Broadband measurement data online checking method and related device

Through online sampling and spectrum analysis, dynamic recording data is established for comparison and verification, which solves the problem of low calibration efficiency of broadband measurement data in the power grid, and realizes automatic verification without power outage, ensuring data quality and grid stability.

CN118980872APending Publication Date: 2024-11-19CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411024559.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The existing technology has low efficiency in the verification of broadband measurement data in the power grid, and it is impossible to effectively verify data such as time/oversynchronization, inter-harmonic and medium-high frequency oscillation, resulting in data errors, and manual increase in volume is time-consuming and labor-intensive, affecting the normal operation of the power grid. .

Method used

By obtaining the online sampling data of the power grid interval signal for spectrum analysis, establishing the wideband measurement data verification configuration data, converting it into dynamic wave recording data, and using comparison method to automatically check without power outage to realize matching mapping of the verification data. and check.

Benefits of technology

It realizes efficient automatic verification of broadband measurement data, shortens the verification time, reduces the impact of power outages, ensures comprehensive verification of data types, and improves the quality of power grid data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118980872A_ABST
    Figure CN118980872A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of power system automation, and discloses a broadband measurement data on-line checking method and a related device, and the method comprises the steps: obtaining on-line sampling data of a power grid interval signal, and carrying out the spectrum analysis to obtain a broadband checking data source; establishing broadband measurement data checking configuration data according to the configuration information in the transformer substation, and converting a broadband checking data source into dynamic recording data according to the broadband measurement data checking configuration data; acquiring broadband measurement data to be checked in the transformer substation; and checking the broadband measurement data to be checked in a comparison mode by taking the broadband measurement data checking configuration data and the dynamic recording data as checking references to obtain a broadband measurement data checking result. According to the invention, automatic verification of broadband measurement data in a transformer station without power failure is realized, and the problems of low manual verification efficiency, influence of power failure on interval operation, incomplete verification data types and the like are solved. The interval outage time can be effectively shortened, and power grid operation is prevented from being affected by power failure; and meanwhile, comprehensive data type checking can be realized, the data quality of broadband measurement data applied by a power grid is ensured, and analysis and application of a broadband domain of a novel power system are supported.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of power system automation, and relates to an online verification method for broadband measurement data and a related device. Background Art

[0002] High-quality measurement data is the basis for the safe and stable operation of the power grid. With the construction of new power systems, the power grid has put forward new and higher requirements for the accuracy and reliability of source, network and load measurement data. After the gradual promotion and deployment of broadband measurement devices for power electronic grids, broadband measurement data includes multiple types of data such as power frequency, sub-supersynchronous, inter-(harmonic) and medium and high frequency oscillations. The amount of data is more than three times that of traditional power frequency data, and the difficulty and complexity of data point verification have increased significantly.

[0003] At present, the broadband measurement data verification of substations is solved by manually adding quantities during on-site power outages, that is, when the equipment is out of power, in order to verify the accuracy and reliability of the measurement equipment or system, the staff manually adds known quantities to the equipment or system for data verification. In actual operation and application, there are the following shortcomings:

[0004] (1) On-site verification is generally limited to power frequency phasor data, while consistency verification of sub / supersynchronous, interharmonic, harmonic, and medium / high frequency oscillation data cannot be effectively verified. This results in data misalignment or even data errors in these types of measurement data, making it difficult to use the measurement data of the broadband measurement device in operation.

[0005] (2) Data verification is achieved through manual addition. Due to the large amount of data and the complexity of verification, manual addition is inefficient and prone to errors. A typical station commissioning data verification often takes about one week to complete, which is time-consuming and labor-intensive.

[0006] (3) Using power outages to verify measurement data seriously affects the normal operation of the power grid. Summary of the invention

[0007] The purpose of the present invention is to overcome the above-mentioned shortcomings of the prior art and provide a method for online calibration of broadband measurement data and related devices.

[0008] In order to achieve the above object, the present invention adopts the following technical solutions:

[0009] According to a first aspect of the present invention, a method for online calibration of broadband measurement data is provided, comprising: obtaining online sampling data of a power grid interval signal and performing spectrum analysis to obtain a broadband calibration data source; establishing broadband measurement data calibration configuration data according to configuration information in a substation, and converting the broadband calibration data source into dynamic recording data according to the broadband measurement data calibration configuration data; obtaining broadband measurement data to be calibrated in the substation; using the broadband measurement data calibration configuration data and the dynamic recording data as calibration benchmarks, calibrating the broadband measurement data to be calibrated in a comparison manner, and obtaining a calibration result of the broadband measurement data.

