Vegetation recovery method for nonferrous metal mining wasteland

ActiveCN102972197APrevent heavy metals from spreading and polluting the environmentImprove efficiencySoil lifting machinesArtificial islandsTerrainIon
The invention provides a vegetation recovery method for a nonferrous metal mining wasteland, which comprises the following steps: 1), terrain consolidation; 2), heavy metal stabilizing disposal; 3), shallow acid-base improvement and flexible impervious isolation: spraying the mixture of an acid-base modifier, a vegetative matrix and resin to a wasteland surface; 4), setting a section of drainage ditch; and 5), laying a vegetation cushion: laying a vegetation cushion on a slope surface and fixing the vegetation cushion with an anchor rod. The method provided by the invention combines the terrain consolidation, the heavy metal stabilizing disposal, the shallow acid-base improvement, the surface layer impervious isolation, wasteland vegetation recovery and other technologies to prevent heavy metal ions from relocating and diffusing to pollute the environment; the wasteland vegetation system is recovered; and the vegetation recovery method is high in standardization and industrialization level, is 2 to 3 times higher than a conventional soil replacement spray-sowing greening method in efficiency, low in governance cost, suitable for the popularization and application of ecological environmental management of large-area nonferrous metal mining wastelands, and remarkable and stable in effect.
Owner:江苏绿之源生态建设有限公司

Treatment method of waste slurry generated by gigging well and drilling

The invention discloses a treatment method of waste slurry generated by gigging a well and drilling, which comprises the following steps of: separating liquid from scraps to remove sands in waste slurry which is generated by gigging a well and drilling and is reflowed from the well; adding inorganic flocculating agent and water in the sanded-removed waste slurry generated by gigging the well and drilling to dilute, stir and damage stability to obtain cement paste with solid content which is less than or equal to 20%; adding polyacrylamide flocculant into the obtained cement paste to stir and perform a cement paste destabilization reaction; after the cement paste destabilization reaction, separating solid from liquid in the cement paste; and returning filter water to the step of separating liquid from scraps to remove the sands as cleaning proportioned water to recycle and/or return to the step of diluting, stirring and damage stability as water for treating and diluting the cement paste. The method can solve the problem for treating and using the waste slurry generated by gigging the well and drilling, can separate sands from mud and water in the waste slurry generated by gigging the well and drilling, can reach the standard and be comprehensively utilized, has large treatment amount to reach 1000 m<3>/h, can treat the waste slurry on a large scale, thereby being capable of reducing the treatment cost of the system. The method can comprehensively utilize and recycle all the waste slurry generated by gigging the well and drilling.
Owner:PUYANG TIANDIREN ENVIRONMENTAL PROTECTION TECH CO LTD +1

Method for extracting gas from coal seam roof complex branched well

The invention relates to a method for extracting gas from a coal seam roof complex branched well, which comprises the following steps of: selecting a coal storage layer with the gas content larger than 8m<3>/t; determining the machine tunnel and the tail tunnel positions excavated by a working surface to be prepared, as the position of a horizontal well section of a complex branched well; confirming the layer position in which a fissure zone generated due to coal mining is located; respectively distributing the horizontal well section above a machine tunnel and a tail tunnel; confirming the positions of a well opening and a deflection point and realizing the angle gain of a large-curvature radius; by adopting a three-opening structure on a well body structure and adopting naked-eye structures for both the horizontal well and the branched wells, constructing a horizontal well section in a selected rock stratum; constructing the branched wells at both sides of the horizontal well section; constructing a downward branched well on the horizontal well section and drilling through the coal storage layer; installing extracting equipment for extracting gas; carrying out negative pressure extraction in the medium and later extracting phases for realizing one well with multiple purposes; and inspecting effects. The method is favorable for reducing the gas content, creating condition for safely and efficiently carrying out coal tunnel excavation and coal mining and really realizing one well with multiple purposes at the coal mining phase.
Owner:HENAN POLYTECHNIC UNIV

Agent for phytoremediation of soil polluted by heavy metals using the waste active Sludge as the original material and the method of the phytoremediation of soil polluted by heavy metals

