An integrated casting structure and casting process of building roof panel
By using a rotor rod and the cams that are staggered in the integrated pouring structure of the building house panel, the problem of difficulty covering the complicated structure area of the vibration tools is solved, and the uniform and efficient construction of the concrete is realized.
Patent Information
- Application Number
- CN202411455326.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2044-10-18
Smart Images

Figure CN118997405B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction, and in particular to an integrated casting structure and casting process of a building roof panel. Background Art
[0002] At present, the construction of building roof panels usually adopts the following steps: the columns, walls, beams and slabs of the roof layer are cast in one piece, and then the parapet, roof machine room, ventilation duct and other structures are built or concrete walls are constructed on the roof panel body. The construction joint is generally set at the bottom where the slab and the wall meet;
[0003] With this kind of separate construction, once the roof waterproofing layer is damaged, water may seep out from the parapet, causing the surface of the exterior wall to fall off. Water seeping around the ventilation duct may flow into the room, and water seeping from the bottom of the elevator room may enter the elevator pit.
[0004] In the prior art, a Chinese patent document with publication number CN107447903B, a cast-in-place thermal insulation integrated slope roof structure and construction method, raises the problem that the integrity, airtightness and mechanical strength of the traditional slope roof cannot be taken into account at the same time, completely solves the defects such as precipitation leakage and erosion, and has the advantages of being easy to install into an integrated slope roof ridge, simple and firm connection, etc., so as to be more suitable for people's requirements for the slope roof ridge to be firm and waterproof, load-bearing, integrated and beautiful and durable. However, consistent with the traditional method, due to the limitations of the vibration tool, especially in complex structures, it is difficult to fully cover all areas, especially the bottom and corners are often not vibrated enough, resulting in insufficient concrete density in these areas. At the bottom of the roof panel body, if the vibration is insufficient, a honeycomb structure may appear in the concrete, which will affect the overall bearing capacity and durability. Therefore, the present application proposes an integrated casting structure and casting process of a building roof panel to meet the integrated casting of the roof panel body and the casting density. Summary of the invention
[0005] In view of this, the purpose of the present invention is to propose an integrated casting structure and casting process for a building roof panel to solve the problem that it is difficult to fully cover all areas due to the limitations of vibration tools, especially in complex structures.
[0006] Based on the above purpose, the present invention provides an integrated casting structure and casting process of a building roof panel, including: a roof panel body, parapet guide walls and an upper part of the parapet are arranged on both sides of the roof panel body, an air duct chamber, a machine room and a steel casing with a water stop ring are arranged in sequence above the roof panel body, air duct guide walls are arranged on both sides of the air duct chamber, an upper part of the air duct is arranged on the top of the air duct chamber, guide walls are arranged on both sides of the machine room, an upper part of the machine room is arranged on the top of the machine room, a roof exhaust pipe is also arranged at the position of the steel casing with a water stop ring, an exposed water inlet is arranged on one side of one of the parapet guide walls, the roof panel body, the water inlet, the parapet guide wall, the air duct guide wall, the machine room guide wall, the upper part of the air duct and both sides of the upper part of the machine room are all provided with inner templates and outer templates for combined fixing, a plurality of the inner templates and the outer templates are splicable structures, and a plurality of the inner templates are provided with connecting plates for connection;
[0007] An installation component, which is arranged below the inner formwork or inside the inner formwork, and is used to support the installation of the inner formwork and provide support during pouring;
[0008] A vibrating assembly is arranged on the outer surfaces of the plurality of inner formworks, and is used for self-vibration when integrally pouring the building roof panel body.
[0009] Preferably, the mounting assembly includes a guide rail fixedly installed on the bottom layer or bottom surface, two abutment plates are arranged below the top of the inner template, a mounting frame is slidably installed above the guide rail, a plurality of walking wheels are arranged at the bottom of the mounting frame and slidably installed above the guide rail, the mounting frame is arranged in a door shape, hydraulic lifting columns are arranged on both sides of the middle part of the top of the mounting frame, and the telescopic ends of the hydraulic lifting columns are adapted to the two abutment plates.