[0010] Optionally, the method of acquiring online sampling data of the grid interval signal and performing spectrum analysis to obtain a broadband calibration data source includes: acquiring three-phase instantaneous voltage data and three-phase instantaneous current data of a grid interval measurement point with a sampling rate of not less than 25.6kHz to obtain online sampling data of the grid interval signal; establishing short sampling data according to the online sampling data of the grid interval signal, and performing spectrum analysis on the short sampling data based on a windowed interpolation method to obtain a current spectrum analysis result; and when the absolute value of the adjacent angular difference of the extreme spectrum lines of the data window within the frequency range of the current spectrum analysis result is π, retaining the current spectrum analysis result; otherwise, establishing long sampling data according to the online sampling data of the grid interval signal, and performing spectrum analysis on the long sampling data based on a windowed interpolation method to update the current spectrum analysis result; calibrating the current spectrum analysis result based on the amplitude-frequency and phase-frequency characteristics of the acquisition loop, and using the calibrated current spectrum analysis result as a broadband calibration data source; wherein the data window in the windowed interpolation method adopts a cosine combination window, and a method of aligning with the whole second of Coordinated Universal Time is used to convert short sampling data or long sampling data into frequency domain data.

[0011] Optionally, establishing broadband measurement data verification configuration data according to configuration information in the substation includes: establishing semantic information of broadband measurement data according to configuration information in the substation, and establishing broadband measurement data verification configuration data according to the semantic information of broadband measurement data; wherein the semantic information includes station name, channel name, station domain code, conversion factor and information point table name; the channel name includes station name, interval name and information name; wherein the information name includes one or more of the following: information name of synchronous phasor, information name of harmonic phasor, information name of interharmonic phasor and information name of oscillation power. Information name; the information name of the synchronous phasor includes one or more of the following: phase voltage phasor, phase current phasor, active power, reactive power, frequency and frequency change rate; the information name of the harmonic phasor includes one or more of the following: phase voltage harmonic phasor, phase current harmonic phasor, the frequency of the harmonic voltage and the frequency of the harmonic current; the information name of the interharmonic phasor includes one or more of the following: phase voltage harmonic phasor, phase current harmonic phasor, the frequency of the interharmonic voltage and the frequency of the interharmonic current; the information name of the oscillating power includes one or more of the following: oscillating power amplitude and power oscillation frequency.

[0012] Optionally, when the broadband calibration data source is converted into dynamic recording data according to the broadband measurement data calibration configuration data, the recording order of the dynamic recording data is set to be consistent with the transmission order of the broadband measurement data calibration configuration data and the broadband calibration data source, and the broadband calibration data source is arranged in chronological order.

[0013] Optionally, the obtaining of the broadband measurement data to be calibrated in the substation includes: obtaining the configuration information and real-time broadband measurement data of the broadband measurement device in the substation by active online calling, and obtaining the first broadband measurement data to be calibrated based on the configuration information and real-time broadband measurement data of the broadband measurement device in the substation; and obtaining the configuration information and real-time broadband measurement data of the broadband processing unit in the substation, and obtaining the second broadband measurement data to be calibrated based on the configuration information and real-time broadband measurement data of the broadband processing unit in the substation.

[0014] Optionally, the method of using the broadband measurement data calibration configuration data and the dynamic recording data as calibration benchmarks and calibrating the broadband measurement data to be calibrated in a comparison manner includes: establishing a one-to-one mapping relationship between the dynamic recording data and the broadband measurement data to be calibrated based on the broadband measurement data calibration configuration data and the configuration data in the broadband measurement data to be calibrated; and performing a comparison between the dynamic recording data and the broadband measurement data to be calibrated at the same time section based on the one-to-one mapping relationship for comparison and matching, to obtain a calibration result of the broadband measurement data.

[0015] Optionally, the comparison between the dynamic recording data and the broadband measurement data to be calibrated according to the one-to-one mapping relationship of the comparison and matching to obtain the broadband measurement data calibration result includes: obtaining first comparison data in the dynamic recording data and second comparison data in the broadband measurement data to be calibrated according to the one-to-one mapping relationship of the comparison and matching; wherein the first comparison data and the second comparison data are two data satisfying the one-to-one mapping relationship of the comparison and matching; and obtaining the phase angle error An of the second comparison data by:

[0016] An=abs(WAn-SAn)

[0017] Wherein, abs() is an absolute value calculation function, WAn is the phase angle of the second comparison data, and SAn is the phase angle of the first comparison data; the amplitude error Am of the second comparison data is obtained by:

[0018] Am=abs(WAm-SAm) / SAm

[0019] Among them, WAm is the amplitude of the second comparison data, and SAm is the amplitude of the first comparison data; when the phase angle error of the second comparison data is greater than the first preset threshold, the wide-band measurement data calibration result of the second comparison data is that the phase is unqualified; otherwise, the wide-band measurement data calibration result of the second comparison data is that the phase is qualified; when the amplitude error of the second comparison data is greater than the second preset threshold, the wide-band measurement data calibration result of the second comparison data is that the amplitude is unqualified; otherwise, the wide-band measurement data calibration result of the second comparison data is that the amplitude is qualified.

