Method and device for controlling submergence of bucket type foundation without water and electronic equipment

By controlling the hook force of the barrel foundation in stages, the problem of cross-critical surface instability of the barrel foundation in deep water environment is solved, stable sinking and stability improvement is achieved, and technical support is provided for the promotion and application of the barrel foundation. .

CN118992782APending Publication Date: 2024-11-22CCCC THIRD HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411116193.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Barrel-type foundations are prone to cross-critical surface instability in deep water environments, resulting in deterioration of stability. There is no effective stabilization technology for reference, which limits its promotion and application.

Method used

By controlling the hook force of the barrel foundation in multiple sinking and laying stages, ensuring that the fixed lifting force of the hook is greater than the lower lifting force, and approaching the maximum rated lifting force when the freeboard height is zero, the iterative algorithm is used to determine the lifting force of each stage. Form preset and backup control schemes to ensure the stability of the barrel foundation during sinking and laying.

Benefits of technology

The stable sinking and release of barrel foundations in deep water environments has been achieved, its stability in the floating state has been enhanced, the promotion and application of new basic forms and processes has been promoted, and quantitative analysis methods have been provided for construction analysis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118992782A_ABST
    Figure CN118992782A_ABST
Patent Text Reader

Abstract

The invention provides a control method and device for submerging a bucket foundation without water and electronic equipment. The method for controlling the bucket foundation to be immersed without water comprises the steps that the maximum rated lifting force T1 of a crane ship in the process of immersing the bucket foundation and the minimum stability augmentation lifting force T2 needed for the bucket foundation to be stable are obtained; the bucket type foundation is controlled to be lowered in multiple sinking stages, a preset control scheme formed by the multiple sinking stages is obtained, in each sinking stage, a lifting hook has lifting hook fixing lifting force and lifting hook lowering lifting force, the lifting hook fixing lifting force is larger than the lifting hook lowering lifting force, the lifting hook fixing lifting force is not larger than T1, and the lifting hook lowering lifting force is not smaller than T2; the lowering lifting force of the lifting hook is critical lifting force when the barrel-type foundation corresponds to the freeboard height of zero; the preset control scheme with the critical lifting force smaller than a * T1 is deleted, a standby control scheme is obtained, and a is larger than or equal to 0.9 and smaller than or equal to 1. According to the method, the barrel type foundation is lowered in multiple stages, and finally the critical lifting force is close to the maximum rated lifting force as much as possible, so that the stability of the barrel type foundation is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of barrel foundation sinking, and in particular to a method, device and electronic equipment for controlling submergence of barrel foundation sinking. Background Art

[0002] During the sinking of the bucket foundation, as the water depth of the bucket foundation continues to increase, the height of the bucket foundation will inevitably be less than the water depth, that is, the bucket end has not touched the bottom after the top cover of the bucket foundation is submerged, and the bucket foundation is in a floating state. Existing construction experience shows that when the bucket foundation is close to being submerged, the bucket foundation tends to overturn. The stability degradation phenomenon of the bucket foundation when the top of the bucket is about to be submerged is defined as the trans-critical surface instability phenomenon. The trans-critical surface instability phenomenon of the variable-section bucket foundation limits the promotion and application of the bucket foundation in deep water environments, but there is currently no stabilization technology for the sinking of the bucket foundation available for reference. Summary of the invention

[0003] The present invention provides a method, device and electronic equipment for controlling the submergence of a bucket-type foundation, which are used to solve the defects of the trans-critical surface instability phenomenon in the prior art.

[0004] The present invention provides a method for controlling the submergence of a barrel-type foundation, comprising: Obtaining the maximum rated lifting force T1 of the crane vessel during the process of sinking the bucket foundation and the minimum stabilizing lifting force T2 required for the bucket foundation to achieve stability; Controlling the lowering of the barrel foundation in multiple sinking stages, obtaining a preset control scheme formed by the multiple sinking stages, wherein the hook in each sinking stage has a hook fixing lifting force and a hook lowering lifting force, the hook fixing lifting force is greater than the hook lowering lifting force, the hook fixing lifting force is not greater than T1, the hook lowering lifting force is not less than T2, and the hook lowering lifting force when the barrel foundation corresponding to the freeboard height is zero is the critical lifting force; The preset control scheme in which the critical lifting force is less than a×T1 is deleted to obtain a backup control scheme, wherein 0.9≤a≤1.

[0005] According to an embodiment of the present application, the control is divided into multiple sinking stages to lower the bucket foundation, and a preset control scheme formed by the multiple sinking stages is obtained, including: When the freeboard height of the barrel foundation is greater than a preset height, controlling the hook lowering force in the sinking stage to be a first lifting force; When the freeboard height of the barrel foundation is less than or equal to the preset height, the hook lowering force in the sinking stage is controlled to be a second lifting force; The first hanging force is smaller than the second hanging force.

[0006] According to an embodiment of the present application, the control is divided into multiple sinking stages to lower the bucket foundation, and in a preset control scheme formed by the multiple sinking stages, the fixed lifting force of the hook in all the sinking stages is equal to T1, and T1≥the second lifting force≥0.875 T1.

[0007] According to an embodiment of the present application, the control is divided into multiple sinking stages to lower the bucket foundation, and a preset control scheme formed by the multiple sinking stages is obtained, including: The hook lowering lifting force in all the sinking stages before the freeboard height is controlled to be zero is equal.

[0008] According to an embodiment of the present application, the control is divided into multiple sinking stages to lower the bucket foundation, and a preset control scheme formed by the multiple sinking stages is obtained, including: Fix the hook, open the air valve of the barrel foundation, and control the hook to maintain the fixed lifting force of the hook; Lower the hook, close the air valve of the barrel foundation, and control the lifting force of the hook to drop from the fixed lifting force of the hook to the lowering lifting force of the hook.

[0009] According to an embodiment of the present application, the control is divided into multiple sinking stages to lower the bucket foundation, and a preset control scheme formed by the multiple sinking stages is obtained, including: In each of the sinking stages, the lifting force of the hook is controlled to be reduced from the hook fixing lifting force to the hook lowering lifting force; The step of deleting the preset control scheme in which the critical lifting force is less than a×T1 to obtain a backup control scheme includes: Determining the freeboard height of the bucket foundation corresponding to each of the sinking stages by an iterative algorithm; The critical lifting force when the freeboard height is zero is obtained, and the magnitude relationship between the critical lifting force when the freeboard height is zero and T1 is determined.