[0010] Preferably, first pair of tie screws connected to the top and bottom surfaces of the inner template are provided on both sides of the top of the mounting frame, and a plurality of second pair of tie screws are connected to both sides of the bottom of the inner template for support and positioning.
[0011] Preferably, the vibrating assembly includes several groups of mounting plates fixedly mounted on the inner side of the inner formwork, each group of the mounting plates is provided with four, a rotating rod is rotatably mounted below every two of the mounting plates, a plurality of cams are arranged above the rotating rod, and the plurality of cams are arranged in an alternating manner, and a first meshing gear is rotatably mounted between every two of the mounting plates.
[0012] Preferably, threaded holes are provided on the outer surfaces of the connecting plates or the inner templates, positioning rings are provided at the lower interior of the threaded holes, threaded sleeves are provided on the side of the positioning rings close to the inner templates, the threaded sleeves are threadedly connected to the threaded holes, vertical rods are provided above several of the threaded holes, and internal threaded grooves are provided at the bottoms of the vertical rods to match the threaded sleeves.
[0013] Preferably, sliding grooves are provided on both sides of the internal thread groove, and a lifting rod is movably installed inside the internal thread groove. The bottom end of the lifting rod passes through the positioning ring, and the side of the rotating rod away from the positioning ring is threadedly connected to the first meshing gear. The bottom of the lifting rod is sleeved with a second meshing gear that meshes with the two first meshing gears.
[0014] Preferably, a telescopic plate is provided on the inner side of the slide groove, a connecting hole is penetrated through the top of the lifting rod, a thread is provided in the connecting hole, floating plates are provided on both sides of the lifting rod, a threaded rod matched with the connecting hole is provided on the side of the floating plate close to the lifting rod, and the top of the telescopic plate is located below the threaded rod.
[0015] Preferably, the bottom of the floating plate is arranged in an arc shape.
[0016] Preferably, a groove is provided on one side of the floating plate close to the telescopic plate, an abutment block is slidably installed inside the groove, and a return spring is provided between the abutment block and the groove to connect them.
[0017] The present invention also discloses a building roof panel integrated casting process, which is applied to the above-mentioned building roof panel integrated casting structure, and comprises the following steps:
[0018] S1: Accurately lay out and position the roof panel, air duct room, machine room and parapet according to the design drawings to ensure the accuracy of subsequent construction;
[0019] S2: In the area where the lines have been laid out, tie the steel bars of the roof panel body, parapet, air duct room, and machine room as required to ensure that the position and density of the steel bars meet the design specifications;
[0020] S3: According to the design requirements, support the roof panel body, air duct guide wall, machine room guide wall and parapet formwork, embed the water inlet and steel casing with water stop ring, and install the inner and outer formwork;
[0021] S4: The installation component is set below or inside the inner formwork to support the inner formwork and the outer formwork. After fixing the guide rail on the bottom layer or bottom surface, it is slidably installed above the guide rail through the installation frame, and the height of the formwork is adjusted by the hydraulic lifting column. The top of the formwork is connected with the first pair of tension screws, and the two sides of the inner formwork are supported with the second pair of tension screws to ensure the stability of the support system;
[0022] S5: Perform integral pouring operation to pour the concrete of the roof panel body, parapet, air duct room, and machine room in one piece. During the pouring process, start the vibrating assembly to ensure the density and uniformity of the concrete. The vibrating assembly hits the inner surface of the inner formwork through the cam to generate uniform vibration to ensure that there is no gap in the concrete.
[0023] S6: The vibrating assembly is set on the outside of the inner formwork. As the concrete flows, the floating plate and the lifting rod rise, driving the rotating rod to rotate, and then driving the cam to hit the surface of the formwork to achieve automatic vibration. This process ensures the compactness of the concrete structure.
[0024] S7: After the concrete pouring is completed, standard curing is carried out until the concrete reaches the designed strength;
[0025] S8: After the concrete reaches the designed strength, the formwork is removed, and the height of the inner formwork is adjusted using the hydraulic lifting column to facilitate the removal of the installation components. The installation frame is then slid out of the guide rail to complete the removal of the entire formwork system.
