Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

44 results about "Freeboard" patented technology

In sailing and boating, a vessel's freeboard is the distance from the waterline to the upper deck level, measured at the lowest point of sheer where water can enter the boat or ship. In commercial vessels, the latter criterion measured relative to the ship's load line, regardless of deck arrangements, is the mandated and regulated meaning.

Offshore transfer trestle with wave compensation function and working method thereof

The invention discloses an offshore transfer trestle with a wave compensation function and a working method thereof. The offshore transfer trestle comprises a heaving mechanism, a trestle system and an active wave compensation control system. According to the invention, the disturbance to the transfer trestle caused by the swaying motion of the two ships can be compensated, even if a freeboard difference exists between the host ship and the target ship, the safe angle between the trestle body and the horizontal plane can still be kept unchanged in the personnel transfer process of the transfer trestle, and the safety and comfort of personnel transfer between the two ships on the sea are improved. After lap joint of the transfer trestle is completed, the front end of the trestle body is fixedly connected with a transfer point, and in the personnel transfer process, the safe angle between the trestle body and the horizontal plane is kept unchanged only by controlling the heaving mechanism. The front end of the trestle body and the transfer point are fixedly connected through the electromagnetic landing cones, an additional mechanical device is not needed for fixing, the trestle body can be rapidly separated from the transfer point in an emergency, emergency lifting is achieved, and safety is improved.
Owner:DALIAN MARITIME UNIVERSITY

Negative buoyancy immersed tube and prefabricating method thereof

The invention relates to the technical field of immersed tube tunnel construction, in particular to a negative buoyancy immersed tube and a prefabricating method thereof. The immersed tube comprises abody, wherein the designed freeboard value of the body is smaller than 0. According to the negative buoyancy immersed tube, pipe joints do not need to be designed to be capable of self-floating in acorresponding water area, therefore, the section height of the immersed pipe does not need to be increased for guaranteeing the minimum freeboard value during floating transportation, the design contradiction between freeboard value consideration and anti-floating in the operation period in the design link is avoided, a dry dock does not need to be set for freeboard value detection, the method isparticularly suitable for engineering projects with limited fields, the design concept that a self-floating immersed tube must be adopted in the prior art is broken through, the structural height canbe reduced to the maximum extent, the engineering amount of a main body structure, foundation trench backfilling and the like is reduced, a freeboard adjusting layer does not need to be arranged, theprefabricating cost and the construction cost are effectively reduced, design difficulty and prefabricating difficulty are reduced, the cumbersome operation of adjusting the freeboard value in water in the floating transportation link is avoided, the transportation time can be shortened, and the method has important popularization significance and good application prospects.
Owner:CCCC FOURTH HARBOR ENG CO LTD +2

Design method of negative buoyancy immersed tube

The invention relates to the technical field of immersed tube tunnel construction, in particular to a design method of a negative buoyancy immersed tube. The method does not need to consider the design of a freeboard adjustment layer or consider the design contradiction between a freeboard value and floating resistance in an operation period, through the design thickness of ballast concrete determined by meeting the structural arrangement requirement, whether the preset first anti-floating coefficient is exceeded or not is inversely calculated, so that negative buoyancy larger than the corresponding preset requirement is obtained, then the design thickness of the first ballast concrete and the design thickness of the second ballast concrete are distributed according to the thickness calculated when the negative buoyancy is equal to the first anti-floating coefficient, it is effectively guaranteed that the immersed tube can meet the negative buoyancy requirement in the sinking and buttjoint stage specified by the existing specification, the negative buoyancy requirement after replacement of a ballast water tank is completed through butt joint specified by the existing specificationcan be met, meanwhile, the bearing capacity requirement of a transport ship is lowered, the lifting force needed in the immersed tube installation process can be reduced, the installation risk is reduced, and the transportation and installation cost is reduced.
Owner:CCCC FOURTH HARBOR ENG CO LTD +2

Lifeboat raft boarding training gathering station for high freeboard ship

The invention provides a lifeboat raft embarkation training collection station for a high freeboard ship. The collection station comprises a closed room which is disposed in a side cabin region of a side below a main deck of a ship body, and is located on a lifeboat collecting and descending route; a passing device which is used for entering the closed room from the deck; a watertight door which is used for closing an opening of the closed room on the ship body outer plate and is connected with a driving device; a boarding device which is used for boarding sailors to the lifeboat from the closed room or returning the sailors to the closed room from the lifeboat; a control device which is connected with the driving device and used for controlling the driving device to act so as to open and close the watertight door; a rope ladder fixing device which is used for fixing the embarkation rope ladder; a ventilation device which is used for ventilating the closed room; lighting equipment which is used for lighting the closed room; and communication equipment which is used for communicating the closed room with the outside. The collection station is advantaged in that the integrated station has double functions, safety of lifeboat raft training can be improved, and therefore the confidence of sailors for training is enhanced.
Owner:708TH RES INST OF CSSC