[0010] According to an embodiment of the present application, the step of determining the freeboard height of the bucket foundation corresponding to each of the sinking stages by an iterative algorithm includes: The liquid level in the first bucket of the bucket foundation corresponding to the lifting force of the hook is determined by the force balance of the entire bucket foundation. h 内1 ; The height of the second liquid level in the barrel of the barrel foundation corresponding to the lifting force of the hook is determined by the force balance of the liquid level in the barrel of the barrel foundation and the conservation of the gas volume in the barrel after the gas valve is closed in the adjacent sinking stage. h 内2 ; The liquid level in the first barrel h内1 and the liquid level in the second barrel h 内2 If the difference is within the set error range, the freeboard height corresponding to the hook lowering force is determined.

[0011] According to an embodiment of the present application, the first liquid level in the bucket of the bucket foundation corresponding to the hook lowering force is determined by the force balance of the entire bucket foundation, including: The sum of the displacement volumes of the bucket cavity in the bucket foundation corresponding to the lifting force of the hook is determined by the following formula: : , where G is the barrel base dry weight, T c To lower the hook, is the sum of the displacement volumes of the bucket foundation corresponding to the lifting force of the hook, The freeboard height h corresponding to the hook lowering force 0c and barrel foundation structure sizing; Depend on Determine the height difference △h between the liquid level inside and outside the bucket foundation when the bucket foundation corresponds to the lifting force of the hook. c ,Depend on 、h 0c The sum of the gas volumes in the barrel can be determined by the size of the barrel foundation structure , and then by Determine the liquid level h in the first barrel based on the size of the barrel foundation structure 内1 ; The second liquid level height in the barrel of the barrel foundation corresponding to the lifting force of the hook is determined by the force balance of the liquid level in the barrel of the barrel foundation and the conservation of the gas volume in the barrel after the air valve is closed in the adjacent sinking stage. h 内2 ,include: The gas pressure p in the bucket foundation corresponding to the hook lowering force is determined by the following formula: c ; , where p0 is the atmospheric pressure, γ w is the bulk density of seawater; The sum of the volume inside the bucket of the bucket foundation corresponding to the hook lowering force is determined by the following formula: : ,in, is the sum of the gas volumes in the bucket corresponding to the lifting force of the hook, where: That is to say ; Depend on Determine the liquid level h in the second barrel based on the size of the barrel foundation structure内2 ; The height of the liquid level in the first barrel h 内1 and the liquid level in the second barrel h 内2 The difference between the values ​​of and is within the set error range, and the freeboard height corresponding to the hook lowering force is determined, including: , δ<δ 允许 , δ 允许 is the allowable error value, then the given lifting force T can be determined c The corresponding barrel foundation freeboard height h 0c .

[0012] The present invention also provides a bucket-type foundation submergence control device, comprising the following modules: An acquisition module, used for acquiring the maximum rated lifting force T1 of the crane ship during the process of sinking the bucket foundation and the minimum stabilizing lifting force T2 required for the bucket foundation to achieve stability; A control module, used for controlling the lowering of the bucket foundation in a plurality of lowering stages, and obtaining a preset control scheme formed by the plurality of lowering stages, wherein the hook in each of the lowering stages has a hook fixing lifting force and a hook lowering lifting force, and the hook lowering lifting force when the freeboard height of the bucket foundation is zero is a critical lifting force; A generation module is used to delete the preset control scheme in which the critical lifting force is less than a×T1, and obtain a backup control scheme, wherein 0.9≤a≤1.

[0013] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, a method for controlling the submergence of a barrel-type foundation as described above is implemented.

[0014] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements any of the above-described methods for controlling the submergence of a barrel-type foundation.

[0015] The present invention also provides a computer program product, including a computer program, which, when executed by a processor, implements any of the above-mentioned methods for controlling the sinking of a barrel-type foundation.

[0016] The bucket foundation submergence control method provided by the present invention lowers the bucket foundation in multiple stages, and finally obtains a critical lifting force as close as possible to the fixed lifting force of the hook, and the stability of the bucket foundation is ensured by the critical lifting force being close to the fixed lifting force of the hook. The bucket foundation submergence control method of the present application establishes for the first time a quantitative analysis method between the lifting force and the sinking amount of the bucket foundation during the sinking process from a floating state with a freeboard height greater than zero (the lower bucket top cover is above the water surface) to a freeboard height equal to zero (the lower bucket top cover is submerged), thereby promoting the popularization and application of this type of new foundation form and process, filling in related gaps, and providing support for construction analysis. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 It is one of the structural diagrams of the barrel foundation in the hanging state.

[0019] Figure 2 This is the second structural diagram of the barrel foundation in the hanging state.

[0020] Figure 3 yes Figure 1 Schematic cross-sectional view at AA in the middle.

[0021] Figure 4 It is a structural diagram of the barrel foundation during floating transportation.

[0022] Figure 5 It is a structural diagram of the barrel foundation when it is sunk.

[0023] Figure 6 It is a structural schematic diagram of the barrel foundation sinking and submergence control method provided by the present invention.

[0024] Figure 7 It is a schematic diagram of the bucket foundation provided by the present invention in an initial state before being sunk.

[0025] Figure 8 It is a schematic diagram of the bucket foundation provided by the present invention in a hook-fixed state.

[0026] Fig. 9 It is a schematic diagram of the bucket foundation provided by the present invention when the hook is lowered.

[0027] Fig.10 It is a schematic diagram of the lifting force analysis when the bucket foundation in the present invention is completely submerged.

[0028] Fig.11 It is a schematic diagram of the unbalanced drainage volume on both sides of the circular cross-section barrel foundation in the present invention when it is completely submerged.

[0029] Fig.12 It is a structural schematic diagram of the electronic device provided by the present invention.

