Construction method of cement stabilized macadam layer
By using a combined construction method of connecting parts and geogrid grids in cement-stabilized gravel layers, the problem of poor deformation resistance of cement-stabilized gravel layers is solved, the overall strength and stability are improved, and the road usage time is extended.
Patent Information
- Application Number
- CN202411043305.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-22
AI Technical Summary
The existing cement-stabilized gravel layer has poor deformation resistance during construction and use, which is prone to cracks and affects the performance of the road.
Using a combined construction method of connectors and geogrid nets, by inserting cylindrical connectors on the foundation ground and pouring concrete, the geogrid nets are embedded to form a multi-layer cement-stabilized gravel layer and coated on the surface. The 2-sodium acrylate homopolymer layer is cured.
It improves the overall strength of cement-stabilized gravel layers, reduces the generation of cracks, prevents relative movement between multiple layers, extends the use time of the road, and reduces the difficulty of maintenance and construction costs.
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of road construction, and in particular to a construction method of a cement-stabilized crushed stone layer. Background Art
[0002] The water-stabilized layer, also called the cement-stabilized gravel layer, is the main load-bearing layer of the entire road structure. It is an important structure to ensure the stability of the entire road structure and can effectively transfer the vertical load of the road to the roadbed.
[0003] At present, the construction of water-stable layer is to use graded crushed stone as aggregate, use a certain amount of cementitious materials and sufficient mortar volume to fill the gaps in the aggregate, and spread and compact it according to the principle of interlocking to form the road base. However, this water-stable layer has poor anti-deformation ability under the influence of load, and is prone to cracks during and after construction, which in turn causes the asphalt surface layer laid on it to crack, affecting the performance of the road.
[0004] Therefore, a new construction process is urgently needed to solve the defects in the prior art. Summary of the invention
[0005] In order to solve the defects in the prior art, the present invention provides a construction method for a cement-stabilized crushed stone layer. The present invention is convenient to construct, saves construction costs, improves construction efficiency, can effectively strengthen the overall strength of the cement-stabilized crushed stone layer, reduce the generation of cracks on the cement-stabilized crushed stone layer, and prevent the relative movement between multiple layers of cement-stabilized crushed stone layers, thereby greatly extending the service life of the road.
[0006] To achieve the above object, the present invention provides a construction method of a cement-stabilized gravel layer, comprising the following steps:
[0007] (1) Construction site preparation: level the site and clean up all debris on the foundation ground, then sprinkle water on the foundation ground to moisten it and let it stand for 2-3 hours;
[0008] (2) Setting cement-stabilized crushed stone interlayer connectors: First, a plurality of connectors are evenly inserted on the foundation ground. Each connector is cylindrical and made of concrete. A plurality of through holes penetrating the inner and outer surfaces are set on the outer circumference of the connector. A detachable inner shell is set inside the connector.
[0009] (3) Laying the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer: Laying the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer on the foundation ground from bottom to top, with a geogrid provided between the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer. After the laying is completed, the connecting parts are evenly embedded in the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer;
[0010] (4) Laying the cement-stabilized gravel top layer: Laying the cement-stabilized gravel mixture on the cement-stabilized gravel middle layer and flattening and rolling it to form the cement-stabilized gravel top layer. After the laying is completed, the connecting pieces are evenly embedded in the cement-stabilized gravel top layer, and the top of the connecting piece is flush with the surface of the cement-stabilized gravel top layer;
[0011] (5) Pull up and remove the inner shells in all the connectors, then pour concrete inside the connectors, and fill the interior of the connectors including multiple through holes;
[0012] (6) Maintenance: Sprinkle water on the top layer of cement-stabilized gravel for maintenance.
[0013] Preferably, in step (2), the connector can be inserted vertically into the base ground; or it can be inserted at a certain angle to the base ground. In this case, the inclination angles of the connectors on both sides of the center line of the cement-stabilized gravel layer can be symmetrical to each other, and the inclination angle is 65-75°.
