Welding device for paving waterproof plate of open cut tunnel
By using an electric rail car and hydraulic push rod to match the arc bearing plate in the laying of tunnel waterproof boards, the problems of high precision and material consumption in the existing technology are solved, the laying efficiency and welding quality are improved, and more efficient Waterproof effect.
Patent Information
- Application Number
- CN202411272067.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-09-11
AI Technical Summary
The existing tunnel waterproof board laying and welding methods require high precision and high material consumption when ensuring joint sealing and durability, which affects the laying efficiency and waterproofing effect.
A welding device for laying open-dig tunnel waterproof boards including electric railcars, locking parts, limiting parts and welding parts is designed, and the limiting and welding of the waterproof boards is used to use multi-stage hydraulic push rods and arc-shaped bearing plates to perform limiting and welding of the waterproof boards. Reduce material consumption and improve welding strength and quality.
It improves the laying efficiency of waterproof boards, reduces material consumption, enhances welding strength and quality, avoids the position deviation of the waterproof board affecting the welding effect, and avoids damage to the waterproof board through the design of the arc-shaped bearing board.
Smart Images

Figure CN118991071A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of waterproof plate welding, and in particular to a welding device for laying waterproof plates in open-cut tunnels. Background Art
[0002] Waterproof board, also known as geomembrane, is an anti-seepage material made of high molecular polymer as the basic raw material. Waterproof board is an important waterproof material in tunnel engineering. It aims to prevent the erosion and soaking of tunnel structure by groundwater, rainwater or other liquid substances, ensure the thermal insulation and shock absorption performance of the tunnel, thereby improving the service life and safety performance of the tunnel.
[0003] Therefore, the laying and welding of tunnel waterproofing panels is a key link in tunnel waterproofing construction, which is directly related to the waterproofing effect and structural safety of the tunnel. The existing laying and welding work of tunnel waterproofing panels usually involves cleaning the laying base surface first, and then laying the waterproofing panels from bottom to top using the tie suspension method, and finally welding the joints between the waterproofing panels.
[0004] The existing waterproof board laying and welding method can achieve good waterproof effect, but there are still certain disadvantages: when the waterproof board is laid and installed from bottom to top using the tie suspension method, this method is crucial to ensure the sealing and durability of the joints, but it requires the operator to have a high degree of precision, thus affecting the efficiency of laying and installation. At the same time, in order to ensure the waterproof effect, this method requires the use of more fixings and waterproof materials, which increases material consumption to a certain extent. Summary of the invention
[0005] In view of the above problems, the embodiment of the present application provides a welding device for laying waterproof panels in an open-cut tunnel to solve the problems existing in the laying and welding of waterproof panels.
[0006] In order to achieve the above-mentioned purpose, the embodiment of the present application provides the following technical solutions: a welding device for laying waterproof panels in open-cut tunnels, comprising an electric rail vehicle slidably arranged on rails and slideways, the electric rail vehicle being fixedly provided with a locking portion for limiting the movement of the electric rail vehicle, the electric rail vehicle being further provided with a cylindrical shell, the cylindrical shell being provided with a limiting portion for tightening and limiting the waterproof panel, and the limiting portion being provided with a welding portion for welding two waterproof panels.
[0007] The cylindrical shell includes a multi-stage hydraulic push rod fixedly arranged inside it, and the outer wall of the first-stage telescopic section of the hydraulic push rod is fixedly provided with an L-shaped support plate corresponding to four sliding through grooves one by one, and the upper end surfaces of the four L-shaped support plates are commonly provided with a supporting ring 1, and the upper end surface of the supporting ring 1 is fixedly provided with a supporting ring 2 through four rectangular blocks.
[0008] The limiting portion includes three arc-shaped supporting plates arranged on the outside of the cylindrical shell, the left side wall of the arc-shaped supporting plate is set as an inclined surface from left to right, the right side walls of the two arc-shaped supporting plates on the front and rear sides are respectively provided with L-shaped sliding plates with the same curvature as the arc-shaped supporting plates connected to them respectively through spring sliding, and the right side wall of the middle arc-shaped supporting plate is provided with an arc-shaped sliding plate with the same curvature as the middle arc-shaped supporting plate through spring sliding.
[0009] The limiting portion also includes four connecting shells arranged on the outside of the cylindrical shell, the telescopic sections of the two connecting shells located in the front and rear directions are respectively fixedly connected to their corresponding arc-shaped supporting plates, and the non-telescopic sections of the two connecting shells in the front and rear directions are respectively fixedly connected to the side walls of the corresponding supporting ring one, the telescopic sections of the two connecting shells located in the middle are jointly fixedly connected to the arc-shaped supporting plate in the middle, and the non-telescopic sections of the two connecting shells in the middle are respectively fixedly connected to the side walls of the corresponding supporting ring two, and limiting groups are arranged inside the four connecting shells.
