Preheating device for PE film production raw materials
By designing the stirring unit, L-shaped rod and heating wire structure in the preheating device, the problem of uneven preheating of PE particles is solved, and the flatness and quality improvement of the PE film is achieved.
Patent Information
- Application Number
- CN202411406900.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Different sizes of PE particles lead to uneven preheating, and some particles are still in solid state, resulting in uneven concave and convexity on the surface of PE film.
A preheating device for raw materials for PE film production is designed, including preheating shell, preheating assembly, fixing assembly and blowing module. Through structures such as stirring units, L-shaped rods and heating wires, uniform preheating of PE particles is achieved. and classification to ensure uniform distribution of wind circulation and heat to avoid blockage.
The uniform preheating of PE particles is achieved, the problem of unevenness of the PE film surface is avoided, and the flatness and quality of the PE film are improved.
Smart Images

Figure CN118990857A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of PE processing, in particular to a device for preheating raw materials for producing PE films. Background Art
[0002] PE is polyethylene plastic, the most basic type of plastic. Plastic bags, cling film, etc. are all PE. PE can be manufactured by different processing methods. Ethylene is the main raw material, propylene and hexene are copolymers, and slurry polymerization or gas phase polymerization is used under the action of a catalyst. The obtained polymer is flashed, separated, dried, granulated, etc. to obtain a finished product with uniform particles. It is odorless, non-toxic, feels like wax, has excellent low temperature resistance, good chemical stability, can withstand the erosion of most acids and alkalis but not resistant to oxidizing acids, is insoluble in general solvents at room temperature, has low water absorption, and has excellent electrical insulation.
[0003] When manufacturing PE film from PE, the raw materials need to be preheated. The existing preheating of raw materials is generally to directly add all PE materials into the preheating device, take them out after a certain period of time, and then pour the preheated PE particles into the melting furnace for melting. However, due to the different sizes of PE particles, some PE particles are heated unevenly during preheating, resulting in the unevenly heated parts still in a solid state, which makes the surface of the PE film uneven when applied to the PE film, so it needs to be improved. Summary of the invention
[0004] In order to solve the problem in the above background technology that the different sizes of PE particles lead to uneven heating of some PE particles during preheating, resulting in the unevenly heated parts remaining in a solid state, making the surface of the PE film uneven after being applied to the PE film, the present invention provides a preheating device for raw materials for PE film production.
[0005] To achieve the above object, the present invention provides the following technical solution: a PE film production raw material preheating device, comprising a preheating shell, a driving motor is fixedly installed at the bottom of the preheating shell, a feed inlet and an air outlet are arranged at the top of the preheating shell, and further comprising:
[0006] A preheating component, wherein the preheating component is disposed in the inner cavity of the preheating shell;
[0007] A fixing assembly, wherein the fixing assembly is fixedly connected to the preheating housing;
[0008] A blowing module, wherein the blowing module is arranged at the lower end of the preheating shell;
[0009] The preheating assembly comprises a mounting shaft, a stirring unit and a second mounting plate are fixedly mounted on the outer wall of the mounting shaft, a movable plate is movably connected to the upper end of the mounting shaft, and a first drain plate, a first mounting plate and three second drain plates are fixedly mounted in sequence in the inner cavity of the preheating housing;
[0010] The fixed assembly includes a first pipeline, a second pipeline is fixedly installed on a side of the preheating shell away from the first pipeline, a moving block is movably connected to the upper end of the preheating shell, an L-shaped rod is fixedly installed on one side of the moving block, and the preheating shell is elastically connected to the moving block through a spring telescopic rod.
[0011] Preferably, the blowing module includes a blower, a fixed box is fixedly installed on one side of the preheating shell, one end of the blower is fixedly installed in the inner cavity of the fixed box, and an inclined plate is fixedly installed at the lower end of the inner cavity of the fixed box.
[0012] Preferably, a slide groove is provided in the preheating shell near the L-shaped rod, and the slide groove is movably connected to the L-shaped rod. The moving block presents an arc surface and moves up and down in the preheating shell.