[0026] S9: Carry out a roof drainage test to ensure that there is no leakage on the roof. If leakage is found, use the under-slab grouting method to repair the leakage until the leakage problem is solved. Then carry out a water storage test again until it passes the inspection.
[0027] Beneficial effects of the present invention:
[0028] 1. This kind of building roof panel integrated casting structure and casting process, by arranging a rotating rod and a cam in the vibrating assembly, the staggered cams can cover various areas of the inner template, avoiding dead corners during the vibration process, thereby ensuring the uniform density of the concrete in the template, secondly, because the rotational vibration of the cam is automatic and continuous, no human intervention is required, which greatly improves the construction efficiency and reduces the problem of uneven vibration caused by human operation. Finally, the mechanical transmission of the rotating rod and the cam is stable and reliable, and can maintain the stability of the vibration effect for a long time, thereby ensuring the overall quality of the concrete structure. Therefore, the combined design of the rotating rod and the cam not only improves the vibration effect, but also improves the degree of automation and construction quality of the construction.
[0029] 2. The integrated casting structure and casting process of the building roof panel are provided with a floating plate, a connecting rod, a first meshing gear and a second meshing gear in the vibrating assembly. The arc-shaped design of the floating plate enables it to sensitively respond to the flow of concrete, ensuring that it smoothly follows and triggers the vibration action during the rising process of the concrete. The connecting rod is connected to the floating plate. When the floating plate rises, the connecting rod transmits this movement to the lifting rod, thereby driving the meshing gear system at the bottom. The precise transmission of the meshing gear system enables the rotating rod to rotate continuously, driving the cams arranged in an interlaced manner above to continuously hit the inner template, forming a uniform vibration effect. This mechanical transmission design not only realizes the automation of vibration, but also ensures the uniform distribution of vibration, avoiding the dead angle problem in the traditional vibration method. At the same time, the coordinated use of the floating plate and the telescopic plate protects the key components from the intrusion of concrete through the design of the groove and the abutment block, ensuring the stable operation of the vibration system and the compactness of the overall structure. The comprehensive application of this structure significantly improves the quality and construction efficiency of concrete pouring.
[0030] 3. This type of building roof panel integrated casting structure and casting process is equipped with an installation component. The installation component is designed to slide through guide rails and walking wheels, so that the formwork system can be quickly installed and disassembled, greatly improving the construction efficiency. The hydraulic lifting column can accurately adjust the height of the inner formwork to ensure the precise positioning of the formwork and the construction surface, avoiding errors in manual operation. The support and connection of the first pair of tension screws and the second pair of tension screws further enhance the stability and positioning accuracy of the formwork system, effectively avoiding the displacement or loosening of the formwork during the casting process. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only for the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0032] Figure 1 It is a schematic diagram of the process of the present invention;
[0033] Figure 2 It is a schematic diagram of the overall three-dimensional structure of the inner template and the vibrating assembly of the present invention;
[0034] Figure 3 This is a schematic diagram of the structure of the inner template and installation components of the present invention;
[0035] Figure 4 This is a schematic diagram of the planar structure of the installation assembly of the present invention;
[0036] Figure 5 This is a schematic diagram of the structure of the installation assembly of the present invention;
[0037] Figure 6 This is a schematic diagram of the structure of the vibrating assembly of the present invention;
[0038] Figure 7 For the present invention Figure 6 The enlarged structural diagram at A in the middle;
[0039] Figure 8 This is a schematic diagram of the exploded structure of the vibrating assembly of the present invention;
[0040] Fig. 9 For the present invention Figure 8 The enlarged structural diagram at B in the middle;
[0041] Fig.10 It is a schematic diagram of the floating plate structure of the present invention.