[0010] Preferably, the outer wall of the cylindrical shell is provided with four sliding through grooves 1 along the circumferential direction, the upper ends of the four sliding through grooves 1 are connected and penetrated by a sliding groove 2 provided on the outer wall of the cylindrical shell, wherein two opposite sliding grooves 2 are symmetrically provided with sliding through grooves 2 inside, the supporting ring 1 and the supporting ring 2 are both slidably arranged in the four sliding grooves 2, and the supporting ring 1 and the supporting ring 2 are provided with square grooves penetrating respectively at the positions of the supporting ring 1 and the supporting ring 2 corresponding to the sliding through groove 2, and the inner wall of the cylindrical shell is provided with four sliding grooves 4 extending in the up and down directions in the circumferential direction, and the four sliding grooves 4 are staggered with the sliding groove 2.
[0011] Preferably, the four L-shaped support plates are arranged corresponding to four sliding through grooves 1, and the end face of the secondary telescopic section of the hydraulic push rod is fixedly provided with a cylindrical table 1 with a taper facing outward, a supporting ring 1 is located above the cylindrical table 1, and a cylindrical table 2 with the same taper as the cylindrical table 1 is fixedly provided at the center position of the cylindrical table 1 through a connecting rod, and the cylindrical table 2 is slidably arranged inside the four sliding grooves 4 through four strip slides and is located below the supporting ring 2.
[0012] Preferably, the limiting group includes a zigzag top plate slidably arranged inside the connecting shell through a spring, the zigzag top plate consists of a horizontal trapezoidal mating section and an inclined push section, the mating section of the zigzag top plate passes through the corresponding sliding through groove 2 and the square groove and is located inside the cylindrical shell, the mating section is located on the inclined surface on one side of the cylindrical shell and is rotatably provided with two roller shafts cooperating with cylindrical table 1 and cylindrical table 2, the push section of the zigzag top plate is slidably arranged inside the connecting shell through a sliding block and is fixedly connected to the inner wall of the connecting shell through a spring, both ends of the push section are arc-shaped, and the arc-shaped outer wall close to the side of the mating section is rotatably provided with a rolling shaft cooperating with the inclined surface of the mating section.
[0013] Preferably, the electric rail vehicle includes a U-shaped support frame with an opening facing downward. On the outer sides of the two vertical sections of the U-shaped support frame that are away from each other, two pulleys distributed in the left-right direction are rotatably arranged. The pulleys are slidably arranged on the rail. On the outer walls of the front and rear ends of the U-shaped support frame, strip-shaped plates with rectangular through slots opened on their end faces are respectively fixed. On the left and right side walls of the U-shaped support frame, two L-shaped plates with different sizes and opposite orientations are respectively fixed.
[0014] Preferably, the locking part includes a first telescopic push rod fixedly arranged on the upper end face of the right L-shaped plate. The telescopic section of the first telescopic push rod is fixedly provided with a strip-shaped push plate. On the left side wall of the strip-shaped push plate, adjusting plugs extending in the horizontal direction are symmetrically fixed at the front and rear positions corresponding to the rectangular through slot. The outer wall of the adjusting plug is provided with a frustum-shaped structure. The locking part further includes two locking clamping plates symmetrically arranged inside the rectangular through slot through a torsion spring. On both of the locking clamping plates, vertical matching sections and inclined locking sections are provided. An arc-shaped groove matching with the adjusting plug is arranged on the matching section. At the bottom of the locking clamping plate, a locking convex block matching with the railway track is fixedly arranged.
[0015] Preferably, the welding part includes a semi-circular rail fixedly arranged on the left side walls of four connecting shells through four connecting plates. In the semi-circular rail, a support block is slidably arranged through two sliding rods. On the upper end face of the support block, two U-shaped blocks with opposite openings are fixedly arranged along the radian direction of the semi-circular rail. In the same U-shaped block, a first flattening roller is rotatably arranged in the left-right direction. On the side walls of the two U-shaped blocks on the same support block that are close to each other, sliding grooves are symmetrically arranged in the front and rear. In the two sliding grooves, sliding blocks are slidably arranged. The sliding blocks are fixedly connected to the bottom walls of their respective sliding grooves through springs. On the side walls of the two sliding blocks that are close to each other, second flattening rollers are symmetrically rotatably arranged in the left and right. On the upper end face of the support block and between the two U-shaped blocks, a first welding head slidably connected to the support block through a mounting seat and a second welding head fixedly arranged on the upper end face of the support block are provided. The side walls of the two sliding blocks that are close to each other are respectively fixedly connected to the mounting seat. Two second welding heads are provided and are respectively located on the front and rear sides of the first welding head. The welding part further includes a driving group for driving the two support blocks to slide.