[0013] Preferably, a cross bar is provided on the top of the stirring unit, and both ends of the cross bar are arc-shaped, and the bottom of the L-shaped rod is arc-shaped, and the stirring unit and the L-shaped rod are abuttingly connected.
[0014] Preferably, the second mounting plate is located at the lower end of the second drain plate, and the surface of the second mounting plate is provided with through holes with the same diameter as the second drain plate, and the number of the through holes is less than that of the through holes on the surface of the second drain plate.
[0015] Preferably, the other end of the first pipe is located at the upper end of the first second leakage plate, the other end of the second pipe is located at the lower end of the bottom second leakage plate, and the bottom of the inner cavity of the preheating shell is an inclined surface.
[0016] Preferably, the inclined plate is an inclined surface, one end of the inclined plate away from the fixed box is fixedly connected to the preheating shell, and a mesh is provided on one side of the preheating shell close to the inclined plate, and the diameter of the mesh is smaller than the diameter of the smallest PE particle.
[0017] Preferably, a fixing ring is provided at the upper end of the mounting shaft, spikes are provided at the top of the movable disk, and the number of the spikes is the same as the number of through holes on the surface of the first leakage disk, and the output end of the driving motor is fixedly connected to the bottom of the mounting shaft.
[0018] Preferably, one side of the stirring unit is in the form of an inclined surface, and is fitted with the first mounting plate, the first drain plate and the second drain plate, and heating wires are arranged in the first mounting plate, the first drain plate and the second drain plate.
[0019] Preferably, a discharge pipe is provided at the bottom of the preheating shell, a support frame is provided at the lower end of the outer wall of the preheating shell, a feed port and an air outlet are provided at the top of the preheating shell, the inner cavity of the feed port is movably connected with a piston, and a connecting rope is provided on the top of the piston, and the end of the connecting rope away from the piston is fixedly connected to the preheating shell.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] The present invention facilitates better preheating of PE particles by arranging the coordination of structures such as a fixed box and an inclined plate. The wind from the blower enters the inner cavity of the fixed box, and the inclined plate guides the wind, so that the wind quickly enters the inner cavity of the preheating shell, and the wind moves back and forth and rises on the mounting disk. In this process, hot air is formed by the heat emitted by the wind and the heating wire, so that the hot air heats the mounting disk and the raw materials on the upper surface of the disk again when moving, so that the preheating effect of PE is better.
[0022] The present invention facilitates the effect of classifying the size of PE particles by arranging the coordination of structures such as a stirring unit and an L-shaped rod. When the first stirring unit at the upper end rotates to abut against the L-shaped rod, the L-shaped rod drives the moving block to move upward, and the larger PE particles on the surface of the first drain disk fall from the first pipe to the surface of the second drain disk at the uppermost end. The second stirring unit abuts against the L-shaped rod, so that the L-shaped rod drives the moving block to move upward. At the same time, the L-shaped rod abuts against the moving disk. The stirring unit causes the preheated smaller PE particles to fall through the second pipe to the bottom of the preheating shell, so that the preheated PE particles are poured into the melting furnace for melting with better effect.
[0023] The present invention facilitates the avoidance of clogging of the drain disc when preheating the PE particles by arranging the cooperation of structures such as a movable disc and an L-shaped rod. The L-shaped rod abuts against the movable disc, so that the spikes on the surface of the movable disc enter into the through holes on the surface of the first drain disc, so that the spikes clean the larger PE particles in the through holes of the first drain disc, thus preventing the larger PE particles from clogging the through holes of the first drain disc and causing the inability to continue feeding. Thus, the preheating of the PE particles can be carried out stably, thus avoiding the waste of time caused by cleaning the particles due to blockage. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the structure of the present invention;
[0025] Figure 2 It is a schematic diagram of the front cross-sectional structure of the present invention;
[0026] Figure 3 for Figure 2 A schematic diagram of the local enlarged structural relationship at the center;
[0027] Figure 4 It is a schematic diagram of the cross-sectional structure of the preheating housing and the blowing module of the present invention;
[0028] Figure 5 This is a schematic diagram of the structural matching relationship between the second drain plate and the second mounting plate of the present invention;
[0029] Figure 6 It is a schematic diagram of the structural matching relationship between the stirring unit and the L-shaped rod of the present invention;
[0030] Figure 7 This is a schematic diagram of the split structure of the preheating component and the fixing component of the present invention;
[0031] Figure 8 It is a schematic diagram of the split structure of the second leakage plate and the second mounting plate of the present invention.