[0042] The markings in the figure are:
[0043] 1. Roof panel body; 2. Water inlet; 3. Parapet guide wall; 4. Air duct room; 5. Air duct guide wall; 6. Machine room; 7. Machine room guide wall; 8. Steel casing with water stop ring; 10. Upper part of parapet; 11. Upper part of air duct; 12. Upper part of machine room; 13. Roof exhaust pipe; 15. Inner formwork; 16. Connecting plate; 17. Threaded hole; 18. Guide rail; 19. Mounting frame; 20. Travel wheel; 21. Hydraulic lifting column; 22. Abutment plate; 23. First pair of tension screws; 24. Second pair of tension screws; 25. Mounting plate; 26. Rotating rod; 27. Cam; 28. First meshing gear; 29. Positioning ring; 30. Threaded sleeve; 31. Vertical rod; 32. Internal thread groove; 33. Slide groove; 34. Telescopic plate; 35. Lifting rod; 36. Second meshing gear; 37. Floating plate; 38. Connecting hole; 39. Threaded rod; 40. Groove; 41. Abutment block; 42. Return spring. DETAILED DESCRIPTION
[0044] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments.
[0045] like Figures 1 to 10As shown, the integral cast structure of the building roof panel comprises a roof panel body 1, parapet guide walls 3 and a parapet upper part 10 are arranged on both sides of the roof panel body 1, an air duct chamber 4, a machine room 6 and a steel casing 8 with a water stop ring are arranged in sequence above the roof panel body 1, air duct guide walls 5 are arranged on both sides of the air duct chamber 4, an air duct upper part 11 is arranged on the top of the air duct chamber 4, machine room guide walls 7 are arranged on both sides of the machine room 6, a machine room upper part 12 is arranged on the top of the machine room 6, a roof exhaust pipe 13 is also arranged at the position of the steel casing 8 with a water stop ring, one side of the parapet guide wall 3 is provided with an exposed water inlet 2, the roof panel body 1, the inlet 2 The water inlet 2, the parapet guide wall 3, the air duct guide wall 5, the machine room guide wall 7, the air duct upper part 11 and the machine room upper part 12 are all provided with inner formwork 15 and outer formwork on both sides for combined fixing, and the inner formworks 15 and the outer formworks are splicable structures, and the inner formworks 15 are all provided with connecting plates 16 for connection; the installation component is arranged below the inner formwork 15 or on the inner side of the inner formwork 15, and the installation component is used to support the installation of the inner formwork 15 and support during pouring; the vibration component is arranged on the outer surface of the inner formworks 15, and the vibration component is used for self-vibration when the building roof panel body 1 is integrally poured;
[0046] After positioning, tie the steel bars, support the flat plate and machine room guide wall 7 formwork, embed the water inlet 2 and the steel casing with water stop ring, then install the inner formwork 15 and the outer formwork, and fix them through the connecting plate 16. The installation assembly is used to support the formwork to ensure its stability during pouring. Then, cast the concrete of the roof panel body 1, parapet, air duct chamber 4 and machine room 6 as a whole. Start the vibrating assembly during the pouring process to ensure the density and uniformity of the concrete. After the concrete pouring is completed, carry out standard maintenance. After reaching the design strength, remove the formwork, and carry out the roof drainage test to ensure that there is no leakage. If there is leakage, use the under-plate grouting method to repair the leakage until it is confirmed that there is no leakage, and then re- A roof water storage test is carried out until it passes the inspection, wherein the parapet guide wall 3, the air duct guide wall 5, the machine room guide wall 7 and the roof panel body 1 are cast as one piece, and a water stop ring steel casing and an exhaust pipe are provided. The seamless connection formed by the one-time integral casting eliminates the risk of water leakage caused by multiple castings in traditional construction, and enhances the waterproof performance of the roof. The splicable design of the inner formwork 15 and the outer formwork, combined with the use of the connecting plate 16, makes the formwork installation simple and quick, while ensuring the stability of the formwork and the molding quality during the casting process. The addition of the vibration assembly ensures the density and uniformity of the concrete, and effectively avoids gaps and quality problems caused by insufficient vibration.
