Vehicle energy management method, related equipment and vehicle

By reasonably allocating the available power of the vehicle, ensuring that the available power of the vehicle-mounted charger is always greater than its minimum operating power, the problem of the vehicle-mounted charger being unable to operate due to insufficient available power is solved, and normal power supply to external electric equipment is achieved. Improve user satisfaction.

CN118991480APending Publication Date: 2024-11-22GREAT WALL MOTOR CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411174803.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The on-board charger cannot be in operation due to insufficient available power, which affects the discharge function of the on-board charger and cannot meet the user's electricity needs.

Method used

By obtaining the current available power and load consumption of the vehicle, determine the available power of the vehicle charger and air conditioner, ensure that the available power of the vehicle charger is always greater than or equal to its minimum operating power, and reasonably allocate the available power to ensure that the vehicle charger and air conditioner Working normally.

Benefits of technology

The normal discharge function of the on-board charger is realized, the electricity consumption needs of external electric equipment is met, and the user satisfaction and the rationality of power distribution are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118991480A_ABST
    Figure CN118991480A_ABST
Patent Text Reader

Abstract

The invention provides a vehicle energy management method, related equipment and a vehicle, and the method comprises the steps: responding to a vehicle-mounted charger in a discharge state, and obtaining the current available power and load consumption power of the vehicle; and first available power of the vehicle-mounted charger and second available power of the air conditioner are determined according to the current available power and the load consumption power, so that the first available power is larger than or equal to first minimum operation power of the vehicle-mounted charger. On the premise that the normal discharging function of the vehicle-mounted charger is guaranteed, the available power is distributed to the vehicle-mounted charger and the air conditioner, the reasonability of power distribution is guaranteed, the power utilization requirement of electric equipment outside a vehicle is met, and the satisfaction degree of users is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of vehicle technology, and in particular to a vehicle energy management method, related equipment and a vehicle. Background Art

[0002] As the interface between electric vehicles and the public power grid, the on-board charger (OBC) can convert alternating current (AC) from the power grid into direct current (DC) required by the high-voltage battery of the electric vehicle to charge the power battery of the electric vehicle; it can also invert the DC power of the power battery into AC power and feed it back to the power grid to realize the energy conversion between the vehicle power battery and the power grid. Among them, the inverter function of the bidirectional on-board charger can also draw power from the power battery and provide 220V AC power to the ground electrical equipment, that is, the on-board charger is in a discharging state. However, since the available power provided by the vehicle is certain, if there are other power-consuming devices in the vehicle at the same time, the on-board charger may be unable to operate due to insufficient available power, affecting the discharge function of the on-board charger, and thus unable to meet the user's power demand. Summary of the invention

[0003] In view of this, the purpose of the present application is to propose a vehicle energy management method, related equipment and vehicle to solve the problem that the on-board charger cannot be in operation due to insufficient available power.

[0004] Based on the above objectives, the first aspect of the present application provides a vehicle energy management method, comprising:

[0005] In response to the on-board charger being in a discharging state, obtaining current available power of the vehicle and load consumption power;

[0006] A first available power of the on-board charger and a second available power of the air conditioner are determined according to the current available power and the load consumption power, so that the first available power is greater than or equal to a first minimum operating power of the on-board charger.

[0007] Optionally, determining the first available power of the on-board charger and the second available power of the air conditioner according to the current available power and the load consumption power includes:

[0008] Determine a first difference between the currently available power and the load consumed power;

[0009] Determining a second difference between the first difference and a preset reserved available power of the on-board charger;

[0010] The first available power and the second available power are determined according to the first difference, the second difference, the first minimum operating power and / or the second minimum operating power of the air conditioner.

[0011] Optionally, determining the first available power and the second available power according to the first difference, the second difference, the first minimum operating power and / or the second minimum operating power of the air conditioner includes:

[0012] In response to the second difference being greater than the second minimum operating power, the reserved available power is used as the first available power, and the second difference is used as the first available power.

[0013] Optionally, determining the first available power and the second available power according to the first difference, the second difference, the first minimum operating power and / or the second minimum operating power of the air conditioner includes:

[0014] In response to the second difference being less than or equal to the second minimum operating power, and the difference between the first difference and the second minimum operating power being greater than or equal to the first minimum operating power, the difference between the first difference and the second minimum operating power is used as the first available power, and the second minimum operating power is used as the second available power.

[0015] Optionally, the method further includes:

[0016] Reacquire a new current available power, and use the difference between the new current available power and the load consumption power as a new first difference;

[0017] In response to the difference between the new first difference and the second minimum operating power being greater than the first preset power of the on-board charger, the first available power of the on-board charger and the second available power of the air conditioner are determined according to the new current available power and the load consumption power.

[0018] Optionally, determining the first available power and the second available power according to the first difference, the second difference, the first minimum operating power and / or the second minimum operating power of the air conditioner includes:

[0019] In response to the second difference being less than or equal to the second minimum operating power, and the difference between the first difference and the second minimum operating power being less than the first minimum operating power, the first minimum operating power is used as the first available power, and the difference between the first difference and the first minimum operating power is used as the second available power.

