Concrete construction equipment and method for steep slope protective surface
Through integrated steep slope protective concrete construction equipment, the automatic moving formwork system and adhesion vibrator, combined with the grinder, the problems of low efficiency, high safety risks and poor concrete surface flatness in the existing construction process are solved. Efficient and safe steep slope concrete construction has been achieved.
Patent Information
- Application Number
- CN202411221626.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The construction technology of slope concrete slab protective structures for existing road and water transport projects has problems such as the equipment of construction personnel, high safety risks, and poor flatness of concrete surfaces. In particular, the crane cooperates with the "model turn" construction lacks a smear operation platform and the hoist traction slip film. Construction requires multiple equipment, resulting in low work efficiency.
The integrated steep slope protective concrete construction equipment is adopted, including tracks, formwork systems and hydraulic drive mechanisms. The formwork system is self-lifted and equipped with a collection hopper and an adhesion vibrator. The automatic movement of the formwork system is achieved through the hydraulic system and the crawler assembly. Adjust the position and combine it with a grinder to level the concrete surface.
It improves construction efficiency and project quality, reduces construction costs and safety risks, has better vibration effect, is flattering the concrete surface, reduces worker working strength and quantity, and reduces the risk of falling from high altitudes.
Smart Images

Figure CN118997157A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of concrete construction, and more specifically to a steep slope protection concrete construction device and method. Background Art
[0002] Most of the existing highway and water transport engineering slopes are designed with large-area concrete slab protection structures. The traditional construction process of concrete slab protection structures is crane-assisted "turnover" construction, or winch-assisted sliding membrane construction. Both of these traditional processes have the problem of too many construction personnel, and the crane-assisted "turnover" construction process lacks a plastering operation platform, and the formwork hoisting process has high safety risks and low work efficiency. The winch-assisted sliding membrane construction process requires two winches to be fixed on the top of the slope. The position of the formwork is not easy to control and reinforce during the lifting process, resulting in poor flatness of the concrete slope. Therefore, this application studies a steep slope protective concrete construction equipment and method to solve the technical problems existing in the existing construction process. Summary of the invention
[0003] One purpose of the present invention is to provide a steep slope protection concrete construction equipment and method, which solves the problems of low efficiency, high safety risk and poor concrete surface flatness of the above-mentioned traditional methods. The integrated steep slope protection concrete construction equipment and method can realize the self-lifting of the formwork system, and the position is accurate, the concrete protection surface has good flatness, and the structure is safe and reliable, which greatly improves the production efficiency and project quality.
[0004] In order to solve the above technical problems, the present invention provides a steep slope surface protection concrete construction equipment, including a pair of tracks, a template system slidably set on the tracks, and a driving mechanism, the tracks are set along the inclination direction of the steep slope surface and fixed on the slope surface, the template system is equipped with a template, a collection hopper for pouring concrete and a vibrator seat for installing an attached vibrator, and the driving mechanism is connected to the template system and is used to intermittently drive the template system to move a template distance along the pair of tracks each time.
[0005] Preferably, a pair of tracks are arranged on a steep slope or a poured concrete slope, and the height of the tracks when arranged on the steep slope is greater than that when arranged on the concrete slope, so that the surfaces of the pair of tracks are flush to adapt to the installation and pouring height of the formwork system.
[0006] Preferably, the driving mechanism includes a hydraulic system and a climbing head assembly, the climbing head assembly includes an upper climbing head assembly and a lower climbing head assembly, which are respectively arranged on the track at intervals and selectively fixed or separately connected to the track, the hydraulic system is used to selectively drive one of the climbing head assemblies to move along the track, while the other climbing head assembly is fixed to the track, and the template system is fixedly connected to one of the climbing head assemblies or selectively connected to one of the climbing head assemblies.
