Anti-crack construction method for nuclear island plant strong constraint structure concrete

By implementing measures such as segmented pouring of low-temperature-increasing crack-resistant concrete, temperature-controlled pipelines, and heat-insulating and moisture-retaining curing, the problems of concrete cracking and leakage during the construction of the nuclear island plant were solved, achieving high crack resistance and leakage prevention of the structure.

CN118997481APending Publication Date: 2024-11-22JIANGSU SOBUTE NEW MATERIALS CO LTD +3
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202310567794.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-19
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

During construction, nuclear island buildings are prone to concrete cracking and leakage, which increases structural vulnerability. Existing technologies are unable to effectively control cracks caused by temperature and shrinkage.

Method used

Low-temperature-increasing crack-resistant concrete is used. Through measures such as segmented pouring, controlling the temperature of the concrete upon placement, temperature-controlled pipelines, and heat preservation and moisture retention curing, combined with specific raw material ratios and construction techniques, the temperature rise and shrinkage of the concrete are controlled to prevent crack formation.

Benefits of technology

This effectively reduced the risk of cracking and leakage in the nuclear island plant structure, and improved the reliability and safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure SMS_2
    Figure SMS_2
  • Figure SMS_3
    Figure SMS_3
  • Figure SMS_4
    Figure SMS_4
Patent Text Reader

Abstract

The invention discloses a nuclear island plant strong constraint structure concrete anti-crack construction method which comprises the following steps: preparing low temperature rise anti-crack concrete for nuclear power, pouring each section of a nuclear island plant strong constraint structure, in the concrete pouring process, building a curing shed to form a closed space, and arranging an intelligent temperature control system inside the closed space. The concrete mold entering temperature needs to be controlled according to the daily average temperature T during construction, the time interval of step-by-step pouring between different sections of solid structures and the temperature of solid structure concrete are controlled, and heat preservation and moisture preservation maintenance is conducted on the nuclear island plant strong constraint structure concrete. According to the anti-crack construction method for the nuclear island plant strong constraint structure concrete, the construction difficulty of the nuclear island plant structure concrete can be effectively reduced, penetrating shrinkage cracks of the concrete are inhibited, dense filling is achieved, and the problems of cracking and leakage are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of nuclear island plant construction, and in particular relates to a method for anti-cracking construction of strongly constrained structural concrete of a nuclear island plant. Background Art

[0002] Once the randomness and uncertainty activities brought by earthquakes exceed the design standards of the plant, the nuclear power plant will enter a nonlinear state, leading to major accidents. Although both at home and abroad, the impact of earthquakes on nuclear power plants has been reduced by selecting high-quality foundations and improving the seismic resistance of structural designs. However, the cracking of concrete caused by construction or the material itself will still greatly increase the vulnerability of the plant. At the same time, due to the characteristics of the nuclear island plant design, the inadequate temperature control measures during construction also induced the generation of cracks, resulting in reduced reliability of the nuclear power plant.

[0003] The results of engineering surveys of similar projects and similar cast-in-place structures show that the nuclear island plant uses special nuclear power cement and other raw materials, and the mix design strength is relatively high, which leads to concentrated hydration heat release of cementitious materials and large temperature shrinkage and self-shrinkage of concrete. At the same time, due to the special design of the nuclear island plant, the constraints are higher than those of ordinary building structures. There are no cooling water pipes buried between the plant structures, which makes it difficult to control the temperature of the cast-in-place structure. After the concrete is poured, it cannot be effectively cooled in the temperature rise stage, and the temperature drop rate is too large in the cooling stage, resulting in cracks. All of the above make it much more difficult to control cracks in the nuclear island plant than in similar ordinary buildings. Summary of the invention

[0004] The purpose of the present invention is to overcome the deficiencies in the prior art and provide a method for anti-cracking construction of strongly constrained structural concrete of a nuclear island plant.

