Optimal configuration method for mobile energy storage capacity of disaster-resistant urban power distribution network
By calculating the failure rate of pole and the probability of building damage to disasters, optimizing the configuration of energy storage system and battery selection, combining traffic data, the reliability and economic problems of the distribution network in extreme weather are solved, and the energy storage system is realized Stable operation and efficient power supply.
Patent Information
- Application Number
- CN202410986817.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-19
AI Technical Summary
The prior art lacks an optimized configuration method for mobile energy storage equipment capacity, which makes it difficult to optimize the reliability and economics of the distribution network in extreme weather and disaster situations.
By calculating the failure rate of the pole for disasters, establishing a building model, determining the configuration indicators of the energy storage system, selecting the appropriate battery type, and optimizing the power and energy of the energy storage vehicle, combining transportation data to optimize the elasticity and operating costs of the distribution network .
It realizes the stable operation and economy of the energy storage system in disaster situations, maximizes the seismic resistance and operating efficiency of the distribution network, and reduces the interruption cost.
Smart Images

Figure CN118983773A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a mobile energy storage optimization technology for a city distribution network, and takes into account life health level and elastic value gain, and in particular to a method for optimizing the configuration of mobile energy storage capacity for a disaster-resistant city distribution network. Background Art
[0002] Due to the uncertainty of extreme weather, multiple disasters may occur simultaneously in actual disaster scenarios, which will have a great impact on the reliable operation of distribution network components. With the advancement of battery technology, the specific power of batteries is getting higher and higher, making it possible to use mobile energy storage devices as emergency power supplies. Mobile energy storage, as an emergency power supply device, can effectively improve the reliability of the distribution system without generating additional carbon emissions. Mobile energy storage equipment has the advantages of flexibility and cleanliness, and has the potential to become an important part of medium and low voltage distribution systems. Mobile energy storage investment is huge. In order to obtain the best investment decision, it is necessary to establish an investment optimization model for mobile energy storage.
[0003] As mobile energy storage technology is still in its infancy and technical preparation stages, existing results are mainly focused on evaluating the role of mobile energy storage in the process of network structure recovery. Researchers mainly study the ability of mobile energy storage to improve network performance. The industry lacks an optimized configuration method for the capacity of mobile energy storage equipment. Summary of the invention
[0004] In order to solve the problem of lack of optimal configuration method for mobile energy storage device capacity in the industry, the present invention provides an optimal configuration method for mobile energy storage capacity of a disaster-resistant urban distribution network.
[0005] The solution adopted by the present invention to solve the technical problem is:
[0006] The method for optimizing the configuration of mobile energy storage capacity of a disaster-resistant urban distribution network comprises the following steps:
[0007] Step 1. Using the historical data of the study area, calculate the failure rate of electric poles under the direct impact of disasters, and draw the failure rate curve of electric poles under the indirect impact of disasters; establish a building model and its damage state, and calculate the total damage probability of electric poles based on the direct and indirect damage probability of disasters on electric poles;
[0008] Step 2. Insert the energy storage system of unlimited capacity into each busbar in turn to determine the corresponding busbar with the lowest energy storage system configuration index ESI; at this stage, the probability of the battery placement scenario in the previous stage is considered; select the type of battery carried by the mobile energy storage vehicle based on indicators such as carbon emissions and battery costs and calculate the total cost of the battery; calculate the operating cost, including the total cost of thermal power generation units, energy storage, gas storage, and energy provided from upstream networks and mobile energy suppliers; calculate the MESS cost considering driver and fuel costs to obtain the optimal power and energy;
[0009] Step 3. Utilize the power and energy from the previous stage to optimize the resilience of the distribution network, and calculate the MESS interruption time in traffic based on the speed of the energy storage vehicle, the speed of other vehicles, and the capacity of the road; use the collected data to maximize the RI of the distribution system while minimizing the interruption cost while reducing the priority load.
[0010] In the step 1 disclosed in this embodiment, the failure rate of electric poles under the direct influence of disasters is calculated, and the failure rate curve of electric poles under the indirect influence of disasters is drawn. The study of natural disaster problems in the power system can be investigated from multiple angles;
[0011] Geographic data alternate with disaster conditions: areal aspects of the land, such as land use and soil moisture levels, mountainous features, land hills, and complex terrain indicators; disaster variables, such as storm duration and intensity, threat level, landfall location, presentation speed, etc.; climate characteristics, such as the Standardized Precipitation Index SPI, annual and monthly rainfall; Since natural disasters can cause different degrees of damage to buildings, random distribution is usually used to describe the behavior of different buildings; for this purpose, in order to calculate the probability of each structural adjustment level, the failure rate function formula of the lognormal distribution is as follows:
[0012]
[0013] In the formula, P[ds|S d ] is the probability of being in or exceeding the structural damage state (ds), φ is the standard normal cumulative distribution function, β ds is the standard deviation of the natural logarithm of the damage state spectrum displacement (ds), S d is the spectral shift, S d,ds is the median spectral displacement when the building reaches the damage threshold (ds)
[0014] This function represents the probability of any building being damaged under different degrees of natural disasters, and the fragility curve is defined as no, slight, moderate, extensive and complete failure levels;
[0015] The formula for determining the impact of building damage on utility poles is as follows:
[0016] P[P b |Bul b ]=e (-λ,Dis) ·PE
[0017] In the formula, P[Pp b |Bul b ] is the probability of failure of electric poles due to collapse of buildings near the busbar, λ is the rate parameter of the exponential function, Dis is the distance between the overhead line and nearby buildings, and PE is the cumulative probability of the damaged state of the building after the disaster.
[0018] In the step 1 disclosed in this embodiment, a building model and its damage state are established, and the total damage probability of the electric poles is calculated according to the direct and indirect damage probability of the disaster to the electric poles;
[0019] The probability of pole collapse under disaster impact is calculated using the failure probability curve; the total probability formula is as follows:
[0020] P Z =P i d +P i b -(P i d P i b )
[0021] Where P Z is the total probability of pole failure, P i d is the probability of failure of the pole due to the direct impact of the disaster, P i b The possibility of utility pole failure due to building demolition.