Sunken gas station of dual-fuel container transport ship

The invention relates to a sunken gas station of a dual-fuel container transport ship, and belongs to the technical field of ship design. The sunken gas station is arranged in the area, above a gas fuel cabin of the transport ship, below ship body main decks on the two sides, and the sunken gas station comprises a gas station door, a gas filling device in the gas station, a gas filling pipe, a gasfilling safety device and a gas station door operation system; the gas station is provided with the gas station door which is opened towards the outboard of the ship body; the gas station door operation system is arranged in the gas station on the inner side of the gas station door; the gas filling device in the gas station is arranged between the gas station door and the gas station door operation system; the gas filling safety device is arranged in the gas station; and the gas filling pipe connected with the gas fuel cabin is arranged in the gas station. The problem of the freeboard heightdifference between the dual-fuel container ship and the filling ship is solved, and the filling pipe of the filling ship can reach a gas station area more safely and efficiently; and more gas fuel canbe filled in a short time, so that the safety and the economy of the ship are improved.
Owner:708TH RES INST OF CSSC

Anti-pirate safety cabin ventilation system

The invention provides an anti-pirate safety cabin ventilation system which is characterized by comprising an emergency air inlet and an emergency air outlet which are located below a freeboard deck, and each emergency air inlet is provided with a first watertight door, a second watertight door and a water inlet leakage detector with a light alarm. A conventional air inlet duct, an emergency air inlet duct, a conventional air outlet duct and an emergency air outlet duct are arranged in the anti-pirate safety cabin, switching between the conventional air inlet duct and the emergency air inlet duct and switching between the conventional air outlet duct and the emergency air outlet duct are achieved through position changes of the fireproof watertight inner door. And after boarding of the pirate, the conventional ventilation system is closed and the emergency ventilation system is opened by switching the second watertight door, so that hidden ventilation between the pirate-preventing safe closed cabin and the external atmosphere is carried out. The position of the emergency ventilation opening is hidden, ventilation power can be provided to guarantee fresh air oxygen supply after pirate boarding and power losing, and life safety of personnel in the anti-pirate safe closed cabin can be effectively guaranteed for a long time.
Owner:708TH RES INST OF CSSC

Boardside planking piezoelectric power generation device utilizing ship rolling

The invention provides a broadside planking piezoelectric power generation device utilizing ship rolling. The device comprises a fixed hinge support, an elastic material, a pressing plate, a cushion block, a piezoelectric material and a reset spring. According to the device, at the beginning of ship design, a piezoelectric material is embedded into a broadside outer plate of a freeboard part of a ship body, when rolling motion occurs in the ship navigation process, water pressure is used for extruding the piezoelectric material to generate power, generated electric energy is processed and then merged into a ship power grid to supply power to ship power equipment, and energy conservation and emission reduction of the ship are achieved. Besides, due to the fact that the length of the freeboard part above the waterline of the ship in the length direction of the ship is very long, a large number of the device can be arranged in a freeboard groove, when the ship performs rolling motion, the area of the freeboard part immersed in seawater is very large, and the pressure of the seawater on a board side outer plate of the freeboard part is very large. According to the invention, the recoverable energy is very huge, and the power generation effect is good.
Owner:GUANGDONG OCEAN UNIVERSITY

Sea ice freeboard estimation method and system based on aviation laser altimetry

The invention provides a north pole sea ice freeboard estimation method and system based on aviation laser altimetry data. The method comprises the steps of processing the aviation laser altimetry data, extracting parameters of laser foot points on a route, carrying out tide correction on the laser altimetry data, and calculating the residual elevation of the laser foot points. According to the surface reflectivity, identifying the inter-ice water channel, and extracting a laser foot point in the inter-ice water channel; calculating the local sea surface height, removing the laser foot points in the abnormal inter-ice water channel according to the large step length, extracting a plurality of points with the minimum residual elevation values of the laser foot points in the inter-ice water channel according to the small step length, and taking the average residual elevation value as the local sea surface height of the section; for the segment without the inter-ice water channel, the local sea surface height is obtained through local sea surface height interpolation of the adjacent segments; and calculating and outputting a sea ice freeboard prediction result by using the residual elevation and the local sea surface height. According to the method, Nile ice and gray ice are effectively removed by using the elevation value of the laser foot point, so that the reliability of a sea ice freeboard estimation result is improved.
Owner:WUHAN UNIV

An offshore transfer trestle with wave compensation function and its working method