Provided is a heavy metal pollution soil repairing agent using excess activated sludge as the rawmaterial, a method of extraction and a method for repairing the heavy metal pollution soil, which relates to a heavy metal pollution soil repairing agent and a method thereof and a method for repairing the heavy metal pollution soil, and solves the problems of high cost, easily secondary pollution and complex operation existing in the repair of the heavy metal pollution soil. The heavy metal pollution soil repairing agent is composed of amylose, protein, nucleic acid, phosphoric acid, amino acid, humic acid compound, uronic acid and the organic substance required for cell lifecycle. The method for distilling the heavy metal pollution soil repairing agent is as follows: the wastewater treatment excess activated sludge reacts under the condition of 80-120 KPa and 60-100 DEG for 8-20 minutes; then centrifuges for 8-20 min at the rotating speed of 5000-7000r/min. The invention adopts the home position repairing or the heterotopia repairing to repair the heavy metal pollution. The invention has low cost and no secondary pollution, simple operation, short repairing period, strong activity and wide range of application.
Owner:HARBIN INST OF TECH

Coal mine underground coal seam long drill hole staged fracturing permeability increase and gas extraction method

ActiveCN108643877AIncrease the scope of fracturing anti-reflectionEfficient extractionFluid removalGas removalUnderground tunnelCement paste
The invention discloses a coal mine underground coal seam long drill hole staged fracturing permeability increase and gas extraction method. The coal mine underground coal seam long drill hole stagedfracturing permeability increase and gas extraction method comprises the steps that a long drill hole with the length more than 100m are drilled into a coal seam using a underground tunnel drilling machine for a coal mine or a kilometer drilling machine; a rigid casing with an one-way valve is lowered into to protect the hole directly using the underground tunnel drilling machine or the kilometerdrilling machine, and casing centralizers are installed at regular intervals; after the casing is lowered, preset volumetric cement paste is injected into an annular space between the outer wall of the casing and a drill hole wall to carry out blocking and sealing; a rigid fracturing pipe with two or multiple packers is lowered into the casing to carry out coal seam staged fracturing step by stepor multistage staged fracturing; and the fracturing pipe and the packers are removed after staged fracturing permeability increase, the casing of coal seam long drill hole opening is accessed with a gas extraction pipeline after drainage finishes to carry out efficient extraction of gas. The engineering amount of a tunnel and hole-drilling can be greatly reduced, the coal seam gas extraction efficiency is improved, and the coal mine underground gas treatment cost is reduced.
Owner:CHINA UNIV OF MINING & TECH

Two-phase STATCOM (Static Synchronous Compensator) management device on traction side of electrified railway, and control method of device

The invention discloses a two-phase STATCOM (Static Synchronous Compensator) management device on a traction side of an electrified railway, and a control method of the device. The device is connected with a two-phase power supply arms on a secondary side of a traction transformer in parallel, and comprises converter equipment and a control system. The converter equipment comprises two single-phase full-bridge inverters with a back-to-back structure form, and two groups of passive filters, wherein the transfer of active power between the two power supply arms can be realized through the control on capacitor voltage on a shared direct current side, and thus the load of two phases can be balanced; the two groups of passive filters are used for compensating harmonic wave and reactive power. The control system comprises a data acquisition system, a master control system, a PWM (Pulse-Width Modulation) signal generation system and a thyristor driving system. The device is arranged on a low-voltage side, so that the capacity demand of the device is reduced, the cost of the device is lowered, and the reliability of the device is improved.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO ELECTRIC POWER RES INST +3

Process for extracting nickel and cobalt from laterite by ore pulp extraction technology

The invention relates to a process for extracting nickel and cobalt from laterite by ore pulp extraction technology, which comprises the following steps of: crushing and grinding the laterite; putting into a high-pressure kettle, and carrying out high-pressure acid leaching to remove iron; pouring into a mixing settling extraction tank with a stirring and settling tank and a baffle plate, carrying out 5-12 grade of extraction, back extraction and phase splitting and washing to respectively obtain mixed solution of nickel and cobalt, waste liquid containing impurities and the ore pulp; extracting and separating nickel from cobalt to respectively obtain pure nickel solution and pure cobalt solution; and precipitating and calcining to obtain nickel oxide and cobalt oxide products. The solution with high concentration is obtained by extraction, the process is shortened, the liquid-solid separation load and a number of washing and filtering processes are reduced, so that energy consumption of production and production cost are reduced and the economic benefit is improved. An extracting agent can be used repeatedly after being saponified and has relatively low comprehensive consumption. The speed of the extraction process is high and is commonly less than 10 minutes. The extraction efficiency is high. The extracted ore pulp can be neutralized uniformly so as to reduce the treatment cost of tailings. The process is simple; the recovery rate is higher; and the nickel and cobalt recovery rates are both more than or equal to 90 percent and the process is easy to popularize.
Owner:JILIN JIEN NICKEL IND +1

