Supporting structure for concrete formwork and construction method

By using the structure of support mesh foundation and auxiliary support components in the concrete formwork, the problems of cumbersome construction and poor quality of traditional formwork support are solved, and efficient and stable concrete structure construction is achieved, reducing costs and improving construction quality.

CN118997464AInactive Publication Date: 2024-11-22CHINA METALLURGICAL CONSTR ENG GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411039468.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The construction of the internal support of traditional concrete formwork has problems such as cumbersome steps, long construction periods and high construction costs, and the internal support is not firmly fixed, resulting in poor quality of the concrete structure.

Method used

The structure method of supporting mesh foundation including vertical and horizontal distribution ribs, auxiliary support components such as tie ribs and water stop screws is adopted. The supporting mesh is formed by binding and clamping with concrete outer cladding and water stop screws to achieve disposable formwork support. Protection reduces pads to assist construction and improves limit stability.

Benefits of technology

The construction cycle is shortened, construction efficiency and quality is improved, costs are reduced, and the support quality of the concrete cast layer is improved through strong nodes and reusable water stop screws.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997464A_ABST
    Figure CN118997464A_ABST
Patent Text Reader

Abstract

The invention discloses a supporting structure for a concrete formwork and a construction method. The supporting structure comprises an auxiliary supporting assembly, and the auxiliary supporting assembly comprises tie bars, a concrete wrapping layer and water stop screws; the middle section of the tie bar is wrapped by the concrete outer wrapping layer, the concrete outer wrapping layer is located between the front formwork and the rear formwork, and the concrete outer wrapping layer is clamped through approaching of the front formwork and the rear formwork, so that an interlayer with a preset thickness is formed between the front formwork and the rear formwork; the front ends of the tie bars are sunken inwards to form front limiting notches, the rear ends of the tie bars are sunken inwards to form rear limiting notches, and the front limiting notches and the rear limiting notches correspondingly connect the crossed joints of the vertical distribution bars and the horizontal distribution bars respectively; the tedious steps of using the inner support can be reduced, the construction progress is accelerated, the inner support is more firmly limited at the preset position, and the construction quality of concrete slabs, columns, beams and other structures is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of template support for concrete slabs, columns or beams, and in particular to a support structure for concrete templates and a construction method. Background Art

[0002] When the traditional formwork internal support reaches a certain length, reinforcing ribs are required, the construction and binding period is long, and the construction cost increases. In addition, the current use of internal supports requires the use of pads for construction, which has the problems of cumbersome steps and low efficiency. Once the internal support is not firmly fixed, there is also the problem of poor construction quality of the concrete structure.

[0003] Therefore, in order to solve the above problems, a support structure and construction method for concrete formwork is needed, which can reduce the cumbersome steps of using internal supports, speed up the construction progress, and make the internal supports more firmly limited in preset positions, thereby improving the construction quality of structures such as concrete slabs, columns and beams. Summary of the invention

[0004] In view of this, the purpose of the present invention is to overcome the defects in the prior art and provide a support structure and construction method for concrete formwork, which can reduce the cumbersome steps of using internal supports, speed up the construction progress, and make the internal supports more firmly limited in preset positions, thereby improving the construction quality of structures such as concrete slabs, columns and beams.

[0005] The support structure for a concrete formwork of the present invention comprises a plurality of vertical distribution bars and a plurality of horizontal distribution bars, wherein the plurality of vertical distribution bars and the plurality of horizontal distribution bars are bound in a mutually perpendicular relationship to form a support mesh foundation, and the concrete formwork further comprises a front formwork and a rear formwork for clamping the support mesh foundation;

[0006] The support structure includes a back rib I supported on the front side of the front template and a back rib II supported on the rear side of the rear template, and the support structure also includes a main rib I supported on the front side of the back rib I and a main rib II supported on the rear side of the back rib II, and the main rib I and the main rib II are parallel to the horizontal distribution ribs;

[0007] The support structure also includes an auxiliary support assembly, which includes tie bars, a concrete outer layer and a water-stop screw;

[0008] The concrete outer layer wraps the middle section of the tie bar, and the concrete outer layer is located between the front formwork and the rear formwork. The front formwork and the rear formwork are brought close together to clamp the concrete outer layer, so that a spacer of a preset thickness is formed between the front formwork and the rear formwork.