[0032] In the figure: 1. preheating shell; 2. support frame; 3. drive motor; 4. preheating component; 401. mounting shaft; 402. first mounting plate; 403. moving plate; 404. first leakage plate; 405. stirring unit; 406. second leakage plate; 407. second mounting plate; 5. fixing component; 501. first pipeline; 502. second pipeline; 503. moving block; 504. L-shaped rod; 505. spring telescopic rod; 6. feed port; 7. air outlet; 8. blowing module; 801. blower; 802. fixing box; 803. inclined plate; 9. discharge pipe. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] like Figures 1 to 8 As shown, the present invention provides a PE film production raw material preheating device, including a preheating shell 1, a driving motor 3 is fixedly installed at the bottom of the preheating shell 1, a feed port 6 and an air outlet 7 are arranged on the top of the preheating shell 1, and also includes:
[0035] A preheating component 4, which is arranged in the inner cavity of the preheating shell 1;
[0036] A fixing component 5, the fixing component 5 is fixedly connected to the preheating housing 1;
[0037] A blowing module 8, which is arranged at the lower end of the preheating shell 1;
[0038] The preheating assembly 4 includes a mounting shaft 401, a stirring unit 405 and a second mounting plate 407 are fixedly mounted on the outer wall of the mounting shaft 401, a movable plate 403 is movably connected to the upper end of the mounting shaft 401, and a first drain plate 404, a first mounting plate 402 and three second drain plates 406 are fixedly mounted in sequence in the inner cavity of the preheating housing 1;
[0039] The fixing assembly 5 includes a first pipe 501, a second pipe 502 is fixedly installed on the side of the preheating shell 1 away from the first pipe 501, a moving block 503 is movably connected to the upper end of the preheating shell 1, an L-shaped rod 504 is fixedly installed on one side of the moving block 503, and the preheating shell 1 is elastically connected to the moving block 503 through a spring telescopic rod 505.
[0040] The above scheme is adopted: through the cooperation of the preheating component 4 and the fixing component 5, the installation shaft 401 drives the stirring unit 405 and the second installation disk 407 to rotate, and the stirring unit 405 rotates to stir the PE particles that fall onto the surface of the first drain disk 404 and push them to move. When the stirring unit 405 pushes the PE particles to move, the smaller PE particles fall from the through holes of the first drain disk 404 to the surface of the first installation disk 402. When the first stirring unit 405 at the upper end rotates to conflict with the L-shaped rod 504, the L-shaped rod 504 drives the moving block 503 to move upward, and the larger PE particles on the surface of the first drain disk 404 fall from the first pipe 501 to the surface of the second drain disk 406 at the upper end. When the first stirring unit 405 at the upper end does not conflict with the L-shaped rod 504, the upper end spring telescopic rod 505 drives the moving block 503 and the L-shaped rod 504 to reset. At this time, the second stirring unit 405 conflicts with the L-shaped rod 504, so that the L-shaped rod 504 drives the moving block 503 to move upward, and at the same time, the L-shaped rod 504 resists the moving disk 403, so that the spikes on the surface of the moving disk 403 enter the through holes on the surface of the first leakage disk 404, so that the spikes clean the larger PE particles in the through holes of the first leakage disk 404, and prevent the larger PE particles from clogging the through holes of the first leakage disk 404. The stirring unit 405 drops the preheated smaller PE particles through the second pipe 502 to the bottom of the preheating shell 1, so that the preheated PE particles are poured into the melting furnace for melting with better effect. At the same time, the mounting shaft 401 drives the second mounting disk 407 to rotate. When the second mounting disk 407 coincides with the through holes of the second leakage disk 406, some of the larger PE particles fall to the surface of the next second leakage disk 406, so that it can continue to be preheated, thereby avoiding uneven heating of the larger PE particles during preheating, resulting in the inability to completely melt and apply to the PE film, making the surface of the PE film uneven.