[0020] Optionally, the method further includes:

[0021] Reacquire new current available power, and use the difference between the new current available power and the load consumption power as a new first difference;

[0022] In response to the difference between the new first difference and the first minimum operating power being greater than the second preset power of the air conditioner, the first available power of the on-board charger and the second available power of the air conditioner are determined according to the new current available power and the load consumption power.

[0023] A second aspect of the present application provides a vehicle energy management device, comprising:

[0024] an acquisition module, configured to acquire the current available power of the vehicle and the load consumption power in response to the on-board charger being in a discharging state;

[0025] The determination module is configured to determine a first available power of the on-board charger and a second available power of the air conditioner according to the current available power and the load consumption power, so that the first available power is greater than or equal to a first minimum operating power of the on-board charger.

[0026] The third aspect of the present application also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable by the processor, wherein the processor implements the method described in the first aspect when executing the computer program.

[0027] A fourth aspect of the present application also provides a vehicle, comprising the electronic device as described in the third aspect.

[0028] As can be seen from the above, the vehicle energy management method, related equipment and vehicle provided by the present application include, in response to the on-board charger being in a discharging state, indicating that the on-board charger is providing power to the external electrical equipment, and at this time, the on-board charger and other power-consuming equipment in the vehicle need to be allocated with available power. The current available power and load consumption power of the vehicle are obtained, wherein the current available optical power includes the discharge power of the power battery and may also include the power generation power of the engine. The load consumption power represents the fixed power consumption of the vehicle load, such as the power consumption of the DC converter and the power consumption of the wiring harness, etc. The first available power of the on-board charger and the second available power of the air conditioner are determined according to the current available power and the load consumption power, so that the first available power is greater than or equal to the first minimum operating power of the on-board charger. The current available power of the vehicle is equal to the power consumption of all power-consuming equipment in the vehicle, so the first available power allocated to the on-board charger and the second available power allocated to the air conditioner can be determined according to the current available power and the load consumption power, and it is ensured that the first available power is greater than or equal to the first minimum operating power of the on-board charger. The first minimum operating power indicates the minimum power at which the on-board charger can operate normally. On the premise of ensuring the normal discharge function of the on-board charger, available power is allocated to the on-board charger and the air conditioner respectively, ensuring the rationality of power distribution, meeting the power needs of external electrical equipment, and improving user satisfaction. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the technical solutions in the present application or related technologies, the drawings required for use in the embodiments or related technical descriptions are briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0030] Figure 1 A schematic diagram of a vehicle energy management method according to an embodiment of the present application;

[0031] Figure 2 A flow chart of vehicle energy management according to an embodiment of the present application;

[0032] Figure 3 A schematic diagram of the structure of a vehicle energy management device according to an embodiment of the present application;

[0033] Figure 4 This is a schematic diagram of the hardware structure of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0034] In order to make the objectives, technical solutions and advantages of the present application more clearly understood, the present application is further described in detail below in combination with specific embodiments and with reference to the accompanying drawings.

[0035] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present application should be the usual meanings understood by people with ordinary skills in the field to which the present application belongs. The "first", "second" and similar words used in the embodiments of the present application do not represent any order, quantity or importance, but are only used to distinguish different components. "Including" or "comprising" and similar words mean that the elements or objects appearing in front of the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0036] As described in the background technology, the on-board charger includes a bi-directional on-board charger (Bi-Direction On-BoardCharger). The power of the bi-directional on-board charger flows in both directions, and it mostly adopts a two-stage conversion structure, which is composed of a bi-directional AC-DC converter and a bi-directional DC-DC converter. It has both charging function and inverter function. ① Charging function: Take power from the power grid, connect to the on-board charger via the ground AC charging pile and AC charging port, and charge the on-board power battery. ② V2L (Vehicle to Load) inverter function: Take power from the on-board power battery, and provide 220VAC AC power to ground electrical equipment via the bi-directional on-board charger, AC charging port, and dedicated V2L AC socket board. ③ V2G (Vehicle-to-grid) inverter function: Take power from the on-board power battery, and connect to the power grid via the bi-directional on-board charger, AC charging port, and ground AC charging pile. When the on-board charger is in a discharging state, the V2L inverter function of the on-board charger is usually used. For example, in a camping scenario, the on-board charger is used to provide power to the external electrical equipment to meet the user's use needs for the external electrical equipment. However, when multiple power-consuming devices in the vehicle are working at the same time, such as the on-board charger, DC converter, air conditioner, etc., there is no method in the related art to reasonably allocate the available power of multiple power-consuming devices, resulting in some power-consuming devices being unable to operate normally. For example, when the available power of the vehicle is certain, if the air conditioner consumes a large amount of power, it may cause the available power of the on-board charger to be insufficient, which in turn causes the on-board charger to be unable to discharge normally, affecting the use of the external electrical equipment. In view of this, the present application proposes a vehicle energy management method, which reasonably allocates the available power to the on-board charger and the air conditioner to ensure that the available power of the on-board charger is always greater than or equal to the minimum operating power of the on-board charger, so as to ensure that the on-board charger can provide power for the external electrical equipment and ensure the normal use of the external electrical equipment.

