Vegetation recovery method for nonferrous metal mining wasteland
A non-ferrous metal and vegetation restoration technology, which is applied in the fields of site preparation methods, botanical equipment and methods, water conservancy projects, etc., can solve the difficult problems of vegetation restoration, achieve remarkable governance effects, prevent the diffusion of heavy metals and pollute the environment, and improve efficiency Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Example Embodiment
[0029] Example 1 Vegetation restoration in a wasteland of a copper mine in Dexing, Jiangxi
[0030] The terrain of the abandoned land is a sloping land made of waste. The surface soil contains heavy metals such as copper and arsenic, and the soil is weakly acidic. The processing steps are as follows:
[0031] (1) Arrangement of near-natural terrain in abandoned land. The wasteland is arranged near natural topography, the slope of the pile body is trimmed according to the slope of the natural repose angle, and the top of the slope is flattened to form a storage yard with a stepped slope, and an ecological bag retaining wall is set at the foot of the slope. The length of the stepped slope is 6m, the width of the step platform is 1.5m, and the height of the ecological bag retaining wall is 0.6m.
[0032] (2) Stabilization of heavy metals. The surface layer of the waste ground is evenly covered with heavy metal stabilizer, and manual raking is used to mix the stabilizer with th...
Example Embodiment
[0041] Example 2 Restoration and management of vegetation in a wasteland of an aluminum mine in Zibo, Shandong
[0042] Part of the mine's abandoned land is sloped. The surface contains iron, titanium, scandium and other metals. The surface soil is alkaline. The treatment process of wasteland with sloped land is as follows:
[0043] (1) Arrangement of near-natural terrain in abandoned land. The wasteland is arranged near natural terrain, and the slope of the pile is arranged according to the slope not greater than the natural repose angle to form a pile yard with a trapezoidal slope and platform, and an ecological bag retaining wall is set at the foot of the slope. The trapezoidal slope is 8m long, the platform width is 3m, and the height of the ecological bag retaining wall is 1.2m.
[0044] (2) Stabilization of heavy metals. The surface layer of the abandoned ground is evenly covered with heavy metal stabilizer, and the rake is used to mix the stabilizer and the shallow...
Example Embodiment
[0052] Example 3 Restoration and management of vegetation in a wasteland of an aluminum mine in Shandong
[0053] The mine's abandoned site is a flat land with potholes. The process of recovery management is the same as that of Example 2, and the different steps are:
[0054] (1) High digging and low filling to level the flat ground;
[0055] (4) Set up interception and drainage ditch in abandoned land. Set up drainage ditch on flat ground, the ditch is 80-120cm wide and 40-60cm deep. Drainage ditch spacing is 25m.
[0056] The recovery and treatment effect achieved is the same as that of Example 2.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap