bottom of the tension tooling.
10. The method for testing the load of a large hook of a drilling system according to claim 9, characterized in that: After the load reaches 100%, the main winch is braked and kept stationary for 10 minutes, and the stress conditions of various parts are checked. After no defects are found, the enlarged hook is slowly lowered, and finally the wire rope is in a completely relaxed state. The method also includes: Read the deformation value at each position and remove the tooling after verification.
Citation Information
Cited By
Hook test method for drilling system of drilling ship
CN120667030A