Process for extracting nickel-cobalt from laterite by using resin-in-pulp adsorption technology

The invention relates to a process for extracting nickel-cobalt from laterite by using resin-in-pulp adsorption technology. The process comprises the following steps of: milling the laterite, and adding sulfuric acid into the milled laterite to perform high-pressure leaching; pouring the ore pulp after the leaching into a reaction kettle for neutral impurity removal; directly pouring the ore pulpafter the impurity removal into an adsorption tank to perform resin adsorption; adopting multilevel counter current absorption to perform desorption on the loaded resin so as to obtain pure nickel and cobalt mixed solution; and performing extraction separation to obtain a nickel-cobalt product. The resin can be used repeatedly after regeneration, the damaged resin is less, the service life of theresin is long, the desorption of the loaded resin and the regeneration of a poor resin are performed at normal temperature and normal pressure and are simple and easy to operate without a pressure vessel and heat regeneration device, thereby saving energy resources and reducing equipment investment. The ore pulp after adsorption is uniformly neutralized to reduce the tailings treating cost. The process shortens the technological process, reduces the liquid-solid separation burden, and reduces a great number of washing and filtering process steps, thereby reducing the production energy consumption and reducing the production cost. The process is simple, and the recovery rate of nickel and cobalt is over 90 percent.
Owner:JILIN JIEN NICKEL IND +1

Preparation method of nickel foam supported bimetal MOF base ozone catalyst, production thereof and application

The invention relates to a preparation method of nickel foam supported bimetal MOF base ozone catalyst, a production thereof and application. The preparation method comprises the steps that a metal organic framework ZIF-67 is taken as a template, nickel foam serves as a carrier, an in-situ hydrothermal-impregnation synthesis method is adopted to prepare a supported porous Mn / Co bimetal MOF base ozone catalyst, bimetal Mn / Co oxide in situ grows on a nickel foam base through a hydrothermal method, the supported bimetal oxide is modified by ZIF-67 through a impregnation method, and thus the nickel foam supported bimetal MOF base ozone catalyst is prepared. According to the preparation method, the crystal size and morphology of the catalyst are regulated effectively and accurately, evenly-distributing of active sites is facilitated, the decomposition rate on ozone and the mineralization rate on organic matter of the nickel foam supported bimetal MOF base ozone catalyst are greatly improved, the problems of separating and recycling of suspended catalysts can be effectively solved, the operation cost of water treatment is lowered, and large application prospects are achieved.
Owner:SHANGHAI NAT ENG RES CENT FORNANOTECH

None-full-depth freezing method for penetrating through ultra-thick water-rich bed rock in shaft deepening

InactiveCN103277103ASave freezing costsFreeze Fee SavingsShaft sinkingSoil scienceBedrock
The invention discloses a none-full-depth freezing method for penetrating through ultra-thick water-rich bed rock in shaft deepening. According to the method, a shaft penetrates through surface soil, the water-rich bed rock, a water-resisting layer and low-permeability bed rock sequentially from top to bottom, and main freezing pipes penetrate through the surface soil and the water-rich bed rock sequentially from top to bottom, penetrate into the water-resisting layer by 10m-20m and stop in a low-permeability rock stratum; a none-full-depth freezing depth is 240m-260m and a wall-caving-preventing freezing depth is 40m-45m; the main freezing pipes are annularly arranged with the circle center of the shaft as a circle center and the distance between the main freezing pipes and the outer wall of the shaft is 2m; wall-caving-preventing freezing pipes penetrate into the surface soil only by 43m and are annularly arranged with the circle center of the shaft as a circle center, and the distance between the wall-caving-preventing freezing pipes and the outer wall of the shaft is 1m. The method is fast in construction, safe and efficient and capable of preventing water damage caused when underground water damages a horsehead and related chamber rock mass along annular water diversion channels during construction of the horsehead after a full-depth freezing shaft is frozen, wherein the annular water diversion channels are formed by the freezing pipes and temperature measuring pipes; therefore, cost for treating water burst is saved, and safety construction of the horsehead and a chamber is guaranteed.
Owner:陕西彬长矿业集团有限公司 +1