[0005] To achieve the above object, the present invention is implemented by adopting the following technical solutions:

[0006] The present invention provides a method for anti-cracking construction of a nuclear island plant building with a strong restraint structure, comprising the following steps:

[0007] Prepare low-temperature, high-rise, crack-resistant concrete for nuclear power, and cast each segment of the strong-constrained structure of the nuclear island plant, wherein the single casting length of the bottom plate area does not exceed 30m, and the single casting length of the wall and floor in each segment does not exceed 20m. When the thickness difference between adjacent floor slabs is ≥300mm, separate segments are required, and when there are floor slabs of different thicknesses in the segment, the thick floor slab is cast first, and then the thin floor slab is cast;

[0008] During the concrete pouring process, the concrete mold temperature needs to be controlled according to the average daily temperature T during construction:

[0009] When the daily average temperature T is less than 10℃, the concrete mold temperature of the walls and floor slabs in each segment is controlled to be 5~20℃;

[0010] When the daily average temperature T≥10℃, the concrete mold temperature of the walls and floor slabs in each segment is controlled to be Ts≤T+10℃ and Ts≤30℃;

[0011] The time interval between the step-by-step pouring of different segmented solid structures shall not be less than 10 days, the maximum temperature rise of the wall and floor concrete in each segment shall not exceed 35°C, the temperature difference between the inside and the outside shall not exceed 15°C, and the center temperature drop rate shall not exceed 3.0°C / d;

[0012] Carry out thermal insulation and moisture maintenance on the strongly constrained structural concrete of the nuclear island plant.

[0013] Furthermore, after the casting of the wall and the floor is completed, a closed area is formed by adding a curing shed, and the concrete intelligent temperature control system is turned on to control the temperature in the closed nuclear island plant area, so as to effectively reduce the maximum temperature rise of the concrete in the floor area. The specific method is as follows:

[0014] Before pouring the floor slab, arrange gas temperature control pipes with a spacing of less than 2 meters along the vertical direction of the floor slab, with a pipe diameter of less than 30 cm, and install water mist spray devices on the sides of the pipes;

[0015] Before pouring the wall, arrange gas temperature control pipes with a spacing of less than 2 meters along the wall direction, with a pipe diameter of less than 30 cm, and install water mist spray devices on the sides of the pipes;

[0016] After the wall and floor are poured, a curing shed is built around to form a closed space, and the gas delivery pipeline is immediately connected. The air conditioner is turned on in the closed space for temperature control. The gas circulation air volume is controlled to be not less than 1000m3 / h in spring and autumn, and not less than 1400m3 / h in summer, and the temperature of the closed space is adjusted to ≤25℃;

[0017] After the air circulation system is turned on, the time to shut it down is selected according to the internal temperature detection of the concrete: when the internal temperature of the concrete reaches the peak and drops by 5°C, the air circulation system is shut down, and it should be shut down no more than 3 days after the pouring is completed;

[0018] In order to maintain constant humidity in the confined space, it is necessary to open the atomizing nozzle of the water mist spray device to control the humidity, and the flow rate should be controlled not less than 0.4L / min. Keep the spray device open for 15 days and then close it, or close it when the maintenance is completed.

[0019] Furthermore, the performance of the low temperature crack resistant concrete meets the following conditions:

[0020] The slump into the mold is 160±20mm, the air content is controlled at 2.5±0.5%, and the strength grade does not exceed C50.

[0021] Furthermore, the low temperature crack resistant concrete comprises the following raw materials and weight fractions:

[0022] 260-330 parts by mass of Portland cement for nuclear power engineering;

[0023] 100-160 parts by mass of fly ash;

[0024] 700-790 parts by mass of fine aggregate;

[0025] 1000-1100 parts by mass of coarse aggregate;

[0026] 36 to 50 parts by weight of an anti-cracking agent;

[0027] 4 to 6 parts by weight of water reducing agent;

[0028] And 145 to 170 parts by mass of mixing water.

[0029] Furthermore, the fine aggregate is natural zone II medium sand, with a mud content of no more than 2.0% and a mud block content of no more than 1.0%;

[0030] The coarse aggregate is 5-20 mm continuously graded crushed stone, and the loose accumulation porosity does not exceed 43%;

[0031] The anti-cracking agent has the functions of temperature rise inhibition and micro expansion. High-efficiency anti-cracking agent for concrete (temperature control, anti-seepage);

[0032] The water reducing agent is a PCA polycarboxylic acid high-performance water reducing agent, and the shrinkage ratio does not exceed 100%.