[0022] In the step 2 disclosed in this embodiment, the probability of the utility pole being damaged in the previous stage is taken into account, and an energy storage system with infinite capacity is inserted into each busbar in turn to determine the corresponding busbar with the lowest ESI;
[0023] Assume that the remaining capacity of the priority load is at the maximum capacity and the system has an ESS with infinite capacity in order to determine the optimal location of the battery; the ESS is installed in sequence with all busbars, and the total load interruption is calculated considering the probability of pole failure. The load interruption calculation formula is as follows:
[0024]
[0025] In the formula, For intermittent load in the positioning stage, is the priority load set, The maximum theoretical demand for the critical load in the positioning phase. Input power to ESS for the positioning phase;
[0026] After obtaining the total load interruption during the battery installation phase of each bus, the ESI value is obtained using the following formula; the energy storage system configuration index ESI definition formula for each bus in the system is as follows:
[0027]
[0028] In the formula, is the event set;
[0029] In the values obtained, the probabilities of different scenarios have been taken into account, and the bus with the lowest index value is an ideal choice for placing an energy storage system; considering the probability of various situations, a low ESI means that there is a low probability of capacity reduction of critical loads in this bus during the interruption time.
[0030] In the step 2 disclosed in this embodiment, a battery carried by a mobile energy storage vehicle is selected;
[0031] MESS's energy storage system technologies include: lead-acid batteries, nickel-based batteries, lithium-ion batteries, metal-air batteries and flow batteries; power batteries at different capacity stages can be recycled. According to the degree of battery capacity attenuation, the recycling can be divided into the following stages:
[0032] ① Normal use stage: 80-100% capacity, can be used as power battery, applied to electric vehicles, etc.;
[0033] ② The first stage of cascade utilization: 60-80% capacity, can be used as energy storage batteries, applied to energy storage power stations, communication base stations, emergency rescue power supplies, low-speed electric vehicles, etc.;
[0034] ③ The second stage of cascade utilization: 20-60% capacity, can be used as backup batteries, applied to household energy storage, lighting power supply, etc.;
[0035] ④Scrap stage: 0-20% capacity, can be disassembled and recycled for raw material recycling;
[0036] For batteries that are used in cascade, the battery capacity loss rate is calculated as follows:
[0037]
[0038] Where ξ is the battery capacity loss rate; n is the charging time;
[0039] The power loss calculation formula for battery use is as follows:
[0040]
[0041] In the formula, E loss is the power loss; Q r is the battery capacity; U is the charging voltage; DOD is the depth of discharge; ξ n is the battery capacity loss rate; E T The energy transfer efficiency of the battery;
[0042] The formula for calculating the life of second-hand batteries used in energy storage scenarios is as follows:
[0043]
[0044] Where, L r is the number of cycles of retired batteries; T is the average daily charge and discharge times of the energy storage system;
[0045] The purchase price of second-life batteries per unit capacity is calculated as follows:
[0046]
[0047] Where n' is the theoretical service life of the battery in normal use; C E ' is the purchase price of the battery per unit capacity during normal use;
[0048] New batteries will generate a lot of carbon emissions during the production stage, while the carbon emissions generated by the transformation of retired batteries are very small; the recycling of waste battery materials, especially aluminum shells, can effectively reduce carbon emissions; the cascade utilization of retired batteries not only reduces carbon emissions, but also reduces the emission of other harmful substances, which can bring good environmental protection effects; the calculation formula for the carbon emission reduction brought by the cascade utilization of 1kWh energy retired batteries in a certain energy storage power station is as follows:
[0049]
[0050] C is the carbon emissions reduced by reusing 1 kWh of retired batteries; N n is the number of new batteries used in the cycle; L n is the number of cycles a new battery is used; E n is the energy of a new battery; C n is the carbon emissions of a new 1kWh battery over its life cycle; N r is the number of retired batteries used in cycles; E r is the energy of the retired battery; C r It is the carbon emissions of a 1kWh retired battery over its life cycle.
[0051] In the step 2 disclosed in this embodiment, the total cost of the battery is calculated;
[0052] The total cost of the battery, TCC, is the most critical factor in calculating the battery capacity and is calculated according to the following description; TCC evaluates all costs associated with acquiring, installing, and delivering the storage system; typically, in ESS, the cost of the power conversion system is expressed in terms of power capacity; energy-related costs include all costs associated with building an energy storage reservoir or water reservoir. The total cost of the PCS system is calculated as follows:
[0053]
[0054] Where PCS is the total cost of power electronics, PCS uc is the unit cost of power electronics, is the maximum power rating of the MESS,
[0055] The total cost of SUC is calculated as follows:
[0056]
[0057] Where SUC is the total storage unit cost, SUC uc is the unit cost of storage unit, η is the input efficiency of MESS;
[0058] The total cost of BOP is calculated as follows:
[0059]
[0060] Where BOP is the total cost of the factory balance, BOP uc is the plant balance unit cost (€ / kWh);
[0061] The total cost calculation formula for PCS, SUC, and BOP is as follows:
[0062] TCC=PCS+SUC+BOP
[0063] The capital recovery factor CRF calculation formula is as follows:
[0064]
[0065] The annualized capital cost AC is calculated as follows:
[0066]
[0067] In the formula, i r is the annual interest rate, y is the energy storage life (years);
[0068] The costs of fuel and truck drivers should be considered in the annual cost of the MESS’s TCC, and each energy storage device is essential to the daily operation of the network, not only when events occur, but also in any situation throughout the year; energy storage devices can be used during extreme weather or to assist power supply during other power outages.
