The invention discloses an underground pressure opening sand setting type perforation sand prevention
pipe column which comprises a non-
channel coupling, a sand setting
pipe is fixedly connected to one end of the non-
channel coupling, an
embossing guide
pipe is fixedly connected to the other end of the non-
channel coupling, a perforating gun is connected to the other end of the
embossing guide pipe, and an exploder is fixedly connected to the interior of the joint of the
embossing guide pipe and the perforating gun. The other end of the sand
settling pipe is connected with a sand filtering pipe, and the other end of the sand filtering pipe is connected with an oil pipe; according to the underground pressure opening sand setting type perforation sand prevention pipe column, the pressure opening sand setting type perforation sand prevention pipe column is installed underground, underground mechanical sand prevention is achieved while well completion is conducted through the underground perforation pipe column, formation sand can be prevented from entering a ground production
system, and the production efficiency is improved. Moreover, the sand prevention pipe column can be prevented from being put down after the perforation pipe column is lifted up after the perforation of the shallow gas well is completed, the
well control risk is effectively avoided, the sand setting function in the pipe is achieved, the
sand filter pipe
airflow channel can be prevented from being buried by stratum sand, and the sand prevention device can be popularized and applied to underground mechanical sand prevention process technologies of various oil fields.