[0007] Preferably, several slots are arranged at intervals on the track, and the climbing head assembly includes a shell and a pin shaft, a spring and a climbing head arranged in the shell, the lower part of the shell is arranged to have an opening shape matching the cross-section of the track and just slidingly fits on the outer periphery of the track, the middle part of the shell has a channel that passes through to the top surface of the track, and the climbing head, a pin shaft and a spring are arranged in sequence from bottom to top, the climbing head is fixedly arranged on the pin shaft, the pin shaft is located directly above the track and rotatably arranged in the shell, the central axis of the pin shaft is parallel to the plane of the track, the pin shaft is selectively fixed or rotatably arranged in the shell by a clamping plate, the pin shaft is arranged on the spring, and the top of the spring is fixed and limited by a limit pin parallel to the pin shaft and located directly above the pin shaft, gaskets are arranged between the opposite sides of the climbing head and the inner wall of the shell, and when the spring and the pin shaft are in a free state, the climbing head just fits in the slot of the track.
[0008] Preferably, the lower plane of the formwork system support extends and is fixedly connected to a fixed frame, on which an adjustment bracket for installing a grinder is provided. The grinder is used to smooth the surface of the concrete after pouring. The grinder is movably arranged on the fixed frame to achieve all-round smoothing of the concrete.
[0009] Preferably, a plurality of horizontal beams are fixedly provided at the bottom of the fixed frame, and protective plates are laid on the beams to form a working platform. Protective railings are provided on the outer sides of the beams to form a safe passage for manual operation together with the protective plates.
[0010] The present invention also provides a steep slope protection concrete construction method, comprising the following steps:
[0011] Step 1: Select different track models according to the type of slope surface where the track is to be installed, and install the track at the first mold position to be poured on the slope surface;
[0012] Step 2: Hoist the entire formwork system onto the track and set up a safety passage;
[0013] Step 3: pour concrete on the formwork system by installing an aggregate hopper, and automatically vibrate the concrete using an attached vibrator installed;
[0014] Step 4: After pouring and vibrating the first form concrete, the entire form system is lifted to the position of the second form through the driving mechanism and adjusted into place;
[0015] Step 5: Install a grinder on the fixed frame, and manually operate the grinder on the safety passage to smooth the surface of the first mold concrete;
[0016] Step 6: Repeat the above steps to carry out the next construction cycle until the construction of the entire steep slope facing concrete is completed.
[0017] Preferably, in step 4, the specific method of lifting the formwork system is:
[0018] First, in the initial state, the hydraulic system is connected to the upper climbing head assembly and the template system, the upper climbing head assembly is fixed in the groove of the track, and the lower climbing head assembly removes the card plate to form a movable connection with the track groove;
[0019] Secondly, the hydraulic system is started to generate an upward pulling force. Under the action of the pulling force, the climbing head of the lower climbing head assembly rotates together with the pin shaft and drives the spring to compress upward. The climbing head and the entire template system leave the current track slot and move. When the climbing head of the lower climbing head assembly moves up to the next track slot, the climbing head of the lower climbing head assembly automatically snaps into the next track slot under the action of the elastic force formed by the compression of the spring, and automatically completes the displacement from the current track slot to the next track slot.
[0020] Again, according to the travel displacement range of the hydraulic system, selectively repeat the above steps to continue moving the lower climbing head assembly and the entire template system;
[0021] Then, the lower climbing head assembly is fixed in the groove of the track, the upper climbing head assembly removes the card plate to form a movable connection with the track groove, and the hydraulic system is started to generate an upward thrust, driving the upper climbing head assembly to move to the next track groove, and the moving distance is the same as the moving distance of the lower climbing head assembly;
[0022] Finally, repeat the above steps until moving to the next mold position.
[0023] Preferably, in the step four, the specific method for lifting the formwork system is as follows: in the initial state, the hydraulic system is respectively connected between the upper climbing head assembly and the lower climbing head assembly, when the upper climbing head assembly is fixed in the slot of the track, the formwork system is connected to the lower climbing head assembly, and the hydraulic system is started to generate an upward pulling force, thereby driving the formwork system and the lower climbing head assembly to move; when the lower climbing head assembly is fixed in the slot of the track, the formwork system is connected to the upper climbing head assembly, and the hydraulic system is started to generate an upward thrust, thereby driving the formwork system and the upper climbing head assembly to move.
[0024] Preferably, the surface finishing and leveling construction of the upper mold concrete and the pouring construction of the lower mold concrete can be carried out simultaneously, and the concrete pouring and vibration can be carried out automatically.
