Variable-stiffness foundation pit fender post and construction method

By adopting a variable stiffness foundation pit enclosure pile design with adjustable stiffness in the foundation pit enclosure system, combined with the assembly method of positioning members and rectangular steel pipes, the inability to adjust the stiffness of the enclosure pile and the low material utilization rate in the prior art is solved. The problem has achieved efficient and environmentally friendly foundation pit construction and reuse of materials.

CN118997173APending Publication Date: 2024-11-22SHANGHAI SHANNAN GEOTECHNICAL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310560202.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-18
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In the existing foundation pit enclosure system, the stiffness of the enclosure pile cannot be adjusted according to the stress characteristics, resulting in low material utilization, and the remaining underground obstacles after construction are not conducive to the later development of underground space.

Method used

The variable-stiffness foundation pit enclosure pile design is adopted, including internal steel and external stiffened rectangular steel pipes. It is fixed by positioning members to form an adjustable enclosure pile structure. Combined with positioning notches and positioning hole design, it realizes flexible assembly of enclosure piles and Disassembly to improve material utilization and construction efficiency.

Benefits of technology

The rigidity of the enclosing piles is adjustable, the material utilization rate is increased by more than 25%, the construction efficiency is high, and it can be recycled and reused, green and environmentally friendly, and is suitable for different stress requirements of foundation pit projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997173A_ABST
    Figure CN118997173A_ABST
Patent Text Reader

Abstract

The invention relates to a variable-rigidity foundation pit fender post and a construction method. The variable-rigidity foundation pit fender post comprises internal profile steel (1), an external stiffening rectangular steel pipe (2) and a positioning component (3). The external stiffening rectangular steel pipe (2) is sleeved on the internal section steel (1) and is fixed on the internal section steel (1) through the positioning component (3). Compared with the prior art, the invention has the advantages of adjustable fender post rigidity, high material utilization rate, environmental protection and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of civil engineering, and in particular to a variable-rigidity foundation pit retaining pile and a construction method. Background Art

[0002] In the current foundation pit retaining system, the most commonly used retaining piles at the side of the foundation pit, such as bored cast-in-place piles, SMW construction method, underground continuous wall, etc., have the following problems:

[0003] First, bored piles use the same pile diameter, SMW method uses the same specification of steel, underground continuous walls use the same wall thickness, and are arranged with equal stiffness along the length of the piles, so the stiffness cannot be adjusted according to the stress characteristics;

[0004] Secondly, according to the calculation and measurement results of the cross-section, the retaining piles are subjected to concentrated forces near the bottom of the pit and the support points, while the forces in other areas are relatively small. The equal-stiffness envelope design method is adopted, and the material utilization rate is low.

[0005] In addition, the bored cast-in-place piles and underground continuous walls currently used will be left underground after the foundation pit construction is completed to form underground obstacles, which is not conducive to the subsequent development of underground space. Summary of the invention

[0006] The purpose of the present invention is to provide a variable-rigidity foundation pit retaining pile and a construction method, wherein the retaining pile has adjustable stiffness, high material utilization rate and is green and environmentally friendly.

[0007] The purpose of the present invention can be achieved by the following technical solutions: A variable rigidity foundation pit retaining pile, comprising an internal steel section, an external stiffening rectangular steel pipe and a positioning member;

[0008] The externally reinforced rectangular steel pipe is sleeved on the internal steel section and fixed on the internal steel section through a positioning component.

[0009] Preferably, the internal steel section is composed of a web and a flange, and has an I-shaped cross section. The external stiffening rectangular steel pipe is provided with positioning notches corresponding to the flanges.

[0010] Preferably, the positioning notch is arranged inside the externally stiffened rectangular steel tube and has a certain distance from the inner wall of the externally stiffened rectangular steel tube.

[0011] Preferably, the cross-sectional shape of the externally reinforced rectangular steel pipe is a rectangle, the inner wall size is the same as the outer wall profile of the internal steel section, and the inner wall of the externally reinforced rectangular steel pipe fits the outer wall of the internal steel section.

[0012] Preferably, the length of the inner steel section is greater than that of the outer stiffening rectangular steel tube.