[0014] In any of the above schemes, it is preferred that in step (2), the concrete comprises the following raw materials in parts by weight: 45-50 of cement, 15-20 of fly ash ceramsite, 20-22 of microsilica fume, 10-12 of ultrafine limestone powder, 20-25 of montmorillonite powder, 15-20 of medium-grained sand, 1-2 of polycarboxylic acid water reducer, and 8-10 of water.
[0015] In any of the above schemes, it is preferred that in step (2), the inner shell is made of PVC material, has a cylindrical structure and is arranged closely inside the connecting piece; a threaded groove is arranged on the outer surface of the inner shell, and a protruding structure is arranged at the top end of the inner surface of the inner shell; when preparing the connecting piece, the inner shell is used as an inner template for pouring concrete, and a release agent is applied on the outer surface of the inner shell.
[0016] In any of the above schemes, it is preferred that in step (3), the geogrid mesh is composed of criss-crossed ribs, and when laying, the geogrid mesh is laid flat on the top surface of the cement-stabilized gravel base layer and is put on the connecting piece; thereafter, the geogrid mesh is leveled, and non-woven fabric is fully spread on the surface of the geogrid mesh during leveling, and compacted and leveled with a leveling roller having a plurality of arc-shaped protrusions on the surface, thereby ensuring that the geogrid mesh is not damaged during compaction and leveling, and that larger pieces of gravel under the geogrid mesh can be further compacted and crushed, so that the geogrid mesh is laid more smoothly; and a middle layer of cement-stabilized gravel is laid on the geogrid mesh.
[0017] In any of the above schemes, preferably, in step (4), a lower bonding layer, a transition layer and an upper bonding layer are sequentially laid between the cement-stabilized crushed stone middle layer and the cement-stabilized crushed stone top layer from bottom to top.
[0018] In any of the above schemes, it is preferred that in step (4), the lower bonding layer and the upper bonding layer are both emulsified asphalt, and the transition layer is composed of a mixture of crushed stone, machine-made sand and methylphenyl silicone resin powder.
[0019] In any of the above schemes, it is preferred that in step (4), the mass ratio of crushed stone, machine-made sand and methylphenyl silicone resin powder in the mixture is 5-8:2-3:1-2, the particle size of the machine-made sand is 3.5-4.5 mm, and the particle size of the methylphenyl silicone resin powder is 2-4 μm.
[0020] In any of the above solutions, preferably, in step (5), the poured concrete is made of the same material as the concrete used for the connector in step (2).
[0021] In any of the above schemes, it is preferred that in step (6), water is sprinkled on the laid cement-stabilized gravel top layer, the water-sprinkled cement-stabilized gravel top layer is completely covered with a plastic film and pressed, and a 2-sodium acrylate homopolymer layer is coated on the side of the plastic film facing the cement-stabilized gravel top layer.
[0022] Beneficial effects of the present invention:
[0023] 1. The present invention is convenient to construct, saves construction costs, improves construction efficiency, can effectively enhance the overall strength of the cement-stabilized gravel layer, reduce the generation of cracks on the cement-stabilized gravel layer, and prevent the relative movement between multiple layers of cement-stabilized gravel layers, thereby greatly extending the service life of the road.
[0024] 2. The connector of the present invention is made of corresponding concrete raw materials, has high mechanical properties, and significantly increases its own strength. It can enhance the overall stability of the three-layer cement-stabilized gravel layer, effectively avoid the collapse of the cement-stabilized gravel layer, and reduce the difficulty of road maintenance; it can also reduce the extension of cracks in the circumferential direction; and when laying the geogrid mesh, the connector can play the role of fixing the geogrid mesh, making it more convenient to lay, and laying the geogrid mesh can make the adjacent cement-stabilized gravel layers better combined and the integrity enhanced. The inner shell can play the role of an inner template when making the connector, and the threaded groove on its outer surface makes it more firmly combined with the concrete during production; when the inner shell is to be pulled up and removed, the convex structure of the inner shell is manually grasped and the inner shell is rotated in the opposite direction of the thread direction of the threaded groove, so that it can be separated from the concrete connector and pulled up and removed, which facilitates the use of the connector. Afterwards, concrete is poured in the connector to make it completely combined with the laid layers of cement-stabilized gravel as a whole, further strengthening the overall strength of the cement-stabilized gravel layer.