[0037] The embodiments of the present application are described in detail below with reference to the accompanying drawings.

[0038] This application provides a vehicle energy management method, referring to Figure 1 , including the following steps:

[0039] Step 102: In response to the on-board charger being in a discharging state, obtain the current available power of the vehicle and the load consumption power.

[0040] Specifically, when the on-board charger is in the discharging state, in order to ensure the discharge capacity of the on-board charger and ensure that the on-board charger can operate normally, it is necessary to reasonably allocate the current available power of the vehicle. The current available power includes the power battery discharge power and the engine power generation power. The power battery discharge power is the power that the power battery can stably output within a period of time, such as the power that can be stably output within 10s or 30s. The power battery discharge power is correlated with the remaining power of the power battery and the power battery temperature. When the remaining power of the power battery is insufficient, the engine is started to charge the power battery, and the engine can also directly power the vehicle-side electrical equipment. Therefore, when the remaining power of the power battery is sufficient, the current available power includes the power battery discharge power; when the remaining power of the power battery is insufficient, the current available power includes the power battery discharge power and the engine power generation power.

[0041] In this embodiment, the load power consumption refers to the power consumed by the load that must be operated at the vehicle end after the vehicle high voltage is powered on, such as the DC-to-DC converter (DCDC) and the wiring harness. At the same time, in order to prevent the power battery from being unable to operate normally due to low temperature, a portion of the available power will be reserved for the heating film used to heat the power battery. Therefore, the load power consumption in this embodiment = DC converter power consumption + wiring harness power consumption + heating film power consumption.

[0042] Step 104: Determine a first available power of the on-board charger and a second available power of the air conditioner according to the current available power and the load power consumption, so that the first available power is greater than or equal to a first minimum operating power of the on-board charger.

[0043] Specifically, the current available power is the total available power that the vehicle can provide at the current moment. The load power consumption can be regarded as the fixed power consumption of the vehicle-side electrical equipment. The difference between the current available power and the load power consumption is the available power that can be allocated to the on-board charger and the air conditioner (AirConditioning, AC). Among them, the first available power is allocated to the on-board charger, and the second available power is allocated to the air conditioner. The power distribution satisfies the equation: Current available power = load power consumption + first available power + second available power.

[0044] During the allocation process, the first available power must always be kept greater than or equal to the first minimum operating power of the on-board charger. In other words, it is necessary to ensure that the on-board charger can operate normally, generate electricity normally, and continuously provide electrical energy to electrical equipment outside the vehicle. The first minimum operating power is the minimum power to keep the on-board charger in operation. At the first minimum operating power, the user can perceive that the on-board charger is operating normally and has a certain effect. Compared with the off state, it can be clearly distinguished that the on-board charger is in a working state. The first minimum operating power is pre-calibrated, and exemplarily, the first minimum operating power is 1kw. On this basis, available power is allocated to the on-board charger and the air conditioner to meet the power needs of the on-board charger and the air conditioner respectively.

[0045] Based on the above steps 102 to 104, this embodiment provides a vehicle energy management method, the method comprising: in response to the on-board charger being in a discharging state, indicating that the on-board charger is providing power to an external electrical device, it is necessary to allocate available power to the on-board charger and other power-consuming devices in the vehicle. The current available power and load consumption power of the vehicle are obtained, wherein the current available optical power includes the discharge power of the power battery and may also include the power generation power of the engine. The load consumption power represents the fixed power consumption of the vehicle load, such as the power consumption of the DC converter and the power consumption of the wiring harness, etc. The first available power of the on-board charger and the second available power of the air conditioner are determined according to the current available power and the load consumption power, so that the first available power is greater than or equal to the first minimum operating power of the on-board charger. The current available power of the vehicle is equal to the power consumption of all power-consuming devices in the vehicle, so the first available power allocated to the on-board charger and the second available power allocated to the air conditioner can be determined according to the current available power and the load consumption power, and it is ensured that the first available power is greater than or equal to the first minimum operating power of the on-board charger. On the premise of ensuring the normal discharge function of the on-board charger, available power is allocated to the on-board charger and the air conditioner respectively, ensuring the rationality of power distribution, meeting the power needs of external electrical equipment, and improving user satisfaction.

[0046] The method for determining the first available power and the second available power is described below through a specific embodiment.

[0047] In some embodiments, determining the first available power of the on-board charger and the second available power of the air conditioner according to the current available power and the load consumption power includes:

[0048] Determine a first difference between the currently available power and the load consumed power;

[0049] Determining a second difference between the first difference and a preset reserved available power of the on-board charger;

[0050] The first available power and the second available power are determined according to the first difference, the second difference, the first minimum operating power and / or the second minimum operating power of the air conditioner.