[0020] According to a second aspect of the present invention, there is provided an online verification system for broadband measurement data, comprising: a data acquisition module for acquiring online sampling data of a power grid interval signal and performing spectrum analysis to obtain a broadband verification data source; a dynamic recording module for establishing broadband measurement data verification configuration data according to configuration information in a substation, and converting the broadband verification data source into dynamic recording data according to the broadband measurement data verification configuration data; a data acquisition module for acquiring broadband measurement data to be verified in the substation; and a data verification module for verifying the broadband measurement data to be verified by comparison using the broadband measurement data verification configuration data and the dynamic recording data as verification benchmarks to obtain verification results of the broadband measurement data.

[0021] According to a third aspect of the present invention, a computer device is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned method for online calibration of broadband measurement data when executing the computer program.

[0022] According to a fourth aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned method for online calibration of broadband measurement data are implemented.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] The broadband measurement data online verification method of the present invention obtains the broadband verification data source by acquiring the online sampling data of the grid interval signal and performing spectrum analysis, then establishes the broadband measurement data verification configuration data based on the configuration information in the substation, and then converts the broadband verification data source into dynamic recording data, so as to realize the matching mapping between the broadband verification data source and the broadband measurement data to be verified, and then uses the broadband measurement data verification configuration data and the dynamic recording data as the verification benchmark, verifies the broadband measurement data to be verified in a comparison manner to obtain the broadband measurement data verification result, and realizes the non-stop automatic verification of the broadband measurement data in the substation, and solves the problems of low efficiency of manual verification, power outage affecting interval operation, and incomplete verification data type. After practical application, the verification time of broadband measurement data of a certain substation is shortened from 1 week to 2 hours; and the non-stop online verification method is adopted, which can effectively reduce the interval outage time and avoid the influence of power outage on grid operation; at the same time, it can realize comprehensive data type verification, ensure the data quality of broadband measurement data applied in the grid, and support the analysis and application of broadband domain of new power system. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 4 is a flow chart of a method for online calibration of broadband measurement data according to an embodiment of the present invention.

[0026] Figure 2 4 is a structural block diagram of a broadband measurement data online calibration system according to an embodiment of the present invention. DETAILED DESCRIPTION

[0027] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0028] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0029] The present invention is further described in detail below in conjunction with the accompanying drawings:

[0030] See also Figure 1 In one embodiment of the present invention, a method for online verification of broadband measurement data is provided to achieve efficient and automated verification of broadband measurement data of a substation in an online scenario without power outage.

[0031] Specifically, the online verification method of broadband measurement data of the present invention comprises the following steps:

[0032] S1: Obtain online sampling data of the grid interval signal and perform spectrum analysis to obtain a broadband calibration data source.

[0033] S2: Establish broadband measurement data verification configuration data according to the configuration information in the substation, and convert the broadband verification data source into dynamic recording data according to the broadband measurement data verification configuration data.

[0034] S3: Obtain the broadband measurement data to be verified in the substation.

[0035] S4: Using the broadband measurement data calibration configuration data and the dynamic recording data as calibration benchmarks, calibrate the broadband measurement data to be calibrated in a comparison manner to obtain the broadband measurement data calibration result.

[0036] The online verification method for broadband measurement data of the present invention obtains the online sampling data of the grid interval signal and performs spectrum analysis to obtain the broadband verification data source, then establishes broadband measurement data verification configuration data based on the configuration information in the substation, and then converts the broadband verification data source into dynamic recording data, so as to realize the matching mapping between the broadband verification data source and the broadband measurement data to be verified, and then uses the broadband measurement data verification configuration data and the dynamic recording data as the verification benchmarks, verifies the broadband measurement data to be verified in a comparison manner to obtain the broadband measurement data verification result, realizes the non-stop automatic verification of the broadband measurement data in the substation, and solves the problems of low efficiency of manual verification, power outage affecting interval operation, and incomplete verification data type.

[0037] After actual application, the verification time of broadband measurement data of a certain substation was shortened from 1 week to 2 hours. The online verification without power outage can effectively reduce the interval downtime and avoid the impact of power outage on grid operation. At the same time, it can realize comprehensive data type verification, ensure the data quality of broadband measurement data used in power grid applications, and support the analysis and application of broadband domain of new power systems.

[0038] In a possible implementation, the method of obtaining online sampling data of the grid interval signal and performing spectrum analysis to obtain a broadband calibration data source includes: obtaining three-phase instantaneous voltage data and three-phase instantaneous current data of a grid interval measurement point with a sampling rate not less than 25.6kHz to obtain online sampling data of the grid interval signal; establishing short sampling data according to the online sampling data of the grid interval signal, and performing spectrum analysis on the short sampling data based on a windowed interpolation method to obtain a current spectrum analysis result; and when the absolute value of the adjacent angle difference of the extreme spectrum line of the data window within the frequency range of the current spectrum analysis result is π, retaining the current spectrum analysis result; otherwise, establishing long sampling data according to the online sampling data of the grid interval signal, and performing spectrum analysis on the long sampling data based on a windowed interpolation method to update the current spectrum analysis result; calibrating the current spectrum analysis result based on the amplitude-frequency and phase-frequency characteristics of the acquisition loop, and using the calibrated current spectrum analysis result as a broadband calibration data source. Among them, the data window in the windowed interpolation method adopts a cosine combination window, and a method of aligning with the whole second of the coordinated universal time is used to convert the short sampling data or the long sampling data into frequency domain data.