[0030] Figure numerals: 1. lower barrel; 2. lower barrel top cover; 3. compartment plate; 4. upper barrel; 5. center of gravity of basic structure; 6. initial center of buoyancy; 7. lifting lug; 8. lifting hook. DETAILED DESCRIPTION

[0031] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] The barrel foundation is a new type of structure with an open bottom and a closed top. It can form a pressure difference inside and outside the barrel by pumping water, overcome resistance and achieve sinking. It is particularly suitable for soft clay seabeds. It has the advantages of not requiring large equipment for water construction and sinking, short water operation time, and no noise during construction. It is used in marine engineering and water transport engineering. The barrel foundation usually adopts a variable cross-section structure with a small upper barrel and a large lower barrel. The lower barrel is buried in the soil to ensure the bearing capacity and stability of the foundation, and the upper barrel is exposed above the water to meet the structural use requirements. This variable cross-section structure can save materials and reduce the weight of the foundation. The schematic diagram of a typical barrel foundation is shown below. Figures 1 to 3 As shown, the barrel-type foundation includes an upper barrel and a lower barrel 1.

[0033] The installation and positioning of the barrel foundation generally adopts the air flotation positioning process. The barrel foundation is transported by a semi-submersible barge. After arriving near the installation location, the semi-submersible barge with the barrel foundation dives as a whole until the barrel foundation floats. During this stage, the exhaust and drain valves on the top of the barrel are kept closed, and the top cover of the lower barrel 1 is higher than the external water surface. Figure 4 As shown; after the bucket foundation is floated to the installation location, the exhaust gas sinks. As the water depth of the bucket foundation application environment continues to increase, the height of the bucket foundation will inevitably be less than the water depth, that is, the bucket end of the bucket foundation is still not in contact with the mud after the bucket top cover 2 is submerged. At this time, the bucket foundation is in a floating state, such as Figure 5 shown.

[0034] For a bucket foundation with a variable cross-section, when the lower bucket 1 is close to being submerged in water, the bucket foundation shows a tendency to capsize due to the sudden change in the waterline of the bucket foundation. In view of the above situation, a crane ship can be used to apply a lifting force to the bucket foundation to increase stability, thereby maintaining the stability of the bucket foundation during the entire sinking process. During the sinking process of the bucket foundation, the lifting force must always be higher than the minimum stabilizing lifting force T2 required to maintain the stability of the bucket foundation, and the lifting force must be less than the rated lifting force of the crane ship (that is, the maximum rated lifting force T1).

[0035] The present application makes the barrel foundation sink through multiple sinking stages, and the lifting force of the hook 8 in all sinking stages circulates within a preset range until the top of the lower barrel 1 is submerged. Each sinking stage includes the process of fixing the hook 8 and the process of lowering the hook 8. During the process of fixing the hook 8: fix the hook 8, open the exhaust valve, the lifting force increases, the draft of the barrel body remains unchanged, and the thickness of the bottom water increases. During the process of lowering the hook 8: close the exhaust valve, release the hook 8, the lifting force decreases, the draft of the barrel body decreases, and the thickness of the bottom water increases.

[0036] Combine the following Figure 6-Figure 12 The present invention describes a method for controlling the submergence of a barrel-type foundation.

[0037] See also Figure 6 According to the embodiment of the present application, the method for controlling the submergence of a barrel foundation includes: Step 100: Obtain the maximum rated lifting force T1 of the crane vessel during the process of sinking the bucket foundation and the minimum stabilizing lifting force T2 required for the bucket foundation to achieve stability.

[0038] Step 200, controlling the lowering of the barrel foundation in a plurality of lowering stages, obtaining a preset control scheme formed by the plurality of lowering stages, wherein the hook 8 in each of the lowering stages has a fixed lifting force of the hook 8 and a lowering lifting force of the hook 8, the fixed lifting force of the hook 8 is greater than the lowering lifting force of the hook 8, the fixed lifting force of the hook 8 is not greater than T1, the lowering lifting force of the hook 8 is not less than T2, and the lowering lifting force of the hook 8 when the freeboard height corresponding to the barrel foundation is zero is the critical lifting force.

[0039] Step 300: Delete the preset control scheme in which the critical lifting force is less than a×T1, and obtain a backup control scheme, where 0.9≤a≤1.

[0040] According to the bucket foundation submergence control method of the embodiment of the present application, the bucket foundation is lowered in multiple stages, and finally the critical lifting force is obtained as close as possible to the fixed lifting force of the hook 8, and the stability of the bucket foundation is ensured by the critical lifting force being close to the fixed lifting force of the hook 8. The bucket foundation submergence control method of the present application establishes for the first time a quantitative analysis method between the lifting force and the sinking amount of the bucket foundation during the sinking process from the floating state of the bucket foundation with a freeboard height greater than zero (the lower bucket top cover 2 is above the water surface) to the freeboard height equal to zero (the lower bucket top cover 2 is submerged), thereby promoting the promotion and application of this type of new foundation form and process, filling in related gaps, and providing support for construction analysis.

[0041] In step 200, the control is divided into multiple sinking stages to lower the bucket foundation, and a preset control scheme formed by the multiple sinking stages is obtained, including: When the freeboard height of the barrel foundation is greater than a preset height, the lowering lifting force of the hook 8 in the sinking stage is controlled to be the first lifting force.

[0042] When the freeboard height of the barrel foundation is less than or equal to the preset height, the lowering lifting force of the hook 8 in the sinking stage is controlled to be the second lifting force.

[0043] The first hanging force is smaller than the second hanging force.

[0044] Since the sinking stages are divided, for the sinking stage with a higher freeboard height, the lowering force of the hook 8 can be controlled to be as close to T2 as possible to accelerate the sinking speed of the bucket foundation. For the sinking stage with a smaller freeboard height, it is necessary to control the difference between the lowering force of the hook 8 and the fixed force of the hook 8 not to be too large to reduce the lowering speed of the bucket foundation. Therefore, the lowering force of the hook 8 is as close to the fixed force of the hook 8 as possible. The preset height can take a specific value, for example, the preset height can be between 0.2 meters and 0.5 meters; the preset height can also be related to the size of the bucket foundation.

[0045] It is worth mentioning that, in different sinking stages, the fixed lifting force of the hook 8 can be the same or different; similarly, in different sinking stages, the lowering lifting force of the hook 8 can be the same or different.

