Assembly type prefabricated column connecting structure and construction method thereof
By using a combined structure of connecting steel bars, casings and channel steel components in prefabricated column connections, the connection operation is simplified, construction efficiency and connection strength are improved, and the problems of cumbersome connection operations and poor installation accuracy in the prior art are solved.
Patent Information
- Application Number
- CN202411409515.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-11-22
AI Technical Summary
现有装配式预制柱连接操作繁琐,效率低,且注浆过程需要时刻观察以防止水泥浆溢出,影响安装精准性。
Adopt a connecting structure that includes connecting steel bars, casings and channel steel components. Fibre cement slurry is poured through the cement grooves of the channel steel components, and the overflowing cement slurry is collected using the channel steel components to simplify connection operations, improve connection strength and installation accuracy. sex.
The prefabricated column connection operation is simplified, construction efficiency is improved, connection strength is enhanced, cement slurry is wasteful, and the vertical installation accuracy of the prefabricated column is ensured.
Smart Images

Figure CN118997342A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of assembled buildings, and in particular to an assembled prefabricated column connection structure and a construction method thereof. Background Art
[0002] Prefabricated columns are vertical prefabricated components that are prefabricated and processed in the factory and then transported to the construction site for installation. In order to facilitate transportation and installation when transported to the site, prefabricated columns are usually not too long. After transportation, multiple sections of prefabricated columns are assembled and connected to form a column of the required length. Therefore, when making each section of prefabricated column, it is necessary not only to design and process the column body, but also to design and process the connection parts at both ends of the column body.
[0003] The existing prefabricated columns are basically connected by holes and steel bar heads. The holes used are generally sleeves. Each sleeve includes a grouting hole and a grouting hole. After the two prefabricated columns are connected, grouting is required at each sleeve. During grouting, it is necessary to always observe the situation at the grouting hole to prevent excessive overflow of cement slurry at the grouting hole, which makes the installation process of the prefabricated column very cumbersome. In addition, the cement slurry used for grouting cannot be too viscous, otherwise it cannot fill the inside of the sleeve. Summary of the invention
[0004] The present invention aims to provide an assembled prefabricated column connection structure and a construction method thereof, so as to solve the problem that the existing assembled prefabricated column connection operation is complicated and inefficient.
[0005] The present invention is achieved through the following technical solutions:
[0006] On the one hand, an assembled prefabricated column connection structure is provided, comprising a first connection part and a second connection part arranged at both ends of a column body, wherein the first connection part comprises a plurality of connecting steel bars, and the second connection part comprises a sleeve and a channel steel assembly. When two prefabricated columns are connected, one end of the connecting steel bar is inserted into the sleeve, and one end of the sleeve passes through the bottom of the channel steel assembly and is fixedly connected to the channel steel assembly. The channel steel assembly connects the ends of a plurality of sleeves to each other, and a central connecting piece is provided at the center of the channel steel assembly, and the central connecting piece comprises a plurality of double-hook steel bars.
[0007] In a possible design, the end of the double-hook steel bar is in a bent hook shape, and one end of the double-hook steel bar is fixed to one end of the first connecting portion on the prefabricated column.
[0008] In a possible design, the channel steel assembly includes a first channel steel and a second channel steel. At the center connecting piece, a cement groove is formed by surrounding the two first channel steels and the two second channel steels. The two first channel steels are arranged on opposite sides of the cement groove, and the two second channel steels are arranged on opposite sides of the cement groove in another direction.
[0009] In a possible design, at the cement groove, a number of connecting reinforcing steel bars are connected between the two first channel steels, and a number of connecting reinforcing steel bars are also connected between the two second channel steels. The connecting reinforcing steel bars connecting the two first channel steels and the connecting reinforcing steel bars connecting the two second channel steels are in a vertical state in space.
[0010] In a possible design, the first channel steel includes a first grouting hole fixed at one end of the first channel steel and a slurry outlet opened at the other end of the first channel steel, and the second channel steel includes a second grouting hole opened at one end thereof, and similarly, a slurry outlet is also opened at the other end of the second channel steel.
[0011] In a possible design, the sleeve is fixedly connected to the connecting steel bars in the prefabricated column via a connecting plate, a plurality of anti-slip rings are fixedly provided on the outside of the sleeve, and anti-slip grooves are provided inside the sleeve.
[0012] In a possible design, the first channel steel includes a first side plate and a second side plate, the first side plate and the second side plate are parallel to the length direction of the first channel steel, the first side plate is located on the side of the first channel steel away from the center position of the prefabricated column, the second side plate is located on the side of the first channel steel close to the center position of the prefabricated column, and the height of the second side plate is lower than that of the first side plate.