[0051] Specifically, the current available power is the total available power that the vehicle can provide at the current moment. The load power consumption can be regarded as the fixed power consumption of the vehicle-side electrical equipment. The difference between the current available power and the load power consumption is recorded as the first difference, which is the available power that can be allocated to the on-board charger and air conditioner. The first difference = current available power - load power consumption.

[0052] The reserved available power is pre-calibrated, and the reserved available power is the power when the on-board charger is working normally. Under the reserved available power, the on-board charger can provide sufficient power for the electrical equipment outside the vehicle. Exemplarily, the reserved available power is 3.3kw. The difference between the first difference and the reserved available power is recorded as the second difference, and the second difference can be regarded as the maximum available power that can be allocated to the air conditioner after the reserved available power is allocated to the on-board charger. The second difference = the first difference - the reserved available power.

[0053] Afterwards, the first available power and the second available power can be jointly determined according to one or more values ​​of the first difference, the second difference, the first minimum operating power, and the second minimum operating power. That is, taking into account the total available power that can be allocated to the on-board charger and the air conditioner, the minimum power for the on-board charger to maintain operation (the first minimum operating power), the minimum power for the air conditioner to maintain operation (the second minimum operating power), and the priority of the normal working power of the on-board charger, the first available power and the second available power are determined to make the power allocation more reasonable. Among them, the second minimum operating power represents the minimum power at which the air conditioner can be operated. At the second minimum operating power, the user can perceive that the air conditioner is operating normally and has a certain effect. Compared with the off state, it can be clearly distinguished that the air conditioner is in a working state. The second minimum operating power is pre-calibrated. For example, the second minimum operating power is 2kw.

[0054] Through the method of this embodiment, when determining the first available power and the second available power, various working states of the on-board charger and the air conditioner are fully considered, including the minimum available power required for operation (such as the first minimum operating power and the second minimum operating power) and the reserved available power that can provide sufficient power for external electrical equipment. In the case that the current available power provided by the vehicle is constantly changing, the available power can be reasonably allocated to the on-board charger and the air conditioner, and it is ensured that the on-board charger is always kept in an operating state to provide electrical energy for external electrical equipment, thereby improving the rationality of available power allocation and user satisfaction.

[0055] On the premise of allocating reserved power to the on-board charger, compare the numerical relationship between the maximum available power that can be allocated to the air conditioner at this time (that is, the second difference) and the second minimum operating power of the air conditioner, and determine the first available power and the second available power according to different numerical relationships, as explained below through specific embodiments.

[0056] When the second difference is greater than the second minimum operating power, in some embodiments, determining the first available power and the second available power according to the first difference, the second difference, the first minimum operating power and / or the second minimum operating power of the air conditioner includes:

[0057] In response to the second difference being greater than the second minimum operating power, the reserved available power is used as the first available power, and the second difference is used as the first available power.

[0058] Specifically, when the second difference is greater than the second minimum operating power, it is equivalent to: current available power - load consumption power - reserved available power > second minimum operating power, indicating that if the reserved available power is allocated to the on-board charger at this time, the air conditioner can still maintain operation. Since the on-board charger has a higher priority than the air conditioner, the first available power allocated to the on-board charger is equal to the reserved available power, and the second available power allocated to the air conditioner is equal to the second difference. In this embodiment, when the current available power can meet the power consumption of the on-board charger and the air conditioner to maintain operation, if it can further meet the on-board charger when operating with the reserved available power, the on-board charger is allocated with the reserved available power, and the remaining available power is allocated to the air conditioner. It can not only ensure that the on-board charger provides sufficient power for the electrical equipment outside the vehicle, but also maintain the user's demand for the use of the air conditioner. Make the current available power distribution reasonable and improve user satisfaction.

[0059] When the second difference is less than or equal to the second minimum operating power, in some embodiments, determining the first available power and the second available power according to the first difference, the second difference, the first minimum operating power and / or the second minimum operating power of the air conditioner includes:

[0060] In response to the second difference being less than or equal to the second minimum operating power, and the difference between the first difference and the second minimum operating power being greater than or equal to the first minimum operating power, the difference between the first difference and the second minimum operating power is used as the first available power, and the second minimum operating power is used as the second available power.

[0061] Specifically, when the second difference is less than or equal to the second minimum operating power, it is equivalent to: current available power - load consumption power - reserved available power ≤ second minimum operating power, indicating that if the reserved available power is allocated to the on-board charger, the air conditioner cannot maintain operation. At this time, it is necessary to limit the available power of the on-board charger, and allocate part of the reserved available power allocated to the on-board charger to the air conditioner. In this process, it is also necessary to always keep the available power of the on-board charger greater than or equal to the first minimum operating power. When the difference between the first difference and the second minimum operating power is greater than or equal to the first minimum operating power, it is equivalent to: current available power - load consumption power - second minimum operating power ≥ first minimum operating power, that is, after a part of the reserved available power is allocated to the air conditioner, assuming that the available power allocated to the air conditioner is only to keep the air conditioner running, and the available power of the on-board charger still exceeds the minimum power required for the on-board charger to maintain operation (that is, the first minimum operating power), the available power of the air conditioner can be kept at the second minimum operating power, and the remaining available power is allocated to the on-board charger, so as to achieve the purpose of giving priority to meeting the use needs of the on-board charger. Specifically, the second minimum operating power is used as the second available power of the air conditioner, and the difference between the first difference and the second minimum operating power is used as the first available power of the on-board charger.