[0046] Of course, in addition to setting different hook 8 lowering forces for different sinking stages under different conditions, the hook 8 fixed lifting force and the hook 8 lowering lifting force in different sinking stages can also be the same. That is, step 200 includes: the hook 8 lowering lifting force in all the sinking stages before the freeboard height is controlled to be zero is equal, or the hook 8 fixed lifting force in all the sinking stages before the freeboard height is controlled to be zero is equal, or the hook 8 lowering lifting force in all the sinking stages before the freeboard height is controlled to be zero is equal and the hook 8 fixed lifting force is equal.

[0047] Each sinking stage includes the process of fixing the hook 8 and the process of lowering the hook 8: The process of fixing the hook 8 includes: fixing the hook 8, opening the air valve of the barrel foundation, and controlling the hook 8 to maintain the fixing lifting force of the hook 8.

[0048] The process of lowering the hook 8 includes: lowering the hook 8, closing the air valve of the barrel foundation, and controlling the lifting force of the hook 8 to decrease from the fixed lifting force of the hook 8 to the lowering lifting force of the hook 8.

[0049] Among them, the initial state of the barrel foundation before sinking can be referred to Figure 7 The process of fixing the hook 8 is as follows: Figure 8 As shown, the lowering process of the hook 8 is as follows Fig. 9 shown.

[0050] Take the process of hook 8 fixing as an example, combined with Figure 8 , taking the entire bucket foundation as the research object, the force balance can be obtained: (1)

[0051] Where G is the dry weight of the bucket foundation, which can be calculated as a known condition by the volume of concrete; T b is the fixed lifting force of hook 8, which is a known condition; It is the sum of the volume of the empty spaces in the barrel; The sum of the volume of the barrel foundation drainage below the external liquid surface; γ w It is the bulk density of sea water.

[0052] Taking the liquid surface in the barrel as the research object, we can get the following from the force balance: (2)

[0053] Among them, p b is the gas pressure in the chamber; p0 is the atmospheric pressure; △h b It is the height difference of liquid level inside and outside the barrel foundation.

[0054] h 0b is the freeboard height, and since the hook 8 is fixed, the draft of the barrel remains unchanged, that is, h 0bunchanged, which is a known condition. b is the volume of gas in the barrel, V' b is the cavity drainage volume. 0b and barrel type foundation structure dimensions can be determined , then G, T b and All the conditions are known, and we can substitute them into formula (1) to get .Depend on 、h 0b The sum of the gas volumes in the barrel can be determined by the size of the barrel foundation structure The cavity cross-section of each chamber of the bucket foundation is known, △h can be obtained b , and then △h b Substituting into equation (1) we can obtain p b ; This solution process does not require iterative calculation.

[0055] In the above formula, the subscript b represents the state of fixing the hook 8 and opening the air valve.

[0056] It should be pointed out that theoretically, if the exhaust is sufficient, the gas pressure in the barrel p b As the pressure approaches the atmospheric pressure p0, the air pressure decreases and the lifting force increases. In fact, during the process of fixing the hook 8 and opening the air valve, the gas pressure in the barrel and the lifting force are always in a state of dynamic equilibrium, and the state parameters at the moment of exhaust completion are required for subsequent calculations. Therefore, it is only necessary to record the total stabilizing lifting force T at the moment of fixing the hook 8 and opening the air valve to exhaust. b , and determine p by calculation b and Used for subsequent calculations.

[0057] Fig. 9 During the lowering process of the hook 8, the air valve is closed, the lifting force is reduced, the draft depth of the barrel is reduced, and the thickness of the bottom sealing water is increased.

[0058] Taking the entire bucket foundation as the research object, the force balance can be obtained: (3)

[0059] Taking the liquid surface in the barrel as the research object, we can get the following from the force balance: (4)

[0060] After closing the gas valve, the amount of gas in the barrel is conserved, and we can get: (5)

[0061] in, is the sum of the volumes of gases in the barrel.

[0062] In the above formula, the subscript c represents the state of closing the gas valve and lowering the hook 8, and the meanings of other symbols are consistent with the above formula; a represents the state of closing the gas valve and fixing the hook 8, and the meanings of other symbols are also consistent with the above formula.

[0063] The subscript c represents the state where the gas valve is closed and the hook 8 is lowered.

[0064] Among them, the lifting force T c is the lifting force of the hook 8, which is a known condition; G is the dry weight of the bucket foundation, which can be measured by the volume of concrete, which is a known condition; p b and is the gas state parameter in the barrel recorded at the end of the previous stage, which is a known condition. The simultaneous equations (3) to (5) combined with the known conditions can produce more than one result, so it is necessary to determine the only result through iterative calculation.

[0065] Assume the lifting force is T c The corresponding freeboard height is h 0c , by h 0c and barrel type foundation structure dimensions can be determined , T c、 G and Substituting into formula (3) we can obtain The cavity cross-section of each chamber is known, Available ;Depend on 、h 0c The sum of the gas volumes in the barrel can be determined by the size of the barrel foundation structure , and then by Determine the liquid level in the first barrel based on the size of the barrel foundation structure h 内1 .

[0066] Will Substituting into equation (4) we can obtain the gas pressure p in the chamber: c ; c Substitute into formula (5), and combine with the calculation result of the previous stage p b and , we can find the sum of the gas volumes in the barrel , and then by Determine the liquid level in the second barrel based on the size of the barrel foundation structure h 内2 ; Theoretically, if h 0c If the value is accurate, then h determined by formula (3) 内1 , and determined by equations (4) and (5) h 内2 , the two values ​​should be equal, and the corresponding iteration error is defined as: (6)

[0067] Adjust h 0c Calculate until δ<δ 允许 , δ 允许 is the allowable error value, then the given lifting force T can be determined c The corresponding barrel foundation freeboard height h 0c .

[0068] The lifting force is given by T b Reduce to T c The draft depth of the barrel foundation changes as follows (h 0b -h 0c ).

[0069] From the above analysis, it can be seen that according to the embodiment of the present application, step 200 includes: In each of the sinking stages, the lifting force of the hook 8 is controlled to be reduced from the fixed lifting force of the hook 8 to the lowering lifting force of the hook 8.

