Construction method of measure bars for fixing second row of steel bars at beam bottom

By using cushion casting, steel bar binding and acceptance methods in the construction of beam bottom steel bars, the problem of poor rigidity of the bar binding is solved, the stability and cost-effectiveness of the bars are achieved, and the quality of the beam is improved.

CN118997495APending Publication Date: 2024-11-22CHINA CONSTRUCTION SIXTH ENGINEERING BUREAU SIXTH CONSTRUCTION CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411155370.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In the construction of the beam bottom steel bars, there is poor firmness during the binding process of the measure bars, which leads to the second row of steel bars at the bottom of the beam being easily disturbed, affecting the grip and wrapping force between the steel bars, and thus affecting the quality of the beam.

Method used

A construction method including cushion casting, steel bar binding and acceptance is adopted. After the concrete cushion strength is sufficient, the vertical reinforcement bracket is used to erect the lower longitudinal reinforcement and tie the nodes through wire drawing, and the 135-degree stretching is used. The hooks and wires are bound to ensure the stability of the measuring ribs.

Benefits of technology

The stability of the second row of steel bars at the bottom of the fixed beam is achieved, the impact of concrete vibration on the steel bars is reduced, the construction cost is reduced, and the grip and wrapping force between the steel bars and concrete is improved, and the quality of the beam is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997495A_ABST
    Figure CN118997495A_ABST
Patent Text Reader

Abstract

The invention is applicable to the technical field of building construction, and provides a construction method of measure bars for fixing a second row of steel bars at the bottom of a beam, which comprises the steps of cushion layer pouring, steel bar binding and steel bar acceptance inspection: firstly, pouring a concrete cushion layer, secondly, constructing lower longitudinal bars and stirrups after the strength of the concrete cushion layer is sufficient, and finally, carrying out construction. The lower longitudinal bars are sequentially placed in the stirrups, nodes are bound and fixed through binding wires, the upper longitudinal bars are bound again through binding wires, the two ends of the tie bars of the binding cushion blocks are installed on the lower longitudinal bars and fixed through binding wires, finally binding points are checked and accepted, and unqualified binding points are subjected to secondary binding; the device has the advantages of being high in applicability, easy to manufacture, good in fixing effect and low in cost, effectively controls the thickness of a protection layer between all layers of steel bars, is not prone to being affected by concrete pouring vibration, overcomes the common quality problem that the thickness of the steel bar protection layer is insufficient in beam two-row steel bar construction, enhances the bond stress between a beam main bar and concrete, and improves the construction efficiency. Therefore, the quality of the beam is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a construction method for fixing a second row of reinforcement bars at the bottom of a beam. Background Art

[0002] During the construction of beam bottom reinforcement, after tying the stirrups and the main reinforcement at the bottom of the beam, it is necessary to construct the measure reinforcement before tying the second and third rows of main reinforcement. Usually, there is a problem of poor firmness during the tying process of the measure reinforcement, which makes the second row of reinforcement at the bottom of the beam easily disturbed, causing the reinforcement at the bottom of the beam to concentrate, seriously affecting the bond strength between the reinforcements at the bottom of the beam, and thus affecting the quality of the beam.

[0003] To this end, the present application provides a construction method that is low in cost, easy to construct, convenient to manufacture, not easily affected by concrete pouring and vibration, and has stable fixation, so as to solve the problems existing in the above-mentioned construction. Summary of the invention

[0004] The purpose of the embodiment of the present invention is to provide a construction method for fixing the measure bars used for the second row of steel bars at the bottom of the beam, aiming to overcome the common quality problems existing in construction, to facilitate workers to carry out construction conveniently, and to solve the problems of the main bars at the bottom of the beam being concentrated, the measure bars being difficult to place, and the measure bars being easily disturbed when placed in the beam groove.