[0025] 3. The bonding layer and transition layer in the present invention can play a buffering role on the cement-stabilized gravel top layer, and improve the stability of the cement-stabilized gravel bottom layer, cement-stabilized gravel middle layer, and cement-stabilized gravel top layer. The plastic film is coated with a 2-sodium acrylate homopolymer layer on the side facing the cement-stabilized gravel top layer, and is covered on the cement-stabilized gravel top layer that needs to be maintained, which can block the emission of water into the air, and use the 2-sodium acrylate homopolymer layer to absorb the evaporated water, so as to continuously transfer water to the cement-stabilized gravel top layer for a long time, and the water supply is uniform and continuous, so that the cement hydration is carried out under better conditions, so there is no need to sprinkle water multiple times or a large amount of water, which reduces labor and has better operability. DETAILED DESCRIPTION
[0026] The technical solution of the present application will be described in detail below in conjunction with the specific implementation methods of the present application, but the following examples are only for understanding the present invention. The embodiments in the present application and the features in the embodiments can be combined with each other, and the present application can be implemented in a variety of different ways as defined and covered by the claims.
[0027] Example 1
[0028] A construction method for a cement-stabilized gravel layer comprises the following steps:
[0029] (1) Construction site preparation: level the site and clean up all debris on the foundation ground, then sprinkle water on the foundation ground to moisten it and let it stand for 2 hours;
[0030] (2) Setting cement-stabilized crushed stone interlayer connectors: First, a plurality of connectors are evenly inserted on the foundation ground. Each connector is cylindrical and made of concrete. A plurality of through holes penetrating the inner and outer surfaces are set on the outer circumference of the connector. A detachable inner shell is set inside the connector.
[0031] (3) Laying the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer: Laying the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer on the foundation ground from bottom to top, with a geogrid provided between the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer. After the laying is completed, the connecting parts are evenly embedded in the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer;
[0032] (4) Laying the cement-stabilized gravel top layer: Laying the cement-stabilized gravel mixture on the cement-stabilized gravel middle layer and flattening and rolling it to form the cement-stabilized gravel top layer. After the laying is completed, the connecting pieces are evenly embedded in the cement-stabilized gravel top layer, and the top of the connecting piece is flush with the surface of the cement-stabilized gravel top layer;
[0033] (5) Pull up and remove the inner shells in all the connectors, then pour concrete inside the connectors, and fill the interior of the connectors including multiple through holes;
[0034] (6) Maintenance: Sprinkle water on the top layer of cement-stabilized gravel for maintenance.
[0035] In step (2), the connecting piece can be inserted at a certain angle to the base ground. At this time, the inclination angles of the connecting pieces on both sides of the center line of the cement-stabilized gravel layer can be symmetrical to each other, and the inclination angle is 75°.
[0036] In the step (2), the concrete comprises the following raw materials in parts by weight: 45 parts of cement, 20 parts of fly ash ceramsite, 20 parts of microsilica fume, 12 parts of ultrafine limestone powder, 20 parts of montmorillonite powder, 20 parts of medium-grained sand, 1 part of polycarboxylate water reducer, and 10 parts of water.
[0037] In step (2), the inner shell is made of PVC material, has a cylindrical structure and is arranged closely inside the connecting piece; a threaded groove is arranged on the outer surface of the inner shell, and a protruding structure is arranged at the top of the inner surface of the inner shell; when preparing the connecting piece, the inner shell is used as an inner template for pouring concrete, and a release agent is applied on the outer surface of the inner shell.