Gas decomposition eliminating liquid and coal mine gas control method

InactiveCN101906989AReduce governance costsCompliance with security governance regulationsGas removalAcetic acidCobalt acetate
The invention relates to a gas decomposition eliminating liquid and a coal mine gas control method. The gas decomposition eliminating liquid is mainly prepared by uniformly mixing beer, acetic acid, cobalt acetate and the like, the gas control method by the gas decomposition eliminating liquid comprises the steps of: drilling liquid injection drill holes on a coal mining face at an interval between 0.6m and 1.5m in the direction same as an inclined direction of a coal layer or at an inclined angle between 0 degree and 20 degrees with the inclined direction of the coal layer, and then injecting the gas decomposition eliminating liquid in the drill holes under a certain pressure to react for 3.5-5 hours. The gas decomposition eliminating liquid is green, satisfies the environmental protection requirement, and is prepared from nontoxic and harmless raw materials, and reaction products of the gas composition eliminating liquid with components of gas are also nontoxic and harmless, and have not harmful affects to the quality and use of coal. The gas control method has simple operation and low cost, and can effectively eliminate gas in coal by over 96%, and gas in coal lanes obviously reduces under a safety limit in the process of injecting the gas decomposition eliminating liquid in the coal.
Owner:吴星剑

Chromium-free tanning production process of low-formaldehyde beach woolskin

The invention relates to a chromium-free tanning production process of a low-formaldehyde beach woolskin. The chromium-free tanning production process comprises the following process procedures of: water soakage, fleshing, degreasing, softening, WT tanning, alkali extraction after the tanning, wet grinding, water scrubbing, drying in the air, conditioning, retanning, alkali extraction after the retanning, fat addition, drying in the air, skin shoveling, dry grinding and dust brushing to obtain a finished product. The chromium-free tanning production process is characterized in that the tanning and the retanning are respectively completed in a tanning solution and a retanning solution which do not contain chromium. By using the chromium-free tanning production process, the processing of the beach woolskin is carried out by adopting a chromium-free tanning agent; not only can the waste chromium zero emission of a tanning working procedure and a retanning working procedure be realized and the sewage treatment cost of an enterprise be decreased, but also the produced beach woolskin is natural in color and is curly and attractive; a leather body is full and soft in hand feel and is lower than 75 mg/kg; a shrinkage temperature is higher than above 80 DEG C; and physical properties and mechanical prosperities can reach those of a fur acquired by an ordinary chromium tanning method.
Owner:宁夏西部皮草有限公司 +1

Economic dispatch optimization method of independent microgrid on basis of dual master control dynamic cooperation

ActiveCN105406520AImproved economic performanceMaximize couplingLoad forecast in ac networkEnergy industryMicrogridProcess engineering
The invention relates to an economic dispatch optimization method of an independent microgrid on the basis of dual master control dynamic cooperation. The independent microgrid comprises two types of master power of a battery energy storage system and a diesel generating set, and two types of non-master power of a wind generating set and a photovoltaic power generation system; the method comprises 1) an economic dispatch optimization strategy of a system when the battery energy storage system is adopted as the master power of the independent microgird; 2) the economic dispatch optimization strategy of the system when the diesel generating set is adopted as the master power of the indepentdent microgird; 3) an economic dispatch optimization process of the independent microgrid of dual master control dynamic cooperation on the basis of a particle swarm optimization algorithm. The economic dispatch optimization method of the independent microgrid on the basis of dual master control dynamic cooperation solves the problem of economic dispatch optimization of two different types of master power of the battery energy storage system and the diesel generating set in the independent microgird, can simultaneously pursue the aims of an optimal operation control mode of the system and minimum generating cost, effectively realize the aim of minimum generating total cost of economic operation and maximum using of renewable energy sources of the independent microgird system, and improve the economic operation performance of the microgrid.
Owner:CHONGQING UNIV OF POSTS & TELECOMM