[0005] The embodiment of the present invention is implemented as follows: a construction method for fixing the second row of steel bars at the bottom of a beam, comprising the following steps: Pad pouring, pouring concrete pad; Rebar binding: after the concrete cushion layer has sufficient strength, the lower longitudinal bars and stirrups are constructed. The stirrups are erected by steel bar brackets, and the lower longitudinal bars are placed in the stirrups in sequence. The nodes of the lower longitudinal bars and stirrups are tied and fixed by tying wires. After the stirrups are turned over and multiple upper longitudinal bars are placed in sequence, they are tied again by tying wires. Pads are tied at the bottom of the tension bars, and the two ends of the tension bars are installed on the lower longitudinal bars and fixed with tying wires. Acceptance of steel bars: acceptance of the binding points of lower longitudinal bars, upper longitudinal bars, spacers and tension bars, and re-binding of binding points that fail the acceptance.

[0006] Preferably, the specifications of the stirrups are the same as those of the tension bars.

[0007] Preferably, both ends of the tie rod are bent 135 degrees, and the length of the straight section of the tie rod is 5d.

[0008] Preferably, the spacers are arranged in the same number as the steel bars at the bottom of the beam, with a maximum of M=X / 2d-1.

[0009] The construction method of the reinforcement bars used to fix the second row of reinforcement bars at the bottom of the beam provided by the embodiment of the present invention has the following advantages: (1) High applicability: After the lower longitudinal reinforcement of the beam bottom is tied, the measure reinforcement tied with the upper pad is directly tied above the stirrups and below the second row of measure reinforcement at the bottom of the beam, forming in one step; (2) Easy and simple to manufacture: the required raw materials are easy to obtain, the cost is low, and the construction difficulty is low; (3) Good fixing effect: The 135-degree hooks at both ends of the tie bar are used to limit the position and are tied and fixed with wire. The concrete is not easily affected by vibration during pouring, which can effectively reduce the side effects caused by vibration. (4) Low cost: By using smaller steel bars to replace the original steel bars, the construction cost is greatly reduced, which is more economical and affordable; (5) It overcomes the common quality problem of insufficient thickness of the steel bar protective layer in the construction of the bottom steel bar of the beam, enhances the bond strength between the steel bars and concrete in the beam, and thus improves the quality of the beam. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a three-dimensional structural diagram of the present invention; Figure 2 It is a front view of the present invention; Figure 3 is a side view of the present invention; Figure 4 A top view of the present invention; In the attached figure: 1-lower longitudinal reinforcement; 2-upper longitudinal reinforcement; 3-stirrups; 4-spacers; 5-tension bars. DETAILED DESCRIPTION

[0011] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0012] The specific implementation of the present invention is described in detail below in conjunction with specific embodiments.

[0013] like Figure 1-Figure 4 As shown, it is a structural diagram of a construction method for fixing the second row of steel bars at the bottom of a beam provided by an embodiment of the present invention, comprising the following steps: 1. Pouring of cushion layer: pouring of concrete cushion layer; 2. Steel bar binding: after the concrete cushion layer has sufficient strength, the lower longitudinal reinforcement 1 and stirrups 3 are constructed. The stirrups 3 are erected by steel bar brackets. The lower longitudinal reinforcement 1 is placed in the stirrups 3 in sequence, and the nodes of the lower longitudinal reinforcement 1 and the stirrups 3 are tied and fixed by tying wires. The stirrups 3 are turned over and multiple upper longitudinal reinforcements 2 are placed in sequence, and then tied again by tying wires. The bottom of the tension reinforcement 5 is tied with a pad 4, and the two ends of the tension reinforcement 5 are installed on the lower longitudinal reinforcement 1 and fixed with tying wires. 3. Acceptance of steel bars: Check and accept the binding points of lower longitudinal bars 1, upper longitudinal bars 2, spacers 4 and tension bars 5, and perform secondary binding on the binding points that fail the acceptance.