[0062] Through the method of this embodiment, when the allocatable available power cannot simultaneously meet the needs of the on-board charger operating at the reserved available power and the air conditioner operating at the minimum power, the available power of the on-board charger is limited. If the allocatable available power can simultaneously meet the needs of the on-board charger operating at the minimum power and the air conditioner operating at the minimum power, the air conditioner is operated at the minimum power, and the remaining allocatable power is allocated to the on-board charger, so as to give priority to meeting the power demand of the on-board charger, and then, under the current limited available power, try to meet the power demand of external electrical equipment to improve user satisfaction.

[0063] When the remaining power of the vehicle's power battery is insufficient, the engine will automatically start to charge the power battery. At the same time, the engine can also directly power the on-board electrical equipment, and the available power of the vehicle will gradually increase. At this time, it is necessary to redistribute the power of the on-board charger and air conditioner, which is described in detail in the following embodiments.

[0064] In some embodiments, the method further comprises:

[0065] Reacquire new current available power, and use the difference between the new current available power and the load consumption power as a new first difference;

[0066] In response to the difference between the new first difference and the second minimum operating power being greater than the first preset power of the on-board charger, the first available power of the on-board charger and the second available power of the air conditioner are determined according to the new current available power and the load consumption power.

[0067] During the specific implementation, the new current available power is obtained again, and the new first difference is calculated according to the new current available power and the fixed load consumption power, that is, the new first difference = new current available power - load consumption power. Afterwards, it is determined whether the difference between the new first difference and the second minimum operating power is greater than the first preset power of the on-board charger. Among them, the first preset power represents the power when the on-board charger can meet the user's power demand, and the first preset power is calibrated in advance. Exemplarily, the first preset power can be 3.5kw. If the difference between the new first difference and the second minimum operating power is greater than the first preset power, it means that the new current available power can simultaneously meet the on-board charger running at the first preset power and the air conditioner running at the second minimum operating power. At this time, the new current available power is sufficient, so the previous power allocation plan can be appropriately adjusted to try to meet the power demand of the on-board charger and the power demand of the air conditioner, and increase the first available power and the second available power.

[0068] Through the method of this embodiment, the power allocation method of the on-board charger and the air conditioner is determined when the current available power is limited, and after the first available power and the second available power are determined, when the available power of the vehicle is increased, the power of the on-board charger and the air conditioner can be reallocated by obtaining the new current available power in real time, and the available power allocated to the on-board charger and the air conditioner can be increased. This embodiment realizes the real-time dynamic allocation of available power, makes full use of the current available power at each moment, formulates a reasonable power allocation plan, tries to meet the user's use needs for air conditioners and external electrical equipment, and improves user satisfaction.

[0069] When the second difference is less than or equal to the second minimum operating power, in other embodiments, determining the first available power and the second available power according to the first difference, the second difference, the first minimum operating power and / or the second minimum operating power of the air conditioner includes:

[0070] In response to the second difference being less than or equal to the second minimum operating power, and the difference between the first difference and the second minimum operating power being less than the first minimum operating power, the first minimum operating power is used as the first available power, and the difference between the first difference and the first minimum operating power is used as the second available power.

[0071] Specifically, when the second difference is less than or equal to the second minimum operating power, it is equivalent to: current available power - load consumption power - reserved available power ≤ second minimum operating power, indicating that if the reserved available power is allocated to the on-board charger, the air conditioner cannot maintain operation. At this time, it is necessary to limit the available power of the on-board charger, and allocate part of the reserved available power allocated to the on-board charger to the air conditioner. In this process, it is also necessary to always keep the available power of the on-board charger greater than or equal to the first minimum operating power. When the difference between the first difference and the second minimum operating power is less than the first minimum operating power, it is equivalent to: current available power - load consumption power - second minimum operating power < first minimum operating power, that is, after a part of the reserved available power is allocated to the air conditioner, assuming that the available power allocated to the air conditioner is only to keep the air conditioner running, but the available power of the on-board charger cannot meet the minimum power required for the on-board charger to maintain operation (that is, the first minimum operating power), then the on-board charger is prioritized to operate at the minimum power and maintain operation to continuously provide power to the external electrical equipment, and the remaining available power is allocated to the air conditioner. Specifically, the first minimum operating power is used as the first available power allocated to the on-board charger, and the difference between the first difference and the first minimum operating power is used as the second available power allocated to the air conditioner. At this time, the second available power cannot maintain the operation of the air conditioner.