[0033] Furthermore, the main measures for mold temperature control include cooling of raw materials, cooling of the production process, insulation during transportation, and temperature control during pouring. The specific operations are as follows:

[0034] Cooling during production: When mixing concrete, use a mixture of cold water and an appropriate amount of ice chips to make the concrete outlet temperature meet the requirements;

[0035] Insulation during transportation: The outer side of the concrete tank is wrapped and insulated as a whole to reduce the temperature of the concrete caused by direct sunlight on the tank and ensure that the temperature of the concrete entering the mold meets the requirements;

[0036] Temperature control during pouring: Before pouring concrete, the tied steel frame can be cooled by sprinkling water so that the temperature of the concrete entering the mold reaches the required level. After sprinkling water, the water on the pouring operation area must be cleaned up.

[0037] Furthermore, after the floor slab concrete is poured, it should be promptly insulated and moisturized, including the following steps:

[0038] For floor structures with a thickness of ≤1m, cover them with 1 layer of geotextile, 1 layer of plastic film and 1 layer of geotextile in sequence; in winter, an additional layer of geotextile should be added on the top layer;

[0039] For floor structures with a thickness of more than 1m, cover them with 1 layer of geotextile, 1 layer of plastic film and 2 layers of geotextile in sequence;

[0040] For floor slabs with a thickness of ≤500mm, the curing time shall be no less than 7 days, and the curing shed can be removed after 4 days of curing;

[0041] For floor slabs with a thickness of 500mm<thickness<1000mm, the curing time shall be no less than 7 days, and the curing shed can be removed after 7 days of curing. For floor slabs with a thickness of ≥1000mm, the curing time shall be no less than 14 days, and the curing shed can be removed when the maximum temperature difference between the concrete surface temperature and the ambient temperature is less than 20℃.

[0042] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the anti-cracking and anti-seepage construction and method of the nuclear island plant floor provided by the present invention improves and innovates key indicators such as structural casting segmentation, concrete component ratio, mold temperature control, concrete entity structure temperature control, and thermal insulation and moisture maintenance, and quantifies control parameter indicators, effectively reducing the difficulty of nuclear island plant structure concrete construction, inhibiting the occurrence of through shrinkage cracks in concrete, achieving dense filling, and solving cracking and leakage problems. DETAILED DESCRIPTION

[0043] The present invention is further described below. The following examples are only used to more clearly illustrate the technical solution of the present invention, and are not intended to limit the protection scope of the present invention.

[0044] In view of the factors involved in the specific working conditions, such as materials (raw materials, concrete mix ratio and performance), structure (external constraints, structural type), construction (casting length, mold temperature), environment (air temperature), etc., based on the stress criterion, the tensile stress caused by the shrinkage of concrete and its tensile strength ratio are used as the cracking risk coefficient, and the cracking risk coefficient is controlled not to exceed 0.7 to obtain relevant anti-cracking technical solutions, such as control indicators such as concrete adiabatic temperature rise, deformation, mold temperature, and casting length. In some embodiments, the above indicators are obtained based on the evaluation results of the software registration No. 1470077 "Structural Concrete Early Cracking Risk Assessment and Analysis Software" developed based on the hydration-temperature-temperature-humidity multi-factor coupling model and a large number of engineering practices.

[0045] On the basis of meeting the above-mentioned crack resistance indicators, the embodiment of the present invention prepares a highly crack-resistant concrete for the crack-resistant and anti-seepage construction method of the nuclear island plant floor in the embodiment of the present invention, and proposes key construction process indicators and solutions from the aspects of preparation of highly crack-resistant and low-temperature high-performance concrete, design of floor concrete segment length, control of concrete mold performance, temperature control and maintenance of concrete solid structure, etc.

[0046] Among them, the preparation control steps of low temperature rising crack resistant concrete are as follows.

[0047] First, determine the mix ratio of crack-resistant concrete.

[0048] Combined with the specific working conditions of the nuclear island plant structure, while ensuring that it does not crack, the concrete crack resistance performance index is obtained, wherein the indoor crack resistance performance index includes adiabatic temperature rise and autogenous volume deformation, and the on-site and physical structure crack resistance performance index includes mold entry temperature, temperature rise value, cooling rate, inside and outside temperature difference, etc. In some embodiments, the above indicators are obtained by using the software registration number 1470077 "Structural Concrete Early Cracking Risk Assessment Analysis Software" developed by using the hydration-temperature-temperature-humidity multi-factor coupling model.