[0025] The present invention has at least the following beneficial effects:
[0026] 1. Reduced construction costs: 5 people can complete the work of 8-10 people in traditional processes. This is mainly because during the lifting process of the formwork system, the formwork system is automatically moved and fixed through the hydraulic system. The number of workers in the concrete vibration process is reduced, and the work intensity of workers is reduced.
[0027] 2. The construction quality is stable and reliable: the vibration process is assisted by an attached vibrator, which has a better vibration effect; the working platform is convenient for finishing, and the finishing effect is better; the template system is installed and positioned more accurately, and the slope protection concrete surface is smoother.
[0028] 3. Reduced safety risks: All operations are performed on the formwork system and guardrails are provided, which greatly reduces the risk of falling from heights.
[0029] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a side structural schematic diagram of the construction equipment of the present invention;
[0031] Figure 2 A top view of the construction equipment of the present invention;
[0032] Figure 3 It is a cross-sectional view of the climbing head assembly of the present invention. DETAILED DESCRIPTION
[0033] In order to better understand the purpose, structure and function of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement it according to the description.
[0034] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials are commercially available unless otherwise specified; in the description of the present invention, the terms "lateral", "longitudinal", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0035] like Figure 1 and Figure 2 As shown, the present invention provides a steep slope surface protection concrete construction equipment, including a pair of tracks 2, a template system 4 slidably arranged on the tracks, and a driving mechanism, the tracks are arranged along the inclination direction of the steep slope surface and fixed on the slope surface, the template system is equipped with a template, a collection hopper 3 for pouring concrete and a vibrator seat 6 for installing an attached vibrator, and the driving mechanism is connected to the template system and is used to intermittently drive the template system to move a template distance each time along the pair of tracks.
[0036] The track is extended along the slope inclination direction and installed on the entire slope. Then the formwork system is installed on the track. The formwork system adopts the existing formwork system structure, is provided with a formwork 1, and is provided with a collection hopper for concrete pouring to realize automatic concrete pouring. After pouring, an attached vibrator is installed through the vibrator seat to realize automatic vibration. The area of each concrete pouring is one mold spacing, and one mold is poured each time. Then the formwork system is moved to the next mold for the same construction until the concrete pouring of one of the slopes is completed in sequence. Then move the track to the next slope and repeat the concrete pouring until the construction of the entire steep slope arc is completed.
[0037] In another technical solution, a pair of rails are arranged on a steep slope or a poured concrete slope. The height of the rails when arranged on the steep slope is greater than that when arranged on the concrete slope, so that the surface of the pair of rails is flush with the installation and pouring height of the formwork system. The rails have two types, large and small. The large one is installed on the slope and the small one is installed on the poured concrete. The rails are fixed to the slope or the poured concrete slope by expansion bolts or steel bars to achieve detachability.
[0038] In another technical solution, the driving mechanism includes a hydraulic system 7 and a climbing head assembly 9, and the climbing head assembly includes an upper climbing head assembly and a lower climbing head assembly, which are respectively arranged on the track at intervals and selectively fixed or separately connected to the track. The hydraulic system is used to selectively drive one of the climbing head assemblies to move along the track, while the other climbing head assembly is fixed to the track, and the template system is fixedly connected to one of the climbing head assemblies or selectively connected to one of the climbing head assemblies.
[0039] The hydraulic system can be a hydraulic cylinder. In one specific embodiment, the hydraulic cylinder is connected to the upper climbing head assembly and the template system respectively, and the template system is connected to the lower climbing head assembly. When the upper climbing head assembly is fixed, the hydraulic cylinder drives the template system and the lower climbing head assembly to move; when the lower climbing head assembly is fixed, the hydraulic cylinder drives the upper climbing head assembly to move; and the movement of the template system is repeatedly achieved. In another specific embodiment, the hydraulic cylinder is connected to the upper climbing head assembly and the lower climbing head assembly respectively, and the template system is selectively connected to the upper climbing head assembly and the lower climbing head assembly. When the upper climbing head assembly is fixed, the template system is connected to the lower climbing head assembly, and the hydraulic cylinder drives the template system and the lower climbing head assembly to move; when the lower climbing head assembly is fixed, the template system is connected to the upper climbing head assembly, and the hydraulic cylinder drives the upper climbing head assembly and the template system to move; and the movement of the template system is repeatedly achieved.