[0013] Preferably, the inner steel section and the outer stiffening rectangular steel tube are both provided with positioning holes at equal intervals along the axial direction thereof, and the positioning holes on the inner steel section and the outer stiffening rectangular steel tube have the same size and spacing.

[0014] Further preferably, the diameter of the positioning hole is slightly larger than the diameter of the positioning line.

[0015] Further preferably, the positioning member includes a positioning line and locking devices arranged at both ends of the positioning line, the positioning line passes through the internal steel section and the external stiffening rectangular steel pipe, and both ends are fixed to the stiffening rectangular steel pipe by the locking devices.

[0016] More preferably, the locking device is detachably mounted on the positioning line.

[0017] A construction method of the variable stiffness foundation pit retaining piles comprises the following steps:

[0018] S1: Sleeve the external stiffening rectangular steel pipe onto the internal steel section;

[0019] S2: Fix the external stiffening rectangular steel tube to the internal steel section through positioning components.

[0020] Preferably, the construction method of the variable stiffness foundation pit retaining piles comprises the following steps:

[0021] Step 1: Pre-set positioning notches inside the externally reinforced rectangular steel pipe;

[0022] Step 2: Insert the external stiffening rectangular steel pipe into the internal steel section to a specific position through the positioning notch;

[0023] Step 3: Pass the positioning line through the positioning hole of the external stiffening rectangular steel pipe and the positioning hole of the internal steel section;

[0024] Step 4: Use a locking device to fix the two ends of the positioning line to the outside of the externally reinforced rectangular steel pipe;

[0025] Step 5: Drive the assembled retaining piles into the original or stirred soil;

[0026] Step 6: After the foundation pit project is completed, pull out the retaining piles;

[0027] Step 8: Remove the locking device, positioning wire and external stiffening rectangular steel pipe in sequence;

[0028] Step 9: Clean and remove rust from the internal steel sections and external reinforced rectangular steel pipes for next use.

[0029] Compared with the prior art, the present invention has the following advantages:

[0030] 1. The stiffness of the retaining pile of the present invention is adjustable, the material utilization rate is high, and it is green and environmentally friendly;

[0031] 2. The present invention forms a variable stiffness retaining pile by wrapping a stiffened rectangular steel pipe outside the inner steel section. The size and length of the stiffened rectangular steel pipe and the steel section can be adjusted according to the stress characteristics of the foundation pit retaining pile, and the material utilization rate can be increased by more than 25% under the premise of meeting the safety requirements;

[0032] 3. The present invention is a fully prefabricated structure with high construction efficiency. After the foundation pit is completed, it can be fully recycled and reused, which is green and environmentally friendly;

[0033] 4. The present invention provides positioning notches, which is beneficial to the fit of the internal steel section and the external stiffening rectangular steel pipe, improves the deformation coordination performance of the internal steel section and the external stiffening rectangular steel pipe, and improves the structural strength of the external stiffening rectangular steel pipe;

[0034] 5. The present invention can precisely strengthen the steel section according to the force requirements by setting the positioning holes and positioning lines, and the material utilization rate is high;

[0035] 6. The present invention can reduce weight while ensuring overall strength through the cross-sectional shape design of the internal steel section and the external stiffening rectangular steel pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 This is a front view of the variable rigidity foundation pit retaining pile of the present invention;

[0037] Figure 2 This is a top view of the variable rigidity foundation pit retaining pile of the present invention;

[0038] Figure 3 This is a front view of the internal steel section of the variable rigidity foundation pit retaining pile of the present invention;

[0039] Figure 4 It is a top view of the internal steel section of the variable rigidity foundation pit retaining pile of the present invention;

[0040] Figure 5 This is a front view of a rectangular steel pipe reinforced with variable rigidity foundation pit retaining piles according to the present invention;

[0041] Figure 6 This is a top view of a rectangular steel pipe reinforced with variable rigidity foundation pit retaining piles according to the present invention;

[0042] Figure 7 It is a top view of the variable rigidity foundation pit retaining pile positioning component of the present invention;

[0043] In the figure: 1-internal steel, 11-internal steel positioning hole, 2-external stiffening rectangular steel pipe, 21-positioning notch, 22-external stiffening rectangular steel pipe positioning hole, 3-positioning member, 31-positioning line, 32-locking device. DETAILED DESCRIPTION

[0044] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. The following embodiments are implemented based on the technical solution of the present invention, and provide detailed implementation methods and specific operation processes, but the protection scope of the present invention is not limited to the following embodiments.