[0069] In the step 2 disclosed in this embodiment, the operation cost is calculated, including the total cost of the thermal power generating unit, energy storage, gas storage, and energy provided from the upstream network and mobile energy suppliers;
[0070] The calculation formula is as follows:
[0071] C T =(C Th +C ES +C GS +C buy +C Mobile )
[0072]
[0073] C ES =((C es,fx ×P es )+(C es,vr ×A es ))
[0074] C TGS =C gs ×(IR s +OR s )
[0075] In the formula, C Th is the operating cost of the thermal unit, C ES is the operating cost of energy storage, C GS is the operating cost of gas storage, C buy The cost of purchasing electricity and natural gas, C Mobile The cost of providing energy to a mobile energy provider, C MT is the marginal cost of the microturbine, P MT is the power of the microturbine, C CHP is the marginal cost of the CHP unit, P CHP is the output power of the cogeneration unit, C es,fx , C es,vr are the fixed and variable operating costs of energy storage, P es is the rated energy storage power, A es is the annual energy storage flow, C gs is the gas storage operation cost, IR s , OR s Input and output limits for gas flow;
[0076] The loss cost of curtailed energy is expressed as follows:
[0077] PC=(P cur ×VOLL elc )+(Q cur ×VOLL gas )
[0078] Where, VOLL elc is the power load loss value, VOLL gas is the natural gas load loss value, P cur , Q cur are the electricity and natural gas consumption values.
[0079] This embodiment discloses that the relevant constraints are listed according to the operating cost formula;
[0080] One of the most fundamental constraints in power systems is the power balance constraint, which is expressed as follows:
[0081]
[0082] Where P MT,t is the micro-turbine output power at time t, P ren,t is the output power of renewable energy at time t, P CHP,t is the output power of the cogeneration unit at time t, P curt-i is the reduced power of node i;
[0083] This formula shows that the total power generated by microturbines, CHP units, renewable energy, purchased electricity, energy storage, etc. should be equal to the power demand of each bus minus the power lost;
[0084] The constraints on the microturbine power generation rate and startup and shutdown costs are as follows:
[0085]
[0086] SUC MT,t ≥SU MT [u MT,t -u MT,t-1 ]
[0087] SUC MT,t ≥0,t∈T
[0088] SDC MT,t ≥SD MT [u MT,t-1 -u MT,t ]
[0089] SDC MT,t ≥0,t∈T
[0090] In the formula, is the minimum and maximum power of the micro gas turbine, SU MT is the startup cost, SD MT For downtime expenses;
[0091] The constraints for disconnecting loads on each bus are as follows:
[0092] 0≤P curt-i,t ≤D i,t
[0093] The constraints of mobile energy storage battery energy storage are as follows:
[0094]
[0095] E min ≤E t,i ≤Emax
[0096]
[0097] In the formula, is the maximum charge / discharge capacity, is a binary variable of charge and discharge state, is the initial energy value stored, E min 、E max is the minimum and maximum value of stored energy, η ch , η dis is the charge / discharge efficiency;
[0098] The above formulas respectively show that the working state of the battery consists of two binary variables, namely, the charging or discharging state; the constraint of the battery charging and discharging capacity; the constraint of the battery storage capacity; the constraint of the storage energy of charging or discharging at the instant t;
[0099] The constraints on the thermal capacity of the power lines are as follows:
[0100]
[0101] In the formula, is the minimum and maximum capacity of Line L;
[0102] The constraints for the CHP unit are as follows:
[0103] H CHP,t +P CHP,t ≥z j,t
[0104] In the formula, H CHP,t is the output power of the CHP at time t, z j,t is the coefficient related to the unit functional area;
[0105] The constraints of the natural gas supply network are as follows:
[0106] The constraints on the amount of gas produced at time t are as follows:
[0107]
[0108] In the formula, is the minimum and maximum production of natural gas wells;
[0109] The constraints of gas pipelines are as follows:
[0110]
[0111] In the formula, C mn is the Weymouth constant of the pipe mn, T0 is the standard temperature, D mn is the pipe diameter, sgn(πm ,π n ) is the gas flow between nodes m and n, π m ,π n is the node pressure;
[0112] Natural gas storage capacity constraints are as follows:
[0113]
[0114] In the formula, is the minimum and maximum gas storage capacity of the gas storage;
[0115] The constraints on natural gas input and output flow are as follows:
[0116] -IR s ≤ΔQ s,t =(Q s,t -Q s,t-1 )≤OR s
[0117] In the formula, Q s,t is the value of gas stored in the gas storage;
[0118] The natural gas balance constraints at each node j are as follows:
[0119] Q inj =Q w -ΔQ s -ΔQ gf -ΔQ pl =-ΔQ
[0120] In the formula, Q inj is the amount of gas injected into each node, ΔQ gf is the gas required by the microturbine, ΔQ pl The gas demand for each node;
[0121] The constraints related to renewable energy production are as follows:
[0122]
[0123] The wind speed is calculated on an hourly basis; after calculating the wind speed, the wind turbine output power is as follows:
[0124]
[0125] Where V ci , V r , V co Starting, rated and cut-off speeds of wind turbines;
[0126] The amount of electricity generated by a solar power plant depends on factors such as radiation and temperature, and is calculated as follows:
[0127]
[0128] Where R is the radiation, P, T, and γ are the correction coefficients of the output power, temperature, and maximum output power of the solar power station;
[0129] The elastic constraints are as follows:
[0130]
[0131] Where h is the exact time when the unpredictable event occurs, H represents the duration of the fault, and the total amount of energy of the disconnected load is the product of the power cut at each node and the termination time when the power is cut off;
[0132] In view of the nonlinear characteristics of natural gas infrastructure, the linearization method was studied, and the piecewise linear method was used to linearize the nonlinear equation of natural gas. The linear flow formula of natural gas in the pipeline is as follows:
[0133]
[0134] In the formula, α l,t , β l,t are the slope and intercept of the piecewise line segment, and the flow of natural gas in the pipeline is linearized due to the sum of linear piecewise functions;
[0135] The upper and lower linear segmented constraints of the gas flow are as follows:
[0136]
[0137] In the formula, is the lower and upper limits of gas flow, ω l,t is a binary indicator for a piecewise linear function.