[0041] like Figure 3 , Figure 4 and Figure 6As shown, the blowing module 8 includes a blower 801, a fixed box 802 is fixedly installed on one side of the preheating shell 1, one end of the blower 801 is fixedly installed in the inner cavity of the fixed box 802, and an inclined plate 803 is fixedly installed at the lower end of the inner cavity of the fixed box 802. A slide groove is provided near the L-shaped rod 504 of the preheating shell 1, and the slide groove is movably connected to the L-shaped rod 504. The moving block 503 presents an arc surface and moves up and down in the preheating shell 1. A cross bar is provided on the top of the stirring unit 405, and the two ends of the cross bar are arc-shaped. The bottom of the L-shaped rod 504 is arc-shaped, and the stirring unit 405 and the L-shaped rod 504 are in abutment with each other.
[0042] The above scheme is adopted: through the cooperation of the blower 801 and the fixed box 802, the wind of the blower 801 enters the inner cavity of the fixed box 802, and the inclined plate 803 guides the wind, so that the wind quickly enters the inner cavity of the preheating shell 1, so that the wind moves back and forth on the mounting plate and rises. In this process, the heat emitted by the wind and the heating wire forms hot air, so that the hot air heats the mounting plate and the raw materials on the upper surface of the plate again when moving. Through the cooperation of the L-shaped rod 504 and the preheating shell 1, the design of the slide groove of the preheating shell 1 allows the L-shaped rod 504 to move in the slide groove, thereby limiting the L-shaped rod 504, making the L-shaped rod 504 more stable when moving, and the moving block The design of the arc surface 503 makes the moving block 503 compatible with the shape of the preheating shell 1. The moving block 503 moves up and down in the preheating shell 1, and then opens and closes the first pipe 501 and the second pipe 502, so as to control the flow of PE particles. Through the design of the stirring unit 405 and the L-shaped rod 504, a total of five groups of stirring units 405 are provided, and there are no cross bars on the tops of the lower three stirring units 405. The design of the cross bars of the upper two stirring units 405 makes it possible to resist the L-shaped rod 504. The arc-shaped design at both ends of the cross bar and the arc-shaped design at the bottom of the L-shaped rod 504 makes it easier for the stirring unit 405 to resist the L-shaped rod 504.
[0043] like Figure 2 , Figure 3 and Figure 8 As shown, the other end of the first pipe 501 is located at the upper end of the first second leakage disk 406, the other end of the second pipe 502 is located at the lower end of the bottom second leakage disk 406, the bottom of the inner cavity of the preheating shell 1 is an inclined surface, the second mounting disk 407 is located at the lower end of the second leakage disk 406, and the surface of the second mounting disk 407 is provided with through holes with the same diameter value as the second leakage disk 406, and the number of through holes is less than the through holes on the surface of the second leakage disk 406.
[0044] The above scheme is adopted: through the design of the first pipe 501 and the second leakage tray 406, the other end of the first pipe 501 is located at the upper end of the second leakage tray 406, so that the larger PE particles can be better preheated, and the other end of the second pipe 502 is located at the lower end of the second leakage tray 406 at the bottom, so that the preheated smaller PE particles fall to the bottom of the inner cavity of the preheating shell 1. The design of the inclined surface at the bottom of the preheating shell 1 makes it possible to quickly remove the preheated PE particles, avoiding the situation where some PE particles are accumulated in the inner cavity of the preheating shell 1 and cannot be removed. The second mounting plate 407 is designed so that the second mounting plate 407 is located at the lower end of the second leakage plate 406 and the number of through holes in the second leakage plate 406 is less than the number of through holes on the surface of the second leakage plate 406, so that when the through holes of the second mounting plate 407 overlap with those of the second leakage plate 406, some larger PE particles fall to the surface of the next second leakage plate 406, so that they can continue to be preheated, and the time when the through holes of the three groups of second mounting plates 407 and the second leakage plates 406 overlap is not synchronized, so that the larger PE particles can be preheated for a longer time, so that the preheating effect of the larger PE particles is better.