[0038] In step (3), the geogrid mesh is composed of crisscrossed ribs. When laying, the geogrid mesh is laid flat on the top surface of the cement-stabilized gravel base layer and is put on the connecting piece; the geogrid mesh is then leveled, and non-woven fabric is fully spread on the surface of the geogrid mesh during leveling, and compacted and leveled with a leveling roller having a plurality of arc-shaped protrusions on the surface. This ensures that the geogrid mesh will not be damaged during compaction and leveling, and can further compact and crush larger pieces of gravel under the geogrid mesh, so that the geogrid mesh is laid more smoothly; a cement-stabilized gravel middle layer is laid on the geogrid mesh.
[0039] In the step (4), a lower bonding layer, a transition layer and an upper bonding layer are laid in sequence from bottom to top between the cement-stabilized crushed stone middle layer and the cement-stabilized crushed stone top layer.
[0040] In step (4), the lower bonding layer and the upper bonding layer are both emulsified asphalt, and the transition layer is composed of a mixture of crushed stone, machine-made sand and methylphenyl silicone resin powder.
[0041] In the step (4), the mass ratio of crushed stone, machine-made sand and methylphenyl silicone resin powder in the mixture is 5:3:1, the particle size of the machine-made sand is 4.5 mm, and the particle size of the methylphenyl silicone resin powder is 2 μm.
[0042] In step (5), the poured concrete is made of the same material as the concrete used for the connecting piece in step (2).
[0043] In step (6), water is sprinkled on the laid cement-stabilized gravel top layer, and the water-sprinkled cement-stabilized gravel top layer is completely covered with a plastic film and pressed tightly, and a 2-sodium acrylate homopolymer layer is coated on the side of the plastic film facing the cement-stabilized gravel top layer.
[0044] Example 2
[0045] A construction method for a cement-stabilized gravel layer comprises the following steps:
[0046] (1) Construction site preparation: level the site and clean up all debris on the foundation ground, then sprinkle water on the foundation ground to moisten it and let it stand for 3 hours;
[0047] (2) Setting cement-stabilized crushed stone interlayer connectors: First, a plurality of connectors are evenly inserted on the foundation ground. Each connector is cylindrical and made of concrete. A plurality of through holes penetrating the inner and outer surfaces are set on the outer circumference of the connector. A detachable inner shell is set inside the connector.
[0048] (3) Laying the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer: Laying the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer on the foundation ground from bottom to top, with a geogrid provided between the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer. After the laying is completed, the connecting parts are evenly embedded in the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer;
[0049] (4) Laying the cement-stabilized gravel top layer: Laying the cement-stabilized gravel mixture on the cement-stabilized gravel middle layer and flattening and rolling it to form the cement-stabilized gravel top layer. After the laying is completed, the connecting pieces are evenly embedded in the cement-stabilized gravel top layer, and the top of the connecting piece is flush with the surface of the cement-stabilized gravel top layer;
[0050] (5) Pull up and remove the inner shells in all the connectors, then pour concrete inside the connectors, and fill the interior of the connectors including multiple through holes;
[0051] (6) Maintenance: Sprinkle water on the top layer of cement-stabilized gravel for maintenance.
[0052] In the step (2), the connecting member can be vertically inserted into the base ground.
[0053] In the step (2), the concrete comprises the following raw materials in parts by weight: 50 parts of cement, 15 parts of fly ash ceramsite, 22 parts of microsilica fume, 10 parts of ultrafine limestone powder, 25 parts of montmorillonite powder, 15 parts of medium-grained sand, 2 parts of polycarboxylate water reducer, and 8 parts of water.
[0054] In step (2), the inner shell is made of PVC material, has a cylindrical structure and is arranged closely inside the connecting piece; a threaded groove is arranged on the outer surface of the inner shell, and a protruding structure is arranged at the top of the inner surface of the inner shell; when preparing the connecting piece, the inner shell is used as an inner template for pouring concrete, and a release agent is applied on the outer surface of the inner shell.
