Coal seam roof and floor drilling site directional drilling gas extraction method
By digging drilling yards on the top and bottom plates of the coal tunnel and drilling into the extraction drilling holes in directional directions, the problems of difficult and high construction costs in the traditional coal mine gas extraction model in deep coal mines are solved, and safe, efficient and economical gas extraction is achieved. The mining has improved the adaptability and environmental protection of coal mine gas management.
Patent Information
- Application Number
- CN202411291627.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-11-22
AI Technical Summary
The traditional coal mine gas extraction model has problems such as difficulty in drilling construction, low pore formation rate, long construction cycle, serious drilling leakage, large project volume, high cost and poor safety and stability in deep coal mines, making it difficult to meet safety and efficiency. , economical production demand.
The top plate and bottom plate of the coal tunnel are respectively excavated, and the top plate drilling yard and the undercover drilling yard are arranged between the two through directional drilling, covering and extracting the coal seam, reducing tunnel construction, improving drilling sealing and Drawing efficiency.
It reduces the cost of gas treatment of coal mines, improves safety and adaptability, reduces the risk of gas leakage, shortens the construction cycle, achieves energy conservation and emission reduction, provides a new gas extraction model, and promotes coal mine technological innovation.
Smart Images

Figure CN118997833A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mine gas extraction, and in particular relates to a directional drilling gas extraction method in a coal seam roof and floor drilling field. Background Art
[0002] Gas extraction is an extremely important part of coal mine gas control. In order to effectively reduce the gas content in coal seams, the industry generally adopts the gas extraction mode of "coal seam + drilling along the seam" in the roadway of the coal seam with ordinary or directional drilling rigs, or arranges the rock layer below the coal seam floor to construct a special bottom extraction roadway for gas control, and constructs the gas extraction mode of "bottom extraction roadway + drilling through the layer" for coal seam gas control.
[0003] With the deepening of coal mining, the traditional "coal seam + drilling along the seam" (such as Figure 1 as shown) or "bottom extraction lane + through-layer drilling" (as shown Figure 2 The gas extraction mode of the existing method (as shown in the figure) can no longer meet the production needs of safety, efficiency and economy. The coal seams in some mines are deep and the coal bodies are soft and broken. The gas extraction mode of "the coal seam + drilling along the seam" has the disadvantages of difficult drilling construction, low porosity and long construction period. In addition, after drilling and sealing the holes and joint extraction, the drilling holes leak seriously due to the development of broken cracks in the coal wall of the roadway, which leads to poor drilling extraction effect and short service cycle. Although the gas extraction mode of "bottom extraction lane + through-layer drilling" can improve the gas extraction effect, the excavation of the bottom extraction lane in the rock layer below the coal seam floor specifically for gas extraction has the disadvantages of large engineering volume, long period, high cost, poor safety and stability, and difficult maintenance and management. It also does not meet the concept requirements of green environmental protection and energy-saving and emission reduction mining. Summary of the invention
[0004] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described hereinafter.
[0005] The present invention provides the following technical solutions: a method for directional drilling gas extraction in coal seam roof and floor drill sites, in which a roof drill site is arranged in the coal roadway roof excavation, and a bottom drill site is arranged under the coal roadway floor excavation. Directional drilling is adopted to arrange the openings of extraction boreholes between the roof drill site and the bottom drill site, and extraction boreholes are covered on the coal seam to extract coal seam gas.
[0006] Furthermore, an uphill tunnel is arranged in the coal tunnel and opened towards the coal seam roof. A local ventilator is installed in front of the opening of the uphill tunnel to supply air for tunnel excavation and subsequent roof drilling and extraction drilling construction. A roof drilling site that meets the requirements of drilling rig arrangement and drilling construction is excavated in the coal seam roof in the uphill tunnel.
[0007] Furthermore, the extraction drilling holes are arranged in the rock strata of the roof drilling site for open drilling, and directional comb drilling holes are constructed through the rock strata of the roof drilling site toward the coal seam below.
[0008] Furthermore, an underground drilling site that meets the requirements of drilling rig arrangement and drilling construction is excavated under the coal seam floor in the coal roadway.
[0009] Furthermore, the extraction drilling holes are arranged in the rock strata of the undercover drilling site for open drilling, and directional comb drilling holes are constructed through the rock strata of the undercover drilling site toward the coal seam above.
[0010] Furthermore, the undercover drilling site adopts diffused ventilation, and the construction depth of the undercover drilling site does not exceed 5m.
[0011] Compared with the prior art, the advantages of the present invention are:
[0012] (1) Cost-effectiveness: The directional drilling gas extraction method of the coal seam roof and floor drilling site has a low construction cost, avoiding the additional tunnel construction and maintenance management costs of the high-extraction tunnel and bottom-extraction tunnel technology, which helps to reduce the mining cost of coal mines and improve economic benefits. At the same time, for coal mines with obvious tunnel pressure and soft and broken coal bodies, the roof and floor drilling site technology effectively solves the problems of difficult drilling construction, low hole completion rate, repeated drilling construction, short service cycle, and poor extraction effect. It can greatly reduce the amount of drilling engineering for coal mine gas extraction and save gas control costs for coal mines.