[0045] like Figure 2 , Figure 4 and Figure 7 As shown, a fixing ring is provided at the upper end of the mounting shaft 401, spikes are provided at the top of the movable disk 403, and the number of the spikes is the same as the number of through holes on the surface of the first leakage disk 404, the output end of the driving motor 3 is fixedly connected to the bottom of the mounting shaft 401, the inclined plate 803 is an inclined surface, and the end of the inclined plate 803 away from the fixed box 802 is fixedly connected to the preheating shell 1, and a mesh is provided on the side of the preheating shell 1 close to the inclined plate 803, and the diameter of the mesh is smaller than the diameter of the smallest PE particle.
[0046] The above scheme is adopted: through the design of the installation shaft 401 and the movable disk 403, the design of the fixing ring of the installation shaft 401, the position of the movable disk 403 is limited to prevent the L-shaped rod 504 from being unable to resist the movable disk 403, the design of the top detection of the movable disk 403, the spikes on the surface of the movable disk 403 enter the through holes on the surface of the first leakage disk 404, so that the spikes can clean up the larger PE particles in the through holes of the first leakage disk 404, and prevent the larger PE particles from clogging the through holes of the first leakage disk 404, resulting in the situation that the material cannot be further discharged, and the number of the spikes is the same as the number of through holes on the surface of the first leakage disk 404, so that all through holes on the surface of the movable disk 403 can be entered Cleaning is carried out, the driving motor 3 is fixedly connected to the mounting shaft 401, so that the driving motor 3 rotates to drive the mounting shaft 401 to rotate, and the mounting shaft 401 rotates to drive the stirring unit 405 and the second mounting disk 407 to rotate. Through the design of the inclined plate 803 and the design of the inclined surface of the inclined plate 803, the wind of the blower 801 is guided to enter the inner cavity of the preheating shell 1. The design of the mesh allows the formed hot air to flow better from the mesh to the upper end of the first mounting disk 402 when passing through the first mounting disk 402, and then be discharged from the air outlet 7. The mesh diameter is smaller than the diameter of the smallest PE particle, so as to prevent PE particles from falling from the mesh into the inner cavity of the fixed box 802.
[0047] like Figure 1 and Figure 2 As shown, a discharge pipe 9 is provided at the bottom of the preheating shell 1, a support frame 2 is provided at the lower end of the outer wall of the preheating shell 1, a feed port 6 and an air outlet 7 are provided at the top of the preheating shell 1, the inner cavity of the feed port 6 is movably connected with a piston, and a connecting rope is provided on the top of the piston, and the end of the connecting rope away from the piston is fixedly connected to the preheating shell 1, one side of the stirring unit 405 is an inclined surface, and is fitted with the first mounting plate 402, the first leakage plate 404 and the second leakage plate 406, and heating wires are provided in the first mounting plate 402, the first leakage plate 404 and the second leakage plate 406.
[0048] The above scheme is adopted: through the design of the discharge pipe 9, the design of the discharge pipe 9 allows the preheated PE particles to be poured into the melting furnace from the discharge pipe 9 for melting, the design of the support frame 2 allows the preheating shell 1 to be supported, the design of the feed port 6 and the air outlet 7 allows the hot air blown out from the bottom to form convection with the air outlet, so that the hot air outlet is discharged to the top of the preheating shell 1, so that the hot air can better heat the plastic raw material on the top of the heating box, so that the plastic raw material can be heated in multiple stages, and the design of the piston allows the feed port 6 to be blocked when no material is added to the preheating shell 1. The plug can prevent dust from falling, and the design of the connecting rope can fix the piston to prevent the loss of the piston. The design of the stirring unit 405 and the design of the inclined surface of the stirring unit 405 can better push and stir the PE particles on the surface of the stirring unit 405. The design of the heating wires of the first mounting plate 402, the first leakage plate 404 and the second leakage plate 406 can heat the surface PE particles with the heating wires in the first mounting plate 402, the first leakage plate 404 and the second leakage plate 406, and also make the wind and the heat emitted by the heating wire form hot wind, so that the hot wind can heat the mounting plate and the raw materials on the upper surface of the plate again when moving.