[0047] like Figures 2 to 5As shown, the installation assembly includes a guide rail 18 fixedly installed on the bottom layer or bottom surface, two abutment plates 22 are arranged below the top of the inner template 15, a mounting frame 19 is slidably installed above the guide rail 18, a plurality of walking wheels 20 are arranged at the bottom of the mounting frame 19 and slidably installed above the guide rail 18, the mounting frame 19 is arranged in a door shape, hydraulic lifting columns 21 are arranged on both sides of the middle of the top of the mounting frame 19, and the telescopic ends of the hydraulic lifting columns 21 are adapted to the two abutment plates 22, first pair of tensioning screws 23 connected to the top and bottom surfaces of the inner template 15 are arranged on both sides of the top of the mounting frame 19, and a plurality of second pair of tensioning screws 24 are connected on both sides of the bottom of the inner template 15 for support and positioning;
[0048] After fixing the guide rail 18 on the bottom layer or bottom surface, the mounting frame 19 is slidably installed above the guide rail 18 through a number of walking wheels 20, and two abutment plates 22 are set below the top of the inner formwork 15 to match the hydraulic lifting columns 21 of the mounting frame 19. Then, the height of the inner formwork 15 is adjusted by the hydraulic lifting columns 21, and the top and bottom surfaces of the inner formwork 15 are connected by the first pair of tension screws 23, and the bottom sides of the bottom of the inner formwork 15 are connected by the second pair of tension screws 24 to ensure the support and positioning of the formwork. After completing the installation and positioning, the one-piece pouring operation of concrete is carried out. After the pouring is completed, the height of the formwork is adjusted by using the hydraulic lifting columns 21 to facilitate the disassembly of the inner formwork 15 and related components. Finally, the mounting frame 19 is slid out from the guide rail 18 to complete the dismantling of the entire formwork system.
[0049] like Figure 2 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 , Fig.10As shown, the vibrating assembly includes a plurality of groups of mounting plates 25 fixedly mounted on the inner side of the inner template 15, each group of mounting plates 25 is provided with four, a rotating rod 26 is rotatably mounted below every two mounting plates 25, a plurality of cams 27 are arranged above the rotating rod 26, and the plurality of cams 27 are arranged in a staggered manner, a threaded hole 17 is provided on the outer surface of the connecting plate 16 or the inner template 15, a positioning ring 29 is provided below the inner part of the threaded hole 17, a threaded sleeve 30 is provided on the side of the positioning ring 29 close to the inner template 15, the threaded sleeve 30 is threadedly connected with the threaded hole 17, a vertical rod 31 is provided above the plurality of threaded holes 17, an internal thread groove 32 is provided at the bottom of the vertical rod 31 to match the threaded sleeve 30, and an internal thread groove 32 is provided at the bottom of the vertical rod 31 Matching with the threaded sleeve 30, both sides of the internal thread groove 32 are provided with a slide groove 33, and the interior of the internal thread groove 32 is movably installed with a lifting rod 35, the bottom end of the lifting rod 35 passes through the positioning ring 29, the side of the rotating rod 26 away from the positioning ring 29 is threadedly connected with the first meshing gear 28, the bottom of the lifting rod 35 is sleeved with a second meshing gear 36 meshing with the two first meshing gears 28, and the inner side of the slide groove 33 is provided with a telescopic plate 34, and the top of the lifting rod 35 is penetrated by a connecting hole 38, and the connecting hole 38 is provided with a thread, and both sides of the lifting rod 35 are provided with a floating plate 37, and the side of the floating plate 37 close to the lifting rod 35 is provided with a threaded rod 39 adapted to the connecting hole 38, and the top of the telescopic plate 34 is located below the threaded rod 39;
[0050] During the concrete pouring process, the inner formwork 15 and related components are first installed in place and fixed on the corresponding supporting structure. As the concrete is poured, the concrete begins to flow in the formwork and gradually rises. The plurality of floating plates 37 fixedly installed on the inner side of the inner formwork 15 will be pushed by the rising concrete and gradually float upward. The rise of the floating plates 37 directly pushes the connected lifting rods 35 to move upward. The upward movement of the lifting rods 35 drives the first meshing gear 28 at the bottom to start rotating. The first meshing gear 28 meshes with the second meshing gears 36 on both sides, thereby driving the rotating rods 26 on both sides to rotate. The rotating rods 26 are equipped with a plurality of staggered cams 27. As the rotating rods 26 rotate, the cams 27 will continuously hit the inner formwork. The inner surface of the plate 15, the vibration generated by the staggered impact is evenly distributed in various parts of the inner template 15, the entire vibration process is driven by the flow of concrete, automatically and continuously, without manual intervention, the structure of the threaded rod 39 and the threaded hole 17, the threaded sleeve 30, and the positioning ring 29 ensures the stability of the lifting rod 35 and the floating plate 37 during the movement, and the slide 33 and the telescopic plate 34 provide additional positioning support, so that the vibration action of the entire system is smooth and efficient, ensuring that the concrete is fully and evenly vibrated during the pouring process, ensuring the density and overall quality of the concrete structure, after the vibration is completed, as the concrete gradually solidifies, the system will stop vibrating and enter the next step of the concrete curing process;
[0051] The bottom of the floating plate 37 is arranged in an arc shape. A groove 40 is provided on one side of the floating plate 37 close to the telescopic plate 34. An abutment block 41 is slidably installed inside the groove 40. A return spring 42 is arranged between the abutment block 41 and the groove 40.