[0016] Preferably, the driving group includes a reciprocating motor fixedly arranged on the upper end face of the U-shaped support frame. The output shaft of the reciprocating motor is rotatably connected to the vertical section of the left L-shaped plate. On the outer wall of the output shaft of the reciprocating motor, a Y-shaped shell connected to the two support blocks is fixedly arranged. In the vertical section inside the Y-shaped shell, a second telescopic push rod is fixedly arranged. The telescopic end of the second telescopic push rod is fixedly provided with two strip-shaped connecting plates. The two strip-shaped connecting plates are respectively slidably arranged inside the two inclined sections of the Y-shaped shell, and the upper end faces of the strip-shaped connecting plates penetrate through the corresponding Y-shaped shells and are fixedly connected to the sliding blocks.
[0017] Compared with the prior art, the embodiment of the present invention has the following beneficial effects:
[0018] 1. When laying and welding the waterproof board in the tunnel, the present invention divides the waterproof board into three sections, and cooperates with three arc-shaped supporting plates to support the three sections of the waterproof board. In actual laying work, only the cut waterproof board needs to be pushed to the corresponding arc-shaped supporting plate, which makes the waterproof board easy to lay, thereby improving the laying efficiency of the waterproof board and reducing the consumption of waterproof board materials during the laying process.
[0019] 2. In the present invention, the multi-stage hydraulic push rod can drive the extension of the folded top plate to realize the pressing and limiting work of the waterproof board on the arc-shaped supporting plate, avoiding the position deviation of the waterproof board caused by external environment and other factors during the later welding work, which affects the welding effect, improving the welding strength and welding quality of the waterproof board. At the same time, the end face of the arc-shaped supporting plate supports the waterproof board through the arc surface, avoiding damage to the waterproof board and affecting the waterproof effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 is a three-dimensional structural schematic diagram of the present invention.
[0021] Figure 2 is a structural schematic diagram of the present invention after removing the tunnel.
[0022] Figure 3 is a structural schematic diagram of the cylindrical shell and the U-shaped support frame in the present invention.
[0023] Figure 4 is a structural schematic diagram of the cylindrical shell in the present invention.
[0024] Figure 5 is a partial structural schematic diagram of the interior of the cylindrical shell in the present invention.
[0025] Figure 6 is a partial structural schematic diagram of the locking part in the present invention.
[0026] Figure 7 is a cross-sectional view of the cylindrical shell and the connecting shell in the present invention.
[0027] Figure 8 is Figure 7 a planar structural schematic diagram of
[0028] Fig. 9 is a connection schematic diagram of the cylindrical shell and the middle arc-shaped supporting plate in the present invention.
[0029] Fig.10 is a cross-sectional view of a partial structure of the welding part in the present invention.
[0030] Fig.11It is a plan sectional view of a partial structure in the welding part of the present invention.
[0031] Fig.12 Schematic diagram of the planar connection relationship between the cylindrical shell and the arc-shaped bearing plate in the present invention.
[0032] Fig.13 It is Fig.10 The partial enlarged view at position A in
[0033] Reference numerals in the figure: 1, electric rail vehicle; 11, C-shaped support frame; 12, pulley; 13, strip plate; 14, L-shaped plate; 2, locking part; 21, telescopic push rod one; 22, strip push plate; 23, adjusting plug; 24, locking clamp plate; 241, arc-shaped groove; 242, locking convex block; 3, cylindrical shell; 31, hydraulic push rod; 311, L-shaped support plate; 312, cylindrical platform one; 313, cylindrical platform two; 3131, strip-shaped sliding plate; 32, supporting ring one; 33, supporting ring two; 34, sliding through groove one; 35, sliding groove two; 36, sliding through groove two; 37, sliding groove four; 4, limiting part; 41, arc-shaped bearing plate; 411, L-shaped sliding plate; 412, arc-shaped sliding plate; 42, connecting shell; 43, limiting group; 431, folded line-shaped top plate; 432, roller; 5, welding part; 51, semi-circular slide rail; 52, support block; 53, C-shaped block; 54, flattening roller one; 55, flattening roller two; 56, welding head one; 57, welding head two; 58, driving group; 581, reciprocating motor; 582, Y-shaped shell; 583, telescopic push rod two; 584, strip-shaped connecting plate; 6, railway track; 7, slideway; 8, tunnel. Specific embodiments
[0034] The following will Figure 1-13 make a further detailed description of this application.
[0035] Please refer to Figure 1 , Figure 2 and Figure 3 , a welding device for laying a waterproof board in an open-cut tunnel, including an electric rail vehicle 1 slidably arranged on a railway track 6 and a slideway 7. A locking part 2 for restricting the movement of the electric rail vehicle 1 is fixedly arranged on the electric rail vehicle 1. A cylindrical shell 3 is further arranged on the electric rail vehicle 1. A limiting part 4 for tightly limiting the waterproof board is arranged on the cylindrical shell 3. A welding part 5 for welding the waterproof board is arranged on the limiting part 4.