[0049] The working principle and use process of the present invention:
[0050] PE particles are added into the inner cavity of the preheating shell 1 through the feed port 6, and the first mounting plate 402, the first drain plate 404 and the second drain plate 406 are heated by heating wires to start the blower 801 and the drive motor 3, and the drive motor 3 drives the mounting shaft 401 to rotate, and the wind of the blower 801 enters the inner cavity of the fixed box 802, and the inclined plate 803 guides the wind, so that the wind quickly enters the inner cavity of the preheating shell 1, so that the wind moves back and forth on the mounting plate and rises. In this process, the heat emitted by the wind and the heating wire forms hot air, which makes the heat When the wind moves, it heats the mounting plate and the raw materials on the upper surface of the plate again, so that the mounting shaft 401 drives the stirring unit 405 and the second mounting plate 407 to rotate, and the stirring unit 405 rotates to stir the PE particles that fall onto the surface of the first drain plate 404 and push them to move. When the stirring unit 405 pushes the PE particles to move, the smaller PE particles fall from the through holes of the first drain plate 404 to the surface of the first mounting plate 402. When the first stirring unit 405 at the upper end rotates to resist the L-shaped rod 504, the L-shaped rod 504 brings The movable block 503 moves upward to squeeze the spring telescopic rod 505 to make it contract, so that the larger PE particles on the surface of the first drain plate 404 fall from the first pipe 501 to the surface of the second drain plate 406 at the upper end. When the first stirring unit 405 at the upper end does not conflict with the L-shaped rod 504, the upper spring telescopic rod 505 drives the movable block 503 and the L-shaped rod 504 to reset. At this time, the second stirring unit 405 conflicts with the L-shaped rod 504, so that the L-shaped rod 504 drives the movable block 503 to move upward, and at the same time, the L-shaped rod 504 The moving disk 403 is resisted, so that the spikes on the surface of the moving disk 403 enter the through holes on the surface of the first drain disk 404, so that the spikes clean the larger PE particles in the through holes of the first drain disk 404, and prevent the larger PE particles from blocking the through holes of the first drain disk 404, causing the situation that the material cannot be further discharged. The moving block 503 moves upward, so that the stirring unit 405 drops the preheated smaller PE particles through the second pipe 502 to the bottom of the preheating shell 1, so that the preheated PE particles are poured into the melting furnace for better melting effect;
[0051] At the same time, the mounting shaft 401 drives the second mounting disk 407 to rotate. When the through holes of the second mounting disk 407 overlap with those of the second leakage disk 406, some larger PE particles fall onto the surface of the next second leakage disk 406, so that they can continue to be preheated. The overlapping time of the through holes of the three groups of second mounting disks 407 and second leakage disks 406 is not synchronized, so that the larger PE particles can be preheated for a longer time, resulting in a better preheating effect for the larger PE particles, thereby avoiding uneven heating of the larger PE particles during preheating, resulting in the inability to completely melt and be applied to the PE film, making the surface of the PE film uneven.