[0138] In the step 2 disclosed in this embodiment, the power and energy of the mobile energy storage battery MESS are optimized according to the annual cost model to obtain the optimal power and energy;
[0139] Determine the optimal power and energy of each energy storage system based on the annual cost model;
[0140]
[0141] In the formula, Inject power into the first phase optimized MESS, The maximum load demand based on the load profile, the input power of the energy storage system is constrained by the maximum demand of the remaining capacity of the priority load;
[0142] The constraints on the power output and energy capacity of each energy storage system are as follows:
[0143]
[0144]
[0145] In the formula, are the highest and lowest nominal energy levels of the MESS, MESS energy capacity optimized for the first phase;
[0146] t1 represents the time step when the MESS reaches the maximum energy, which is approximately the first time step since the beginning of the disaster;
[0147] At any given moment, the energy stored is related to the energy injected by the following formula:
[0148]
[0149] Where Δt is the time step of the event, which is assumed to be 1 h; η is the efficiency of the zinc-bromine battery used in the energy storage system;
[0150]
[0151] The total annual cost of the energy storage system’s PCS, BOP, and storage unit plus the annual cost of the mobile energy storage vehicle and the fuel limit in the system budget is calculated as follows:
[0152]
[0153] The constraint condition for the total power of the mobile energy storage system input to the priority load is the total number of priority loads equal to the energy input of the energy storage system. Due to the elimination of power loss, the amount of transmitted power should not be greater than the amount of input power, and the total amount of transmitted power should not exceed the maximum value of the critical load. The formula used is as follows:
[0154]
[0155] In the formula, It is the transition power between MESS and priority load;
[0156] The limited transmission power in the above formula does not always correspond exactly to the supply of the critical load, which always leads to some load reduction. The calculation formula for this reduction is as follows:
[0157]
[0158] In the formula, To reduce critical loads during the optimization phase;
[0159] The formula for minimizing the number of loads with higher priority is as follows:
[0160]
[0161] In the formula, To reduce the interruption loss cost per unit power of important loads;
[0162] The above formula also calculates the cost of the reduced load, where Represents the constraints on the loss of critical load units according to the priority of the loads.
[0163] In the step 3 disclosed in this embodiment, the elasticity of the power and energy optimization distribution network in the previous stage is used to calculate the MESS interruption time in traffic according to the speed of the energy storage vehicle, the speed of other vehicles and the capacity of the road;
[0164] When a serious incident occurs in a DN, it must be acknowledged that the probability of restoring all critical loads is low, therefore, the types can be divided into three categories: the most important, the least important, and the loads that do not belong to the above two categories; if the supply is interrupted, each load will suffer losses according to their level of importance;
[0165] In addition, the mobile energy storage vehicle must consider factors such as the size and speed of the vehicle, the road capacity, and the driving speed when transferring between nodes, and use the size and speed of the vehicle and the capacity of the road to simulate road traffic;
[0166]
[0167] Where Tr is the time required to move on the road considering road traffic; Tr 0 is the time required to move on the road regardless of the road traffic conditions; Vr is the road traffic volume; Cr is the road capacity; V mess is the average speed of MESS; V veh is the average speed of all vehicles; Tr tot is the travel time of MESS on the road.
[0168] In the step 3 disclosed in this embodiment, the collected data is used to maximize the RI of the distribution system while minimizing the interruption cost while reducing the priority load;
[0169] The following formula optimizes the second stage with the goal of maximizing RI. During the whole optimization process, the priority of key loads, road traffic and the spatiotemporal operation model of MESS are all taken into consideration;
[0170] The injection power of ESSs is constrained by the priority critical loads, as follows:
[0171]
[0172] In the formula, the injected power is limited to the required power of the priority load on the same island, and the function σ (e,s,i) Determine the presence of both batteries and loads on the island; this phase differs from the optimization phase, which determines battery energy and power, in that loads are prioritized in this phase; thus, high priority loads can be delivered sooner during an event due to power constraints;
[0173] When an event occurs, the power output and energy capacity of each MESS are limited to the maximum output and minimum output, and the formula is as follows:
[0174]
[0175]
[0176] At each interruption and event time, the stored energy is related to the injected power by the following formula:
[0177]
[0178] In order to fully utilize the full capacity of the battery, the maximum injection power of the MESS on the island should be less than the total load requirement of the island. The formula is as follows:
[0179]
[0180] When the maximum MESS injection power exceeds the required power, Z(i,s) tends to zero;
[0181] When the MESS is forced to move from one discharge station to another, the injected power is equal to zero, and the formula is as follows:
[0182]
[0183] Moving time T tot Dependence on the speed of road traffic, vehicles and trucks;
[0184] The formula for connecting or disconnecting MESS in all islands and scenes is as follows:
[0185]
[0186] The total power provided by ESSs to the critical loads during the event is equal to the injection power of the battery, constrained to be the sum of the critical loads at the interruption time and the event time, as follows:
[0187]
[0188] In the formula, represents the input power of the second stage ESS, represents the transition power between ESS and critical loads during a disaster, Represents critical load demand based on load distribution;
[0189] The limited transmission power in the above formula does not always correspond completely to the supply of priority loads, which always leads to a reduction in some priority loads. The calculation formula for this reduction is as follows:
[0190]
[0191] In the formula, represents the critical loads reduced during the optimization phase;
[0192] Control the number of critical loads that must be cut, especially those with higher priority, with the following formula:
[0193]
[0194] In the formula, represents the probability of a disaster occurring. Represents the sum of the critical loads present during the outage time.
[0195] Positive effects:
[0196] The present invention uses mobile battery storage to enhance the earthquake resistance of the distribution network. By calculating the vulnerability curves of various buildings and their impact on the failure of utility poles, the probability of utility pole failure due to disaster impact is determined, thereby optimizing the arrangement of mobile energy storage capacity, so that the energy storage system can be more stable and economical during operation. The present invention also takes into account the role of traffic and vehicle speed in providing critical loads, analyzes the performance of mobile battery storage with low traffic flow and long interruption time, and combines the actual operating status of the urban distribution network and the characteristics of the energy storage system to minimize the operating cost of the energy storage system while ensuring power supply safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0197] Figure 1 This is a flow chart of an embodiment of the present application;
[0198] Figure 2 This is a schematic diagram of the structure of the mobile energy storage in the embodiment of the present application;
[0199] Figure 3 A block diagram of enhancing system flexibility according to an embodiment of the present application;
[0200] Figure 4 This is a curve diagram showing the impact of different levels of road traffic on RI in an embodiment of the present application;
[0201] Figure 5 This is a curve diagram showing the effect of interruption time on RI in an embodiment of the present application;
[0202] Figure 6 This is a curve diagram showing the impact of interruption time on interruption cost according to an embodiment of the present application. DETAILED DESCRIPTION
[0203] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Although the embodiments of the present invention have been shown and described, it can be understood by those of ordinary skill in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the attached claims and their equivalents. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without making creative work are within the scope of protection of the present invention.