[0070] Step 300 includes: Step 310: Determine the freeboard height of the bucket foundation corresponding to each of the sinking stages by an iterative algorithm; Step 320: Obtain the critical lifting force when the freeboard height is zero, and determine the magnitude relationship between the critical lifting force when the freeboard height is zero and T1.

[0071] According to one embodiment of the present application, step 310 includes: Step 311: Determine the liquid level in the first barrel of the barrel foundation corresponding to the lifting force of the hook 8 by the force balance of the entire barrel foundation. h 内1 ; Step 312: Determine the height of the second liquid level in the barrel of the barrel foundation corresponding to the lowering force of the hook 8 based on the force balance of the liquid level in the barrel of the barrel foundation and the conservation of the gas volume in the barrel after the air valve is closed in the adjacent sinking stage. h 内2 ; Step 313: The liquid level in the first barrel is h 内1 and the liquid level in the second barrel h 内2 The difference is within the set error range, and the freeboard height corresponding to the lowering force of the hook 8 is determined.

[0072] Step 311 includes: The sum of the drainage volumes of the bucket cavity in the bucket foundation corresponding to the lifting force of the hook 8 is determined by the following formula: : , where G is the barrel base dry weight, Tc To lower the lifting force of the hook 8, is the sum of the displacement volumes of the bucket foundation corresponding to the lifting force of the hook 8, The freeboard height h corresponding to the lowering force of the hook 8 0c and bucket foundation structure sizing; Depend on Determine the height difference △h between the inner and outer liquid levels of the bucket foundation when the bucket foundation corresponds to the lifting force of hook 8. c ,Depend on 、h 0c The sum of the gas volumes in the barrel can be determined by the size of the barrel foundation structure , and then by Determine the liquid level in the first barrel based on the size of the barrel foundation structure h 内1 .

[0073] Step 312 includes: The gas pressure p in the bucket-type foundation corresponding to the lifting force of the hook 8 is determined by the following formula: c ; , where p0 is the atmospheric pressure, γ w is the bulk density of seawater; The sum of the volume of the bucket corresponding to the lifting force of the hook 8 is determined by the following formula: : ,in, is the sum of the gas volumes in the bucket corresponding to the lifting force of the hook 8, where: That is to say ; Depend on Determine the liquid level in the second barrel based on the size of the barrel foundation structure h 内2 ; Step 313 includes: , δ<δ 允许 , δ 允许 is the allowable error value, then the given lifting force T can be determined c The corresponding barrel foundation freeboard height h 0c .

[0074] According to an embodiment of the present application, in step 200, the fixed lifting force of the hook 8 in all the sinking stages can be taken as T1. Further, in step 220, the value of the second lifting force satisfies: T1 ≥ second lifting force ≥ 0.875 T1. In this case, the second lifting force is very close to T1, and the stability of the bucket foundation when it is about to be submerged is better.

[0075] In a specific embodiment of the present application, the upper barrel is 9m high, the lower barrel 1 is 10m high, the lower barrel 1 is 36.6m long, and the lower barrel 1 is 20m wide. The barrel-type basic structure is as follows: Figures 1 to 3 As shown, the total volume of concrete is 1489m 3 The total weight of the barrel foundation and the upper barrel top operating platform is 3748t, and the preset stabilization lifting force cycle range is 200t~400t.

[0076] Starting from the freeboard height of the barrel foundation of 1.0m, the hook 8 is fixed for the first time and the air valve is opened. The calculation results of formula (1) and formula (2) are shown in Table 1. As the lifting force increases, the gas volume in the barrel decreases, the displacement volume of the barrel foundation decreases, and the liquid level in the barrel increases, that is, seawater enters the barrel. pb = 1.470 times standard atmospheric pressure and = 2881.578 (m 3 ), which is a known condition for the next stage of calculation.

[0077] Table 1 Results of opening the air valve of the first fixed hook 8

[0078] Then, the air valve is closed for the first time and the hook 8 is lowered. The iterative calculation results of equations (3) to (5) are shown in Table 2, where the liquid level 1 in the barrel in Table 2 is determined by equation (3), and the liquid level in the barrel is determined by equations (4) and (5), with an allowable error of 0.001%.

[0079] Table 2 Results of closing the air valve when lowering hook 8 for the first time

[0080] In summary, the hook 8 can be fixed for the first time, the air valve is opened, the air valve is closed, and the hook 8 is lowered. In the process of reducing the lifting force from 400t to 200t, the freeboard height of the barrel foundation is reduced from 1.0m to 0.684m, and the sinking amount is 0.316m.

[0081] Similarly, the lifting force and freeboard height in the subsequent sinking process are shown in Table 3. That is, after three cycles, when the lifting force is 215t, the bucket 1 under the bucket foundation is submerged.

[0082] Table 3 Analysis results of the sinking process

[0083] It should be pointed out that the lifting force at the moment of the submergence of the lower barrel 1 is only 215t, which is close to the lower limit of the lifting force cycle; because the floating state of the foundation changes suddenly (stability deteriorates) at the moment of the submergence of the lower barrel 1, the stability of the bucket foundation is ensured by making the lifting force close to the upper limit of the lifting force cycle at this moment. It is set that the lifting force at the moment of the submergence of the lower barrel 1 of the bucket foundation should be no less than 350t, then the control requirements can be met by adding a lifting force cycle and reducing the range of the lifting force cycle when the freeboard height is small; in the specific operation position, the freeboard lifting force of the last two rows in Table 3 is changed from 400t-215.85t to 400t-350t, and then the lifting force cycle of 350t-400t is increased. The final analysis results are shown in Table 4. By optimizing the lifting force control scheme, the lifting force at the moment of the submergence of the lower barrel 1 can be 365t, which is greater than the preset value of 350t. In summary, the state analysis method of the bucket foundation sinking process proposed in the present invention can provide support for the construction process planning and maintain the stable sinking of the bucket foundation.

[0084] Table 4 Analysis results of optimized sedimentation process

[0085] According to an embodiment of the present application, the maximum rated lifting force T1 of the crane vessel is determined, and the minimum stabilization lifting force T2 can be obtained by empirical value or by iterative calculation. When obtained by iterative algorithm, it may include: Step 400, determining assumptions for foundation stability analysis of a variable-section bucket foundation under a submerged condition of the lower bucket 1; Step 500, establishing a calculation formula for the stabilization lifting force required for a bucket foundation using a lifting force stabilization process; Step 600, and using an iterative algorithm to solve the minimum stabilization lifting force result.