[0039] Specifically, a collection terminal can be used to synchronously collect and monitor the grid interval signal online to form a broadband calibration data source. The collection terminal can be isolated from the operating equipment using caliper current sensing technology and resistive voltage divider sensing technology, which can ensure the operation of the secondary system without power outages. On this basis, real-time measurement of broadband data can be achieved based on synchronous high-speed sampling of grid signals.

[0040] In this embodiment, the acquisition terminal realizes the rapid synchronous acquisition of the three-phase instantaneous voltage and three-phase instantaneous current signals at the interval measurement point of the power grid at a sampling rate of not less than 25.6kHz. Among them, the sampling rate is configurable, and the highest sampling rate in this embodiment is 60kHz. In this embodiment, the acquisition terminal constructs a short sampling data cache interface service and a long sampling data cache interface service, both of which are used to store sampling data. Among them, the short sampling data cache interface service can return sampling data of length Ns, i.e., short sampling data, in real time. Ns is configurable, and the typical value is 5120 (200ms time); the long sampling data cache interface service can return sampling data of length Ns*D, i.e., long sampling data, in real time. D is configurable, and the typical value is 20.

[0041] In this implementation, based on a windowed interpolation method (interpolated DFT, IpDFT), a mixed basis is used to implement spectrum analysis of the sampled data, that is, to convert time domain data into frequency domain data.

[0042] During spectrum analysis, the data window uses a cosine combination window. The selection rule of the cosine combination window is: the peak energy of the side lobe is small and the attenuation rate is large, the width of the main lobe is wide, the windowing function has little effect on the frequencies around the main lobe, and the energy is concentrated in the main lobe. For example, the Hanning window function can be selected.

[0043] Spectral analysis uses the method of aligning with the whole second of UTC (Coordinated Universal Time) to convert the sampling data into frequency domain data. When performing spectrum analysis, short sampling data is first used for spectrum analysis; then, the absolute value of the adjacent angular difference of the extreme spectrum line of the data window within the frequency range is calculated to see if it is π (pi). If it is not π, it is considered that there is a frequency aliasing problem in the spectrum line, and long sampling data is used for spectrum analysis to achieve adaptive adjustment of frequency resolution and improve the frequency resolution of the measured data.

[0044] In this embodiment, after spectrum analysis, the synchronous phasor, harmonic, interharmonic, sub / supersynchronous oscillation and medium / high frequency oscillation data within the range of 5000Hz are corrected and estimated based on the energy conservation mechanism to obtain the sampled multi-frequency phasor data, i.e., the spectrum analysis result. Then, the multi-frequency phasor data is calibrated based on the amplitude-frequency and phase-frequency characteristics of the acquisition loop. The frequency of the multi-frequency phasor data is dynamically segmented, and the phase and amplitude of the multi-frequency phasor data are calibrated in each frequency band based on the phase-frequency characteristics of the acquisition loop. The frequency band is divided into M files, and the frequency band range of each file is [0, 1*5000 / M], [1*5000 / M, 2*5000 / M], ..., [(M-1)*5000 / M, M*5000 / M]. M can be dynamically configured, and the default value of M is generally 5. After calibration, a multi-frequency phasor calibration data source of the same section within the range of 5000Hz is formed, i.e., a broadband calibration data source.

[0045] In a possible implementation, establishing broadband measurement data verification configuration data according to the substation configuration information includes: establishing semantic information of broadband measurement data according to the substation configuration information, and establishing broadband measurement data verification configuration data according to the semantic information of broadband measurement data.

[0046] Among them, the semantic information includes station name, channel name, station domain code, conversion factor and information point table name; the channel name includes station name, interval name and information name; among them, the information name includes one or more of the following: information name of synchronous phasor, information name of harmonic phasor, information name of interharmonic phasor and information name of oscillation power; the information name of synchronous phasor includes one or more of the following: phase voltage phasor, phase current phasor, active power, reactive power, frequency and frequency change rate; the information name of harmonic phasor includes one or more of the following: phase voltage harmonic phasor, phase current harmonic phasor, frequency of harmonic voltage and frequency of harmonic current; the information name of interharmonic phasor includes one or more of the following: phase voltage harmonic phasor, phase current harmonic phasor, frequency of interharmonic voltage and frequency of interharmonic current; the information name of oscillation power includes one or more of the following: oscillation power amplitude and power oscillation frequency.

[0047] Specifically, based on the source configuration information of the measurement data in the substation, the channel names of the synchronous phasors, harmonic phasors, interharmonic phasors and oscillation power are constructed, including the station name, interval name and information name. In this implementation, the channel name length consists of 16 characters, and the format is: station name_interval name_information name.