[0009] The front end of the tie bar is recessed inward to form a front limiting notch, and the rear end of the tie bar is recessed inward to form a rear limiting notch, and the front limiting notch and the rear limiting notch respectively and correspondingly connect the nodes where the vertical distribution bar and the horizontal distribution bar intersect;

[0010] The inner rod of the water-stop screw is pre-buried in the outer layer of concrete, the mountain-shaped piece of the water-stop screw is threadedly connected to the inner rod through the outer rod, and the mountain-shaped piece is limited by a nut threadedly connected to the outer rod.

[0011] The main rib I is limited at the front side of the back rib I by the corresponding mountain-shaped piece, and the main rib II is limited at the rear side of the back rib II by the corresponding mountain-shaped piece.

[0012] Furthermore, the concrete outer layer has functional teeth extending outwards.

[0013] Furthermore, the tie bar is in a "C" shape.

[0014] Furthermore, the functional teeth are rectangular.

[0015] Furthermore, the functional teeth are in a plurality of blocks, and the plurality of functional teeth are evenly distributed on the top and bottom of the concrete outer envelope.

[0016] Furthermore, the back of the tie bar is welded to the inner rod of the water-stop screw to form a whole.

[0017] The present invention also discloses a concrete construction method for a support structure of a concrete formwork, comprising the following construction steps:

[0018] S1. Support net foundation binding;

[0019] S2. Tie the tie bars with concrete outer cover on the support net;

[0020] S3. The front template and the rear template clamp the outer layer of the concrete through the back rib Ⅰ, back rib Ⅱ, main rib Ⅰ and main rib Ⅱ;

[0021] S4. pouring concrete in the compartment formed by the front formwork and the rear formwork;

[0022] S5. Remove the mold and maintain it, and recycle the reused part of the water-stop screw.

[0023] The beneficial effects of the present invention are as follows: a support structure and construction method for concrete formwork disclosed in the present invention can complete the formwork support construction at one time by adopting a special auxiliary support component, without the auxiliary construction of pads, the construction period is shortened, the efficiency is greatly increased, and the construction cost can be saved. Due to the existence of strong nodes, the formwork quality of the concrete pouring layer is greatly improved, thereby ensuring the construction quality. In addition, the raw materials are easy to obtain, and waste steel bars can be selected on site as tie bars, which can be used in combination with reusable water-stop screws to reduce construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0025] Figure 1 It is a structural schematic diagram of the present invention;

[0026] Figure 2 It is a schematic diagram of the construction facade structure of the present invention;

[0027] Figure 3 It is a structural schematic diagram of the auxiliary support assembly of the present invention;

[0028] Figure 4 For the present invention Figure 3 Schematic diagram of the AA structure. DETAILED DESCRIPTION

[0029] Figure 1 It is a structural schematic diagram of the present invention. As shown in the figure, the support structure for the concrete formwork in this embodiment;

[0030] The concrete formwork includes a plurality of vertical distribution bars 2 and a plurality of horizontal distribution bars 1, which are tied in a mutually perpendicular relationship to form a support mesh foundation, and the concrete formwork also includes a front template 3 and a rear template 4 that clamp the support mesh foundation; wherein the front and rear templates are connected in a mutually perpendicular relationship to form a support mesh foundation; Figure 2 The above is the standard, and I will not repeat it here;

[0031] In this solution, the vertical distribution reinforcement 2, the horizontal distribution reinforcement 1, the front template 3 and the rear template 4 respectively correspond to any one of the existing technologies to form a concrete grouting interlayer, which will not be repeated here;

[0032] The support structure includes a back rib Ⅰ5 supported on the front side of the front template 3 and a back rib Ⅱ6 supported on the rear side of the rear template 4, and the support structure also includes a main rib Ⅰ7 supported on the front side of the back rib Ⅰ5 and a main rib Ⅱ8 supported on the rear side of the back rib Ⅱ6, and the main rib Ⅰ7 and the main rib Ⅱ8 are parallel to the horizontal distribution rib 1;