[0204] like Figure 1 As shown, the present invention provides a method for optimizing the configuration of mobile energy storage capacity in a disaster-resistant urban distribution network. The framework is modeled as a MILP model, including the following steps:
[0205] S01: Determine the probability of utility pole failure due to a disaster shock.
[0206] The failure rate curve of electric poles directly affected by the disaster is calculated using the historical data of the study area. In order to draw the failure rate curve of electric poles caused by the indirect impact of the earthquake, the building model and its damage status are first established, and the total failure probability is calculated based on the probability of direct and indirect failure of electric poles caused by the earthquake.
[0207] S02: Batteries with unlimited capacity are inserted into each bus one by one, taking into account the probability of the battery placement scenario in the previous stage, to determine the appropriate bus with the lowest ESI index.
[0208] S03: Select battery type and optimize battery power and energy.
[0209] The comparative analysis of different battery technology characteristics is shown in the following table:
[0210]
[0211]
[0212] Calculate the annual costs of PCS, SUC and BOP, as well as the total capital cost TCC of the battery to obtain the best power and energy.
[0213] The main costs of TCC are shown in Table 2:
[0214]
[0215] S04: Optimize the resilience of the distribution network by leveraging power and energy from the previous phase.
[0216] The MBSS interruption time in traffic is calculated based on the speed of the energy storage vehicle, the speed of other vehicles and the capacity of the road. Using the collected data, the RI of the distribution system is maximized while minimizing the interruption cost, thereby reducing the priority load.
[0217] In order to verify the application value of the optimal configuration method of mobile energy storage capacity for disaster-resistant urban distribution networks designed in this paper, which takes into account the life health level and elastic value gain, an experimental verification was carried out using historical disaster data in a certain area as a sample. The disaster analyzed was a power outage caused by an earthquake.
[0218] First, using the historical data of the study area, the failure rate of electric poles under the direct impact of disasters is calculated, and the failure rate curve of electric poles under the indirect impact of disasters is drawn. The building model and its damage state are established, and the total damage probability of electric poles is calculated based on the direct and indirect damage probability of disasters on electric poles.
[0219] Secondly, the energy storage system with unlimited capacity is inserted into each busbar in turn to determine the corresponding busbar with the lowest energy storage system configuration index. In this stage, the probability of battery placement scenarios in the previous stage is considered. PCS, SUC, and BOP costs are calculated, and the MESS cost is calculated considering driver and fuel costs. The MESS power and energy are optimized according to the annual cost model to obtain the optimal power and energy.
[0220] Finally, the power and energy from the previous stage are used to optimize the elasticity of the distribution network, and the MESS interruption time in traffic is calculated based on the speed of the energy storage vehicle, the speed of other vehicles, and the capacity of the road. Using the collected data, the RI of the distribution system is maximized while minimizing the interruption cost while reducing the priority load.
[0221] The specific steps in the above power grid model are:
[0222] To assess the indirect impact of an earthquake on the distribution network, the collapse probabilities of low-rise, mid-rise, and high-rise buildings around utility poles are first calculated to determine the extent of damage to these poles.
[0223] The probability of collapse of various types of buildings during an earthquake is shown in the following table:
[0224]
[0225] The specifications of the energy storage batteries used in the system are shown in the table below:
[0226]
[0227] Road traffic and vehicle data are shown in the table below:
[0228]
[0229] The optimization results of system elasticity are shown in the following table:
[0230]
[0231] Figure 4 The impact of different levels of road traffic on RI for road traffic volume and road capacity. Road traffic volume and road capacity can change significantly immediately after an event, and this variability has an impact on the movement of the MESS. The greater the road traffic volume, the longer it takes to move between points, and the lower the RI.
[0232] In actual use, it is almost difficult to predict the interruption time caused by any natural disaster, so the interruption time period analyzed in this method is between 6 and 14 hours. Figure 5 As shown, according to the figure, by increasing the interruption time, the performance of MESS is better and at the end of the period, its RI is 0.82.
[0233] Figure 6 The interruption cost related to the interruption time is illustrated. As the interruption time increases, the interruption cost increases in a smooth curve.
[0234] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for optimizing the configuration of mobile energy storage capacity in a disaster-resistant urban distribution network, characterized in that: The following steps are involved: Step 1. Using the historical data of the study area, calculate the failure rate of electric poles under the direct impact of disasters, and draw the failure rate curve of electric poles under the indirect impact of disasters; establish a building model and its damage state, and calculate the total damage probability of electric poles based on the direct and indirect damage probability of disasters on electric poles; Step 2. Insert the energy storage system of unlimited capacity into each busbar in turn to determine the corresponding busbar with the lowest energy storage system configuration index ESI; at this stage, the probability of the battery placement scenario in the previous stage is considered; select the type of battery carried by the mobile energy storage vehicle based on indicators such as carbon emissions and battery costs and calculate the total cost of the battery; calculate the operating cost, including the total cost of thermal power generation units, energy storage, gas storage, and energy provided from upstream networks and mobile energy suppliers; calculate the MESS cost considering driver and fuel costs to obtain the optimal power and energy; Step 3. Utilize the power and energy from the previous stage to optimize the resilience of the distribution network, and calculate the MESS interruption time in traffic based on the speed of the energy storage vehicle, the speed of other vehicles, and the capacity of the road; use the collected data to maximize the RI of the distribution system while minimizing the interruption cost while reducing the priority load.