[0052] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0053] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A PE film production raw material preheating device, comprising a preheating shell (1), a driving motor (3) is fixedly installed at the bottom of the preheating shell (1), and a feed inlet (6) and an air outlet (7) are arranged at the top of the preheating shell (1), characterized in that: Also includes: A preheating component (4), wherein the preheating component (4) is arranged in the inner cavity of the preheating shell (1); A fixing assembly (5), wherein the fixing assembly (5) is fixedly connected to the preheating shell (1); A blowing module (8), wherein the blowing module (8) is arranged at the lower end of the preheating shell (1); The preheating assembly (4) comprises a mounting shaft (401), a stirring unit (405) and a second mounting disk (407) are fixedly mounted on the outer wall of the mounting shaft (401), a movable disk (403) is movably connected to the upper end of the mounting shaft (401), and a first leakage disk (404), a first mounting disk (402) and three second leakage disks (406) are fixedly mounted in sequence in the inner cavity of the preheating shell (1); The fixing assembly (5) comprises a first pipe (501); a second pipe (502) is fixedly mounted on a side of the preheating shell (1) away from the first pipe (501); a moving block (503) is movably connected to the upper end of the preheating shell (1); an L-shaped rod (504) is fixedly mounted on one side of the moving block (503); and the preheating shell (1) is elastically connected to the moving block (503) via a spring telescopic rod (505).
2. The PE film production raw material preheating device according to claim 1 is characterized in that: The blowing module (8) comprises a blower (801), a fixed box (802) is fixedly mounted on one side of the preheating shell (1), one end of the blower (801) is fixedly mounted on the inner cavity of the fixed box (802), and an inclined plate (803) is fixedly mounted on the lower end of the inner cavity of the fixed box (802).
3. The PE film production raw material preheating device according to claim 1 is characterized in that: The preheating shell (1) is provided with a slide groove near the L-shaped rod (504), and the slide groove is movably connected to the L-shaped rod (504). The moving block (503) presents an arc surface and moves up and down in the preheating shell (1).
4. The PE film production raw material preheating device according to claim 1 is characterized in that: A cross bar is provided on the top of the stirring unit (405), and both ends of the cross bar are arc-shaped. The bottom of the L-shaped rod (504) is also arc-shaped. The stirring unit (405) and the L-shaped rod (504) are connected in abutting manner.
5. The PE film production raw material preheating device according to claim 1 is characterized in that: The second mounting plate (407) is located at the lower end of the second leakage plate (406), and the surface of the second mounting plate (407) is provided with through holes with the same diameter as the second leakage plate (406), and the number of through holes is less than that of the through holes on the surface of the second leakage plate (406).
6. The PE film production raw material preheating device according to claim 1 is characterized in that: The other end of the first pipe (501) is located at the upper end of the first second leakage plate (406), the other end of the second pipe (502) is located at the lower end of the bottom second leakage plate (406), and the bottom of the inner cavity of the preheating shell (1) is an inclined surface.
7. The PE film production raw material preheating device according to claim 2 is characterized in that: The inclined plate (803) is in the form of an inclined surface, and one end of the inclined plate (803) away from the fixed box (802) is fixedly connected to the preheating shell (1). A mesh is provided on one side of the preheating shell (1) close to the inclined plate (803), and the diameter of the mesh is smaller than the diameter of the smallest PE particle.
8. The PE film production raw material preheating device according to claim 1 is characterized in that: A fixing ring is provided at the upper end of the installation shaft (401), spikes are provided at the top of the movable disk (403), and the number of the spikes is the same as the number of through holes on the surface of the first leakage disk (404), and the output end of the driving motor (3) is fixedly connected to the bottom of the installation shaft (401).
9. The PE film production raw material preheating device according to claim 1, characterized in that: One side of the stirring unit (405) is inclined and fits with the first mounting plate (402), the first drain plate (404) and the second drain plate (406). The first mounting plate (402), the first drain plate (404) and the second drain plate (406) are all provided with heating wires.
10. The PE film production raw material preheating device according to claim 1, characterized in that: A discharge pipe (9) is arranged at the bottom of the preheating shell (1), a support frame (2) is arranged at the lower end of the outer wall of the preheating shell (1), a feed port (6) and an air outlet (7) are arranged at the top of the preheating shell (1), a piston is movably connected to the inner cavity of the feed port (6), and a connecting rope is arranged at the top of the piston, and the end of the connecting rope away from the piston is fixedly connected to the preheating shell (1).