[0072] Through the method of this embodiment, when the allocatable available power cannot simultaneously meet the needs of the on-board charger operating at the reserved available power and the air conditioner operating at the minimum power, the available power of the on-board charger is limited. If the allocatable available power cannot simultaneously meet the needs of the on-board charger operating at the minimum power and the air conditioner operating at the minimum power, priority is given to ensuring that the on-board charger operates at the minimum power (the first minimum operating power), and the remaining allocatable power is allocated to the air conditioner, so as to give priority to meeting the power demand of the on-board charger, and then try to meet the power demand of external electrical equipment under the condition of limited current available power.

[0073] When the remaining power of the vehicle's power battery is insufficient, the engine will automatically start to charge the power battery. At the same time, the engine can also directly power the on-board electrical equipment, and the available power of the vehicle will gradually increase. At this time, it is necessary to redistribute the power of the on-board charger and air conditioner, which is described in detail in the following embodiments.

[0074] In some embodiments, the method further comprises:

[0075] Reacquire a new current available power, and use the difference between the new current available power and the load consumption power as a new first difference;

[0076] In response to the difference between the new first difference and the first minimum operating power being greater than the second preset power of the air conditioner, the first available power of the on-board charger and the second available power of the air conditioner are determined according to the new current available power and the load consumption power.

[0077] During specific implementation, the new current available power is obtained again, and a new first difference is calculated based on the new current available power and the fixed load power consumption, that is, the new first difference = new current available power - load power consumption. Afterwards, it is determined whether the difference between the new first difference and the first minimum operating power is greater than the second preset power of the air conditioner. Among them, the second preset power represents the power when the air conditioner can meet the user's electricity demand. Exemplarily, the second preset power is 2.5kw. If the difference between the new first difference and the first minimum operating power is greater than the second preset power, it means that the new current available power can simultaneously meet the air conditioner running at the second preset power and the on-board charger running at the first minimum operating power. At this point, the new current available power is sufficient, so the previous power allocation method can be appropriately adjusted to try to meet the power demand of the on-board charger and the power demand of the air conditioner, and to increase the first available power and the second available power.

[0078] Through the method of this embodiment, the power allocation method of the on-board charger and the air conditioner is determined when the current available power is limited, and after the first available power and the second available power are determined, when the available power of the vehicle is increased, the power of the on-board charger and the air conditioner can be reallocated by obtaining the new current available power in real time. When the air conditioner can initially operate at the second minimum operating power, the available power allocated to the on-board charger and the air conditioner can be increased respectively. This embodiment realizes the real-time dynamic allocation of available power, makes full use of the current available power at each moment, formulates a reasonable power allocation plan, tries to meet the user's use needs for the air conditioner and external electrical equipment, and improves user satisfaction.

[0079] It should be noted that Figure 2 A flow chart of a vehicle energy management method according to an embodiment of the present application is shown. Figure 2 As shown, the embodiments of the present application can be further described in the following manner:

[0080] First, assuming that the available power of the onboard charger OBC is the reserved available power, the available power allocated to the air conditioner AC = current available power - load consumption power - reserved available power. Determine whether the available power of AC is less than the second minimum operating power. If the available power of AC is not less than the second minimum operating power, determine that the available power of OBC (first available power) is equal to the reserved available power, and the available power of AC (second available power) = current available power - load consumption power - reserved available power.

[0081] If the available power of AC is less than the second minimum operating power, assume that the available power of AC is the second minimum operating power, and determine whether the available power of OBC is less than the first minimum operating power. If it is, set the available power of OBC (first available power) to the first minimum operating power, and the available power of AC (second available power) = current available power - load consumption power - first minimum operating power. After that, monitor the new current available power of the vehicle in real time. If the available power of AC is determined to exceed the second preset power according to the new current available power, re-allocate power to OBC and AC. If the available power of AC is determined to be less than or equal to the second preset power according to the new current available power, no adjustment is made.

[0082] If the available power of the OBC is not less than the first minimum operating power, the available power of the AC (the second available power) is set to the second minimum operating power, and the available power of the OBC (the first available power) = the current available power - the load consumption power - the second minimum operating power. After that, the new current available power of the vehicle is monitored in real time. If the available power of the OBC is determined to exceed the first preset power according to the new current available power, the power of the OBC and the AC is reallocated. If the available power of the OBC is determined to be less than or equal to the first preset power according to the new current available power, no adjustment is made.

[0083] It should be noted that the method of the embodiment of the present application can be performed by a single device, such as a computer or server. The method of this embodiment can also be applied to a distributed scenario and completed by multiple devices cooperating with each other. In the case of such a distributed scenario, one of the multiple devices can only perform one or more steps in the method of the embodiment of the present application, and the multiple devices will interact with each other to complete the described method.

[0084] It should be noted that the above describes some embodiments of the present application. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the above embodiments and still achieve the desired results. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0085] Based on the same inventive concept, corresponding to any of the above-mentioned embodiment methods, the present application also provides a vehicle energy management device.