2. The method for optimizing the configuration of mobile energy storage capacity in a disaster-resistant urban distribution network according to claim 1 is characterized in that: In the step 1, the failure rate of electric poles under the direct influence of disasters is calculated, and the failure rate curve of electric poles under the indirect influence of disasters is drawn. The study of natural disaster problems in power systems can be examined from multiple angles; Geographic data alternate with disaster conditions: areal aspects of the land, such as land use and soil moisture levels, mountainous features, land hills, and complex terrain indicators; disaster variables, such as storm duration and intensity, threat level, landfall location, presentation speed, etc.; climate characteristics, such as the Standardized Precipitation Index SPI, annual and monthly rainfall; Since natural disasters can cause different degrees of damage to buildings, random distribution is usually used to describe the behavior of different buildings; for this purpose, in order to calculate the probability of each structural adjustment level, the failure rate function formula of the lognormal distribution is as follows: In the formula, P[ds|S d ] is the probability of being in or exceeding the structural damage state (ds), φ is the standard normal cumulative distribution function, β ds is the standard deviation of the natural logarithm of the damage state spectrum displacement (ds), S d is the spectral shift, is the median spectral displacement when the building reaches the damage threshold (ds) This function represents the probability of any building being damaged under different degrees of natural disasters, and the fragility curve is defined as no, slight, moderate, extensive and complete failure levels; The formula for determining the impact of building damage on utility poles is as follows: P[Pp b |Bull b ]=e (-λ,Dis) ·ON In the formula, P[Pp b |Bul b ] is the probability of failure of electric poles due to collapse of buildings near the busbar, λ is the rate parameter of the exponential function, Dis is the distance between the overhead line and nearby buildings, and PE is the cumulative probability of the damaged state of the building after the disaster.
3. The method for optimizing the configuration of mobile energy storage capacity in a disaster-resistant urban distribution network according to claim 2 is characterized in that: In the step 1, a building model and its damage state are established, and the total damage probability of the electric poles is calculated according to the direct and indirect damage probability of the disaster to the electric poles; The probability of pole collapse under disaster impact is calculated using the failure probability curve; the total probability formula is as follows: P Z =P i d +P i b -(P i d P i b ) Where P Z is the total probability of pole failure, P i d is the probability of failure of the pole due to the direct impact of the disaster, P i b The possibility of utility pole failure due to building demolition.
4. The method for optimizing the configuration of mobile energy storage capacity in a disaster-resistant urban distribution network according to claim 3 is characterized in that: In step 2, the probability of pole damage in the previous stage is taken into account, and the energy storage system with infinite capacity is inserted into each busbar in turn to determine the corresponding busbar with the lowest ESI; Assume that the remaining capacity of the priority load is at the maximum capacity and the system has an ESS with infinite capacity in order to determine the optimal location of the battery; the ESS is installed in sequence with all busbars, and the total load interruption is calculated considering the probability of pole failure. The load interruption calculation formula is as follows: In the formula, For intermittent load during positioning phase, is the priority load set, The maximum theoretical demand for the critical load in the positioning phase. Input power to ESS for the positioning phase; After obtaining the total load interruption during the battery installation phase of each bus, the ESI value is obtained using the following formula; the energy storage system configuration index ESI definition formula for each bus in the system is as follows: In the formula, is the event set; In the values obtained, the probabilities of different scenarios have been taken into account, and the bus with the lowest index value is an ideal choice for placing an energy storage system; considering the probability of various situations, a low ESI means that there is a low probability of capacity reduction of critical loads in this bus during the interruption time.
5. The method for optimizing the configuration of mobile energy storage capacity in a disaster-resistant urban distribution network according to claim 4 is characterized in that: In step 2, a battery carried by a mobile energy storage vehicle is selected; MESS's energy storage system technologies include: lead-acid batteries, nickel-based batteries, lithium-ion batteries, metal-air batteries and flow batteries; power batteries at different capacity stages can be recycled. According to the degree of battery capacity attenuation, the recycling can be divided into the following stages: ① Normal use stage: 80-100% capacity, can be used as power battery, applied to electric vehicles, etc.; ② The first stage of cascade utilization: 60-80% capacity, can be used as energy storage batteries, applied to energy storage power stations, communication base stations, emergency rescue power supplies, low-speed electric vehicles, etc.; ③ The second stage of cascade utilization: 20-60% capacity, can be used as backup batteries, applied to household energy storage, lighting power supply, etc.; ④Scrap stage: 0-20% capacity, can be disassembled and recycled for raw material recycling; For batteries that are used in cascade, the battery capacity loss rate is calculated as follows: Where ξ is the battery capacity loss rate; n is the charging time; The power loss calculation formula for battery use is as follows: In the formula, E loss is the power loss; Q r is the battery capacity; U is the charging voltage; DOD is the depth of discharge; ξ n is the battery capacity loss rate; E T The energy transfer efficiency of the battery; The formula for calculating the life of second-hand batteries used in energy storage scenarios is as follows: Where, L r is the number of cycles of retired batteries; T is the average daily charge and discharge times of the energy storage system; The purchase price of second-life batteries per unit capacity is calculated as follows: Where n' is the theoretical service life of the battery in normal use; C E ' is the purchase price of the battery per unit capacity during normal use; New batteries will generate a lot of carbon emissions during the production stage, while the carbon emissions generated by the transformation of retired batteries are very small; the recycling of waste battery materials, especially aluminum shells, can effectively reduce carbon emissions; the cascade utilization of retired batteries not only reduces carbon emissions, but also reduces the emission of other harmful substances, which can bring good environmental protection effects; the calculation formula for the carbon emission reduction brought by the cascade utilization of 1kWh energy retired batteries in a certain energy storage power station is as follows: C is the carbon emissions reduced by reusing 1 kWh of retired batteries; N n is the number of new batteries used in the cycle; L n is the number of cycles a new battery is used; E n is the energy of a new battery; C n is the carbon emissions of a new 1kWh battery over its life cycle; N r is the number of retired batteries used in cycles; E r is the energy of the retired battery; C r It is the carbon emissions of a 1kWh retired battery over its life cycle.