[0013] In a possible design, the connecting plate is in a square frame shape, one side of the connecting plate is fixedly connected to one end of each of the sleeves, and the other side of the connecting plate is fixedly connected to one end of each connecting steel bar.
[0014] On the other hand, a construction method of an assembled prefabricated column connection structure is provided, comprising the following steps:
[0015] S1. Complete the installation of the first section of prefabricated columns first, ensure that the installation position of the first section of prefabricated columns is accurate, and ensure that the verticality of the first section of prefabricated columns meets the design standards;
[0016] S2. Grouting is performed in the casing of the prefabricated column of the first section that has been installed. Glass fiber or basalt fiber is added to the cement slurry for grouting the casing to increase the strength of the cement after the cement slurry solidifies;
[0017] S3. Cement slurry is poured into the cement groove at the center of the channel steel assembly. The cement slurry poured is the same cement slurry with fibers as that injected into the casing. The cement slurry is poured into the cement groove starting from the center of the cement groove. The amount of cement slurry poured is greater than the designed capacity of the cement groove.
[0018] S4. Hoist the prefabricated column to be installed, ensure that the first connection part of the prefabricated column is in a vertical downward state, align the connecting steel bar below the prefabricated column with the sleeve on the lower prefabricated column, and start to lower the hoisted prefabricated column after alignment, and continuously adjust the position of the upper prefabricated column during the lowering process to align the two prefabricated columns until the upper prefabricated column is completely placed on the lower channel steel assembly;
[0019] S5, injecting grout into the first channel steel and the second channel steel from the grouting holes on the first channel steel and the second channel steel to fill the first channel steel and the second channel steel, and then applying cement slurry around the channel steel assembly after the first channel steel and the second channel steel are filled, so as to cover the connection position;
[0020] S6. Wait for the cement slurry to solidify.
[0021] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0022] 1. The present invention completes the connection of two prefabricated columns by matching four channel steels, a plurality of sleeves and connecting steel bars. The connection operation is simple and there is no need to perform grouting operations on too many grouting holes, which can effectively improve the construction efficiency during the connection.
[0023] 2. The present invention connects by cooperating with the connecting steel bar and the sleeve, and adopts the method of grouting first and then inserting to connect, which can make the contact between the connecting steel bar and the sleeve and the cement slurry closer. At the same time, one end of the sleeve passes through the bottom of the channel steel assembly and is fixedly connected to the channel steel assembly. The channel steel assembly connects the ends of multiple sleeves to each other. When the connecting steel bar and the sleeve are butt-jointed, the groove in the channel steel assembly can also collect the excess cement slurry overflowing from the sleeve when the connecting steel bar and the sleeve are butt-jointed, so as to avoid the waste of cement slurry.
[0024] 3. The present invention connects by connecting the steel bars and inserting the sleeves, and can use cement slurry with added fibers as an adhesive material, which can make the connection stronger and the connection effect better. Moreover, all the excess cement slurry overflowing from the sleeves flows into the grooves of the channel steel components, and will not flow into the end faces of the two prefabricated columns to affect the verticality of the upper prefabricated columns during installation, thereby making the installation of the prefabricated columns more accurate. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0026] Figure 1 It is a structural schematic diagram of two prefabricated columns in the present invention in a state where they are not combined and docked;
[0027] Figure 2 is a schematic structural diagram of the second connecting portion in the present invention;
[0028] Figure 3 It is a structural schematic diagram of two prefabricated columns in the present invention in a combined butt-jointed state;
[0029] Figure 4 It is a cross-sectional view at AA in the present invention;
[0030] Figure 5 It is a structural schematic diagram of the connecting plate in the present invention;
[0031] Figure 6 is a cross-sectional view of the first channel steel in the present invention;
[0032] Figure 7 It is a half-section view of the first connecting portion in the present invention.