[0086] refer to Figure 3 , the vehicle energy management device comprises:

[0087] an acquisition module, configured to acquire the current available power of the vehicle and the load consumption power in response to the on-board charger being in a discharging state;

[0088] The determination module is configured to determine a first available power of the on-board charger and a second available power of the air conditioner according to the current available power and the load consumption power, so that the first available power is greater than or equal to a first minimum operating power of the on-board charger.

[0089] For the convenience of description, the above device is described in terms of functions divided into various modules. Of course, when implementing the present application, the functions of each module can be implemented in the same or multiple software and / or hardware.

[0090] The device of the above embodiment is used to implement the corresponding vehicle energy management method in any of the above embodiments, and has the beneficial effects of the corresponding method embodiment, which will not be repeated here.

[0091] Based on the same inventive concept, corresponding to any of the above-mentioned embodiments, the present application also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the vehicle energy management method described in any of the above embodiments is implemented.

[0092] Figure 4 A more specific schematic diagram of the hardware structure of an electronic device provided in this embodiment is shown, and the device may include: a processor 1010, a memory 1020, an input / output interface 1030, a communication interface 1040, and a bus 1050. The processor 1010, the memory 1020, the input / output interface 1030, and the communication interface 1040 are connected to each other through the bus 1050 in the device.

[0093] The processor 1010 can be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of this specification.

[0094] The memory 1020 may be implemented in the form of ROM (Read Only Memory), RAM (Random Access Memory), static storage device, dynamic storage device, etc. The memory 1020 may store an operating system and other application programs. When the technical solutions provided in the embodiments of this specification are implemented by software or firmware, the relevant program codes are stored in the memory 1020 and are called and executed by the processor 1010.

[0095] The input / output interface 1030 is used to connect the input / output module to realize information input and output. The input / output module can be configured in the device as a component (not shown in the figure), or it can be externally connected to the device to provide corresponding functions. The input device may include a keyboard, a mouse, a touch screen, a microphone, various sensors, etc., and the output device may include a display, a speaker, a vibrator, an indicator light, etc.

[0096] The communication interface 1040 is used to connect a communication module (not shown) to realize communication interaction between the device and other devices. The communication module can realize communication through a wired mode (such as USB, network cable, etc.) or a wireless mode (such as mobile network, WIFI, Bluetooth, etc.).

[0097] The bus 1050 includes a path that transmits information between the various components of the device (eg, the processor 1010, the memory 1020, the input / output interface 1030, and the communication interface 1040).

[0098] It should be noted that, although the above device only shows the processor 1010, the memory 1020, the input / output interface 1030, the communication interface 1040 and the bus 1050, in the specific implementation process, the device may also include other components necessary for normal operation. In addition, it can be understood by those skilled in the art that the above device may also only include the components necessary for implementing the embodiments of the present specification, and does not necessarily include all the components shown in the figure.

[0099] The electronic device of the above embodiment is used to implement the corresponding vehicle energy management method in any of the above embodiments, and has the beneficial effects of the corresponding method embodiment, which will not be repeated here.

[0100] Based on the same inventive concept, corresponding to any of the above-mentioned embodiment methods, the present application also provides a non-transitory computer-readable storage medium, wherein the non-transitory computer-readable storage medium stores computer instructions, and the computer instructions are used to enable the computer to execute the vehicle energy management method described in any of the above embodiments.

[0101] The computer-readable medium of this embodiment includes permanent and non-permanent, removable and non-removable media, and information storage can be implemented by any method or technology. Information can be computer-readable instructions, data structures, modules of programs, or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, read-only compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device.

[0102] The computer instructions stored in the storage medium of the above embodiments are used to enable the computer to execute the vehicle energy management method described in any of the above embodiments, and have the beneficial effects of the corresponding method embodiments, which will not be repeated here.

[0103] Based on the same concept, corresponding to any of the above-mentioned embodiment methods, the present application also provides a computer program product, including computer program instructions. When the computer program instructions are run on a computer, the computer executes the method described in any of the above embodiments, which has the beneficial effects of the corresponding method embodiments and will not be repeated here.

[0104] It is understandable that before using the technical solutions of each embodiment of the present disclosure, the type, scope of use, usage scenarios, etc. of the personal information involved will be informed to the user in an appropriate manner, and the user's authorization will be obtained.

[0105] For example, in response to receiving an active request from a user, a prompt message is sent to the user to clearly remind the user that the operation requested to be performed will require obtaining and using the user's personal information. Thus, the user can independently choose whether to provide personal information to software or hardware such as an electronic device, application, server or storage medium that performs the operation of the technical solution of the present disclosure according to the prompt message.

[0106] As an optional but non-limiting implementation, in response to receiving the user's active request, the prompt information may be sent to the user in the form of a pop-up window, in which the prompt information may be presented in text form. In addition, the pop-up window may also carry a selection control for the user to choose "agree" or "disagree" to the electronic device providing personal information.