6. The method for optimizing the configuration of mobile energy storage capacity in a disaster-resistant urban distribution network according to claim 5 is characterized in that: In the step 2, the total cost of the battery is calculated; The total cost of the battery, TCC, is the most critical factor in calculating the battery capacity and is calculated according to the following description; TCC evaluates all costs associated with acquiring, installing, and delivering a storage system. Typically, in ESS, the cost of the power conversion system is expressed in terms of power capacity. Energy-related costs include all costs associated with building an energy storage reservoir or water reservoir. The total cost of a PCS system is calculated as follows: Where PCS is the total cost of power electronics, PCS uc is the unit cost of power electronics, is the maximum power rating of the MESS, The total cost of SUC is calculated as follows: Where SUC is the total storage unit cost, SUC uc is the unit cost of storage unit, η is the input efficiency of MESS; The total cost of BOP is calculated as follows: Where BOP is the total cost of the factory balance, BOP uc The unit cost of the factory balance The total cost calculation formula for PCS, SUC, and BOP is as follows: TCC=PCS+SUC+BOP The capital recovery factor CRF calculation formula is as follows: The annualized capital cost AC is calculated as follows: In the formula, i r is the annual interest rate, y is the energy storage life (years); The costs of fuel and truck drivers should be considered in the annual cost of the MESS’s TCC, and each energy storage device is essential to the daily operation of the network, not only when events occur, but also in any situation throughout the year; energy storage devices can be used during extreme weather or to assist power supply during other power outages.
7. The method for optimizing the configuration of mobile energy storage capacity in a disaster-resistant urban distribution network according to claim 6 is characterized in that: In step 2, the operating cost is calculated, including the total cost of the thermal power generation unit, energy storage, gas storage, and energy provided from the upstream network and mobile energy suppliers; The calculation formula is as follows: C T =(C Th +C ES +C GS +C buy +C Mobile ) C ES =((C es,fx ×P es )+(C es,vr ×A es )) C TGS =C gs ×(IR s +OR s ) In the formula, C Th is the operating cost of the thermal unit, C ES is the operating cost of energy storage, C GS is the operating cost of gas storage, C buy The cost of purchasing electricity and natural gas, C Mobile The cost of providing energy to a mobile energy provider, C MT is the marginal cost of the microturbine, P MT is the power of the microturbine, C CHP is the marginal cost of the CHP unit, P CHP is the output power of the combined heat and power unit, C es,fx , C es,vr are the fixed and variable operating costs of energy storage, P es is the rated energy storage power, A es is the annual energy storage flow, C gs is the gas storage operation cost, IR s , OR s Input and output limits for gas flow; The loss cost of curtailed energy is expressed as follows: PC=(P cur ×VOLL elc )+(Q cur ×VOLL gas ) Where, VOLL elc is the power load loss value, VOLL gas is the natural gas load loss value, P cur , Q cur are the electricity and natural gas consumption values.
8. The method for optimizing the configuration of mobile energy storage capacity in a disaster-resistant urban distribution network according to claim 7 is characterized in that: List the relevant constraints based on the operating cost formula; One of the most fundamental constraints in power systems is the power balance constraint, which is expressed as follows: Where P MT,t is the micro-turbine output power at time t, P ren,t is the output power of renewable energy at time t, P CHP,t is the output power of the cogeneration unit at time t, P curt-i is the reduced power of node i; This formula shows that the total power generated by microturbines, CHP units, renewable energy, purchased electricity, energy storage, etc. should be equal to the power demand of each bus minus the power lost; The constraints on the microturbine power generation rate and startup and shutdown costs are as follows: SUC MT,t ≥SU MT [in MT,t -in MT,t-1 ] SUC MT,t ≥0,t∈T SDC MT,t ≥SD MT [u MT,t-1 -u MT,t ] SDC MT,t ≥0,t∈T In the formula, is the minimum and maximum power of the micro gas turbine, SU MT is the startup cost, SD MT For downtime expenses; The constraints for disconnecting loads on each bus are as follows: 0≤P curt-i,t ≤D i,t The constraints of mobile energy storage battery energy storage are as follows: AND min ≤E t,i ≤E max In the formula, is the maximum charge / discharge capacity, is a binary variable of charge and discharge state, is the initial energy value stored, E min 、E max is the minimum and maximum value of stored energy, η ch , η dis is the charge / discharge efficiency; The above formulas respectively show that the working state of the battery consists of two binary variables, namely, the charging or discharging state; the constraint of the battery charging and discharging capacity; the constraint of the battery storage capacity; the constraint of the storage energy of charging or discharging at the instant t; The constraints on the thermal capacity of the power lines are as follows: In the formula, is the minimum and maximum capacity of Line L; The constraints for the CHP unit are as follows: H CHP,t +P CHP,t ≥z j,t In the formula, H CHP,t is the output power of the CHP at time t, z j,t is the coefficient related to the unit functional area; The constraints of the natural gas supply network are as follows: The constraints on the amount of gas produced at time t are as follows: In the formula, is the minimum and maximum production of natural gas wells; The constraints of gas pipelines are as follows: In the formula, C mn is the Weymouth constant of the pipe mn, T0 is the standard temperature, D mn is the pipe diameter, sgn(π m ,π n ) is the gas flow between nodes m and n, π m ,π n is the node pressure; Natural gas storage capacity constraints are as follows: In the formula, is the minimum and maximum gas storage capacity of the gas storage; The constraints on natural gas input and output flow are as follows: -GO s ≤ΔQ s,t (Q) s,t -Q s,t-1 )≤OR s In the formula, Q s,t is the value of gas stored in the gas storage; The natural gas balance constraints at each node j are as follows: Q inj =Q w -ΔQ s -ΔQ gf -ΔQ pl =-ΔQ In the formula, Q inj is the amount of gas injected into each node, ΔQ gf is the gas required by the microturbine, ΔQ pl The gas demand for each node; The constraints related to renewable energy production are as follows: The wind speed is calculated on an hourly basis; after calculating the wind speed, the wind turbine output power is as follows: Where V ci , V r , V co Starting, rated and cut-off speeds of wind turbines; The amount of electricity generated by a solar power plant depends on factors such as radiation and temperature, and is calculated as follows: Where R is the radiation, P, T, and γ are the correction coefficients of the output power, temperature, and maximum output power of the solar power station; The elastic constraints are as follows: Where h is the exact time when the unpredictable event occurs, H represents the duration of the fault, and the total amount of energy of the disconnected load is the product of the power cut at each node and the termination time when the power is cut off; In view of the nonlinear characteristics of natural gas infrastructure, the linearization method was studied, and the piecewise linear method was used to linearize the nonlinear equation of natural gas. The linear flow formula of natural gas in the pipeline is as follows: In the formula, α l,t , β l,t are the slope and intercept of the piecewise line segment, and the flow of natural gas in the pipeline is linearized due to the sum of linear piecewise functions; The upper and lower linear segmented constraints of the gas flow are as follows: In the formula, is the lower and upper limits of gas flow, ω l,t is a binary indicator for a piecewise linear function.