[0055] In step (3), the geogrid mesh is composed of crisscrossed ribs. When laying, the geogrid mesh is laid flat on the top surface of the cement-stabilized gravel base layer and is put on the connecting piece; the geogrid mesh is then leveled, and non-woven fabric is fully spread on the surface of the geogrid mesh during leveling, and compacted and leveled with a leveling roller having a plurality of arc-shaped protrusions on the surface. This ensures that the geogrid mesh will not be damaged during compaction and leveling, and can further compact and crush larger pieces of gravel under the geogrid mesh, so that the geogrid mesh is laid more smoothly; a cement-stabilized gravel middle layer is laid on the geogrid mesh.
[0056] In the step (4), a lower bonding layer, a transition layer and an upper bonding layer are laid in sequence from bottom to top between the cement-stabilized crushed stone middle layer and the cement-stabilized crushed stone top layer.
[0057] In step (4), the lower bonding layer and the upper bonding layer are both emulsified asphalt, and the transition layer is composed of a mixture of crushed stone, machine-made sand and methylphenyl silicone resin powder.
[0058] In the step (4), the mass ratio of crushed stone, machine-made sand and methylphenyl silicone resin powder in the mixture is 4:1:1, the particle size of the machine-made sand is 3.5 mm, and the particle size of the methylphenyl silicone resin powder is 4 μm.
[0059] In step (5), the poured concrete is made of the same material as the concrete used for the connecting piece in step (2).
[0060] In step (6), water is sprinkled on the laid cement-stabilized gravel top layer, and the water-sprinkled cement-stabilized gravel top layer is completely covered with a plastic film and pressed tightly, and a 2-sodium acrylate homopolymer layer is coated on the side of the plastic film facing the cement-stabilized gravel top layer.
[0061] In addition, in order to further improve the technical effect of the present invention, in this embodiment, the connecting piece can be set by piling, including the following construction steps:
[0062] 1) Carry out point measurements according to design requirements and deploy pile drivers at designated locations;
[0063] 2) Prefabricate the connecting piece and set the pile tip at the bottom end of the connecting piece;
[0064] 3) Lift the prefabricated connection guard, hold it firmly with the outer immersed tube, and seal it longitudinally; the bottom of the outer immersed tube is connected to the pile tip of the connection piece;
[0065] 4) Use a pile driver to drive the outer immersed pipe and the connecting parts into the foundation simultaneously along the preset direction, and the pile tip enters the hard soil layer;
[0066] 5) Pull up the outer immersed tube by vibration, leaving the connecting parts in the foundation.
[0067] This construction method improves the durability and firmness of the connectors, saves project costs, greatly improves the strength of the connectors and their ability to resist lateral deformation, and fully utilizes the mechanical properties of the connector structure when laying the cement-stabilized gravel layer in the later stage.
[0068] Example 3
[0069] A construction method for a cement-stabilized gravel layer comprises the following steps:
[0070] (1) Construction site preparation: level the site and clean up all debris on the foundation ground, then sprinkle water on the foundation ground to moisten it and let it stand for 2.5 hours;
[0071] (2) Setting cement-stabilized crushed stone interlayer connectors: First, a plurality of connectors are evenly inserted on the foundation ground. Each connector is cylindrical and made of concrete. A plurality of through holes penetrating the inner and outer surfaces are set on the outer circumference of the connector. A detachable inner shell is set inside the connector.
[0072] (3) Laying the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer: Laying the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer on the foundation ground from bottom to top, with a geogrid provided between the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer. After the laying is completed, the connecting parts are evenly embedded in the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer;
[0073] (4) Laying the cement-stabilized gravel top layer: Laying the cement-stabilized gravel mixture on the cement-stabilized gravel middle layer and flattening and rolling it to form the cement-stabilized gravel top layer. After the laying is completed, the connecting pieces are evenly embedded in the cement-stabilized gravel top layer, and the top of the connecting piece is flush with the surface of the cement-stabilized gravel top layer;
[0074] (5) Pull up and remove the inner shells in all the connectors, then pour concrete inside the connectors, and fill the interior of the connectors including multiple through holes;
[0075] (6) Maintenance: Sprinkle water on the top layer of cement-stabilized gravel for maintenance.