[0045] Example 1

[0046] A variable stiffness foundation pit retaining pile, such as Figures 1 to 7 As shown, it includes internal steel sections 1, external stiffening rectangular steel pipes 2 and positioning components 3.

[0047] The externally reinforced rectangular steel pipe 2 is inserted into the internal steel section 1 to a specific height through the positioning notch 21 set inside; the positioning wire 31 in the positioning member 3 passes through the externally reinforced rectangular steel pipe positioning hole 22 and the internal steel section positioning hole 11, and both ends of the positioning wire 31 are fixed to the externally reinforced rectangular steel pipe 2 by locking devices 32.

[0048] The internal steel section 1 is made of steel and is composed of components such as a web and a flange. The cross-section is in the shape of an "I" character and is longer than the external stiffening rectangular steel pipe 2. The internal steel section positioning holes 11 are located in the web of the internal steel section 1 and are arranged at a certain distance. The size meets the requirements for the positioning line 31 to pass through. The external stiffening rectangular steel pipe 2 is rectangular in shape and made of steel. It has a certain wall thickness. The inner wall size is the same as the outer wall profile of the internal steel section 1 to meet the insertion requirements and make the two fit tightly. Its length is shorter than the internal steel section 1. The positioning notch 21 is located inside the external stiffening rectangular steel pipe 2 and is made of steel or other materials. It is connected to the external stiffening rectangular steel pipe 2 by welding or other reliable methods. It has a certain spacing with the edge of the external stiffening rectangular steel pipe 2 to meet the insertion requirements of the internal steel section 1. The external stiffening rectangular steel pipe positioning hole 22 is located on the side wall of the external stiffening rectangular steel pipe 2. Its size and spacing are the same as the internal steel section positioning hole 11. The positioning member 3 is composed of a positioning line 31 and locking devices 32 at both ends of the positioning line. The positioning wire 31 is made of steel or other rigid materials and has a certain rigidity. After the positioning member 3 is set, no obvious relative displacement occurs between the internal steel section 1 and the external stiffening rectangular steel tube 2. The locking device 32 is made of steel and can be a fixing bolt or other fastening member, which can be connected to the positioning wire 31 as a whole and can fix the positioning wire 31 to the outside of the external stiffening rectangular steel tube 2.

[0049] In this embodiment, a construction process of a variable stiffness foundation pit retaining pile includes:

[0050] The first step: pre-arrange a positioning notch 21 inside the externally reinforced rectangular steel pipe 2;

[0051] Step 2: insert the external stiffening rectangular steel pipe 2 into the internal steel section 1 to a specific position through the positioning notch 21;

[0052] Step 3: Pass the positioning line 31 through the external stiffening rectangular steel pipe positioning hole 22 and the internal steel positioning hole 11;

[0053] Step 4: Use the locking device 32 to fix the two ends of the positioning line 31 to the outside of the externally reinforced rectangular steel pipe 2;

[0054] Step 5: Drive the assembled retaining piles into the original or stirred soil;

[0055] Step 6: After the foundation pit project is completed, pull out the retaining piles;

[0056] Step 8: Remove the locking device 32, the positioning wire 31 and the externally reinforced rectangular steel pipe 2 in sequence;

[0057] Step 9: Clean and remove rust from the internal steel section 1 and the external reinforced rectangular steel pipe 2 for next use.

[0058] Comparative analysis with existing pile types:

[0059] The foundation pit retaining piles can be roughly divided into three sections from top to bottom. The first section can be called the deformation control section, the second section can be called the strength control section, and the third section can be called the stability control section. Regarding the structural strength requirement, the strength control section is subjected to the greatest force, the deformation control section is subjected to the second greatest force, and the stability control section is subjected to the least force. Conventional prefabricated retaining piles are generally set to equal strength, that is, the cross-sectional dimensions of the retaining piles are determined by the strength control section, resulting in a large amount of retaining pile material usage. The present invention can set the stiffness and strength of the retaining piles in sections according to the requirements of the retaining piles. The specific distribution is roughly as follows: Compared with conventional retaining piles, the cross-sectional strength of the deformation control section can be taken as 80% of that of the strength control section, and the strength of the stability control section can be taken as 50% of that of the strength control section. The comprehensive material utilization rate is approximately 75% of that of conventional retaining piles. For projects that do not have high requirements for deformation, the material saving effect will be better.