[0033] The reference numerals represent: 1-first connection part, 2-second connection part, 3-sleeve, 301-anti-slip ring, 4-first channel steel, 401-first side plate, 402-second side plate, 41-first grouting hole, 5-second channel steel, 51-second grouting hole, 6-connecting reinforcing steel bar, 7-connecting steel bar, 8-connecting plate, 9-double hook steel bar. DETAILED DESCRIPTION
[0034] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0035] Embodiment 1, as Figures 1 to 7 As shown, an assembled prefabricated column connection structure includes a first connection part 1 and a second connection part 2 arranged at both ends of the column body, wherein the first connection part 1 includes a plurality of connection steel bars 7, and the connection steel bars 7 are a section of exposed threaded steel bars designed in advance on the prefabricated column and extending beyond the prefabricated column;
[0036] The second connecting part 2 includes a sleeve 3 and a channel steel assembly. When connecting two prefabricated columns, one end of the connecting steel bar 7 is inserted into the sleeve 3, and one end of the sleeve 3 passes through the bottom of the channel steel assembly and is fixedly connected to the channel steel assembly. The channel steel assembly connects the ends of multiple sleeves 3 to each other. When installing the prefabricated column, the channel steel assembly is used to support the bottom end surface of another prefabricated column. When connecting, the connecting steel bar 7 and the sleeve 3 can be connected by grouting first and then inserting, which can make the contact between the connecting steel bar 7 and the sleeve 3 and the cement slurry closer. At the same time, when the connecting steel bar 7 and the sleeve 3 are butt-jointed, the groove in the channel steel assembly It is also possible to collect excess cement slurry overflowing from the sleeve 3 when the connecting steel bar 7 and the sleeve 3 are connected, thereby avoiding waste of cement slurry. The connecting steel bar 7 is directly inserted into the sleeve 3 to complete the connection between the connecting steel bar 7 and the sleeve 3. This connection method can use cement slurry with a large slump to connect the two. For example, using cement slurry with added fibers as the adhesive material of the present invention can make the connection strength stronger and the connection effect better. Moreover, all the excess cement slurry overflowing from the sleeve 3 flows into the groove of the channel steel assembly, and will not flow into the end faces of the two prefabricated columns, thereby affecting the verticality of the upper prefabricated column during installation, making the installation of the prefabricated column more precise.
[0037] Furthermore, a central connecting piece is provided at the center of the channel steel assembly, and the central connecting piece includes a plurality of double hooked steel bars 9, the ends of the double hooked steel bars 9 are bent hook-shaped, and one end of the double hooked steel bars 9 is fixed to one end of the first connecting portion 1 on the prefabricated column. When the prefabricated column is manufactured, one end of each of the double hooked steel bars 9 is inserted into the prefabricated column, and the double hooked steel bars 9 are fixed in the prefabricated column after the prefabricated column solidifies. The channel steel assembly includes a first channel steel 4 and a second channel steel 5. At the central connecting piece, a cement groove is formed by two of the first channel steels 4 and two of the second channel steels 5. The two first channels Steel 4 is arranged on two opposite sides of the cement groove, and two second channel steels 5 are arranged on two opposite sides of the cement groove in another direction. At the cement groove, a number of connecting reinforcing steel bars 6 are connected between the two first channel steels 4, and a number of connecting reinforcing steel bars 6 are also connected between the two second channel steels 5. The connecting reinforcing steel bars 6 connecting the two first channel steels 4 and the connecting reinforcing steel bars 6 connecting the two second channel steels 5 are in a vertical state in space. When connecting two pipe piles, cement slurry is first poured into the cement groove to ensure that the amount of cement slurry poured into the cement groove is greater than the capacity of the cement groove.
[0038] It should be noted that cement slurry has a certain slump. When pouring cement slurry from the middle of the cement groove, the height in the middle position of the cement groove will be significantly higher than the height at the edge of the cement groove. When pouring, the height of the cement slurry at the edge of the cement groove is observed to determine whether to stop pouring cement slurry. When the height of the cement slurry at the edge of the cement groove is close to the height of the channel steel, the pouring is stopped. Since the height of the cement at the center of the cement groove is greater than the height of the cement slurry at the edge, it can be effectively ensured that the amount of cement slurry poured is greater than the capacity of the cement groove. When the prefabricated column at the upper end falls, the cement slurry is squeezed into the channel steel assembly, and the center of the prefabricated column can be tightly connected by cement slurry.
[0039] In this embodiment, the first channel steel 4 includes a first grouting hole 41 fixed at one end of the first channel steel 4 and a grouting outlet opened at the other end of the first channel steel 4, and the second channel steel 5 includes a second grouting hole 51 opened at one end thereof, and similarly, a grouting outlet is also opened at the other end of the second channel steel 5. When the casing 3 and the cement groove are filled with cement slurry, the interior of the channel steel assembly is not filled with cement slurry. Therefore, grouting is required to fill the gap inside the channel steel assembly. Grouting can be injected into the first channel steel 4 through the first grouting hole 41 to fill the interior of the first channel steel 4, and grouting can be injected into the second channel steel 5 through the second grouting hole 51 to complete the filling of the gap in the second channel steel 5.