The invention discloses a sea transfer trestle with wave compensation function and a working method thereof. The sea transfer trestle includes a heave mechanism, a trestle system and an active wave compensation control system. The invention can compensate the disturbance of the transfer trestle due to the swaying motion of the two ships, even if there is a difference in freeboard between the host ship and the target ship, it can still ensure that the safe angle between the trestle bridge body and the horizontal plane remains unchanged during the personnel transfer process of the transfer trestle bridge. Improve the safety and comfort of personnel transfer between two ships at sea. After the transfer trestle bridge of the present invention is lapped, the front end of the trestle bridge body is fixedly connected to the transfer point, and the personnel transfer process only needs to control the heave mechanism to ensure that the trestle bridge body and the horizontal plane maintain a safe angle. The front end of the trestle bridge body of the present invention and the transfer point are fixedly connected by electromagnetic landing cones, without additional mechanical devices for fixing, so that the trestle bridge body can be quickly separated from the transfer point in an emergency, and can be lifted urgently to improve safety sex.
Owner:DALIAN MARITIME UNIVERSITY

Wharf buoyancy tank leveling structure with balance weights and wharf buoyancy tank

PendingCN110857555AGuaranteed level statusGuaranteed planktonic stabilityBreakwatersQuaysFreeboardMechanical engineering
The invention relates to the field of floating wharfs, and provides a wharf buoyancy tank leveling structure with balance weights and a wharf buoyancy tank. A through hole is formed in a buoyancy tankbody, a leveling device is arranged in the through hole, and comprises a cover plate, a pull rod, a flange plate and the balance weights, the pull rod is longitudinally inserted in the through hole,the top of the pull rod is detachably connected with the through hole through the cover plate, the flange plate is arranged on the bottom of the pull rod, and the balance weights are pressed above theflange plate. The wharf buoyancy tank leveling structure with the balance weights is used, the number of balance weights is increased and decreased or the balance weights of the different weights areallocated, the adjusting of the height of a freeboard on the local position of the wharf buoyancy tank can be achieved, when the position of the certain leveling device needs to be adjusted, the pullrod is pulled out, the number or the kind of the balance weights is adjusted on the flange plate, after adjusting, the pull rod is inserted into the through hole, the top face of the buoyancy tank achieves the horizontal state while the flowing stability of the buoyancy tank is ensured, and after leveling, the horizontal state of the wharf buoyancy tank can be kept for a long time.
Owner:CHINA RAILWAY FIFTH SURVEY & DESIGN INST GRP

Immersed tube freeboard monitoring system and method

PendingCN114658036AHigh measurement accuracyPlay the role of reducing waves and currentsArtificial islandsFoundation testingEngineeringImmersed tube
The invention relates to an immersed tube freeboard monitoring system and method, and belongs to the technical field of immersed tube floating transportation, and the immersed tube freeboard monitoring system comprises a measurement assembly, a data transmission module and a server; the measuring assembly is installed on the side portion of the immersed tube and comprises a pile casing and a pressure sensor fixedly installed in the pile casing, and the pile casing is provided with a through hole so that seawater can enter the pile casing to make contact with the pressure sensor. The data transmission module is installed on the top of the immersed tube and electrically connected to the pressure sensor so as to transmit pressure data measured by the pressure sensor. The server is arranged in a master control room and is in communication connection with the data transmission module so as to receive pressure data measured by the pressure sensor; the server is provided with a calculation module, and the calculation module is used for calculating the freeboard of the immersed tube according to the pressure data measured by the pressure sensor. The immersed tube freeboard monitoring system can automatically monitor the immersed tube freeboard in real time in the immersed tube floating transportation process, the measurement precision is high, and the measurement risk is low.
Owner:CCCC FIRST HARBOR ENG +1

Freeboard detection method of inland waterway ships based on deep enhanced neural network

ActiveCN109375235BImprove the accuracy of draft recognitionLower lidar requirementsNeural architecturesElectromagnetic wave reradiationFreeboardAlgorithm
The invention discloses an inland river ship freeboard detection method based on a deep enhanced neural network. A laser radar and a linked tripod head are set on a high pole on the bank of a river, the tripod head drives the laser radar to adjust a detection height and an orientation angle to scan one side of the ship, ship contour images under different detection parameters are obtained, a reinforcement learning neural network is used as an approximator of a reinforcement learning value function, and ship contour information is input into the reinforcement learning neural network to determine the actions of the current laser radar and the linked tripod head to correctly identify the freeboard of a current ship. According to the method, based on the recognition capability of a convolutional neural network for image recognition, a reinforcement learning algorithm is combined to construct the deep enhanced neural network, the existing technical deficiencies of a deep learning network inthe field of ship overload recognition are overcome, the detection ability of the laser radar for ship freeboard information is improved, and therefore, a technical support is provided for the automatic identification of inland river ship draught.
Owner:WUHAN UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products