[0049] The designed concrete mix ratio is shown in Table 1.

[0050] Table 1 Mix ratio of C50 high crack resistance concrete for nuclear island plant Unit: kg / m 3

[0051]

[0052] As a choice of raw materials, the performance of nuclear power cement should meet the requirements of GB / T31545-2015 "Portland Cement for Nuclear Power Engineering" and CCES01 in the "Guidelines for Durability Design and Construction of Concrete Structures". The specific physical performance index requirements are shown in Table 2;

[0053] Table 2 Physical properties of silicate cement for nuclear power engineering

[0054]

[0055]

[0056] The performance of fly ash shall comply with the requirements of Grade II and above specified in GB / T 1596 "Fly ash used in cement and concrete"; the performance of slag powder shall comply with the requirements of Grade S95 and above specified in GB / T18046 "Granulated blast furnace slag powder used in cement, mortar and concrete" and the requirements of CCES01 in "Guidelines for Durability Design and Construction of Concrete Structures"; the fine aggregate shall be natural Zone II medium sand with a mud content not exceeding 2.0% and a mud block content not exceeding 1.0%; the performance of coarse aggregate shall comply with the requirements of 5-20mm continuous graded crushed stone specified in GB / T 14685 "Pebble and Crushed Stone for Construction", and the loose stacking porosity shall not exceed 43%.

[0057] Among them, the anti-cracking agent uses the HME-V concrete (temperature control, anti-seepage) high-efficiency anti-cracking agent with temperature rise suppression and micro-expansion functions produced by Jiangsu Subote New Materials Co., Ltd., which is compounded by a calcium-magnesium composite expansive agent and a concrete hydration temperature rise inhibitor. The performance of the calcium-magnesium composite expansive agent should comply with the requirements of "Calcium-Magnesium Composite Expansive Agent for Concrete" T / CECS 10082, and the performance of the concrete hydration temperature rise inhibitor should comply with the requirements of "Concrete Hydration Temperature Rise Inhibitor" JC / T 2608.

[0058] Among them, the water reducer uses the PCA concrete high-performance water reducer produced by Jiangsu Subote New Materials Co., Ltd., which has excellent thickening effect. While ensuring the control of concrete workability, its shrinkage rate does not exceed 100%.

[0059] It should be noted that the mixing water includes solid flake ice for cooling the temperature, and is not limited to liquid water.

[0060] Example 1

[0061] The anti-cracking and anti-seepage construction method provided in the embodiment of the present invention is applied to the 4.9m floor of a nuclear island safety plant, where the floor strength is C45, the anti-seepage grade is P8, and the thickness is 500mm. This embodiment will take this floor as an object to introduce the application of the anti-cracking and anti-seepage and surface beauty construction method provided by the present invention.

[0062] (A) Preparation of high crack-resistant concrete.

[0063] The raw materials of self-compacting and highly crack-resistant concrete of the required quality are selected, including cement, fly ash, fine aggregate, coarse aggregate, anti-cracking agent, and PCA high-performance concrete water reducing agent. The highly crack-resistant concrete is prepared by mixing according to the amounts shown in Table 3 below.

[0064] Table 3 Mix ratio of C50P8 high crack resistance concrete Unit: kg / m 3

[0065] Nuclear power cement Fly ash Anti-cracking agent fine aggregate coarse aggregate Water reducing agent Mixing water 270 120 45 720 1060 4 160

[0066] The performance test results of the above-mentioned high crack resistance concrete are shown in Table 4.

[0067] Table 4 High crack resistance concrete performance

[0068]

[0069] (II) Construction process control of anti-cracking and anti-seepage of nuclear island plant floor slab concrete.

[0070] First, the structure is divided into segments by length.

[0071] In this embodiment, the floor slab thickness is 500 mm, and the thickness difference between adjacent floor slabs does not exceed 300 mm. There is no need to divide the floor slabs into separate sections, and the section length is set to 20 m.

[0072] Second, temperature control process.

[0073] In this embodiment, the construction time is spring, the average daily temperature is 15°C, and the concrete mold temperature control target is ≤30°C. The main measure for concrete mold temperature control is to use silo spray cooling, and use 5°C cold water and 50kg to 70kg ice chips per cubic meter of concrete to mix with ice water instead of mixing water.