[0036] During specific operation, first control the electric rail vehicle 1 to move under the waterproof board to be laid inside the tunnel 8, control the locking part 2 to lock the electric rail vehicle 1, then insert the waterproof board to be laid and welded into the limiting part 4, immediately control the limiting part 4 to limit and fix the waterproof board, and finally control the electric rail vehicle 1 to move along the slideway 7 and weld the joint of the waterproof board through the welding part 5.
[0037] Please refer to Figure 3 , the electric rail vehicle 1 includes a U-shaped support frame 11 with a downward opening. On the outer walls of the two vertical sections of the U-shaped support frame 11, two pulleys 12 distributed in the left-right direction are rotatably arranged. The pulleys 12 are slidably arranged on the slide rail. On the outer walls of the front and rear ends of the U-shaped support frame 11, strip plates 13 with rectangular through grooves opened on the end faces are respectively fixed. The rectangular through groove strip plates 13 are located between the two pulleys 12. On the left and right side walls of the U-shaped support frame 11, two L-shaped plates 14 with different sizes and opposite orientations are respectively fixed.
[0038] Please refer to Figure 3 and Figure 6 , the locking part 2 includes a first telescopic push rod 21 fixedly arranged on the upper end face of the right L-shaped plate 14. A strip-shaped push plate 22 is fixedly arranged on the telescopic section of the first telescopic push rod 21. On the left side wall of the strip-shaped push plate 22, adjusting plugs 23 extending horizontally are symmetrically fixedly arranged at the positions corresponding to the rectangular through grooves. The outer wall of the adjusting plug 23 is set as a frustum-shaped structure. The locking part 2 further includes two locking clamping plates 24 symmetrically arranged inside the rectangular through groove through a torsion spring. Vertical matching sections and inclined locking sections are arranged on the two locking clamping plates 24.
[0039] Please refer to Figure 6 , an arc-shaped groove 241 matched with the adjusting plug 23 is arranged on the matching section, and a locking convex block 242 matched with the rail 6 is fixedly arranged at the bottom of the locking section.
[0040] When the waterproof board needs to be laid and welded, first control the electric rail vehicle 1 to move to the designated laying location, and then control the first telescopic push rod 21 on the right L-shaped plate 14 to extend. When the first telescopic push rod 21 extends, the strip-shaped push plate 22 drives the adjusting plugs 23 on both sides to move leftward synchronously and cooperate with the arc-shaped grooves 241 of the corresponding two locking clamping plates 24. At this time, the locking sections of the two locking clamping plates 24 gradually approach synchronously under the action of the adjusting plugs 23, and the rail 6 is clamped by the locking convex blocks 242, so as to increase the friction between the electric rail vehicle 1 and the rail 6, and the electric rail vehicle 1 completes the locking work.
[0041] It should be noted that the U-shaped support frame 11 is slidably arranged on the slideway 7 in the middle of the tunnel 8 through a rectangular slider, while the pulleys 12 on both sides are respectively rotatably arranged on the rails 6 on both sides.
[0042] Please refer to Figure 4 and Figure 5 , on the outer wall of the cylindrical shell 3, four first sliding through grooves 34 are opened along the circumferential direction. The upper ends of the four first sliding through grooves 34 are all communicated with a second sliding groove 35 opened on the outer wall of the cylindrical shell 3. Among them, two relatively arranged second sliding grooves 35 are symmetrically provided with second sliding through grooves 36 inside in the up and down direction. The inner wall of the cylindrical shell 3 is provided with four fourth sliding grooves 37 extending in the up and down direction along the circumferential direction, and the four fourth sliding grooves 37 are arranged staggeredly with the second sliding grooves 35.
[0043] Please refer to Figure 5 and Figure 8 , the cylindrical shell 3 includes a multi-stage hydraulic push rod 31 fixedly arranged inside it. On the outer wall of the first-stage telescopic section of the hydraulic push rod 31, L-shaped support plates 311 corresponding to the four first sliding through grooves 34 are fixedly arranged. On the end face of the second-stage telescopic section of the hydraulic push rod 31, a first cylindrical platform 312 with a taper facing outwards is fixedly arranged. At the central position of the first cylindrical platform 312, a second cylindrical platform 313 with the same taper as the first cylindrical platform 312 is fixedly arranged through a connecting rod. The second cylindrical platform 313 is slidably arranged inside the four fourth sliding grooves 37 through four strip-shaped sliding plates 3131. On the upper end faces of the four L-shaped support plates 311, a first supporting ring 32 is jointly arranged. The first supporting ring 32 is located above the first cylindrical platform 312. On the upper end face of the first supporting ring 32, a second supporting ring 33 located above the second cylindrical platform 313 is fixedly arranged through four rectangular blocks. The first supporting ring 32 and the second supporting ring 33 are both slidably arranged in the four second sliding grooves 35. At the positions corresponding to the second sliding through grooves 36, the first supporting ring 32 and the second supporting ring 33 are both provided with square grooves penetrating through themselves.