[0040] In another technical solution, Figure 3As shown, several slots are arranged at intervals on the track, and the climbing head assembly includes a shell 5 and a pin shaft 8, a spring 19 and a climbing head 20 arranged in the shell. The lower part of the shell is arranged to have an opening shape matching the cross-section of the track and just slides on the outer periphery of the track. The middle part of the shell has a channel that passes through to the top surface of the track, and a climbing head, a pin shaft and a spring are arranged therein from bottom to top. The climbing head is fixed on the pin shaft, and the pin shaft is located directly above the track and rotatably arranged in the shell. The central axis of the pin shaft is parallel to the plane of the track. The pin shaft is selectively fixed or rotatably arranged in the shell by a clamping plate 12. A spring is arranged on the pin shaft, and its top is fixed and limited by a limit pin 17 parallel to the pin shaft and located directly above the pin shaft. Gaskets 21 are arranged between the opposite sides of the climbing head and the inner wall of the shell. When the spring and the pin shaft are in a free state, the climbing head just fits in the slot of the track.
[0041] After the card is inserted into the pin shaft, it is used to fix the pin shaft and limit its rotation; the limit pin is used to limit the displacement of the upper end of the spring; the R-type spring card pin 18 is set on the limit pin to prevent the limit pin from falling off; the gasket is used to control the horizontal displacement of the crawling head to ensure that its movement does not deviate from the plane where the card slot is located. When the card is pulled out and the external force drives the crawling head assembly to move, the crawling head is separated from the card slot and rotates to compress the spring. The direction of rotation of the crawling head is set to only move in the direction of movement. When the crawling head moves to the next card slot, it automatically falls into the card slot under the elastic force of the spring. If you want to fix it, insert the card plate to fix and limit the movement.
[0042] In another technical solution, the lower plane of the formwork system support extends and is fixedly connected to a fixed frame 10, on which an adjustment bracket 11 for installing a grinder is provided. The grinder is used to smooth the concrete surface after pouring. The grinder is movably arranged on the fixed frame to achieve all-round smoothing of the concrete.
[0043] In another technical solution, a plurality of horizontal beams 13 are fixedly provided at the bottom of the fixed frame, and protective plates are laid on the beams to form a working platform 14. Protective railings 16 are provided on the outer side of the beams to form a manually operated safety passage 15 together with the protective plates.
[0044] The present invention also provides a steep slope protection concrete construction method, comprising the following steps:
[0045] Step 1: Select different track models according to the type of slope surface where the track is to be installed, and install the track at the first mold position to be poured on the slope surface;
[0046] Step 2: Use cranes and other equipment to hoist the entire formwork system onto the track, set up a safety passage, put it in place, and prepare for all work;
[0047] Step 3: Pour concrete on the formwork system by installing a collecting hopper, pour the concrete evenly into the formwork, pour in layers, and each layer is 30cm-50cm thick. Vibrate the concrete manually by inserting a vibrating rod, and use an attached vibrator installed to automatically vibrate the concrete;
[0048] Step 4: After pouring and vibrating the first form concrete, the entire form system is lifted to the position of the second form through the driving mechanism and adjusted into place;
[0049] Step 5: Install a grinder on the fixed frame, and manually stand on the safety passage to operate the grinder to smooth the surface of the first mold concrete;
[0050] Step 6: Repeat the above steps to carry out the next cycle construction until the construction of the entire steep slope protection concrete is completed. The surface finishing and leveling construction of the upper mold concrete and the pouring construction of the next mold concrete can be carried out at the same time, and the concrete pouring and vibration can be carried out automatically.
[0051] In another technical solution, in step 4, the specific method of lifting the formwork system is:
[0052] First, in the initial state, the hydraulic system is connected to the upper climbing head assembly and the template system, the upper climbing head assembly is fixed in the groove of the track, and the lower climbing head assembly removes the card plate to form a movable connection with the track groove;
[0053] Secondly, the hydraulic system is started to generate an upward pulling force. Under the action of the pulling force, the climbing head of the lower climbing head assembly rotates together with the pin shaft and drives the spring to compress upward. The climbing head and the entire template system leave the current track slot and move. When the climbing head of the lower climbing head assembly moves up to the next track slot, the climbing head of the lower climbing head assembly automatically snaps into the next track slot under the action of the elastic force formed by the compression of the spring, and automatically completes the displacement from the current track slot to the next track slot.