[0074] Third, the temperature control process of each segmented physical structure.

[0075] In this embodiment, since the concrete thickness is 500 mm, the temperature difference between the surface and the inside of the concrete needs to be controlled to be no more than 20° C. Before pouring the floor slab, a gas temperature control pipeline with a diameter of 20 cm is arranged at a spacing of 1 meter along the vertical direction of the floor slab, and a water mist spray device is installed on the side of the pipeline.

[0076] After the floor slab is poured, a maintenance shed is built to form a closed space, and the gas delivery pipeline is opened. Since the average daytime temperature during the floor slab maintenance period is 30°C and the average nighttime temperature is 20°C, the system needs to set the gas temperature inside the pipeline to be 20 degrees Celsius lower than the ambient temperature. In this embodiment, the gas temperature in the pipeline is controlled to be 10°C during the period from 10:00 to 19:00 in the daytime, and the gas temperature in the pipeline is controlled to be 0°C during the period from 19:00 to 10:00 the next day. At the same time, the spray device is turned on to keep the humidity in the closed space of the floor at 80%. Through structural monitoring, it can be seen that the concrete temperature of the floor slab is kept within 47°C, which meets the indicator that the temperature difference between the inside and outside of the concrete does not exceed 20°C.

[0077] In this embodiment, before pouring the floor slab, a gas temperature control pipeline is arranged at intervals of 1 meter along the wall below the floor slab, and a water mist spray device is installed on the side of the pipeline.

[0078] After the floor slab is poured, a maintenance shed is built to form a closed space, and the cold air delivery pipeline is opened. Since the average daytime temperature during the floor slab maintenance period is 15°C and the average nighttime temperature is 10°C, the system controls the gas flow rate inside the pipeline to 1000m 3 / h, control the temperature of the enclosed space under the floor slab at 25℃, and 2 days after the floor slab is poured, detect that the floor slab concrete temperature drops by 5℃ from the peak temperature, and then turn off the air conditioning. At the same time, turn on the spray device to keep the humidity in the enclosed space of the floor at 80%, and keep the spray device turned on for 15 days before turning it off, or until the end of maintenance.

[0079] Fourth, maintenance technology.

[0080] In this embodiment, the floor slab concrete is promptly insulated and moisturized after demoulding. Since the thickness is 500 mm, the floor slab is covered with 1 layer of geotextile + 1 layer of plastic film + 1 layer of geotextile.

[0081] The curing period is 8 days, and the curing shed can be removed 4 days after the start of curing.

[0082] According to the regulation of various parameters in the aforementioned anti-cracking and anti-seepage construction method of the present invention, it can be seen that all indicators in Table 5 meet the requirements, and no problems such as penetrating shrinkage cracks, looseness and leakage occur after the floor slab is cast according to the technical solution provided by the present invention.

[0083] Table 5 Key parameters for temperature monitoring of high crack-resistant slab concrete

[0084] Concrete Mold temperature Maximum temperature rise Temperature difference between inside and outside Cooling rate Factory floor concrete 18℃ 18℃ 10℃ 2.2℃ / d

[0085] Example 2

[0086] The anti-cracking and anti-seepage construction method provided by the present invention is applied to the first layer wall of a nuclear island safety plant, wherein the wall strength is C40, the anti-seepage grade is P8, and the thickness is 0.9m. This embodiment will take this wall as an object to introduce the application of the anti-cracking and anti-seepage and surface beauty construction method provided by the present invention.

[0087] (A) Preparation of high crack-resistant concrete.

[0088] The raw materials of self-compacting and highly crack-resistant concrete of the required quality are selected, including cement, fly ash, fine aggregate, coarse aggregate, anti-cracking agent, and PCA high-performance concrete water reducing agent. The highly crack-resistant concrete is prepared by mixing according to the amounts shown in Table 6 below.

[0089] Table 6C40P8 high crack resistance concrete mix ratio Unit: kg / m 3

[0090] Nuclear power cement Fly ash Anti-cracking agent fine aggregate coarse aggregate Water reducing agent Mixing water 270 120 45 740 1050 4.5 153

[0091] The performance test results of the above-mentioned high crack resistance concrete are shown in Table 7.