[0044] Please refer to Figure 2 and Figure 7 , the limiting part 4 includes three arc-shaped bearing plates 41 arranged along the semi-circular circumference direction. The left side wall of the arc-shaped bearing plate 41 is set as an inclined surface from left to right. On the right side walls of the two arc-shaped bearing plates 41 on the front and back sides, L-shaped sliding plates 411 with the same radian as the arc-shaped bearing plates 41 connected to them are slidably arranged through springs respectively. On the right side wall of the middle arc-shaped bearing plate 41, an arc-shaped sliding plate 412 with the same radian as the middle arc-shaped bearing plate 41 is slidably arranged through a spring.
[0045] Please refer to Figure 7 , Figure 8 and Fig.12The limiting portion 4 also includes four end-surface telescopic connecting shells 42 arranged on the outside of the cylindrical shell 3. The telescopic sections of the two connecting shells 42 in the front and rear directions are respectively fixedly connected to their corresponding arc-shaped support plates 41, and the non-telescopic sections of the two connecting shells 42 in the front and rear directions are respectively fixedly connected to the side walls of the corresponding supporting ring 1 32. The telescopic sections of the two connecting shells 42 in the middle are jointly fixedly connected to the arc-shaped support plate 41 in the middle, and the non-telescopic sections of the two connecting shells 42 in the middle are respectively fixedly connected to the side walls of the corresponding supporting ring 2 33. The four connecting shells 42 are each provided with a limiting group 43, and the limiting group 43 includes a spring slidingly arranged inside the connecting shell 42 The zigzag top plate 431 is composed of a horizontal trapezoidal matching section and an inclined push section. The matching section of the zigzag top plate 431 passes through the corresponding sliding groove 2 36 and the square groove and is located inside the cylindrical shell 3. The matching section is located on the inclined surface on one side of the cylindrical shell 3 and is rotatably provided with two rollers 432 that match the cylindrical table 1 312 and the cylindrical table 2 313. The push section of the zigzag top plate 431 is slidably provided inside the connecting shell 42 through a sliding block and is fixedly connected to the inner wall of the connecting shell 42 through a spring. Both ends of the push section are arc-shaped, and the arc-shaped outer wall close to the matching section is rotatably provided with a rolling shaft that matches the inclined surface of the matching section.
[0046] When the electric rail vehicle 1 moves to the specified position and is locked and fixed, the first telescopic section of the hydraulic push rod 31 is controlled to extend, and the four L-shaped support plates 311 and the supporting ring 1 32 move upward synchronously under the drive of the hydraulic push rod 31. At this time, the supporting ring 2 33 also moves upward synchronously under the drive of the four rectangular blocks. When the supporting ring 1 32 and the supporting ring 2 33 move upward synchronously, the connecting shell 42 located on the side walls of the supporting ring 1 32 and the supporting ring 2 33 also drives the arc-shaped supporting plate 41 to move upward synchronously, so that the L-shaped slide plate 411 and the arc-shaped slide plate 412 are in contact with the inner wall of the tunnel 8.
[0047] Then, the waterproof board to be laid and welded is manually pushed along the inclined surface of the arc-shaped bearing plate 41 into the inside of the arc-shaped bearing plate 41, and then the hydraulic push rod 31 is controlled to continue to extend. The two rollers 432 on the matching section of the broken-line-shaped top plate 431 are pushed upward through its secondary telescopic section. At this time, the two pushing sections of the broken-line-shaped top plate 431 located below move to both sides respectively under the pushing of the cylindrical platform one 312 and the matching section, and gradually push the corresponding arc-shaped bearing plate 41 through the pushing sections of the broken-line-shaped top plate 431. The telescopic connecting shell 42 driven by the arc-shaped bearing plate 41 moves to both sides respectively, and then the waterproof boards on the front and back sides are tightened against the inner wall of the tunnel 8. The cylindrical platform two 313 located above slides upward along the four sliding grooves four 37 driven by the connecting rod. When the cylindrical platform two 313 moves upward, the rollers 432 on the matching sections of the two middle broken-line-shaped top plates 431 are pushed by the cylindrical platform two 313, and the matching sections of the two middle broken-line-shaped top plates 431 move away from each other and drive the pushing sections to extend, and then push the corresponding arc-shaped bearing plate 41 and tighten the waterproof board against the inner wall of the tunnel 8.
[0048] It should be noted that the first-stage telescopic section of the hydraulic push rod 31 is not in the initial position, that is, the first-stage telescopic section extends a certain height, and the purpose is to reduce the stroke when the arc-shaped bearing plate 41 pushes against the inner wall of the tunnel 8 later.