[0107] It is understandable that the above notification and the process of obtaining user authorization are merely illustrative and do not constitute a limitation on the implementation of the present disclosure. Other methods that meet relevant laws and regulations may also be applied to the implementation of the present disclosure.

[0108] A person skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present application is limited to these examples. In line with the concept of the present application, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of the different aspects of the embodiments of the present application as described above, which are not provided in detail for the sake of simplicity.

[0109] In addition, to simplify the description and discussion, and in order not to make the embodiments of the present application difficult to understand, the known power supply / ground connection with the integrated circuit (IC) chip and other components may or may not be shown in the provided drawings. In addition, the device can be shown in the form of a block diagram to avoid making the embodiments of the present application difficult to understand, and this also takes into account the fact that the details of the implementation of these block diagram devices are highly dependent on the platform to be implemented in the embodiments of the present application (that is, these details should be fully within the scope of understanding of those skilled in the art). In the case of elaborating specific details (e.g., circuits) to describe exemplary embodiments of the present application, it is obvious to those skilled in the art that the embodiments of the present application can be implemented without these specific details or when these specific details are changed. Therefore, these descriptions should be considered to be illustrative rather than restrictive.

[0110] Although the present application has been described in conjunction with specific embodiments of the present application, many replacements, modifications and variations of these embodiments will be apparent to those skilled in the art from the foregoing description. For example, other memory architectures (e.g., dynamic RAM (DRAM)) may use the embodiments discussed.

[0111] The embodiments of the present application are intended to cover all such substitutions, modifications and variations that fall within the broad scope of the present application. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the embodiments of the present application should be included in the protection scope of the present application.

Claims

1. A vehicle energy management method, characterized in that: include: In response to the on-board charger being in a discharging state, obtaining current available power of the vehicle and load consumption power; A first available power of the onboard charger and a second available power of the air conditioner are determined according to the current available power and the load consumption power, so that the first available power is greater than or equal to a first minimum operating power of the onboard charger.

2. The method according to claim 1, characterized in that The determining the first available power of the on-board charger and the second available power of the air conditioner according to the current available power and the load consumption power includes: Determine a first difference between the currently available power and the load consumed power; Determining a second difference between the first difference and a preset reserved available power of the on-board charger; The first available power and the second available power are determined according to the first difference, the second difference, the first minimum operating power and / or the second minimum operating power of the air conditioner.

3. The method according to claim 2, characterized in that The determining the first available power and the second available power according to the first difference, the second difference, the first minimum operating power and / or the second minimum operating power of the air conditioner includes: In response to the second difference being greater than the second minimum operating power, the reserved available power is used as the first available power, and the second difference is used as the first available power.

4. The method according to claim 2, characterized in that: The determining the first available power and the second available power according to the first difference, the second difference, the first minimum operating power and / or the second minimum operating power of the air conditioner includes: In response to the second difference being less than or equal to the second minimum operating power, and the difference between the first difference and the second minimum operating power being greater than or equal to the first minimum operating power, the difference between the first difference and the second minimum operating power is used as the first available power, and the second minimum operating power is used as the second available power.

5. The method according to claim 4, characterized in that The method further comprises: Reacquire a new current available power, and use the difference between the new current available power and the load consumption power as a new first difference; In response to the difference between the new first difference and the second minimum operating power being greater than the first preset power of the on-board charger, the first available power of the on-board charger and the second available power of the air conditioner are determined according to the new current available power and the load consumption power.

6. The method according to claim 2, characterized in that The determining the first available power and the second available power according to the first difference, the second difference, the first minimum operating power and / or the second minimum operating power of the air conditioner includes: In response to the second difference being less than or equal to the second minimum operating power, and the difference between the first difference and the second minimum operating power being less than the first minimum operating power, the first minimum operating power is used as the first available power, and the difference between the first difference and the first minimum operating power is used as the second available power.

7. The method according to claim 6, characterized in that The method further comprises: Reacquire a new current available power, and use the difference between the new current available power and the load consumption power as a new first difference; In response to the difference between the new first difference and the first minimum operating power being greater than the second preset power of the air conditioner, the first available power of the on-board charger and the second available power of the air conditioner are determined according to the new current available power and the load consumption power.

8. A vehicle energy management device, characterized in that: include: an acquisition module, configured to acquire the current available power of the vehicle and the load consumption power in response to the on-board charger being in a discharging state; The determination module is configured to determine a first available power of the on-board charger and a second available power of the air conditioner according to the current available power and the load consumption power, so that the first available power is greater than or equal to a first minimum operating power of the on-board charger.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and running on the processor, characterized in that: When the processor executes the program, the method according to any one of claims 1 to 8 is implemented.

10. A vehicle, characterized in that: The vehicle comprises the electronic device as claimed in claim 9.

Citation Information

Cited By

  • Control method and device of vehicle-mounted charger, computing equipment and computer program product

    CN119872292A