9. The method for optimizing the configuration of mobile energy storage capacity in a disaster-resistant urban distribution network according to claim 8 is characterized in that: In the step 2, the power and energy of the mobile energy storage battery MESS are optimized according to the annual cost model to obtain the optimal power and energy; Determine the optimal power and energy of each energy storage system based on the annual cost model; In the formula, Inject power into the first phase optimized MESS, The maximum load demand based on the load profile, the input power of the energy storage system is constrained by the maximum demand of the remaining capacity of the priority load; The constraints on the power output and energy capacity of each energy storage system are as follows: In the formula, are the highest and lowest nominal energy levels of the MESS, MESS energy capacity optimized for the first phase; t1 represents the time step when the MESS reaches the maximum energy, which is approximately the first time step since the beginning of the disaster; At any given moment, the energy stored is related to the energy injected by the following formula: Where Δt is the time step of the event, which is assumed to be 1 h; η is the efficiency of the zinc-bromine battery used in the energy storage system; The total annual cost of the energy storage system’s PCS, BOP, and storage unit plus the annual cost of the mobile energy storage vehicle and the fuel limit in the system budget is calculated as follows: The constraint condition for the total power of the mobile energy storage system input to the priority load is the total number of priority loads equal to the energy input of the energy storage system. Due to the elimination of power loss, the amount of transmitted power should not be greater than the amount of input power, and the total amount of transmitted power should not exceed the maximum value of the critical load. The formula used is as follows: In the formula, is the transition power between MESS and priority load; The limited transmission power in the above formula does not always correspond exactly to the supply of the critical load, which always leads to some load reduction. The calculation formula for this reduction is as follows: In the formula, To reduce critical loads during the optimization phase; The formula for minimizing the number of loads with higher priority is as follows: In the formula, To reduce the interruption loss cost per unit power of important loads; The above formula also calculates the cost of the reduced load, where Represents the constraints on the loss of critical load units according to the priority of the loads.
10. The method for optimizing the configuration of mobile energy storage capacity in a disaster-resistant urban distribution network according to claim 9, characterized in that: In step 3, the elasticity of the distribution network is optimized by using the power and energy in the previous stage, and the MESS interruption time in traffic is calculated according to the speed of the energy storage vehicle, the speed of other vehicles and the capacity of the road; When a serious incident occurs in a DN, it must be acknowledged that the probability of restoring all critical loads is low, therefore, the types can be divided into three categories: the most important, the least important, and the loads that do not belong to the above two categories; If the supply is disrupted, each load will suffer losses depending on their level of importance; In addition, the mobile energy storage vehicle must consider factors such as the size and speed of the vehicle, the road capacity, and the driving speed when transferring between nodes, and use the size and speed of the vehicle and the capacity of the road to simulate road traffic; Where Tr is the time required to move on the road considering road traffic; Tr 0 is the time required to move on the road regardless of the road traffic conditions; Vr is the road traffic volume; Cr is the road capacity; V mess is the average speed of MESS; V veh is the average speed of all vehicles; Tr tot is the travel time of MESS on the road.
11. The method for optimizing the configuration of mobile energy storage capacity in a disaster-resistant urban distribution network according to claim 10, characterized in that: In step 3, the collected data is used to maximize the RI of the distribution system while reducing the priority loads while minimizing the interruption cost; The following formula optimizes the second stage with the goal of maximizing RI. During the whole optimization process, the priority of key loads, road traffic and the spatiotemporal operation model of MESS are all taken into consideration; The injection power of ESSs is constrained by the priority critical loads, as follows: In the formula, the injected power is limited to the required power of the priority load on the same island, and the function σ (e,s,i) Determine the presence of both batteries and loads on the island; this phase differs from the optimization phase, which determines battery energy and power, in that loads are prioritized in this phase; thus, high priority loads can be delivered sooner during an event due to power constraints; When an event occurs, the power output and energy capacity of each MESS are limited to the maximum output and minimum output, and the formula is as follows: At each interruption and event time, the stored energy is related to the injected power by the following formula: In order to fully utilize the full capacity of the battery, the maximum injection power of the MESS on the island should be less than the total load requirement of the island. The formula is as follows: When the maximum MESS injection power exceeds the required power, Z(i,s) tends to zero; When the MESS is forced to move from one discharge station to another, the injected power is equal to zero, and the formula is as follows: Moving time T tot Dependence on the speed of road traffic, vehicles and trucks; The formula for connecting or disconnecting MESS in all islands and scenes is as follows: The total power provided by ESSs to the critical loads during the event is equal to the injection power of the battery, constrained to be the sum of the critical loads at the interruption time and the event time, as follows: In the formula, represents the input power of the second stage ESS, represents the transition power between ESS and critical loads during a disaster, Represents critical load demand based on load distribution; The limited transmission power in the above formula does not always correspond completely to the supply of priority loads, which always leads to a reduction in some priority loads. The calculation formula for this reduction is as follows: In the formula, represents the critical loads reduced during the optimization phase; Control the number of critical loads that must be cut, especially those with higher priority, with the following formula: In the formula, represents the probability of a disaster occurring. Represents the sum of the critical loads present during the outage time.
Citation Information
Cited By
Toughness prevention scheduling method for hydrogen-containing comprehensive energy system
CN121189782A