[0076] In step (2), the connector can be inserted at a certain angle to the base ground. At this time, the inclination angles of the connectors on both sides of the center line of the cement-stabilized gravel layer can be symmetrical to each other, and the inclination angle is 65°.
[0077] In the step (2), the concrete comprises the following raw materials in parts by weight: 48 parts of cement, 18 parts of fly ash ceramsite, 21 parts of microsilica fume, 11 parts of ultrafine limestone powder, 23 parts of montmorillonite powder, 18 parts of medium-grained sand, 1.5 parts of polycarboxylate water reducer, and 9 parts of water.
[0078] In step (2), the inner shell is made of PVC material, has a cylindrical structure and is arranged closely inside the connecting piece; a threaded groove is arranged on the outer surface of the inner shell, and a protruding structure is arranged at the top of the inner surface of the inner shell; when preparing the connecting piece, the inner shell is used as an inner template for pouring concrete, and a release agent is applied on the outer surface of the inner shell.
[0079] In step (3), the geogrid mesh is composed of crisscrossed ribs. When laying, the geogrid mesh is laid flat on the top surface of the cement-stabilized gravel base layer and is put on the connecting piece; the geogrid mesh is then leveled, and non-woven fabric is fully spread on the surface of the geogrid mesh during leveling, and compacted and leveled with a leveling roller having a plurality of arc-shaped protrusions on the surface. This ensures that the geogrid mesh will not be damaged during compaction and leveling, and can further compact and crush larger pieces of gravel under the geogrid mesh, so that the geogrid mesh is laid more smoothly; a cement-stabilized gravel middle layer is laid on the geogrid mesh.
[0080] In the step (4), a lower bonding layer, a transition layer and an upper bonding layer are laid in sequence from bottom to top between the cement-stabilized crushed stone middle layer and the cement-stabilized crushed stone top layer.
[0081] In step (4), the lower bonding layer and the upper bonding layer are both emulsified asphalt, and the transition layer is composed of a mixture of crushed stone, machine-made sand and methylphenyl silicone resin powder.
[0082] In the step (4), the mass ratio of crushed stone, machine-made sand and methylphenyl silicone resin powder in the mixture is 7:3:1, the particle size of the machine-made sand is 4 mm, and the particle size of the methylphenyl silicone resin powder is 3 μm.
[0083] In step (5), the poured concrete is made of the same material as the concrete used for the connecting piece in step (2).
[0084] In step (6), water is sprinkled on the laid cement-stabilized gravel top layer, and the water-sprinkled cement-stabilized gravel top layer is completely covered with a plastic film and pressed tightly, and a 2-sodium acrylate homopolymer layer is coated on the side of the plastic film facing the cement-stabilized gravel top layer.
[0085] In addition, in order to further improve the technical effect of the present invention, in this embodiment, the preparation of the connecting piece includes the following steps:
[0086] 1) dry-mixing the above-mentioned cement, fly ash ceramsite, microsilica fume, ultrafine limestone powder and medium-grained sand in the above-mentioned parts by weight for 10 minutes, adding half the weight of water and half the weight of montmorillonite powder, and wet-mixing for 15 minutes to form a mixed slurry;
[0087] 2) After the remaining water and montmorillonite powder are evenly mixed, the polycarboxylate water reducer is slowly added and stirred to obtain a mixed solution;
[0088] 3) adding the mixed solution in step 2) into the mixed slurry in step 1) and continuing stirring for 20 minutes;
[0089] 4) Pour the prepared concrete mixture into a template consisting of an inner shell and an outer mold, remove the mold after 1 day, and perform standard curing to obtain the connecting piece.