[0040] Advantageously, the sleeve 3 is fixedly connected to the connecting steel bars 7 in the prefabricated column via a connecting plate 8, a plurality of anti-slip rings 301 are fixedly provided on the outside of the sleeve 3, and the anti-slip rings 301 can effectively increase the bonding state between the sleeve 3 and the cement, and anti-slip grooves are provided inside the sleeve 3, and the anti-slip grooves can effectively increase the bonding state between the sleeve 3 and the cement inside the sleeve, thereby making the connection between the two prefabricated columns more firm and reliable.
[0041] Advantageously, the first channel steel 4 includes a first side plate 401 and a second side plate 402, wherein the first side plate 401 and the second side plate 402 are parallel to the length direction of the first channel steel 4, the first side plate 401 is located on a side of the first channel steel 4 away from the center position of the prefabricated column, and the second side plate 402 is located on a side of the first channel steel 4 close to the center position of the prefabricated column, and the height of the second side plate 402 is lower than the first side plate 401. By lowering the height of the side of the channel steel close to the cement groove, when the prefabricated column is installed, when the upper prefabricated column falls, the splashing caused by the upper prefabricated column squeezing the cement slurry in the cement groove can be effectively prevented, and the cement slurry at the cement groove can be squeezed into the first channel steel 4 more smoothly.
[0042] Advantageously, the second channel steel 5 may also adopt the same high and low side plate structure as the first channel steel 4 .
[0043] In this embodiment, the connecting plate 8 is in a square shape, one side of the connecting plate 8 is fixedly connected to one end of each of the sleeves 3, and the other side of the connecting plate 8 is fixedly connected to one end of each connecting steel bar 7. The fixed connection method between the connecting plate 8 and the connecting steel bar 7 and between the connecting plate 8 and the sleeve 3 is preferably welding. The cooperation between the connecting plate 8 and the sleeve 3 can firstly seal the bottom of the sleeve 3, and secondly, the end of each connecting steel bar 7 is fixedly connected by the connecting plate 8, which can improve the overall strength of the steel bar structure inside the prefabricated column, make the overall connection effect of the steel bar structure better, and make the strength of the prefabricated column higher.
[0044] Embodiment 2: Based on Embodiment 1, this embodiment further provides a construction method for an assembled prefabricated column connection structure, which specifically includes the following steps:
[0045] S1. Complete the installation of the first section of prefabricated columns first, ensure that the installation position of the first section of prefabricated columns is accurate, and ensure that the verticality of the first section of prefabricated columns meets the design standards;
[0046] S2, grouting is performed in the casing 3 on the prefabricated column of the first section that has been installed, and glass fiber or basalt fiber is added to the cement slurry for grouting the casing 3 to improve the strength of the cement after the cement slurry solidifies;
[0047] S3, pouring cement slurry into the cement groove at the center of the channel steel assembly, the poured cement slurry uses the same cement slurry with fibers as the cement slurry injected into the casing 3, the cement slurry is poured into the cement groove starting from the center of the cement groove, and the amount of cement slurry poured is greater than the designed capacity of the cement groove;
[0048] S4, hoist the prefabricated column to be installed, ensure that the first connection part 1 of the prefabricated column is in a vertical downward state, align the connecting steel bar 7 below the prefabricated column with the sleeve 3 on the lower prefabricated column, and start to lower the hoisted prefabricated column after alignment, and continuously adjust the position of the upper prefabricated column during the lowering process to align the two prefabricated columns until the upper prefabricated column is completely placed on the lower channel steel assembly;
[0049] S5. Inject grout into the first channel steel 4 and the second channel steel 5 from the grouting holes on the first channel steel 4 and the second channel steel 5 to fill the inside of the first channel steel 4 and the second channel steel 5. After filling the first channel steel 4 and the second channel steel 5, apply cement slurry around the channel steel assembly to cover the connection position to ensure the aesthetic appearance.
[0050] S6. Wait for the cement slurry to solidify. After the cement slurry solidifies, the cement slurry and the fiber mixture in each casing 3 have high strength after solidification, which can fully ensure that the connection between the casing 3 and the connecting steel bar 7 reaches the required tensile strength.
[0051] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. An assembled prefabricated column connection structure, comprising a first connection part (1) and a second connection part (2) arranged at both ends of a column body, characterized in that: The first connecting portion (1) comprises a plurality of connecting steel bars (7); The second connecting portion (2) comprises a sleeve (3) and a channel steel assembly. When two prefabricated columns are connected, one end of the connecting steel bar (7) is inserted into the sleeve (3), and one end of the sleeve (3) passes through the bottom of the channel steel assembly and is fixedly connected to the channel steel assembly. The channel steel assembly connects the ends of multiple sleeves (3) to each other. A central connecting piece is arranged at the center of the channel steel assembly, and the central connecting piece comprises a plurality of double hook-shaped steel bars (9).