[0013] (2) Safety: The top and bottom plate drilling site technology reduces the risk of large-scale tunnel construction of high-extraction tunnels or bottom-extraction tunnels in the rock strata above the top plate or below the bottom plate of the coal seam by excavating drilling sites on the top and bottom plates of the coal seam for gas extraction, thereby reducing geological disasters and safety risks. At the same time, since the top and bottom plate drilling site technology drills holes in the top and bottom plate rock strata, the drilling holes have better sealing properties than the in-layer drilling of the coal seam, which can effectively prevent gas leakage and accumulation. However, the construction and use of high-extraction tunnels and bottom-extraction tunnels have a certain impact on the overall stability of the mine, especially under complex geological conditions, which may cause safety hazards such as tunnel collapse and gas accumulation.
[0014] (3) Adaptability: The top and bottom plate drilling site technology has strong adaptability and flexibility. The layout of the drilling site and boreholes can be more flexible, and gas extraction can be achieved in a smaller space. By adjusting the drilling site layout, borehole design and extraction process, gas extraction can be achieved for different coal seams and gas storage conditions. At the same time, the top and bottom plate drilling site technology has a short construction period and can quickly respond to gas extraction needs. Traditional high-extraction tunnel and bottom-extraction tunnel technologies may be difficult to implement due to space limitations, and the construction period is long, especially when the geological conditions of the coal mine are relatively complex and there are many faults, collapse columns, folds or magma intrusions. Structures such as these may be subject to greater restrictions.
[0015] (4) Technological innovation: The roof and floor drilling technology is highly innovative and practical. It effectively solves the shortcomings of the traditional gas extraction modes of "coal seam + drilling along the layer" and "bottom extraction tunnel + drilling through the layer" under special gas geological conditions in terms of scheme design, construction organization, and efficiency and benefits. It provides a new gas extraction mode for coal mine gas control, provides a new direction for the advancement of coal mine gas extraction technology, and promotes technological innovation and development in the coal mining industry.
[0016] (5) Environmental protection and energy conservation and emission reduction: The top and bottom plate drilling technology can reduce the generation of mine waste and environmental pollution, help reduce energy consumption and carbon emissions, and achieve energy conservation and emission reduction goals. However, the construction and use of high-extraction lanes and bottom-extraction lanes may cause surface subsidence and deformation, and the large-scale excavation of lanes will produce a large amount of waste gangue. If it cannot be used, it will further damage the surrounding environment and is not conducive to the green and sustainable development of coal mines. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the gas extraction mode of "coal seam + drilling along the seam";
[0018] Figure 2 This is a schematic diagram of the "bottom extraction tunnel + through-layer drilling" gas extraction mode;
[0019] Figure 3 This is a schematic diagram of the gas extraction mode of "coal seam roof drilling site + directional extraction drilling hole";
[0020] Figure 4 This is a schematic diagram of the gas extraction mode of "undercover drilling site in the coal seam + directional extraction drilling hole";
[0021] Figure 5 This is a schematic diagram of the plan layout of the roof drilling site of this coal seam;
[0022] Figure 6 This is a schematic diagram of the plan layout of the undercover drilling site in this coal seam.
[0023] In the figure: 1- fully mechanized mining working face; 2- coal roadway; 3- along-layer drilling hole; 4- bottom extraction roadway; 5- through-layer drilling hole; 6- coal seam; 7- roof drilling site; 8- extraction drilling hole; 9- bottom drilling site; 10- local ventilator; 11- wind duct. DETAILED DESCRIPTION
[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] like Figure 3 to Figure 6 As shown: a directional drilling gas extraction method for the top and bottom plate drill sites of the coal seam, a top plate drill site 7 is arranged in the coal roadway roof excavation, and an undercover drill site 9 is arranged under the coal roadway floor excavation. The directional drilling method is adopted to arrange the opening of the extraction borehole 8 between the top plate drill site 7 and the undercover drill site 9, and the extraction borehole is covered toward the coal seam 6 to extract the coal seam gas.
[0026] Since the roof drilling site 7 has strong adaptability and flexibility, the roof drilling site 7 can be flexibly designed and arranged in any mining coal roadway according to the needs of underground gas extraction. An uphill roadway is opened in the coal roadway 2 toward the coal seam roof, and a local ventilator 10 is installed in front of the opening of the uphill roadway to supply air for roadway excavation and the later construction of the roof drilling site 7 and the extraction borehole 8. A roof drilling site 7 that meets the requirements of drilling rig arrangement and drilling construction is excavated in the coal seam roof in the uphill roadway.