[0086] In step 400, the variable-section bucket foundation determines the assumptions for foundation stability analysis under the condition that the lower bucket 1 is submerged.

[0087] In the embodiment, the assumptions for determining the foundation stability analysis include: the floating state analysis of the barrel-type 1 foundation in a static water environment does not consider the influence of environmental loads such as wind, waves, and currents; the influence of the exhaust and sinking of the barrel-type foundation on the gas volume and air pressure in the barrel is not considered, and the analysis is only performed under the conditions of a given depth and gas volume; the width of the upper barrel is consistent with that of the barrel-type foundation, and the cross-section changes only in the length direction; The base structure center of gravity 5 of the barrel foundation is located above the initial buoyancy center 6 of the foundation when it is at a given sinking depth and has not rotated. The foundation rotates at a small angle with the initial buoyancy center 6 of the foundation when it is at a given sinking depth and has not rotated as the center of rotation, and the bottom water in the barrel foundation can form an effective seal. The dynamic process during the reciprocating swing of the foundation is not considered, and only a static analysis is performed on a given state. The gas state conversion time is negligible, and it is directly converted from one state to another. The gas pressure in all directions in the barrel foundation is the same, and the internal water level surface is always a plane. The total buoyancy of the foundation remains unchanged, that is, the total displacement V of the foundation remains unchanged. The sum of the total buoyancy and the total hanging force of the barrel foundation remains unchanged, that is, the deadweight of the barrel foundation.

[0088] Step 500, establishing a calculation formula for the stabilization lifting force required for a bucket foundation using a lifting force stabilization process.

[0089] In the embodiment, in order to facilitate the establishment of a calculation formula for the stabilizing lifting force required for a bucket foundation using a lifting force stabilizing process, the following provisions are made: the cross-sections of the upper bucket and the lower bucket 1 are both rectangular; the bucket foundation is a symmetrical two-compartment structure; before the foundation rotates, a YOZ coordinate system is established with the initial buoyancy center 6 position as the origin, the Y axis is parallel to the bottom edge line of the structure, and the Z axis is perpendicular to the bottom edge line of the structure; after the foundation rotates, a Y'OZ' coordinate system is still established with the initial buoyancy center 6 position as the origin, the Y' axis is parallel to the water level line, and the Z' axis is perpendicular to the water level line; the direction of the stabilizing lifting force is always kept vertically upward.

[0090] like Fig.10 As shown, step 500 specifically includes: relative to the YOZ coordinate system, the unbalanced drainage volume on one side of the upper barrel for: ; in, For a small rotation angle, is the barrel foundation width, is the length of the upper barrel; Relative to the YOZ coordinate system, the volume moment generated by the unbalanced displacement volume on both sides of the upper barrel is for: ; Relative to the YOZ coordinate system, the volume difference of the liquid level in the single compartment of the lower barrel 1 for: ; in, is the barrel foundation length; Relative to the YOZ coordinate system, the volume moment generated by the liquid level difference in all compartments of the lower barrel 1 is for: ; The direction of action is opposite to the rotation direction of the bucket foundation, and plays a restoring role; The direction of action is the same as the rotation direction of the bucket foundation, which intensifies the rotation; therefore, relative to the YOZ coordinate system, the buoyancy center of the bucket foundation after rotation of The coordinates are: ; in, It is the unilateral lifting force on the lower side of the barrel top cover 2 under the barrel foundation. is the bulk density of water; The center of buoyancy of the barrel foundation after rotation relative to the rotated Y'OZ' coordinate system The Y' coordinate is: ; Note that the moment of inertia of the horizontal section of the upper barrel is: ; The sum of the moments of inertia of the horizontal sections of the cavities in each compartment of the lower barrel 1 is: ; but,

[0091] ; Relative to the rotated Y'OZ' coordinate system, the Y' coordinate of the center of gravity 5G of the rotated base structure is: ; in, The height of the center of gravity of the basic structure is 5; is the height of the initial buoyancy center 6 of the bucket foundation at a given sinking depth when no rotation occurs; Based on the rotating barrel type basic buoyancy center Taking the moment as the reference point, the overturning moment MO is: ; The anti-overturning moment MR provided by the unilateral hanging force is: ; It is the plane distance from the lifting lug 7 to the center axis of the barrel foundation; Therefore, for the bucket foundation with enhanced stability, when the lower bucket 1 is completely submerged, the foundation stability judgment condition is: ; When the above equation is established, the combined moment formed by the foundation gravity, buoyancy and hanging force restores the structure to balance, that is, the restoring moment formed by the unbalanced drainage of the upper barrel 4 and the external hanging force is greater than the rotational moment formed by the liquid level difference in the lower barrel 1 and the deadweight of the barrel foundation; The minimum single-side stabilizing lifting force required for stable sinking of deep bucket foundation is obtained for: .

[0092] In the embodiment, it is shown that under the condition of complete submergence: the minimum stabilizing lifting force increases with the difference between the height of the center of gravity 5 of the foundation structure and the height of the center of buoyancy, that is, the higher the center of gravity and the lower the center of buoyancy, the worse the self-stabilizing ability of the foundation, and the greater the required stabilizing lifting force; it decreases with the difference between the inertia of the horizontal section of the upper barrel and the sum of the moments of inertia of the horizontal sections of the cavities in each compartment of the lower barrel 1, that is, the foundation barrel is conducive to the stability of the foundation, while the water in the cavities in each compartment of the lower barrel 1 is not conducive to the stability of the foundation; it is proportional to the foundation inclination, which is different from the floating stability calculation formula before the foundation is submerged in water and the caisson lifting force stabilization calculation formula, which does not contain the inclination, because the assumption that the lifting force is always vertically upward is adopted, which is consistent with the bucket foundation crane lifting stabilization process, because the inclination term cannot be offset in the derivation, in actual application, the allowable inclination can be assumed first, and the required stabilizing lifting force range can be determined, and then verified through model tests or typical construction; it is inversely proportional to the length of the lever arm, and the required lifting force result can be changed by adjusting the arrangement of the lifting lugs 7 to change the lever arm length.