[0033] In this scheme, the back ribs Ⅰ5, back ribs Ⅱ6, main ribs Ⅰ7 and main ribs Ⅱ8 respectively correspond to any one of the existing technologies, and it is appropriate to realize the interlayer of concrete grouting formed by the auxiliary limiting front template 3 and the rear template 4, which will not be repeated here;

[0034] The support structure also includes an auxiliary support assembly, which includes a tie bar 9, a concrete outer layer 10 and a water-stop screw 12; wherein the water-stop screw 12 is selected from any one of the prior art, and the inner rod of the water-stop screw 12 is perpendicular to the front formwork 3 and the rear formwork 4, which will not be described in detail here;

[0035] The concrete outer layer 10 is made of concrete at least one grade higher than the cast concrete to cast the inner rod of the water stop screw 12 and the tie bar 9 to form an integral support member to meet the use requirements of high-strength structural parts and can be used as an internal support;

[0036] The concrete outer layer 10 and the inner rod of the water-stop screw 12 and the tie bar 9 are prefabricated to form a whole, which can be directly used in construction, and different specifications are prepared for use according to the general concrete layer casting thickness; more specifically, the concrete outer layer 10 has a functional tooth 11 extending outward, and the design purpose of the functional tooth 11 is to increase the contact area with the concrete and increase the gripping ability. The functional tooth 11 is rectangular, and the rectangular functional teeth 11 are a number of continuous and equidistantly arranged teeth. More precisely, the functional teeth 11 are a number of blocks, and the functional teeth 11 are evenly distributed on the top and bottom of the concrete outer layer 10, and the spacing direction is evenly distributed in the front and rear directions. The front end face of the concrete outer layer 10 is parallel to the front template 3, and the rear end face of the concrete outer layer 10 is parallel to the rear template 4.

[0037] During construction, the front formwork 3 and the rear formwork 4 are clamped with the concrete outer layer 10 by the water-stop screw 12, and the main ribs Ⅰ7 and the main ribs Ⅱ8 are respectively limited on the back ribs Ⅰ5 and the back ribs Ⅱ6 by the water-stop screw 12. After the construction is completed, the reused part of the water-stop screw 12 is dismantled and reused to improve resource utilization;

[0038] The concrete outer layer 10 wraps the middle section of the tie bar 9 to form a strong connection structure of reinforced concrete. The concrete outer layer 10 is located between the front formwork 3 and the rear formwork 4. The front formwork 3 and the rear formwork 4 are brought close to clamp the concrete outer layer 10, so that a barrier layer of a preset thickness is formed between the front formwork 3 and the rear formwork 4.

[0039] The front end of the tie bar 9 is recessed inward to form a front limit notch, and the rear end of the tie bar 9 is recessed inward to form a rear limit notch. The front limit notch and the rear limit notch respectively connect the nodes where the vertical distribution bar 2 and the horizontal distribution bar 1 intersect, and the connection method is mainly inward buckle node, supplemented by binding connection;

[0040] More precisely, the tie bar 9 is in a "C" shape; the limiting capacity is improved, and the tie strength can be further guaranteed; when the reverse tension occurs, the higher the strength of the overall force connection node of the structure, the higher the strength of the poured concrete layer structure, and the construction quality is improved;

[0041] The inner rod of the water stop screw 12 is embedded in the concrete outer layer 10, and the back of the tie bar 9 is welded to the inner rod of the water stop screw 12 to form a whole, which improves the structural strength. The back is the side of the tie bar 9 away from the front limit notch and the rear limit notch, which will not be described here. This connection method has a large contact area and an excellent connection effect, and can improve the structural strength of the concrete outer layer 10.

[0042] The mountain-shaped piece of the water-stop screw 12 is threadedly connected to the inner rod through the outer rod, and the mountain-shaped piece is limited by a nut threadedly connected to the outer rod. The main rib I7 is limited at the front side of the back rib I5 through the corresponding mountain-shaped piece, and the main rib II8 is limited at the rear side of the back rib II6 through the corresponding mountain-shaped piece. The water-stop screw 12 can select any one of the existing technologies to achieve the established purpose of this scheme, which will not be repeated here. The scheme of adopting the water-stop screw 12 can greatly shorten the construction period, and some of the accessories can be reused, which is conducive to reducing costs.