[0048] In this embodiment, the information names include: the information name of the synchronized phasor, the information name of the harmonic phasor, the information name of the interharmonic phasor and the information name of the oscillation power. Among them, the information names of the synchronized phasors are as follows: phase voltage phasor UxV, phase current phasor IxV, active power OOP, reactive power 00Q, frequency ODF and frequency change rate DFT. The information names of the harmonic phasors are as follows: phase voltage harmonic phasor UxH, phase current harmonic phasor IxK, frequency of harmonic voltage UxK, and frequency of harmonic current IxK. The information names of the interharmonic phasors are as follows: phase voltage harmonic phasor UxI, phase current harmonic phasor IxI, frequency of interharmonic voltage UxF and frequency of interharmonic current IxF. The information names of the oscillation power are as follows: oscillation power amplitude SPN and power oscillation frequency SFN. It should be noted that the number of information names can be set as needed, and some of the above contents can be included to realize the verification of specific types of broadband measurement data.

[0049] In a possible implementation, when the broadband calibration data source is converted into dynamic recording data according to the broadband measurement data calibration configuration data, the recording order of the dynamic recording data is set to be consistent with the transmission order of the broadband measurement data calibration configuration data and the broadband calibration data source, and the broadband calibration data source is arranged in chronological order.

[0050] Specifically, the broadband measurement data calibration configuration data SRC_CFG0 is recorded, and based on SRC_CFG0, the broadband calibration data source is converted into the dynamic recording data SRC_DYN0, and SRC_DYN0 includes SRC_CFG0 and the broadband calibration data source. Among them, the transmission order of SRC_CFG0 and the broadband calibration data source is consistent with the recording order of the dynamic recording data, and the dynamic recording data is arranged in chronological order. In this embodiment, the data file of SRC_DYN0 is 100 frames per second, and one data file is recorded every minute. The data of one file is used as a data transmission unit, and the transmission start and end time is in minutes as the minimum unit. The generated dynamic recording data can be stored in the calibration benchmark directory of the calibration terminal.

[0051] In a possible implementation, the obtaining of the broadband measurement data to be calibrated in the substation includes: obtaining the configuration information and real-time broadband measurement data of the broadband measurement device in the substation by active online calling, and obtaining the first broadband measurement data to be calibrated based on the configuration information and real-time broadband measurement data of the broadband measurement device in the substation; and obtaining the configuration information and real-time broadband measurement data of the broadband processing unit in the substation, and obtaining the second broadband measurement data to be calibrated based on the configuration information and real-time broadband measurement data of the broadband processing unit in the substation.

[0052] Specifically, the communication configuration information in the substation is loaded, the network ports and IP addresses of the offline pipes, command pipes and real-time pipes of the broadband data processing unit and the broadband measurement device in the substation are obtained, and then a communication connection is established with the broadband measurement device and the broadband processing unit. Then, the configuration information and real-time broadband measurement data of the broadband measurement device and the broadband processing unit are obtained in an online active subscription manner. The configuration information of the broadband measurement device received is recorded as WDevice_CFG1, and the real-time broadband measurement data is recorded as WDevice_DATA1. Then, based on WDevice_CFG1 and WDevice_DATA1, a dynamic file, namely, the first broadband measurement data to be verified WDevice_DYN1, is generated. The configuration information of the broadband processing unit received is recorded as WPdc_CFG1, and the real-time broadband measurement data is recorded as WPdc_DATA1. Then, based on WPdc_CFG1 and WPdc_DATA1, a dynamic file, namely, the second broadband measurement data to be verified WPdc_DYN1, is generated. WDevice_DYN1 and WPdc_DYN1 can be saved in the calibrated directory of the calibration terminal according to their types.

[0053] In a possible implementation, the calibration of the broadband measurement data to be calibrated in a comparison manner using the broadband measurement data calibration configuration data and the dynamic recording data as calibration benchmarks includes: establishing a one-to-one mapping relationship between the dynamic recording data and the broadband measurement data to be calibrated based on the broadband measurement data calibration configuration data and the configuration data in the broadband measurement data to be calibrated; and performing a comparison between the dynamic recording data and the broadband measurement data to be calibrated at the same time section based on the one-to-one mapping relationship for comparison and matching to obtain a calibration result of the broadband measurement data.

[0054] Specifically, obtain the files in the calibration reference directory and the calibrated directory respectively. Then, based on SRC_CFG0, calibrate the consistency of WDevice_CFG1 and WPdc_CFG1 respectively, calibrate according to the phasor and analog quantity classification, and establish a one-to-one mapping relationship between WDevice_CFG1 and SRC_CFG0 through the channel name, and establish a one-to-one mapping relationship between WPdc_CFG1 and SRC_CFG0.

[0055] If a one-to-one mapping relationship cannot be established, the verification fails. Otherwise, the channel names are compared for consistency. If the channel names are consistent, the mapping verification passes. Otherwise, the mapping verification fails.