[0092] Table 7 High crack resistance concrete performance

[0093]

[0094]

[0095] (II) Construction process control of anti-cracking and anti-seepage concrete wall of nuclear island plant

[0096] In this embodiment, the construction time is summer, the average daily temperature is 35°C, and the concrete mold temperature control target is ≤30°C. The main measure for concrete mold temperature control is to use silo spray cooling, and use 5°C cold water and 80kg ice chips mixed with ice water mixture instead of mixing water for each cubic meter of concrete.

[0097] In this embodiment, before the wall is poured, a gas temperature control pipe with a diameter of 25 cm is arranged at intervals of 1 meter along the wall layer, and a water mist spray device is installed on the side of the pipe. After the wall is poured and the formwork is removed, the cold air delivery pipe is opened. Since the average daytime temperature during the floor maintenance period is 35°C and the average nighttime temperature is 30°C, the system controls the gas flow rate inside the pipe to 1500m 3 / h, control the temperature of the enclosed space under the floor slab at 20℃, and 2.5 days after the floor slab is poured, detect that the floor slab concrete temperature has dropped by 5℃ from the peak temperature, and then turn off the air conditioning. At the same time, turn on the spray device to keep the humidity in the enclosed space of the floor at 80%, and keep the spray device turned on for 15 days before turning it off, or until the end of maintenance.

[0098] Fourth, maintenance technology.

[0099] In this embodiment, the wall concrete is promptly maintained for heat preservation and moisture retention after demoulding, and a layer of plastic film + 2 layers of geotextile are applied. After 15 days of maintenance, when the surface temperature of the concrete drops to 25°C, the maintenance shed is removed.

[0100] According to the regulation of various parameters in the aforementioned anti-cracking and anti-seepage construction method of the present invention, it can be seen that all indicators in Table 8 meet the requirements, and no problems such as penetrating shrinkage cracks, looseness and leakage occur after the floor slab is cast according to the technical solution provided by the present invention.

[0101] Table 8 Key parameters for temperature monitoring of high crack resistance wall concrete

[0102] Concrete Mold temperature Maximum temperature rise Temperature difference between inside and outside Cooling rate Factory wall concrete 30℃ 23℃ 15℃ 2.0℃ / d

[0103] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for anti-cracking construction of strong-constraint structural concrete of a nuclear island plant, characterized in that: The steps include: Prepare low-temperature crack-resistant concrete for nuclear power, and cast the walls and floor slabs in each segment of the strong constraint structure of the nuclear island plant. When the thickness difference between adjacent floor slabs is ≥300mm, separate segments are required. When there are floor slabs of different thicknesses in the segments, cast the thick floor slabs first, and then cast the thin floor slabs. During the concrete pouring process, the concrete mold temperature needs to be controlled according to the average daily temperature T during construction: When the daily average temperature T is less than 10℃, the concrete temperature of the walls and floor slabs in each section should be controlled at 5~20℃; When the daily average temperature T≥10℃, the concrete mold temperature of the walls and floor slabs in each segment is controlled to be Ts≤T+10℃ and Ts≤30℃; The time interval between the step-by-step pouring of different segmented solid structures shall not be less than 10 days. A closed space is formed by building a curing shed, and an intelligent temperature control system is installed inside to control the maximum temperature rise of the wall and floor concrete in each segment to not exceed 35°C, the temperature difference between the inside and the outside to not exceed 15°C, and the center temperature drop rate to not exceed 3.0°C / d; Carry out thermal insulation and moisture maintenance on the strongly constrained structural concrete of the nuclear island plant.

2. The method for anti-cracking construction of strong-constraint structural concrete of nuclear island plant according to claim 1 is characterized in that: After the walls and floor slabs are poured, a closed space is formed by building a curing shed, and the intelligent concrete temperature control system is turned on to control the temperature in the closed nuclear island plant area to effectively reduce the maximum temperature rise of the concrete in the floor slab area. The specific method is as follows: Before pouring the floor slab, arrange gas temperature control pipes with a spacing of less than 2 meters along the vertical direction of the floor slab, with a pipe diameter of less than 30 cm, and install water mist spray devices on the sides of the pipes; Before pouring the wall, arrange gas temperature control pipes with a spacing of less than 2 meters along the wall direction, with a pipe diameter of less than 30 cm, and install water mist spray devices on the sides of the pipes; After the wall and floor are poured, a closed area is formed by adding a curing shed, and the gas delivery pipeline is immediately connected. The air conditioner is turned on in the closed space for temperature control. The gas circulation air volume is controlled to be not less than 1000m3 / h in spring and autumn, and not less than 1400m3 / h in summer, and the temperature of the closed space is adjusted to ≤25℃; After the air circulation system is turned on, the time to shut it down is selected according to the internal temperature detection of the concrete: when the internal temperature of the concrete reaches the peak and drops by 5°C, the air circulation system is shut down, and it should be shut down no more than 3 days after the pouring is completed; In order to maintain constant humidity in the confined space, it is necessary to open the atomizing nozzle of the water mist spray device to control the humidity, and the flow rate should be controlled not less than 0.4L / min. Keep the spray device open for 15 days and then close it, or close it when the maintenance is completed.