[0049] Please refer to Fig.10 、 Fig.11 and Fig.13 The welding part 5 includes a semi-circular slide rail 51 fixedly arranged on the left side walls of the four connecting shells 42 through four connecting plates. In the semi-circular slide rail 51, a support block 52 is slidably arranged through two sliding rods. On the upper end surface of the support block 52, two C-shaped blocks 53 with opposite openings are fixedly arranged along the radian direction of the semi-circular slide rail 51. In the same C-shaped block 53, a flattening roller one 54 is rotatably arranged in the left-right direction. On the side walls of the two C-shaped blocks 53 on the same support block 52 close to each other, sliding grooves are symmetrically arranged in the front and back. Inside the two sliding grooves, sliding blocks are slidably arranged. The sliding blocks are fixedly connected to the bottom walls of their respective sliding grooves through springs. On the side walls of the two sliding blocks close to each other, flattening rollers two 55 are symmetrically rotatably arranged in the left-right direction. On the upper end surface of the support block 52 and between the two C-shaped blocks 53, a welding head one 56 slidably connected to the support block 52 through a mounting seat and a welding head two 57 fixedly arranged on the upper end surface of the support block 52 are provided. The side walls of the two sliding blocks close to each other are respectively fixedly connected to the mounting seat. There are two welding heads two 57 and they are respectively located on the front and back sides of the welding head one 56. The welding part 5 further includes a driving group 58 for driving the two support blocks 52 to slide.
[0050] Please refer to Figure 2 、 Fig.10 and Fig.11, the driving group 58 includes a reciprocating motor 581 fixedly arranged on the upper end face of the C-shaped support frame 11. The output shaft of the reciprocating motor 581 is rotatably connected to the vertical section of the left L-shaped plate 14. A Y-shaped housing 582 connected to the two support blocks 52 is fixedly arranged on the outer wall of the output shaft of the reciprocating motor 581. A second telescopic push rod 583 is fixedly arranged on the vertical section inside the Y-shaped housing 582. The telescopic end of the second telescopic push rod 583 is fixedly provided with two strip-shaped connecting plates 584. The two strip-shaped connecting plates 584 are respectively slidably arranged inside the two inclined sections of the Y-shaped housing 582, and the upper end faces of the strip-shaped connecting plates 584 penetrate through the corresponding Y-shaped housing 582 and are fixedly connected to the sliding blocks.
[0051] After the three arc-shaped bearing plates 41 tightly limit the waterproof plates placed thereon, first control the first telescopic push rod 21 to drive the strip-shaped plate 13 and the adjusting plugs 23 on both sides to move to the right. At this time, the two limit clamping plates rebound and reset under the action of the torsion springs and cancel the locking work on the electric rail vehicle 1. Then control the second telescopic push rod 583 inside the Y-shaped housing 582 to drive the two strip-shaped connecting plates 584 to extend synchronously. At this time, the first welding head 56 on the mounting seat and the two second flattening rollers 55 on both sides also extend synchronously under the drive of the strip-shaped connecting plates 584 and make the first welding head 56 and the two second flattening rollers 55 higher than the first flattening roller 54 and the second welding head 57.
[0052] When the preparation work is completed, control the electric rail vehicle 1 to gradually move to the right along the slideway 7, and while moving, first use the second flattening roller 55 to roll and flatten the joint of the two waterproof plates, and then use the first welding head 56 to weld the rolled and flattened joint.
[0053] After the welding of the three waterproof plates in the first batch is completed, control the electric rail vehicle 1 to move to the next working position, and repeat the installation and limiting steps of the waterproof plates. By controlling the retraction of the second telescopic push rod 583, the first welding head 56 and the two second flattening rollers 55 on both sides are lower than the second welding head 57 and the first flattening roller 54. Then drive the Y-shaped housing 582 and the two support blocks 52 to slide along the semi-circular slide rail 51 by the reciprocating motor 581. While the two support blocks 52 are sliding, first use the first flattening roller 54 to roll and flatten the arc-shaped joints of the two batches of waterproof plates. After the flattening is completed, use the second welding head 57 to weld and fix the arc-shaped joints to complete the welding and fixing work of the two batches of waterproof plates.
[0054] It should be noted that the welding head 1 56 and the welding head 2 57 are set in different directions, that is, the welding head 1 56 and the welding head 2 57 are set at a 90-degree direction, and the center of the semicircular slide rail 51 is the same as the center of the tunnel 8, so the two smoothing rollers 1 54 can be close to the inner wall of the tunnel 8 and roll and smooth it. When the two support blocks 52 slide clockwise along the semicircular slide rail 51 and the welding head 2 57 welds the arc joint, the welding head 2 57 located at the rear side slides in the clockwise direction. When the welding head 2 57 on the front side moves to the area where the welding is completed, the welding work is stopped, and only the arc joints in the completed welding area are rolled and smoothed by the smoothing roller 1 54 to ensure the flatness of the welding work. Conversely, when the two support blocks 52 rotate counterclockwise around the semicircular slide rail 51, the welding head 2 57 on the front side stops welding when it slides to the area where the welding head 2 57 on the rear side is completed, and only the arc joints in the completed welding area are rolled and smoothed by the smoothing roller 1 54.