Gas control method for triple-purpose use of drilled holes in coal floor of close distance seam group

The invention discloses a gas control method for triple-purpose use of drilled holes in a coal floor of a close distance seam group, and belongs to coal mine gas control methods. In the coal floor of a mine, drilled holes in the same drill site are used, and gas extraction is performed according to the steps as follows: firstly, before coal mining, gas in a coal seam is extracted in advance through the drilled holes in the coal floor of the mine, and danger of the outburst of coal in the coal seam at the upper part and the gas is eliminated; secondly, the coal at the upper part is mined, when the coal seam at the upper part is mined, mining pressure relief and stress relief are caused to coal seams at the upper part and in the middle, the drilled holes of the original drill site are used, and gas in the coal seams at the upper part and in the middle in a mining pressure relief zone is extracted in a negative pressure manner; and finally, the coal seam in the middle and the coal seam at the lower part are mined, and simultaneously, the original drilled hole is used again, and gas in a mining layer is extracted in the negative pressure manner. The work efficiency can be improved, the gas extraction efficiency is high, the cost is saved, the concentration of the extracted gas is high, and the utilization of the gas is facilitated. The gas control method comprises the control of gas in close distance seam groups of two or more coal seams.
Owner:CHINA UNIV OF MINING & TECH

Magnetic separation purifying treatment technology for removing heavy metal pollution of soil

The invention relates to a magnetic separation purifying treatment technology for removing heavy metal pollution of soil, which is characterized in that a responsive or adsorptive magnetic carrier granular material is used for adsorption trapping of heavy metals in soil, and then magnetic separation and soil separation are carried out; the technology comprises the following steps: 1) preparing the soil and producing slurry; 2) performing adsorption trapping on the heavy metals by a magnetic carrier; 3) performing magnetic separation; 4) regenerating the material; and 5) recovering the heavy metals and performing concentrated treatment. The technology can compensate disadvantages of current soil dressing methods, chemical methods, physical methods and biological methods for soil restoration, has the advantages that the technology process is simple, the magnetic carrier granular material can be regenerated and recycled, the treatment cost is low, advantages of an ore dressing technology and an ore dressing machine can be performed, removal, decrement, purification and restoration of the heavy metal pollution for various scales of the soil are developed, no lots of dirty (waste) water is generated during a whole process, secondary pollution or allopatric pollution cannot be generated, and the heavy metals can be recovered.
Owner:CUG WUHAN GOLDEN SHIELD ENVIRONMENTAL TECH CO LTD

Hole-sealing, hydraulic-fracturing and gas-extraction integrated construction device and construction method thereof

A hole-sealing, hydraulic-fracturing and gas-extraction integrated construction device comprises a first bag, a second bag, a grouting pipe, a hydraulic fracturing pipe, a gas extraction pipe and a perforated pipe. The first bag is arranged in a drilled hole and located near a hole opening, the second bag is arranged in the drilled hole and located near the hole bottom, the grouting pipe and the gas extraction pipe both sequentially penetrate through the first bag and the second bag from left to right and then extend into the hole bottom, and the left end of the perforated pipe is coaxially and fixedly connected with the right end of the gas extraction pipe. The outer diameter of the hydraulic fracturing pipe is smaller than the inner diameter of the gas extraction pipe, the hydraulic fracturing pipe is coaxially arranged in the gas extraction pipe and the perforated pipe, and the right end of the hydraulic fracturing pipe rightwards extends out of the right end of the perforated pipe. The invention further discloses a hole-sealing, hydraulic-fracturing and gas-extraction integrated construction method, that is, after a hydraulic fracturing procedure, the hole continues to be used for gas extraction; and a novel layer-penetrating fracturing-gas extraction integrated hole drilling and sealing process is provided, the good versatility of the drilled hole is guaranteed, the number of drilled holes is reduced, and the construction cost is lowered accordingly.
Owner:HENAN POLYTECHNIC UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products