[0056] After the mapping check is passed, the data consistency check is performed. Taking SRC_DYN0 as the benchmark, WDevice_DYN1 and WPdc_DYN1 are compared with SRC_DYN0 respectively.

[0057] In this implementation, based on SRC_DYN0, WDevice_DYN1 and WPdc_DYN1, synchronized phasor data, harmonic phasor data, harmonic frequency data, interharmonic phasor data, interharmonic frequency data, oscillation power amplitude and oscillation power frequency are respectively parsed and obtained. Of course, according to different verification requirements, only one or several specific types of data can be obtained for subsequent comparison and verification.

[0058] When comparing specifically, for different types of data: For synchronous phasor data, the mapping relationship between phasor data and analog data is matched by channel name, and then the amplitude and phase angle errors of the data are compared one by one at the same time section based on the time series data of SRC_DYN0. The harmonic frequency data corresponding to the harmonic phasor data is matched by channel name, and the harmonic order is obtained according to the harmonic frequency data value, harmonic order = harmonic frequency value / 50, and then a harmonic comparison time series data set of harmonic phasor-harmonic order is constructed; the amplitude and phase angle errors of the comparison data of the harmonics are compared one by one at the same time section based on the time series data set of SRC_DYN0. The interharmonic frequency corresponding to the interharmonic phasor data is obtained by matching the channel name, and the amplitude-phase-frequency interharmonic data combination is constructed to obtain the interharmonic data combination within the same section time. The interharmonic comparison data set is constructed according to the frequency. The amplitude and phase angle errors of the data are compared successively at the same time section based on the time series data set of SRC_DYN0. The oscillation power frequency corresponding to the oscillation power data is obtained by matching the channel name, and the amplitude-frequency oscillation power data combination is constructed to obtain the harmonic phasor data combination within the same section time. The interharmonic comparison data set is constructed according to the frequency, and the amplitude and phase angle errors of the data are compared successively at the same time section.

[0059] In a possible implementation, the comparison between the dynamic recording data and the broadband measurement data to be calibrated based on the one-to-one mapping relationship of the comparison and matching to obtain the broadband measurement data calibration result includes: obtaining the first comparison data in the dynamic recording data and the second comparison data in the broadband measurement data to be calibrated based on the one-to-one mapping relationship of the comparison and matching; wherein the first comparison data and the second comparison data are two data that satisfy the one-to-one mapping relationship of the comparison and matching.

[0060] The phase angle error An of the second comparison data is obtained by:

[0061] An=abs(WAn-SAn)

[0062] The amplitude error Am of the second comparison data is obtained by:

[0063] Am=abs(WAm-SAm) / SAm

[0064] Wherein, abs() is an absolute value calculation function, WAn is the phase angle of the second comparison data, SAn is the phase angle of the first comparison data; WAm is the amplitude of the second comparison data, and SAm is the amplitude of the first comparison data.

[0065] When the phase angle error of the second comparison data is greater than the first preset threshold, the wide-band measurement data calibration result of the second comparison data is that the phase is unqualified; otherwise, the wide-band measurement data calibration result of the second comparison data is that the phase is qualified; when the amplitude error of the second comparison data is greater than the second preset threshold, the wide-band measurement data calibration result of the second comparison data is that the amplitude is unqualified; otherwise, the wide-band measurement data calibration result of the second comparison data is that the amplitude is qualified.

[0066] In this embodiment, the first preset threshold is set to 5°, that is, when the phase angle error of the second comparison data is greater than 5°, the phase angle of the second comparison data, i.e., the current broadband measurement data to be calibrated, is judged to be unqualified. The second preset threshold is set to 5%, that is, when the amplitude error of the second comparison data is greater than 5°, the amplitude of the second comparison data, i.e., the current broadband measurement data to be calibrated, is judged to be unqualified.

[0067] Optionally, after obtaining the broadband measurement data calibration results, a calibration report can be generated. The calibration report supports word, pdf and excel formats and is provided for use by on-site operation and maintenance personnel.

[0068] In a possible implementation manner, taking harmonic data in broadband measurement data as an example, the process flow of the online verification method of broadband measurement data of a substation in a non-stop power supply scenario is described.

[0069] S11: Generation of harmonic data source. In the scenario of non-stop power supply, a broadband verification data source of the same section is formed by online acquisition. The broadband verification data source includes data types such as synchronous phasors, harmonics, interharmonics and power data. Harmonic data is extracted to form a harmonic data source.

[0070] S12: Recording of harmonic data broadband calibration data source. Load the broadband source configuration information in the substation, construct the semantic information of the harmonic data broadband calibration data source, convert the harmonic data broadband calibration data source into dynamic recording data based on the semantic information, and store the dynamic recording data in the calibration benchmark directory.