2. The assembled prefabricated column connection structure according to claim 1, characterized in that: The end of the double-hook steel bar (9) is in a bent hook shape, and one end of the double-hook steel bar (9) is fixed to one end of the first connecting portion (1) on the prefabricated column.
3. The assembled prefabricated column connection structure according to claim 1, characterized in that: The channel steel assembly comprises a first channel steel (4) and a second channel steel (5). At a central connecting piece, a cement groove is formed by surrounding two of the first channel steels (4) and two of the second channel steels (5). The two first channel steels (4) are arranged on two opposite sides of the cement groove, and the two second channel steels (5) are arranged on two opposite sides of the cement groove in another direction.
4. The assembled prefabricated column connection structure according to claim 3, characterized in that: At the cement groove, a plurality of connecting reinforcing steel bars (6) are connected between the two first channel steels (4), and a plurality of connecting reinforcing steel bars (6) are also connected between the two second channel steels (5). The connecting reinforcing steel bars (6) connecting the two first channel steels (4) and the connecting reinforcing steel bars (6) connecting the two second channel steels (5) are in a vertical state in space.
5. The assembled prefabricated column connection structure according to claim 3, characterized in that: The first channel steel (4) comprises a first grouting hole (41) opened at one end of the first channel steel (4) and a grouting outlet opened at the other end of the first channel steel (4); the second channel steel (5) comprises a second grouting hole (51) opened at one end thereof; similarly, the other end of the second channel steel (5) is also provided with a grouting outlet.
6. The assembled prefabricated column connection structure according to claim 1, characterized in that: The sleeve (3) is fixedly connected to the connecting steel bar (7) in the prefabricated column via a connecting plate (8); a plurality of anti-slip rings (301) are fixedly provided on the outside of the sleeve (3); and anti-slip grooves are provided inside the sleeve (3).
7. The assembled prefabricated column connection structure according to claim 3, characterized in that: The first channel steel (4) comprises a first side plate (401) and a second side plate (402), wherein the first side plate (401) and the second side plate (402) are parallel to the length direction of the first channel steel (4), the first side plate (401) is located on a side of the first channel steel (4) away from the center position of the prefabricated column, and the second side plate (402) is located on a side of the first channel steel (4) close to the center position of the prefabricated column, and the height of the second side plate (402) is lower than that of the first side plate (401).
8. The assembled prefabricated column connection structure according to claim 6, characterized in that: The connecting plate (8) is in a square frame shape, one side of the connecting plate (8) is fixedly connected to one end of each of the sleeves (3), and the other side of the connecting plate (8) is fixedly connected to one end of each connecting steel bar (7).
9. A construction method for an assembled prefabricated column connection structure according to claims 1-8, characterized in that: The method comprises the following steps: S1. Complete the installation of the first section of prefabricated columns first, ensure that the installation position of the first section of prefabricated columns is accurate, and ensure that the verticality of the first section of prefabricated columns meets the design standards; S2, grouting is performed in the casing (3) on the prefabricated column of the first section that has been installed, and glass fiber or basalt fiber is added to the cement slurry for grouting the casing (3) to improve the strength of the cement after the cement slurry solidifies; S3, pouring cement slurry into the cement groove at the center of the channel steel assembly, the poured cement slurry uses the same cement slurry with fibers as the cement slurry injected into the casing (3), the cement slurry is poured into the cement groove starting from the center of the cement groove, and the amount of cement slurry poured is greater than the designed capacity of the cement groove; S4, hoisting the prefabricated column to be installed, ensuring that the first connection part (1) of the prefabricated column is in a vertical downward state, aligning the connecting steel bar (7) below the prefabricated column with the sleeve (3) on the lower prefabricated column, and starting to lower the hoisted prefabricated column after alignment, and constantly adjusting the position of the upper prefabricated column during the lowering process, so that the two prefabricated columns are aligned, until the upper prefabricated column is completely placed on the lower channel steel assembly; S5, injecting grout into the first channel steel (4) and the second channel steel (5) from the grouting holes on the first channel steel (4) and the second channel steel (5) to fill the first channel steel (4) and the second channel steel (5), and then applying cement slurry around the channel steel assembly after the first channel steel (4) and the second channel steel (5) are filled, so as to cover the connection position; S6. Wait for the cement slurry to solidify.