[0054] Again, the hydraulic system continues to generate pulling force, and the formwork system can complete the displacement within the stroke range of the hydraulic system cylinder and automatically fix in the track slot. According to the stroke displacement range of the hydraulic system, the above steps are selectively repeated to continue moving the lower climbing head assembly and the entire formwork system;
[0055] Then, the lower climbing head assembly is fixed in the groove of the track, the upper climbing head assembly removes the card plate to form a movable connection with the track groove, and the hydraulic system is started to generate an upward thrust, driving the upper climbing head assembly to move to the next track groove, and the moving distance is the same as the moving distance of the lower climbing head assembly;
[0056] Finally, repeat the above steps until moving to the next mold position.
[0057] In another technical solution, in step four, the specific method for lifting the formwork system is as follows: in the initial state, the hydraulic system is respectively connected between the upper climbing head assembly and the lower climbing head assembly, and when the upper climbing head assembly is fixed in the slot of the track, the formwork system is connected to the lower climbing head assembly, and the hydraulic system is started to generate an upward pulling force, thereby driving the formwork system and the lower climbing head assembly to move; when the lower climbing head assembly is fixed in the slot of the track, the formwork system is connected to the upper climbing head assembly, and the hydraulic system is started to generate an upward thrust, thereby driving the formwork system and the upper climbing head assembly to move.
[0058] It is understood that the present invention is described by some embodiments, and those skilled in the art are aware that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation mode, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, other modifications can be easily implemented, so without departing from the general concept defined by the claims and the equivalent scope, the present invention is not limited to the specific details and the illustrations shown and described here.
Claims
1. A steep slope protection concrete construction equipment, characterized in that: It includes a pair of tracks, a template system slidably arranged on the tracks, and a driving mechanism. The tracks are arranged along the inclination direction of the steep slope and fixed on the slope. The template system is equipped with a template, a collection hopper for pouring concrete, and a vibrator seat for installing an attached vibrator. The driving mechanism is connected to the template system and is used to intermittently drive the template system to move a template distance each time along the pair of tracks.
2. The steep slope protection concrete construction equipment according to claim 1, characterized in that: A pair of tracks is arranged on a steep slope or a poured concrete slope. The height of the tracks when arranged on the steep slope is greater than that when arranged on the concrete slope, so that the surfaces of the pair of tracks are flush and adapt to the installation and pouring height of the formwork system.
3. The steep slope protection concrete construction equipment according to claim 1, characterized in that: The driving mechanism includes a hydraulic system and a climbing head assembly, the climbing head assembly includes an upper climbing head assembly and a lower climbing head assembly, which are respectively arranged on the track at intervals and selectively fixed or separately connected to the track. The hydraulic system is used to selectively drive one of the climbing head assemblies to move along the track, while the other climbing head assembly is fixed to the track, and the template system is fixedly connected to one of the climbing head assemblies or selectively connected to one of the climbing head assemblies.
4. The steep slope protection concrete construction equipment according to claim 3, characterized in that: Several slots are arranged at intervals on the track, and the climbing head assembly includes a shell and a pin shaft, a spring and a climbing head arranged in the shell. The lower part of the shell is arranged to have an opening shape matching the cross-section of the track and is just slidably fitted on the outer periphery of the track. The middle part of the shell has a channel that passes through to the top surface of the track, and a climbing head, a pin shaft and a spring are arranged in sequence from bottom to top. The climbing head is fixed on the pin shaft, and the pin shaft is located directly above the track and is rotatably arranged in the shell. The central axis of the pin shaft is parallel to the plane of the track. The pin shaft is selectively fixed or rotatably arranged in the shell by a clamping plate. A spring is arranged on the pin shaft, and the top of the spring is fixed and limited by a limit pin parallel to the pin shaft and located directly above the pin shaft. Gaskets are arranged between the opposite sides of the climbing head and the inner wall of the shell. When the spring and the pin shaft are in a free state, the climbing head just fits in the slot of the track.