[0055] In the description of the embodiments of the present invention, it should be noted that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the embodiments of the present invention. In addition, in the description of the present invention, unless otherwise specified, "multiple", "multiple roots", and "multiple groups" mean two or more.
[0056] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "connect", "install", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0057] The embodiments of this specific implementation method are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, all equivalent changes made according to the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A welding device for laying waterproof panels in an open-cut tunnel, comprising an electric rail vehicle (1) slidably arranged on a rail (6) and a slideway (7), characterized in that: The electric rail vehicle (1) is fixedly provided with a locking portion (2) for limiting the movement of the electric rail vehicle (1), and the electric rail vehicle (1) is also provided with a cylindrical shell (3), and the cylindrical shell (3) is provided with a limiting portion (4) for pressing and limiting the waterproof plate, and the limiting portion (4) is provided with a welding portion (5) for welding two waterproof plates; The cylindrical shell (3) comprises a multi-stage hydraulic push rod (31) fixedly arranged inside the cylindrical shell, an outer wall of the first telescopic section of the hydraulic push rod (31) is fixedly provided with an L-shaped support plate (311) corresponding to four sliding through grooves (34) one by one, the upper end surfaces of the four L-shaped support plates (311) are commonly provided with a supporting ring (32), and the upper end surface of the supporting ring (32) is fixedly provided with a supporting ring (33) through four rectangular blocks; The limiting portion (4) comprises three arc-shaped supporting plates (41) arranged outside the cylindrical shell (5), the left side wall of the arc-shaped supporting plate (41) being arranged as an inclined surface from left to right, the right side walls of the two arc-shaped supporting plates (41) on the front and rear sides are respectively provided with L-shaped sliding plates (411) having the same curvature as the arc-shaped supporting plates (41) connected to them respectively through spring sliding, and the right side wall of the middle arc-shaped supporting plate (41) is provided with an arc-shaped sliding plate (412) having the same curvature as the middle arc-shaped supporting plate (41) through spring sliding; The limiting portion (4) also includes four connecting shells (42) arranged on the outside of the cylindrical shell (5), the telescopic sections of the two connecting shells (42) located in the front and rear directions are respectively fixedly connected to their corresponding arc-shaped supporting plates (41), and the non-telescopic sections of the two connecting shells (42) in the front and rear directions are respectively fixedly connected to the side walls of the corresponding supporting ring 1 (32), the telescopic sections of the two connecting shells (42) located in the middle are jointly fixedly connected to the arc-shaped supporting plate (41) in the middle, and the non-telescopic sections of the two connecting shells (42) in the middle are respectively fixedly connected to the side walls of the corresponding supporting ring 2 (33), and the four connecting shells (42) are each provided with a limiting group (43) inside.
2. A welding device for laying waterproof panels in an open-cut tunnel according to claim 1, characterized in that: The outer wall of the cylindrical shell (3) is provided with four sliding through grooves (34) along the circumferential direction, and the upper ends of the four sliding through grooves (34) are connected and penetrated by sliding grooves (35) provided on the outer wall of the cylindrical shell (3), wherein two opposite sliding grooves (35) are provided with sliding through grooves (36) symmetrically arranged in the upper and lower parts, and the supporting ring (32) and the supporting ring (33) are both slidably arranged in the four sliding grooves (35), and the supporting ring (32) and the supporting ring (33) are provided with square grooves penetrating their respective positions corresponding to the sliding through grooves (36), and the inner wall of the cylindrical shell (3) is provided with four sliding grooves (37) extending in the upper and lower directions in the circumferential direction, and the four sliding grooves (37) are staggered with the sliding grooves (35).
3. The welding device for laying waterproofing board in open-cut tunnel according to claim 1, characterized in that: The four L-shaped support plates (311) are arranged corresponding to the four first sliding through grooves (34). A first cylindrical platform (312) with an outward taper is fixedly arranged on the end face of the secondary telescopic section of the hydraulic push rod (31). A first supporting ring (32) is located above the first cylindrical platform (312). A second cylindrical platform (313) with the same taper as the first cylindrical platform (312) is fixedly arranged at the central position of the first cylindrical platform (312) through a connecting rod. The second cylindrical platform (313) is slidably arranged inside the four fourth sliding grooves (37) through four strip-shaped sliding plates (3131) and is located below the second supporting ring (33).