[0060] The above description of the embodiments is to facilitate the understanding and use of the invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the scope of protection of the present invention.

Claims

1. A variable stiffness foundation pit retaining pile, characterized in that: It comprises an internal steel section (1), an external stiffening rectangular steel tube (2) and a positioning member (3); The externally reinforced rectangular steel pipe (2) is sleeved on the internal steel section (1) and fixed on the internal steel section (1) via a positioning component (3).

2. The variable stiffness foundation pit retaining pile according to claim 1 is characterized in that: The internal steel section (1) is composed of a web and a flange, and has an I-shaped cross section. The external stiffening rectangular steel pipe (2) is provided with a positioning notch (21) corresponding to the flange.

3. The variable stiffness foundation pit retaining pile according to claim 1, characterized in that: The positioning notch (21) is arranged inside the externally reinforced rectangular steel pipe (2) and has a certain distance from the inner wall of the externally reinforced rectangular steel pipe (2).

4. The variable rigidity foundation pit retaining pile according to claim 1, characterized in that: The cross-sectional shape of the externally reinforced rectangular steel pipe (2) is rectangular, the inner wall size is the same as the outer wall profile of the internal steel section (1), and the inner wall of the externally reinforced rectangular steel pipe (2) is in close contact with the outer wall of the internal steel section (1).

5. The variable rigidity foundation pit retaining pile according to claim 1, characterized in that: The inner steel section (1) is longer than the outer stiffening rectangular steel tube (2).

6. The variable rigidity foundation pit retaining pile according to claim 1, characterized in that: The inner steel section (1) and the outer stiffening rectangular steel tube (2) are both provided with positioning holes at equal intervals along the axial direction thereof. The positioning holes on the inner steel section (1) and the outer stiffening rectangular steel tube (2) have the same size and spacing.

7. The variable rigidity foundation pit retaining pile according to claim 6, characterized in that: The positioning member (3) comprises a positioning line (31) and locking devices (32) arranged at both ends of the positioning line (31); the positioning line (31) passes through the internal steel section (1) and the external stiffening rectangular steel pipe (2), and both ends are fixed to the stiffening rectangular steel pipe (2) through the locking devices (32).

8. The variable rigidity foundation pit retaining pile according to claim 7, characterized in that: The locking device (32) is detachably mounted on the positioning line (31).

9. A construction method for variable rigidity foundation pit retaining piles according to any one of claims 1 to 8, characterized in that: The following steps are involved: S1: Sleeve the external stiffening rectangular steel tube (2) onto the internal steel section (1); S2: The external stiffening rectangular steel tube (2) is fixed to the internal steel section (1) by means of a positioning member (3).

10. The construction method of variable rigidity foundation pit retaining piles according to claim 9, characterized in that: The following steps are involved: The first step: pre-arranging a positioning notch (21) inside the externally reinforced rectangular steel pipe (2); Step 2: insert the external stiffening rectangular steel tube (2) into the internal steel section (1) to a specific position through the positioning notch (21); Step 3: Pass the positioning line (31) through the positioning hole of the external stiffening rectangular steel pipe (2) and the positioning hole of the internal steel section (1); Step 4: Using a locking device (32) to fix the two ends of the positioning wire (31) to the outside of the externally reinforced rectangular steel pipe (2); Step 5: Drive the assembled retaining piles into the original or stirred soil; Step 6: After the foundation pit project is completed, pull out the retaining piles; Step 8: disassemble the locking device (32), the positioning wire (31) and the externally reinforced rectangular steel pipe (2) in sequence; Step 9: Clean and remove rust from the internal steel (1) and the external reinforced rectangular steel pipe (2) for next use.