5. The steep slope protection concrete construction equipment according to claim 1, characterized in that: The lower plane of the formwork system bracket extends and is fixedly connected to a fixed frame, on which an adjustment bracket for installing a grinder is provided. The grinder is used to smooth the surface of the concrete after pouring. The grinder is movably arranged on the fixed frame to achieve all-round smoothing of the concrete.
6. The steep slope protection concrete construction equipment according to claim 5, characterized in that: A plurality of horizontal beams are fixedly arranged at the bottom of the fixed frame, and protective plates are laid on the beams to form a working platform. Protective railings are arranged on the outer sides of the beams, and the protective railings and the protective plates form a safe passage for manual operation.
7. A steep slope protection concrete construction method, characterized in that: The steps include: Step 1: Select different track models according to the type of slope surface where the track is to be installed, and install the track at the first mold position to be poured on the slope surface; Step 2: Hoist the entire formwork system onto the track and set up a safety passage; Step 3: pour concrete on the formwork system by installing an aggregate hopper, and automatically vibrate the concrete using an attached vibrator installed; Step 4: After pouring and vibrating the first form concrete, the entire form system is lifted to the position of the second form through the driving mechanism and adjusted into place; Step 5: Install a grinder on the fixed frame, and manually operate the grinder on the safety passage to smooth the surface of the first mold concrete; Step 6: Repeat the above steps to carry out the next construction cycle until the construction of the entire steep slope facing concrete is completed.
8. The steep slope protection concrete construction method according to claim 7, characterized in that: In step 4, the specific method of lifting the formwork system is as follows: First, in the initial state, the hydraulic system is connected to the upper climbing head assembly and the template system, the upper climbing head assembly is fixed in the groove of the track, and the lower climbing head assembly removes the card plate to form a movable connection with the track groove; Secondly, the hydraulic system is started to generate an upward pulling force. Under the action of the pulling force, the climbing head of the lower climbing head assembly rotates together with the pin shaft and drives the spring to compress upward. The climbing head and the entire template system leave the current track slot and move. When the climbing head of the lower climbing head assembly moves up to the next track slot, the climbing head of the lower climbing head assembly automatically snaps into the next track slot under the action of the elastic force formed by the compression of the spring, and automatically completes the displacement from the current track slot to the next track slot. Again, according to the travel displacement range of the hydraulic system, selectively repeat the above steps to continue moving the lower climbing head assembly and the entire template system; Then, the lower climbing head assembly is fixed in the groove of the track, the upper climbing head assembly removes the card plate to form a movable connection with the track groove, and the hydraulic system is started to generate an upward thrust, driving the upper climbing head assembly to move to the next track groove, and the moving distance is the same as the moving distance of the lower climbing head assembly; Finally, repeat the above steps until moving to the next mold position.
9. The steep slope protection concrete construction method according to claim 8, characterized in that: In the step four, the specific method for lifting the formwork system is as follows: in the initial state, the hydraulic system is respectively connected between the upper climbing head assembly and the lower climbing head assembly, when the upper climbing head assembly is fixed in the slot of the track, the formwork system is connected to the lower climbing head assembly, and the hydraulic system is started to generate an upward pulling force, thereby driving the formwork system and the lower climbing head assembly to move; when the lower climbing head assembly is fixed in the slot of the track, the formwork system is connected to the upper climbing head assembly, and the hydraulic system is started to generate an upward thrust, thereby driving the formwork system and the upper climbing head assembly to move.
10. The steep slope protection concrete construction method according to claim 7, characterized in that: The surface finishing and leveling of the upper concrete mold and the pouring of the next concrete mold can be carried out simultaneously, and the concrete pouring and vibration can be carried out automatically.
Citation Information
Patent Citations
Sliding form parallel translation concrete lining machine as well as construction method thereof
CN101250877A
Construction method for steep slope concrete embankment simple sliding plate
CN118056955A
Trackless hydraulic self-climbing formwork system and construction process thereof
CN118564044A
Climbing scaffold with lift mechanism
CN2457268Y
Guide-type climbing scaffold structure
CN2594379Y