3. The method for anti-cracking construction of strong-constraint structural concrete of nuclear island plant according to claim 1 is characterized in that: The performance of the low temperature crack-resistant concrete meets the following conditions: The slump into the mold is 160±20mm, the air content is controlled at 2.5±0.5%, and the strength grade does not exceed C50.

4. The method for anti-cracking construction of strong-constraint structural concrete of nuclear island plant according to claim 3 is characterized in that: The low temperature rise crack resistant concrete comprises the following raw materials and weight fractions: 260-330 parts by mass of Portland cement for nuclear power engineering; 100-160 parts by mass of fly ash; 700-790 parts by mass of fine aggregate; 1000-1100 parts by mass of coarse aggregate; 36 to 50 parts by weight of an anti-cracking agent; 4 to 6 parts by weight of water reducing agent; And 145 to 170 parts by mass of mixing water.

5. The method for anti-cracking construction of strong-constraint structural concrete of nuclear island plant according to claim 4 is characterized in that: The fine aggregate is natural zone II medium sand, with a mud content of no more than 2.0% and a mud block content of no more than 1.0%; The coarse aggregate is 5-20 mm continuously graded crushed stone, and the loose accumulation porosity does not exceed 43%; The anti-cracking agent has the functions of temperature rise inhibition and micro expansion. -V concrete (temperature control, anti-seepage) high-efficiency anti-cracking agent; The water reducing agent is a PCA polycarboxylic acid high-performance water reducing agent, and the shrinkage ratio does not exceed 100%.

6. The method for anti-cracking construction of strong-constraint structural concrete of nuclear island plant according to claim 1 is characterized in that: The main measures for mold temperature control include cooling of raw materials, cooling of the production process, insulation during transportation, and temperature control during pouring. The specific operations are as follows: Cooling during production: When mixing concrete, use a mixture of cold water and an appropriate amount of ice chips to make the concrete outlet temperature meet the requirements; Insulation during transportation: The outer side of the concrete tank is wrapped and insulated as a whole to reduce the temperature of the concrete caused by direct sunlight on the tank and ensure that the temperature of the concrete entering the mold meets the requirements; Temperature control during pouring: Before pouring concrete, the tied steel frame can be cooled by sprinkling water so that the temperature of the concrete entering the mold reaches the required level. After sprinkling water, the water on the pouring operation area must be cleaned up.

7. The method for anti-cracking construction of strong-constraint structural concrete of nuclear island plant according to claim 1 is characterized in that: After the floor slab concrete is poured, it should be timely insulated and moisturized, including the following steps: For floor structures with a thickness of ≤1m, cover them with 1 layer of geotextile, 1 layer of plastic film and 1 layer of geotextile in sequence; in winter, an additional layer of geotextile should be added on the top layer; For floor structures with a thickness of more than 1m, cover them with 1 layer of geotextile, 1 layer of plastic film and 2 layers of geotextile in sequence; For floor slabs with a thickness of ≤500mm, the curing time shall be no less than 7 days, and the curing shed can be removed after 4 days of curing; For floor slabs with a thickness of 500mm<thickness<1000mm, the curing time shall be no less than 7 days, and the curing shed can be removed after 7 days of curing. For floor slabs with a thickness of ≥1000mm, the curing time shall be no less than 14 days, and the curing shed can be removed when the maximum temperature difference between the concrete surface temperature and the ambient temperature is less than 20℃.

Citation Information

Cited By

  • Tunnel secondary lining concrete anti-crack additive and construction and acceptance method