[0027] In combination with the needs of gas extraction engineering in the underground mining area, several extraction boreholes 8 are designed and constructed to evenly cover the coal seam extraction area. The extraction boreholes 8 are arranged in the rock stratum of the roof drilling site 7 for hole drilling, and directional comb-shaped boreholes are constructed through the rock stratum of the roof drilling site 7 to the coal seam below (if the coal seam 6 is hard and not easy to collapse, holes can also be drilled in the rock stratum of the roof drilling site 7 to penetrate the coal seam 6 and then directional drilling of the entire coal hole can be carried out); the terminal hole spacing and coverage of the extraction boreholes 8 are determined according to the extraction radius and the pre-extraction area required for technical briefing.
[0028] Since the undercover drilling site 9 has strong adaptability and flexibility, it can be flexibly designed and arranged in any mining coal roadway according to the needs of underground gas extraction. In the coal roadway 2, an undercover drilling site 9 that meets the requirements of drilling rig arrangement and drilling construction is excavated under the coal seam floor. Or the undercover drilling site 9 is arranged in the connecting horizontal river of the adjacent coal roadway 2. The undercover drilling site 9 adopts diffusion ventilation, and the construction depth of the undercover drilling site does not exceed 5m to avoid becoming a blind roadway. The extraction borehole 8 is arranged in the rock stratum of the undercover drilling site 9 for hole drilling, and directional comb drilling is constructed through the rock stratum of the undercover drilling site 9 to the upper coal seam (if the coal seam 6 is hard and not easy to collapse, it is also possible to drill holes in the rock stratum of the undercover drilling site 9 and penetrate the coal seam 6 for full coal hole directional drilling). The terminal hole spacing and coverage of the extraction borehole 8 are determined according to the extraction radius and the pre-extraction area required for technical briefing.
[0029] Taking the high-burst mines in Jincheng and Changzhi areas of Shanxi Province as an example, in order to solve the problem of gas control, many mines have promoted the application of the bottom extraction tunnel through-layer drilling pre-extraction gas control mode. Among them, the bottom extraction tunnel can be divided into the bottom extraction tunnel in the pre-extraction mining face recovery area and the bottom extraction tunnel in the pre-extraction excavation area. The bottom extraction tunnel in the pre-extraction mining face recovery area is arranged at the center of the mining face, and the bottom extraction tunnel in the pre-extraction coal tunnel excavation area is arranged closer to a coal tunnel.
[0030] The comprehensive unit price of the bottom extraction tunnel is about 14,000 yuan per meter. According to the working face length of 1,500m, the cost of constructing only one bottom extraction tunnel is 21 million yuan. By constructing an undercover drilling site in this coal seam, the construction of the bottom extraction tunnel can be directly cancelled. It is only necessary to construct an undercover drilling site chamber every 300-500m in the tunnel of this coal seam. According to the working face length of 1,500m, each working face generally only needs to arrange 3-5 drilling site chambers. According to 5 calculations, the cost of constructing an undercover drilling site chamber in this coal seam is only 5*70,000 yuan = 350,000 yuan.
[0031] To sum up, the construction of an undercover drilling site (roof drilling site) in this coal seam can greatly save the cost required for the construction of bottom extraction tunnels (high extraction tunnels), effectively solves the dilemma between gas control and economic benefits in mines, and has a strong guiding significance for mine gas control work.
[0032] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A directional drilling gas extraction method for a coal seam roof and floor drilling site, characterized in that: A roof drilling site is arranged in the coal roadway roof excavation, and an undercover drilling site is arranged under the coal roadway floor. Directional drilling is used to arrange the openings of the extraction boreholes between the roof drilling site and the undercover drilling site. The extraction boreholes are covered on the coal seam to extract coal seam gas.
2. The method for gas extraction by directional drilling in a coal seam roof and floor drilling field according to claim 1 is characterized in that: An uphill tunnel is opened in the coal tunnel towards the coal seam roof. A local ventilator is installed in front of the opening of the uphill tunnel to supply air for tunnel excavation and subsequent roof drilling and extraction drilling construction. A roof drilling site that meets the requirements of drilling rig arrangement and drilling construction is excavated in the coal seam roof in the uphill tunnel.
3. The method for gas extraction by directional drilling in a coal seam roof and floor drilling field according to claim 2 is characterized in that: The extraction drilling holes are arranged in the rock strata of the roof drilling site for open drilling, and directional comb drilling holes are constructed through the rock strata of the roof drilling site to the coal seam below.
4. The method for gas extraction by directional drilling in a coal seam roof and floor drilling field according to claim 1 is characterized in that: An underground drilling site that meets the requirements of drilling rig layout and drilling construction is excavated underneath the coal seam floor in the coal roadway.
5. The method for gas extraction by directional drilling in a coal seam roof and floor drilling field according to claim 4 is characterized in that: The extraction drilling holes are arranged in the rock strata of the undercover drilling site for open drilling, and directional comb drilling holes are constructed through the rock strata of the undercover drilling site to the coal seam above.
6. The method for gas extraction by directional drilling in a coal seam roof and floor drilling field according to claim 4 is characterized in that: The undercover drilling site adopts diffusion ventilation, and the construction depth of the undercover drilling site does not exceed 5m.