The invention relates to a segmentation, block and carrying stage construction method for a ship draft sign, which comprises the following steps of: manufacturing a segment where the bottom of a middle water gauge sign is located, and drawing and mounting the bottom of the middle water gauge sign; a block where the top of the middle water gauge and the
freeboard mark are located is manufactured, and the top of the middle water gauge mark and the
freeboard mark are worked out and installed; manufacturing a section where the bottom of the head water gauge mark is located, and performing drawing and mounting on the bottom of the head water gauge mark; a block where the head water gauge mark is located is manufactured, and the top of the head water gauge mark is worked out and installed; building a dock and
slipway three-dimensional measurement and
control network, and carrying out rapid and refined large-closure carrying work of each subsection and block; according to the
base line of the segmented block where the middle water gauge mark and the
freeboard mark are located, the whole ship body
base line is determined, and finally water gauge mark positioning scribing is conducted on the
tail area according to the whole ship body
base line. According to the method, the draft water gauge mark and the freeboard mark are marked and installed in the segment or block stage, the production procedure is effectively moved forwards, cross construction of the segments and the blocks in the large closure carrying stage is reduced, the later production construction difficulty is lowered, and the overall integrity is improved.