[0052] During the concrete pouring process, as the concrete gradually fills the formwork and begins to flow, the bottom arc surface of the floating plate 37 can smoothly contact and follow the rising concrete, and the abutment block 41 protects the telescopic position of the telescopic plate 34 from being poured by concrete, thereby ensuring the normal use of the telescopic plate 34. When the floating plate 37 rises, it will drive the telescopic plate 34 to rise synchronously to block both sides of the vertical rod 31 to ensure vibration.
[0053] The present application also discloses a building roof panel integrated casting process, which is applied to the above-mentioned building roof panel integrated casting structure, and includes the following steps:
[0054] S1: Accurately lay out and position the roof panel body 1, the air duct chamber 4, the machine room 6 and the parapet according to the design drawings to ensure the accuracy of subsequent construction;
[0055] S2: In the area where the lines have been laid out and positioned, tie the steel bars of the roof panel body 1, parapet, air duct room 4, and machine room 6 as required to ensure that the position and density of the steel bars meet the design specifications;
[0056] S3: According to the design requirements, the roof panel body 1, the air duct guide wall 5, the machine room guide wall 7 and the parapet formwork are supported, the water inlet 2 and the steel casing with the water stop ring are embedded, and the inner formwork 15 and the outer formwork are installed;
[0057] S4: The mounting assembly is arranged below or inside the inner template 15, and is used to support the inner template 15 and the outer template. After the guide rail 18 is fixed on the bottom layer or the bottom surface, it is slidably mounted above the guide rail 18 through the mounting frame 19, and the template height is adjusted by the hydraulic lifting column 21. The top of the template is connected by the first tension screw 23, and the two sides of the inner template 15 are supported by the second tension screw 24 to ensure the stability of the support system;
[0058] S5: Perform an integral pouring operation to integrally pour the concrete of the roof panel body 1, parapet, air duct chamber 4, and machine room 6. During the pouring process, start the vibrating assembly to ensure the density and uniformity of the concrete. The vibrating assembly interlacedly hits the inner surface of the inner template 15 through the cam 27 to generate uniform vibration to ensure that there is no gap in the concrete.
[0059] S6: The vibrating assembly is arranged on the outside of the inner formwork 15. As the concrete flows, the floating plate 37 and the lifting rod 35 rise accordingly, driving the rotating rod 26 to rotate, and then driving the cam 27 to hit the surface of the formwork to achieve automatic vibration. This process ensures the compactness of the concrete structure.