[0043] This solution uses special auxiliary support components to complete the formwork support construction in one go, without the need for auxiliary construction of pads, thus shortening the construction period, greatly increasing efficiency, and saving construction costs. Due to the presence of strong nodes, the formwork quality of the concrete casting layer is greatly improved, thereby ensuring the construction quality. In addition, the raw materials are easy to obtain, and waste steel bars can be selected on site as tie bars 9, which, combined with reusable water-stop screws 12, can reduce construction costs.

[0044] The present invention also discloses a concrete construction method for a support structure of a concrete formwork, comprising the following construction steps:

[0045] S1. Support net foundation binding;

[0046] S2. The tie bars 9 having a concrete outer layer 10 are tied on the support net;

[0047] S3. Through the back edge Ⅰ5, back edge Ⅱ6, main edge Ⅰ7 and main edge Ⅱ8 so that the front template 3 and the rear template 4 will clamp the concrete outer layer 10;

[0048] S4 pouring concrete in the interlayer formed by the front template 3 and the rear template 4;

[0049] S5. Remove the mold and perform curing, and recover the reused part of the water-stop screw 12.

[0050] This construction method is convenient and simple, with a short construction period, and the auxiliary support components are prefabricated, which can be used on site, saving the steps of pad construction. The structure is more secure in binding the support net foundation, and the quality of the reinforced concrete building layer can be guaranteed.

[0051] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A support structure for a concrete formwork, the concrete formwork comprising a plurality of vertical distribution bars and a plurality of horizontal distribution bars, the plurality of vertical distribution bars and the plurality of horizontal distribution bars being tied in a mutually perpendicular relationship to form a support mesh foundation, the concrete formwork further comprising a front formwork and a rear formwork for clamping the support mesh foundation, characterized in that: The support structure includes a back rib I supported on the front side of the front template and a back rib II supported on the rear side of the rear template, and the support structure also includes a main rib I supported on the front side of the back rib I and a main rib II supported on the rear side of the back rib II, and the main rib I and the main rib II are parallel to the horizontal distribution ribs; The support structure also includes an auxiliary support assembly, which includes tie bars, a concrete outer layer and a water-stop screw; The concrete outer layer wraps the middle section of the tie bar, and the concrete outer layer is located between the front formwork and the rear formwork. The front formwork and the rear formwork are brought close together to clamp the concrete outer layer, so that a spacer of a preset thickness is formed between the front formwork and the rear formwork. The front end of the tie bar is recessed inward to form a front limiting notch, and the rear end of the tie bar is recessed inward to form a rear limiting notch, and the front limiting notch and the rear limiting notch respectively and correspondingly connect the nodes where the vertical distribution bar and the horizontal distribution bar intersect; The inner rod of the water-stop screw is pre-buried in the outer layer of concrete, the mountain-shaped piece of the water-stop screw is threadedly connected to the inner rod through the outer rod, and the mountain-shaped piece is limited by a nut threadedly connected to the outer rod. The main rib I is limited at the front side of the back rib I by the corresponding mountain-shaped piece, and the main rib II is limited at the rear side of the back rib II by the corresponding mountain-shaped piece.

2. The support structure for concrete formwork according to claim 1, characterized in that: The concrete outer envelope has functional teeth extending outwardly.

3. The support structure for concrete formwork according to claim 1, characterized in that: The tie bar is in a "C" shape.

4. The support structure for concrete formwork according to claim 2, characterized in that: The functional teeth are rectangular.

5. The support structure for concrete formwork according to claim 2, characterized in that: The functional teeth are in a plurality of blocks, and the plurality of functional teeth are evenly distributed on the top and the bottom of the concrete outer envelope.

6. The support structure for concrete formwork according to claim 1, characterized in that: The back of the tie bar is welded to the inner rod of the water-stop screw to form a whole.

7. A method for constructing a concrete structure based on the support structure for a concrete formwork according to any one of claims 1 to 6, characterized in that: The construction steps include: S1. Support net foundation binding; S2. Tie the tie bars with concrete outer cover on the support net; S3. The front template and the rear template clamp the outer layer of the concrete through the back rib Ⅰ, back rib Ⅱ, main rib Ⅰ and main rib Ⅱ; S4. pouring concrete in the compartment formed by the front formwork and the rear formwork; S5. Remove the mold and maintain it, and recycle the reused part of the water-stop screw.