[0093] Step 600, an iterative algorithm is used to solve the minimum stabilization lifting force result.

[0094] In the embodiment, in step 500, the minimum single-side stabilizing lifting force required for the stable sinking of the deep-water bucket foundation is With Angle Related, and: ; Both the left and right sides of the above equation contain the stabilizing force to be solved , and the buoyancy center height before foundation rotation Also with the stability enhancement It is a typical nonlinear equation, and the bisection method is used to iteratively solve it.

[0095] In the embodiment, although restrictions such as two compartments, symmetrical compartment distribution, and rectangular plane shapes of lower barrel 1, upper barrel and pontoon are introduced for the convenience of derivation, the relevant regularity results derived in this study can be extended to barrel foundations with other cross-sectional forms and numbers of compartments.

[0096] For example, if the cross section of the lower barrel 1 is a circle with a radius of R, the unbalanced displacement volume of the lower barrel 1 is as follows: Fig.11 As shown, the X axis is orthogonal to the Y axis. Relative to the YOX coordinate system, the volume moment generated by the unbalanced displacement volume of the lower barrel 1 is for: ; in, for Fig.10The y coordinate of any point in the integral domain can be expressed as "the distance from any point in the integral region to the x-axis when projected on the xoy plane; this indicates that the above formula still holds for circular cross sections, that is, the above derivation is not limited by the cross-sectional shape of the barrel foundation.

[0097] For example, when the lower barrel 1 is divided into four rectangular compartments, relative to the YOZ coordinate system, the liquid level difference volume in the single compartment of the lower barrel 1 is for: ; Relative to the YOZ coordinate system, the volume moment generated by the liquid level difference in all compartments of the lower barrel 1 is for: ; This shows that the above derivation is still valid for the four-compartment barrel foundation, that is, it is not limited by the number of compartments in the barrel foundation.

[0098] In summary, The method can be used for calculating the floating stability of a variable-section bucket foundation stabilized by pontoons when the lower bucket 1 is completely submerged.

[0099] Fig.12 An example of a physical structure diagram of an electronic device is shown in FIG. Fig.12 As shown, the electronic device may include: a processor (processor) 810, a communication interface (Communications Interface) 820, a memory (memory) 830 and a communication bus 840, wherein the processor 810, the communication interface 820, and the memory 830 communicate with each other through the communication bus 840. The processor 810 can call the logic instructions in the memory 830 to execute the bucket foundation sinking submergence control method, which includes: obtaining the maximum rated lifting force T1 of the crane ship and the minimum stabilizing lifting force T2 required for the bucket foundation to achieve stability during the sinking of the bucket foundation; controlling the bucket foundation to be lowered in multiple sinking stages, and obtaining a preset control scheme formed by multiple sinking stages, wherein the hook 8 in each of the sinking stages has a hook 8 fixed lifting force and a hook 8 lowering lifting force, respectively, the hook 8 fixed lifting force is greater than the hook 8 lowering lifting force, the hook 8 fixed lifting force is not greater than T1, the hook 8 lowering lifting force is not less than T2, and the hook 8 lowering lifting force when the freeboard height corresponding to the bucket foundation is zero is the critical lifting force; deleting the preset control scheme in which the critical lifting force is less than a×T1, and obtaining a backup control scheme, wherein 0.9≤a≤1.

[0100] In addition, the logic instructions in the above-mentioned memory 830 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or the part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0101] On the other hand, the present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the bucket foundation sinking submergence control method provided by the above methods, the method including: obtaining the maximum rated lifting force T1 of the crane ship and the minimum stabilizing lifting force T2 required for the bucket foundation to achieve stability during the sinking of the bucket foundation; controlling the lowering of the bucket foundation in multiple sinking stages to obtain a preset control scheme formed by multiple sinking stages, wherein the hook 8 in each of the sinking stages has a fixed lifting force of the hook 8 and a lowering lifting force of the hook 8, the fixed lifting force of the hook 8 is greater than the lowering lifting force of the hook 8, the fixed lifting force of the hook 8 is not greater than T1, the lowering lifting force of the hook 8 is not less than T2, and the lowering lifting force of the hook 8 when the freeboard height of the bucket foundation is zero is the critical lifting force; deleting the preset control scheme in which the critical lifting force is less than a×T1 to obtain a backup control scheme, wherein 0.9≤a≤1.

[0102] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the bucket foundation sinking submergence control method provided by the above-mentioned methods, the method comprising: obtaining the maximum rated lifting force T1 of the crane ship and the minimum stabilizing lifting force T2 required for the bucket foundation to achieve stability during the sinking of the bucket foundation; controlling the lowering of the bucket foundation in multiple sinking stages to obtain a preset control scheme formed by the multiple sinking stages, wherein the hook 8 in each of the sinking stages has a fixed lifting force of the hook 8 and a lowering lifting force of the hook 8, respectively, the fixed lifting force of the hook 8 is greater than the lowering lifting force of the hook 8, the fixed lifting force of the hook 8 is not greater than T1, the lowering lifting force of the hook 8 is not less than T2, and the lowering lifting force of the hook 8 when the freeboard height corresponding to the bucket foundation is zero is the critical lifting force; deleting the preset control scheme in which the critical lifting force is less than a×T1 to obtain a backup control scheme, wherein 0.9≤a≤1.

[0103] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0104] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0105] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for controlling the submergence of a barrel foundation. It is characterized in that include: Obtaining the maximum rated lifting force T1 of the crane vessel during the process of sinking the bucket foundation and the minimum stabilizing lifting force T2 required for the bucket foundation to achieve stability; Controlling the lowering of the barrel foundation in multiple sinking stages, obtaining a preset control scheme formed by the multiple sinking stages, wherein the hook in each sinking stage has a hook fixing lifting force and a hook lowering lifting force, the hook fixing lifting force is greater than the hook lowering lifting force, the hook fixing lifting force is not greater than T1, the hook lowering lifting force is not less than T2, and the hook lowering lifting force when the barrel foundation corresponding to the freeboard height is zero is the critical lifting force; The preset control scheme in which the critical lifting force is less than a×T1 is deleted to obtain a backup control scheme, wherein 0.9≤a≤1.