[0071] S13: Online acquisition of harmonic data to be verified of the substation. Online active subscription of configuration information and real-time harmonic data of the broadband measurement device and the broadband processing unit, generating harmonic configuration files and harmonic dynamic files of the broadband measurement device; generating harmonic configuration files and harmonic dynamic files of the broadband processing unit. Online active call for harmonic dynamic files of the broadband measurement device and harmonic dynamic files of the broadband processing unit. The harmonic configuration files and harmonic dynamic files of the broadband measurement device and the broadband processing unit are stored in the verified directory.

[0072] S14: Online consistency check of harmonic data. Obtain the files in the check reference directory and the check directory respectively, extract the harmonic data in the dynamic recording data and the harmonic dynamic files of the broadband measurement device and the broadband processing unit for consistency check, determine whether the harmonic data is qualified, and automatically generate a check report.

[0073] The following are device embodiments of the present invention, which can be used to implement the method embodiments of the present invention. For details not disclosed in the device embodiments, please refer to the method embodiments of the present invention.

[0074] See also Figure 2 In another embodiment of the present invention, a broadband measurement data online verification system is provided, which can be used to implement the above-mentioned broadband measurement data online verification method. Specifically, the broadband measurement data online verification system includes a data acquisition module, a dynamic recording module, a data acquisition module and a data verification module.

[0075] Among them, the data acquisition module is used to obtain the online sampling data of the power grid interval signal and perform spectrum analysis to obtain the broadband calibration data source; the dynamic recording module is used to establish broadband measurement data calibration configuration data according to the configuration information in the substation, and convert the broadband calibration data source into dynamic recording data according to the broadband measurement data calibration configuration data; the data acquisition module is used to obtain the broadband measurement data to be calibrated in the substation; the data verification module is used to use the broadband measurement data calibration configuration data and the dynamic recording data as the calibration basis, and to calibrate the broadband measurement data to be calibrated in a comparison manner to obtain the broadband measurement data calibration result.

[0076] All relevant contents of each step involved in the above-mentioned embodiment of the broadband measurement data online calibration method can be referred to the functional description of the functional modules corresponding to the broadband measurement data online calibration system in the embodiment of the present invention, and will not be repeated here.

[0077] The division of modules in the embodiments of the present invention is schematic and is only a logical function division. There may be other division methods in actual implementation. In addition, each functional module in each embodiment of the present invention may be integrated into one processor, or may exist physically separately, or two or more modules may be integrated into one module. The above-mentioned integrated modules may be implemented in the form of hardware or in the form of software functional modules.

[0078] In another embodiment of the present invention, a computer device is provided, the computer device comprising a processor and a memory, the memory being used to store a computer program, the computer program comprising program instructions, and the processor being used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or may be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc., which are the computing core and control core of the terminal, which are suitable for implementing one or more instructions, and are specifically suitable for loading and executing one or more instructions in a computer storage medium to implement a corresponding method flow or a corresponding function; the processor described in the embodiment of the present invention can be used for the operation of the online verification method of broadband measurement data.

[0079] In another embodiment of the present invention, the present invention further provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device for storing programs and data. It is understandable that the computer-readable storage medium here can include both the built-in storage medium in the computer device and the extended storage medium supported by the computer device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the corresponding steps of the online calibration method for broadband measurement data in the above embodiment.

[0080] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0081] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0082] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0083] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0084] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for online verification of broadband measurement data. It is characterized in that include: Obtain online sampling data of the grid interval signal and perform spectrum analysis to obtain a broadband calibration data source; According to the configuration information in the substation, establish broadband measurement data verification configuration data, and convert the broadband verification data source into dynamic recording data according to the broadband measurement data verification configuration data; Obtain broadband measurement data to be verified in the substation; The broadband measurement data calibration configuration data and dynamic recording data are used as calibration benchmarks, and the broadband measurement data to be calibrated is calibrated in a comparison manner to obtain the broadband measurement data calibration result.

2. The method for online verification of broadband measurement data according to claim 1, It is characterized in that The method of obtaining online sampling data of the grid interval signal and performing spectrum analysis to obtain a broadband calibration data source includes: Acquire the three-phase instantaneous voltage data and the three-phase instantaneous current data of the grid interval measurement point with a sampling rate of not less than 25.6kHz, and obtain the online sampling data of the grid interval signal; Establish short sampling data according to the online sampling data of the power grid interval signal, and perform spectrum analysis on the short sampling data based on the windowing interpolation method to obtain the current spectrum analysis result; and when the absolute value of the adjacent angular difference of the extreme spectrum line of the data window within the frequency range of the current spectrum analysis result is π, retain the current spectrum analysis result; otherwise, establish long sampling data according to the online sampling data of the power grid interval signal, and perform spectrum analysis on the long sampling data based on the windowing interpolation method to update the current spectrum analysis result; The current spectrum analysis result is calibrated based on the amplitude-frequency and phase-frequency characteristics of the acquisition loop, and the calibrated current spectrum analysis result is used as the data source for broadband calibration; The data window in the windowed interpolation method adopts a cosine combination window, and the method of aligning with the whole second of the coordinated universal time is used to convert the short sampling data or the long sampling data into the frequency domain data.