[0090] The outer mold is composed of two semicircular molds, and the inner surfaces of the two semicircular molds are radially provided with a plurality of upper and lower layered connecting rods, and the inner ends of the connecting rods can abut against the outer surface of the inner shell. The connecting rods are coated with a release agent and are removed together with the outer mold after pouring concrete, thereby forming a through hole on the concrete connector.
[0091] As a result, the preparation of the connecting parts is convenient, the connecting parts have high mechanical properties, and meet the requirements of light weight and high strength, which can greatly save energy consumption and preparation time and improve production efficiency.
[0092] It can be seen from the above embodiments that the present invention is convenient to construct, saves construction costs, improves construction efficiency, can effectively enhance the overall strength of the cement-stabilized gravel layer, reduce the occurrence of cracks on the cement-stabilized gravel layer, and prevent relative movement between multiple layers of cement-stabilized gravel layers, thereby greatly extending the service life of the road.
[0093] The connector of the present invention is made of corresponding concrete raw materials, has high mechanical properties, and significantly increases its own strength. It can enhance the overall stability of the three-layer cement-stabilized gravel layer, effectively avoid the collapse of the cement-stabilized gravel layer, and reduce the difficulty of road maintenance; and can reduce the extension of cracks in the circumferential direction; and when laying the geogrid mesh, the connector can play the role of fixing the geogrid mesh, making it more convenient to lay, and laying the geogrid mesh can make the adjacent cement-stabilized gravel layers better combined and the integrity is enhanced. The inner shell can play the role of an inner template when making the connector, and the threaded groove on its outer surface makes it more firmly combined with the concrete during production; when the inner shell is to be pulled up and removed, the convex structure of the inner shell is manually grasped and the inner shell is rotated in the opposite direction of the thread direction of the threaded groove, so that it can be separated from the concrete connector and pulled up and removed, which is convenient for the use of the connector. Afterwards, concrete is poured in the connector to make it completely combined with the laid layers of cement-stabilized gravel as a whole, further strengthening the overall strength of the cement-stabilized gravel layer.
[0094] The bonding layer and transition layer in the present invention can play a buffering role on the cement-stabilized crushed stone top layer, and improve the stability of the cement-stabilized crushed stone bottom layer, the cement-stabilized crushed stone middle layer, and the cement-stabilized crushed stone top layer. The plastic film is coated with a 2-sodium acrylate homopolymer layer on the side facing the cement-stabilized crushed stone top layer, and is covered on the cement-stabilized crushed stone top layer that needs to be maintained, which can block the emission of water into the air, and utilize the 2-sodium acrylate homopolymer layer to absorb evaporated water, so as to continuously transfer water to the cement-stabilized crushed stone top layer for a long time, and the water supply is uniform and continuous, so that the cement hydration is carried out under better conditions, so there is no need to sprinkle water multiple times or a large amount of water, which reduces labor and has better operability.
[0095] The above is only a preferred embodiment of the present invention, and does not limit the present invention in other forms. Any technician familiar with the profession may use the above disclosed technical content to change or modify it into an equivalent embodiment with equivalent changes. However, any simple modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention without departing from the technical solution of the present invention still belongs to the protection scope of the technical solution of the present invention.
Claims
1. A method for constructing a cement-stabilized gravel layer, characterized in that: The following steps are involved: (1) Construction site preparation: level the site and clean up all debris on the foundation ground, then sprinkle water on the foundation ground to moisten it and let it stand for 2-3 hours; (2) Setting cement-stabilized crushed stone interlayer connectors: First, a plurality of connectors are evenly inserted on the foundation ground. Each connector is cylindrical and made of concrete. A plurality of through holes penetrating the inner and outer surfaces are set on the outer circumference of the connector. A detachable inner shell is set inside the connector. (3) Laying the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer: Laying the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer on the foundation ground from bottom to top, with a geogrid provided between the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer. After the laying is completed, the connecting parts are evenly embedded in the cement-stabilized gravel bottom layer and the cement-stabilized gravel middle layer; (4) Laying the cement-stabilized gravel top layer: Laying the cement-stabilized gravel mixture on the cement-stabilized gravel middle layer and flattening and rolling it to form the cement-stabilized gravel top layer. After the laying is completed, the connecting pieces are evenly embedded in the cement-stabilized gravel top layer, and the top of the connecting piece is flush with the surface of the cement-stabilized gravel top layer; (5) Pull up and remove the inner shells in all the connectors, then pour concrete inside the connectors, and fill the interior of the connectors including multiple through holes; (6) Maintenance: Sprinkle water on the top layer of cement-stabilized gravel for maintenance.