4. The welding device for laying waterproofing board in open-cut tunnel according to claim 1, characterized in that: The limiting group (43) includes a folded top plate (431) slidably arranged inside the connecting housing (42) through a spring. The folded top plate (431) is composed of a horizontal trapezoidal matching section and an inclined pushing section. The matching section of the folded top plate (431) penetrates through the second sliding through grooves (36) and the square grooves corresponding to each other and is located inside the cylindrical housing (3). Two roller shafts (432) matched with the first cylindrical platform (312) and the second cylindrical platform (313) are rotatably arranged on the inclined surface on one side inside the cylindrical housing (3) of the matching section. The pushing section of the folded top plate (431) is slidably arranged inside the connecting housing (42) through a sliding block and is fixedly connected with the inner wall of the connecting housing (42) through a spring. Both ends of the pushing section are arc-shaped, and a rolling shaft matched with the inclined surface of the matching section is rotatably arranged on the arc-shaped outer wall close to the matching section.
5. A welding device for laying waterproofing panels in an open-cut tunnel according to claim 4, characterized in that: The electric rail vehicle (1) includes a U-shaped support frame (11) with an opening facing downward. Two pulley wheels (12) distributed in the left-right direction are rotatably arranged on the outer walls of the two vertical sections of the U-shaped support frame (11) away from each other. The pulley wheels (12) are slidably arranged on the rail. Strip-shaped plates (13) with rectangular through grooves opened on the end faces are respectively fixed on the outer walls of the front and rear ends of the U-shaped support frame (11). Two L-shaped plates (14) with different sizes and opposite orientations are respectively fixed on the left and right side walls of the U-shaped support frame (11).
6. A welding device for laying waterproofing panels in an open-cut tunnel according to claim 5, characterized in that: The locking part (2) includes a first telescopic push rod (21) fixedly arranged on the upper end face of the right L-shaped plate (14). A strip-shaped push plate (22) is fixedly arranged on the telescopic section of the first telescopic push rod (21). Adjusting plugs (23) extending in the horizontal direction are symmetrically fixed on the left side wall of the strip-shaped push plate (22) corresponding to the positions of the rectangular through grooves. The outer wall of the adjusting plug (23) is provided with a frustum-shaped structure. The locking part (2) further includes two locking clamping plates (24) symmetrically arranged inside the rectangular through groove through a torsion spring. Both of the two locking clamping plates (24) are provided with vertical matching sections and inclined locking sections. An arc-shaped groove (241) matched with the adjusting plug (23) is arranged on the matching section. A locking convex block (242) matched with the rail (6) is fixedly arranged at the bottom of the locking clamping plate (24).
7. The welding device for laying waterproofing board in an open-cut tunnel according to claim 1, characterized in that: The described welding part (5) includes a semi-circular slide rail (51) fixedly arranged on the left side walls of four connecting shells (42) through four connecting plates. A support block (52) is slidably arranged in the semi-circular slide rail (51) through two sliding rods. On the upper end surface of the support block (52), two U-shaped blocks (53) with opposite openings are fixedly arranged along the radian direction of the semi-circular slide rail (51). A flattening roller one (54) is rotatably arranged in the same U-shaped block (53) in the left-right direction. On the side walls of the two U-shaped blocks (53) on the same support block (52) that are close to each other, sliding grooves are symmetrically arranged in the front and back. Sliding blocks are slidably arranged inside the two sliding grooves. The sliding blocks are fixedly connected to the bottom walls of their respective sliding grooves through springs. On the side walls of the two sliding blocks that are close to each other, flattening rollers two (55) are symmetrically rotatably arranged in the left and right directions. On the upper end surface of the support block (52) and between the two U-shaped blocks (53), a welding head one (56) slidably connected to the support block (52) through a mounting seat and a welding head two (57) fixedly arranged on the upper end surface of the support block (52) are provided. The side walls of the two sliding blocks that are close to each other are respectively fixedly connected to the mounting seat. Two welding heads two (57) are provided and are respectively located on the front and back sides of the welding head one (56). The welding part (5) further includes a driving group (58) for driving the two support blocks (52) to slide.
8. The welding device for laying waterproofing board in an open-cut tunnel according to claim 5, characterized in that: The described driving group (58) includes a reciprocating motor (581) fixedly arranged on the upper end surface of the U-shaped support frame (11). The output shaft of the reciprocating motor (581) is rotatably connected to the vertical section of the left L-shaped plate (14). An outer wall of the output shaft of the reciprocating motor (581) is fixedly provided with a Y-shaped shell (582) connected to the two support blocks (52). A telescopic push rod two (583) is fixedly arranged in the vertical section inside the Y-shaped shell (582). The telescopic end of the telescopic push rod two (583) is fixedly provided with two strip-shaped connecting plates (584). The two strip-shaped connecting plates (584) are respectively slidably arranged inside the two inclined sections of the Y-shaped shell (582), and the upper end surfaces of the strip-shaped connecting plates (584) penetrate through the corresponding Y-shaped shells (582) and are fixedly connected to the sliding blocks.
Citation Information
Patent Citations
Waterproof plate laying method
CN112145209A
Tunnel waterproof plate laying and welding trolley
CN218701372U
Tunnel waterproof laying trolley
CN219733419U
Railway tunnel waterproof plate laying equipment
CN220353881U