3. The method for online verification of broadband measurement data according to claim 1, It is characterized in that The step of establishing broadband measurement data verification configuration data according to the configuration information in the substation includes: Establishing semantic information of broadband measurement data according to configuration information in the substation, and establishing broadband measurement data verification configuration data according to the semantic information of broadband measurement data; Among them, the semantic information includes station name, channel name, station domain code, conversion factor and information point table name; the channel name includes station name, interval name and information name; among them, the information name includes one or more of the following: information name of synchronous phasor, information name of harmonic phasor, information name of interharmonic phasor and information name of oscillation power; the information name of synchronous phasor includes one or more of the following: phase voltage phasor, phase current phasor, active power, reactive power, frequency and frequency change rate; the information name of harmonic phasor includes one or more of the following: phase voltage harmonic phasor, phase current harmonic phasor, frequency of harmonic voltage and frequency of harmonic current; the information name of interharmonic phasor includes one or more of the following: phase voltage harmonic phasor, phase current harmonic phasor, frequency of interharmonic voltage and frequency of interharmonic current; the information name of oscillation power includes one or more of the following: oscillation power amplitude and power oscillation frequency.

4. The method for online verification of broadband measurement data according to claim 1, It is characterized in that When converting the broadband calibration data source into dynamic recording data according to the broadband measurement data calibration configuration data, the recording order of the dynamic recording data is set to be consistent with the transmission order of the broadband measurement data calibration configuration data and the broadband calibration data source, and the broadband calibration data source is arranged in chronological order.

5. The method for online verification of broadband measurement data according to claim 1, It is characterized in that The obtaining of the broadband measurement data to be verified in the substation includes: By means of online active calling, the configuration information and real-time broadband measurement data of the broadband measurement device in the substation are obtained, and the first broadband measurement data to be verified is obtained according to the configuration information and real-time broadband measurement data of the broadband measurement device in the substation; and the configuration information and real-time broadband measurement data of the broadband processing unit in the substation are obtained, and the second broadband measurement data to be verified is obtained according to the configuration information and real-time broadband measurement data of the broadband processing unit in the substation.

6. The method for online verification of broadband measurement data according to claim 1, It is characterized in that The method of using the broadband measurement data to calibrate the configuration data and the dynamic recording data as the calibration basis and calibrating the broadband measurement data to be calibrated in a comparison manner includes: According to the broadband measurement data calibration configuration data and the configuration data in the broadband measurement data to be calibrated, a one-to-one mapping relationship between the dynamic recording data and the broadband measurement data to be calibrated is established; According to the one-to-one mapping relationship of the comparison and matching, the dynamic recording data and the broadband measurement data to be verified are compared at the same time section to obtain the broadband measurement data verification result.

7. The method for online verification of broadband measurement data according to claim 6, It is characterized in that The comparison between the dynamic recording data and the broadband measurement data to be verified based on the one-to-one mapping relationship of the comparison and matching, and obtaining the broadband measurement data verification result includes: According to the one-to-one mapping relationship of the comparison and matching, first comparison data in the dynamic recording data and second comparison data in the broadband measurement data to be verified are obtained; wherein the first comparison data and the second comparison data are two data satisfying the one-to-one mapping relationship of the comparison and matching; The phase angle error An of the second comparison data is obtained by: An=abs(WAn-SAn) Wherein, abs() is an absolute value calculation function, WAn is the phase angle of the second comparison data, and SAn is the phase angle of the first comparison data; The amplitude error Am of the second comparison data is obtained by: Am=abs(WAm-SAm) / SAm Wherein, WAm is the amplitude of the second comparison data, and SAm is the amplitude of the first comparison data; When the phase angle error of the second comparison data is greater than the first preset threshold, the wide-band measurement data calibration result of the second comparison data is that the phase is unqualified; otherwise, the wide-band measurement data calibration result of the second comparison data is that the phase is qualified; when the amplitude error of the second comparison data is greater than the second preset threshold, the wide-band measurement data calibration result of the second comparison data is that the amplitude is unqualified; otherwise, the wide-band measurement data calibration result of the second comparison data is that the amplitude is qualified.

8. A broadband measurement data online verification system, It is characterized in that include: A data acquisition module is used to obtain online sampling data of the power grid interval signal and perform spectrum analysis to obtain a broadband calibration data source; The dynamic wave recording module is used to establish broadband measurement data verification configuration data according to the configuration information in the substation, and convert the broadband verification data source into dynamic wave recording data according to the broadband measurement data verification configuration data; A data acquisition module is used to acquire the broadband measurement data to be verified in the substation; The data verification module is used to verify the broadband measurement data to be verified by comparison with the broadband measurement data verification configuration data and the dynamic recording data as the verification basis, and obtain the broadband measurement data verification result.

9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the method for online calibration of broadband measurement data as claimed in any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the steps of the method for online calibration of broadband measurement data as claimed in any one of claims 1 to 7 are implemented.