2. The construction method of cement stabilized gravel layer according to claim 1, characterized in that: In step (2), the connector can be inserted vertically into the base ground; or it can be inserted at a certain angle to the base ground. In this case, the inclination angles of the connectors on both sides of the center line of the cement-stabilized gravel layer can be symmetrical to each other, and the inclination angle is 65-75°.
3. The construction method of cement stabilized gravel layer according to claim 1 or 2, characterized in that: In the step (2), the concrete comprises the following raw materials in parts by weight: 45-50 parts of cement, 15-20 parts of fly ash ceramsite, 20-22 parts of microsilica fume, 10-12 parts of ultrafine limestone powder, 20-25 parts of montmorillonite powder, 15-20 parts of medium-grained sand, 1-2 parts of polycarboxylic acid water reducer, and 8-10 parts of water.
4. The construction method of cement stabilized gravel layer according to claim 3, characterized in that: In step (2), the inner shell is made of PVC material, has a cylindrical structure and is arranged closely inside the connecting piece; a threaded groove is arranged on the outer surface of the inner shell, and a protruding structure is arranged at the top of the inner surface of the inner shell; when preparing the connecting piece, the inner shell is used as an inner template for pouring concrete, and a release agent is applied on the outer surface of the inner shell.
5. The construction method of cement stabilized gravel layer according to claim 4, characterized in that: In the step (3), the geogrid mesh is composed of crisscrossed ribs. When laying, the geogrid mesh is laid flat on the top surface of the cement-stabilized crushed stone base layer and is put on the connecting piece; The geogrid mesh is then leveled by spreading non-woven fabric all over the surface of the geogrid mesh, and compacting and leveling it with a leveling roller having a plurality of arc-shaped protrusions on the surface; a cement-stabilized gravel middle layer is laid on the geogrid mesh.
6. The method for constructing a cement-stabilized crushed stone layer according to claim 4 or 5, characterized in that: In the step (4), a lower bonding layer, a transition layer and an upper bonding layer are laid in sequence from bottom to top between the cement-stabilized crushed stone middle layer and the cement-stabilized crushed stone top layer.
7. The construction method of cement stabilized gravel layer according to claim 6, characterized in that: In step (4), the lower bonding layer and the upper bonding layer are both emulsified asphalt, and the transition layer is composed of a mixture of crushed stone, machine-made sand and methylphenyl silicone resin powder.
8. The method for constructing a cement-stabilized crushed stone layer according to claim 7, characterized in that: In the step (4), the mass ratio of crushed stone, machine-made sand and methylphenyl silicone resin powder in the mixture is 5-8:2-3:1-2, the particle size of the machine-made sand is 3.5-4.5 mm, and the particle size of the methylphenyl silicone resin powder is 2-4 μm.
9. The method for constructing a cement-stabilized crushed stone layer according to claim 7 or 8, characterized in that: In step (5), the poured concrete is made of the same material as the concrete used for the connecting piece in step (2).
10. The method for constructing a cement-stabilized crushed stone layer according to claim 3, characterized in that: In step (6), water is sprinkled on the laid cement-stabilized gravel top layer, and the water-sprinkled cement-stabilized gravel top layer is completely covered with a plastic film and pressed tightly, and a 2-sodium acrylate homopolymer layer is coated on the side of the plastic film facing the cement-stabilized gravel top layer.