[0060] S7: After the concrete pouring is completed, standard curing is carried out until the concrete reaches the designed strength;
[0061] S8: After the concrete reaches the designed strength, the formwork is removed, and the height of the inner formwork 15 is adjusted by using the hydraulic lifting column 21 to facilitate the removal of the installation components, and the mounting frame 19 is slid out of the guide rail 18 to complete the removal of the entire formwork system;
[0062] S9: Carry out roof drainage test to ensure that there is no leakage on the roof. If leakage is found, use the under-slab grouting method to repair the leakage until the leakage problem is solved. Then carry out water storage test again until it passes the test;
[0063] Compared with the prior art, the automatic vibrating assembly introduced in the overall pouring process ensures the density and uniformity of the concrete in the inner formwork 15 through the staggered impact of the cam 27, especially for the bottom area that is difficult to reach, and effectively avoids the problems of vibration dead angle and uneven density in the traditional vibration method through self-vibration. The automated operation of the vibrating assembly not only improves the construction efficiency and reduces the necessity of manual intervention, but also cooperates with the external vibrating rod to further enhance the upper layer vibration effect of the concrete, ensuring the high quality of the entire pouring process.
Claims
1. An integrated casting structure of a building roof panel, characterized in that: include: A roof panel body (1), wherein both sides of the roof panel body (1) are provided with parapet guide walls (3) and a parapet upper part (10), and an air duct chamber (4), a machine room (6) and a steel casing with a water stop ring (8) are sequentially arranged above the roof panel body (1), both sides of the air duct chamber (4) are provided with air duct guide walls (5), the top of the air duct chamber (4) is provided with an air duct upper part (11), both sides of the machine room (6) are provided with machine room guide walls (7), the top of the machine room (6) is provided with a machine room upper part (12), and the steel casing with a water stop ring ( 8) is also provided with a roof exhaust pipe (13), one side of one of the parapet guide walls (3) is provided with an exposed water inlet (2), the roof panel body (1), the water inlet (2), the parapet guide wall (3), the air duct guide wall (5), the machine room guide wall (7), the upper part of the air duct (11) and both sides of the upper part of the machine room (12) are provided with inner formwork (15) and outer formwork for combined fixing, a plurality of the inner formworks (15) and the outer formworks are of a splicable structure, and a connecting plate (16) is provided between the plurality of the inner formworks (15) for connection; An installation component, the installation component is arranged below the inner formwork (15) or on the inner side of the inner formwork (15), and the installation component is used to support the installation of the inner formwork (15) and provide support during pouring; A vibrating assembly, the vibrating assembly being arranged on the outer surfaces of the plurality of inner formworks (15), the vibrating assembly being used for self-vibration when integrally pouring the building roof panel body (1); The vibrating assembly comprises a plurality of groups of mounting plates (25) fixedly mounted on the inner side of the inner template (15), each group of the mounting plates (25) being provided with four, a rotating rod (26) being rotatably mounted below each two of the mounting plates (25), a plurality of cams (27) being arranged above the rotating rods (26), and the plurality of cams (27) being arranged in a staggered manner, a first meshing gear (28) being rotatably mounted between each two of the mounting plates (25), a threaded hole (17) being provided on the outer surface of the connecting plate (16) or the inner template (15), a positioning ring (29) being arranged below the inside of the threaded hole (17), a threaded sleeve (30) being provided on a side of the positioning ring (29) close to the inner template (15), the threaded sleeve (30) being threadedly connected to the threaded hole (17), a vertical rod (31) being arranged above each of the threaded holes (17), an inner thread groove (32) being provided at the bottom of the vertical rod (31) being connected to the threaded sleeve (32) 0), both sides of the internal thread groove (32) are provided with sliding grooves (33), the interior of the internal thread groove (32) is movably provided with a lifting rod (35), the bottom end of the lifting rod (35) passes through the positioning ring (29), the side of the rotating rod (26) away from the positioning ring (29) is threadedly connected to the first meshing gear (28), and the bottom of the lifting rod (35) is sleeved with a second meshing gear (36) which is engaged with the two first meshing gears (28). The inner side of the slide groove (33) is provided with a telescopic plate (34), the top of the lifting rod (35) is penetrated by a connecting hole (38), the connecting hole (38) is provided with a thread, both sides of the lifting rod (35) are provided with a floating plate (37), a side of the floating plate (37) close to the lifting rod (35) is provided with a threaded rod (39) adapted to the connecting hole (38), and the top of the telescopic plate (34) is located below the threaded rod (39).