2. The method for controlling the submergence of a barrel foundation according to claim 1, It is characterized in that The control is to lower the bucket foundation in multiple sinking stages, and obtain a preset control scheme formed by the multiple sinking stages, including: When the freeboard height of the barrel foundation is greater than a preset height, controlling the hook lowering force in the sinking stage to be a first lifting force; When the freeboard height of the barrel foundation is less than or equal to the preset height, the hook lowering force in the sinking stage is controlled to be a second lifting force; The first hanging force is smaller than the second hanging force.

3. The method for controlling the submergence of a barrel foundation according to claim 2, It is characterized in that The control is divided into multiple sinking stages to lower the bucket foundation, and in a preset control scheme formed by the multiple sinking stages, the fixed lifting force of the hook in all the sinking stages is equal to T1, and T1≥the second lifting force≥0.875 T1.

4. The method for controlling the submergence of a barrel foundation according to claim 1, It is characterized in that The control is to lower the bucket foundation in multiple sinking stages, and obtain a preset control scheme formed by the multiple sinking stages, including: The hook lowering lifting force in all the sinking stages before the freeboard height is controlled to be zero is equal.

5. The method for controlling the submergence of a barrel foundation according to any one of claims 1 to 4, It is characterized in that The control is to lower the bucket foundation in multiple sinking stages, and obtain a preset control scheme formed by the multiple sinking stages, including: Fix the hook, open the air valve of the barrel foundation, and control the hook to maintain the fixed lifting force of the hook; Lower the hook, close the air valve of the barrel foundation to control the lifting force of the hook from the fixed lifting force of the hook to the lowering lifting force of the hook.

6. The method for controlling the submergence of a barrel foundation according to any one of claims 1 to 4, It is characterized in that The control is to lower the bucket foundation in multiple sinking stages, and obtain a preset control scheme formed by the multiple sinking stages, including: In each of the sinking stages, the lifting force of the hook is controlled to be reduced from the hook fixing lifting force to the hook lowering lifting force; The step of deleting the preset control scheme in which the critical lifting force is less than a×T1 to obtain a backup control scheme includes: Determining the freeboard height of the bucket foundation corresponding to each of the sinking stages by an iterative algorithm; The critical lifting force when the freeboard height is zero is obtained, and the magnitude relationship between the critical lifting force when the freeboard height is zero and T1 is determined.

7. The method for controlling the submergence of a barrel foundation according to claim 6, It is characterized in that The step of determining the freeboard height of the bucket foundation corresponding to each of the sinking stages by an iterative algorithm comprises: The liquid level in the first bucket of the bucket foundation corresponding to the lifting force of the hook is determined by the force balance of the entire bucket foundation. h 内1 ; The height of the second liquid level in the barrel of the barrel foundation corresponding to the lifting force of the hook is determined by the force balance of the liquid level in the barrel of the barrel foundation and the conservation of the gas volume in the barrel after the gas valve is closed in the adjacent sinking stage. h 内2 ; The liquid level in the first barrel h 内1 and the liquid level in the second barrel h 内2 If the difference is within the set error range, the freeboard height corresponding to the hook lowering force is determined.

8. The method for controlling the submergence of a barrel foundation according to claim 7, It is characterized in that The liquid level in the first barrel of the barrel foundation corresponding to the lifting force of the hook is determined by the force balance of the entire barrel foundation. h 内1 ,include: The sum of the displacement volumes of the bucket cavity in the bucket foundation corresponding to the lifting force of the hook is determined by the following formula: : , where G is the barrel base dry weight, T c To lower the hook, is the sum of the displacement volumes of the bucket foundation corresponding to the lifting force of the hook, The freeboard height h corresponding to the hook lowering force 0c and barrel foundation structure sizing; Depend on Determine the height difference △h between the liquid level inside and outside the bucket foundation when the bucket foundation corresponds to the lifting force of the hook. c ,Depend on 、h 0c The sum of the gas volumes in the barrel can be determined by the size of the barrel foundation structure , and then by Determine the liquid level in the first barrel based on the size of the barrel foundation structure h 内1 ; The second liquid level height in the barrel of the barrel foundation corresponding to the hook lowering force is determined by the force balance of the liquid level in the barrel of the barrel foundation and the conservation of the gas volume in the barrel after the air valve is closed in the adjacent sinking stage. h 内2 ,include: The gas pressure p in the bucket foundation corresponding to the hook lowering force is determined by the following formula: c ; , where p 0 is the atmospheric pressure, γ w is the bulk density of seawater; The sum of the volume inside the bucket of the bucket foundation corresponding to the hook lowering force is determined by the following formula: : ,in, is the sum of the gas volumes in the bucket corresponding to the lifting force of the hook, where: That is to say ; Depend on Determine the liquid level h in the second barrel based on the size of the barrel foundation structure 内2 ; The height of the liquid level in the first barrel h 内1 and the liquid level in the second barrel h 内2 The difference between the values ​​of and is within the set error range, and the freeboard height corresponding to the hook lowering force is determined, including: , δ<δ 允许 , δ 允许 is the allowable error value, then the given lifting force T can be determined c The corresponding barrel foundation freeboard height h 0c .

9. A bucket-type foundation submergence control device, It is characterized in that include: An acquisition module, used for acquiring the maximum rated lifting force T1 of the crane ship during the process of sinking the bucket foundation and the minimum stabilizing lifting force T2 required for the bucket foundation to achieve stability; A control module, used for controlling the lowering of the bucket foundation in a plurality of lowering stages, and obtaining a preset control scheme formed by the plurality of lowering stages, wherein the hook in each of the lowering stages has a hook fixing lifting force and a hook lowering lifting force, and the hook lowering lifting force when the freeboard height of the bucket foundation is zero is a critical lifting force; A generation module is used to delete the preset control scheme in which the critical lifting force is less than a×T1, and obtain a backup control scheme, wherein 0.9≤a≤1.

10. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the program, the barrel foundation submergence control method as described in any one of claims 1 to 8 is implemented.

11. A non-transitory computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the barrel foundation submergence control method as described in any one of claims 1 to 8 is implemented.

12. A computer program product comprising a computer program, It is characterized in that When the computer program is executed by a processor, the barrel foundation submergence control method as described in any one of claims 1 to 8 is implemented.