[0014] The present application provides a construction method for fixing the measure bars used for the second row of steel bars at the bottom of the beam, which has the characteristics of high applicability, simple production, good fixing effect and low cost. After the lower longitudinal reinforcement 1 at the bottom of the beam is tied, the measure bars tied with the upper pad 4 are directly tied on the stirrups 3 and under the second row of measure bars at the bottom of the beam, and are formed in one step; the required raw materials are simple and easy to obtain, the cost is low, and the construction difficulty is low; the 135-degree hooks at both ends of the tension bar 5 are used to limit the position, and the wire is used to tie and fix it, so it is not easily affected by vibration when pouring concrete, and the side effects caused by vibration can be effectively reduced; the construction cost is greatly reduced by using smaller-sized steel bars to replace the original measure bars, which is more economical and affordable; it also overcomes the common quality problem of insufficient thickness of the steel bar protective layer in the construction of the steel bars at the bottom of the beam, and enhances the bond strength between the steel bars and concrete in the beam.

[0015] In one embodiment of the present invention, the specifications of the stirrups 3 are the same as those of the tie bars 5. When the price changes of the steel bars and the cushion blocks 4 have the greatest impact on the construction, the random price changes of the two interact with each other and are selected through human rational analysis. For example, (1) when the price of spacer block 4 is less than RMB 0.73 per piece, it is feasible to replace the original measure reinforcement with 6 mm steel bars; when the price of spacer block 4 is more than RMB 0.69 per piece, it is feasible to replace the original measure reinforcement with 8 mm steel bars. (2) If the cost of steel bars is above RMB 2.75 / kg, it is feasible to use 6mm steel bars to replace the original steel bars; if the cost of steel bars is above RMB 2.89 / kg, it is feasible to use 8mm steel bars to replace the original steel bars; (3) When the price of spacer block 4 is less than RMB 0.69 per piece and the cost of steel bars is more than RMB 2.89 per kg, the use of any type of steel bars with a diameter of less than 20 mm can save the cost of reinforcement bars, which is consistent with maximizing the benefits of the project.

[0016] like Figure 1 As shown, as another preferred embodiment of the present invention, both ends of the tie rod 5 are bent 135 degrees, and the length of the straight section of the tie rod 5 is 5d.

[0017] In an example of the present invention, the diameter of the tie rod 5 is d, and the two ends of the tie rod 5 are symmetrically bent to ensure that the size of the bending portion remains consistent.

[0018] like Figure 1 As shown, as another preferred embodiment of the present invention, the spacers 4 are arranged in the same number as the beam bottom reinforcements, which is at most M=X / 2d-1.

[0019] In one embodiment of the present invention, M is the quantity, X is the beam width, and d is the diameter of the steel bars at the bottom of the beam.

[0020] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be considered exemplary and non-restrictive in all respects, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention.

[0021] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A construction method for fixing the second row of steel bars at the bottom of a beam, characterized in that: The following steps are involved: Pad pouring, pouring concrete pad; Rebar binding: after the concrete cushion layer has sufficient strength, the lower longitudinal bars and stirrups are constructed. The stirrups are erected by steel bar brackets, and the lower longitudinal bars are placed in the stirrups in sequence. The nodes of the lower longitudinal bars and stirrups are tied and fixed by tying wires. After the stirrups are turned over and multiple upper longitudinal bars are placed in sequence, they are tied again by tying wires. Pads are tied at the bottom of the tension bars, and the two ends of the tension bars are installed on the lower longitudinal bars and fixed with tying wires. Acceptance of steel bars: acceptance of the binding points of lower longitudinal bars, upper longitudinal bars, spacers and tension bars, and re-binding of binding points that fail the acceptance.

2. A construction method for fixing the second row of steel bars at the bottom of a beam according to claim 1, characterized in that: The specifications of the stirrups are the same as those of the tension bars.

3. The construction method of fixing the second row of steel bars at the bottom of the beam according to claim 1, characterized in that: Both ends of the tie rod are bent 135 degrees, and the length of the straight section of the tie rod is 5d.

4. The construction method of fixing the second row of steel bars at the bottom of the beam according to claim 1, characterized in that: The spacers are arranged in the same number as the steel bars at the bottom of the beam, with a maximum of M=X / 2d-1.