2. The integrated casting structure of building roof panels according to claim 1, characterized in that: The mounting assembly comprises a guide rail (18) fixedly mounted on a bottom layer or bottom surface, two abutment plates (22) are arranged below the top of the inner template (15), a mounting frame (19) is slidably mounted above the guide rail (18), a plurality of running wheels (20) are arranged at the bottom of the mounting frame (19) and are slidably mounted above the guide rail (18), the mounting frame (19) is arranged in a door shape, and hydraulic lifting columns (21) are arranged on both sides of the middle of the top of the mounting frame (19), and the telescopic ends of the hydraulic lifting columns (21) are adapted to the two abutment plates (22).
3. The integrated casting structure of building roof panels according to claim 2, characterized in that: Both sides of the top of the mounting frame (19) are provided with first pair of tie screws (23) connected to the top and bottom surfaces of the inner template (15), and both sides of the bottom of the inner template (15) are connected to a plurality of second pair of tie screws (24) for support and positioning.
4. The integrated casting structure of building roof panels according to claim 3 is characterized in that: The bottoms of the floating plates (37) are all arranged in an arc shape.
5. The integrated casting structure of building roof panels according to claim 4 is characterized in that: A groove (40) is provided on one side of the floating plate (37) close to the telescopic plate (34), an abutment block (41) is slidably mounted inside the groove (40), and a return spring (42) is provided between the abutment block (41) and the groove (40).
6. A building roof panel integrated casting process, applied to the building roof panel integrated casting structure as claimed in claim 5, characterized in that: The following steps are involved: S1: Accurately lay out and position the roof panel body (1), the air duct chamber (4), the machine room (6) and the parapet according to the design drawings to ensure the accuracy of subsequent construction; S2: In the area where the lines have been laid out and positioned, tie the steel bars of the roof panel body (1), parapet, air duct chamber (4), and machine room (6) as required, ensuring that the position and density of the steel bars meet the design specifications; S3: According to the design requirements, the roof panel body (1), the air duct guide wall (5), the machine room guide wall (7) and the parapet formwork are supported, the water inlet (2) and the steel casing with a water stop ring are embedded, and the inner formwork (15) and the outer formwork are installed; S4: The mounting assembly is arranged below or inside the inner template (15) and is used to support the inner template (15) and the outer template. After the guide rail (18) is fixed on the bottom layer or the bottom surface, it is slidably mounted above the guide rail (18) through the mounting frame (19), and the template height is adjusted by using the hydraulic lifting column (21). The top of the template is connected by using the first tensioning screw rod (23), and the two sides of the inner template (15) are supported by the second tensioning screw rod (24) to ensure the stability of the support system; S5: Performing an integral pouring operation to integrally pour the concrete of the roof panel body (1), the parapet, the air duct chamber (4), and the machine room (6) in place. During the pouring process, the vibrating assembly is started to ensure the density and uniformity of the concrete. The vibrating assembly interlacedly strikes the inner surface of the inner template (15) through the cam (27) to generate uniform vibration to ensure that there are no gaps in the concrete. S6: The vibrating assembly is arranged on the outside of the inner formwork (15). As the concrete flows, the floating plate (37) and the lifting rod (35) rise accordingly, driving the rotating rod (26) to rotate, thereby driving the cam (27) to hit the surface of the formwork, thereby achieving automatic vibration. This process ensures the compactness of the concrete structure. S7: After the concrete pouring is completed, standard curing is carried out until the concrete reaches the designed strength; S8: After the concrete reaches the designed strength, the formwork is removed, and the height of the inner formwork (15) is adjusted using the hydraulic lifting column (21) to facilitate the removal of the installation components, and the installation frame (19) is slid out of the guide rail (18), thereby completing the removal of the entire formwork system; S9: Carry out a roof drainage test to ensure that there is no leakage on the roof. If leakage is found, use the under-slab grouting method to repair the leakage until the leakage problem is solved. Then carry out a water storage test again until it passes the inspection.
Citation Information
Patent Citations
A cast-in-place integrated thermal insulation pitched roof structure and construction method
CN107447903B
Column pouring device with vibrating function
CN111706080A
Constructional column formwork capable of automatically vibrating and construction method thereof
CN117403877A