Ship appendage equipment impact test platform and use method thereof

By designing a high-strength steel welding impact test platform for ship-owned equipment, the existing platform structure is solved, the problems of reduced strength, high safety hazards and high lifting difficulty are improved, and the safety and application scope of the test platform are improved, satisfying the Requirements for heavyweight test methods.

CN118999985APending Publication Date: 2024-11-22TAIHU LAB OF DEEPSEA TECH SCI +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411113420.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

During the test use of existing ship-owned equipment impact test platforms, there are problems such as reduced structural strength, high safety hazards, high lifting difficulty and insufficient sinking resistance. Especially for poor test safety and reliability of equipment with cabins .

Method used

A ship-owned equipment impact test platform was designed, which was manufactured using high-strength steel welding. The platform body consists of an outer shell, an inner bottom plate, an inner side structure, a watertight bulkhead and a large opening structure, and a double-layer bottom structure is set up. The cross structure with vertical and horizontal vertical plates adds platform hoisting lugs and watertight bulkheads. Through three basic forms of test tooling, the platform's anti-sinking ability and operation safety are enhanced.

Benefits of technology

The test platform has a compact and reasonable structure and convenient operation, which meets the requirements of heavyweight test methods, improves the safety and scope of application of tests, extends the service life of the platform, and ensures the safety and reliability of tests.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118999985A_ABST
    Figure CN118999985A_ABST
Patent Text Reader

Abstract

The ship appendage equipment impact test platform is composed of a waterproof ceiling and a platform body, the platform body depends on a thick plate frame structure arranged in the middle of a double-layer bottom, a large opening structure is formed in the double-layer bottom, and an inner bottom plate of the platform, the inner wall of the large opening structure and an outer bottom plate serve as mounting surfaces of a tested device. The impact test requirements of various kinds of ship appendage equipment can be met through the test tools in three basic forms, and the actual ship installation and use state of the equipment can be fully simulated especially for the appendage equipment with a cabin penetrating structure. A pair of watertight bulkheads is arranged in the platform body, so that the anti-sinking capability of the test platform is greatly enhanced aiming at the risk existing in the impact test of the cabin penetrating equipment. The platform lifting lugs are arranged on the inner bottom plate of the platform body through the thick plate frame structure, the overall lifting difficulty of the platform is lowered, and the operation safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of experiment and test technology, in particular to an impact test platform for ship appendage equipment and a use method thereof. Background Art

[0002] The impact resistance of ship equipment determines the combat effectiveness and vitality of ships in wartime. Therefore, all major naval countries stipulate that ship equipment must pass the impact test before it can be installed on ships. At present, ship equipment is mainly subjected to impact tests in accordance with the provisions of GJB150.18-1986. According to Section 2.2 of Test 10 in GJB150.18-1986, ship equipment is divided into three categories: A, B, and C according to its installation location. Ship equipment with a mass of more than 2.7t (Class A / Class B equipment) should be subjected to underwater explosion impact tests on a floating impact platform. Such ship equipment is generally called heavy equipment.

[0003] Appendage equipment (Class C equipment) refers to ship equipment that is directly installed on the outer plate below the waterline of the ship and bears the impact load transmitted from the hull structure and the underwater explosion shock wave load during the underwater non-contact explosion, such as propellers, stern brackets, rudders, sonars, etc. Ship appendage equipment is subject to impact tests in accordance with the provisions of GJB10285-2021. Based on the heavyweight test method specified in GJB150.18-1986, GJB10285-2021 introduces the test requirements of MIL-DTL-901E for appendage equipment: The appendage equipment is installed on the outer bottom plate of the floating impact platform, and the impact test is carried out according to the working conditions of the heavyweight test.

[0004] According to the requirements of relevant test standards and specifications: floating impact platform (see Figure 1 ) is a double-decker flat-bottomed boat made of high-strength steel, consisting of a waterproof roof 101 and a platform body 102 (see Figure 2 ) composition: The waterproof ceiling 101 is composed of a ceiling frame and a waterproof tarpaulin, which is used to prevent the water splashed into the platform by the explosion during the test; the platform body 102 is composed of a double bottom 103 and a side structure 104, the outer bottom plate 106 of the double bottom 103 and the inner bottom plate 105 are reinforced by the longitudinal and transverse plate structure 107 between the double bottom, the heavy equipment of Class A and Class B ships under test is installed on the inner bottom plate 105, and the attached equipment under test is installed on the outer bottom plate 106.

[0005] Regarding the impact test requirements for ship appendage equipment, the above-mentioned floating impact platform has the following limitations when used in the test:

[0006] (I) In order to simulate the installation and use status of the actual ship, the cables or structural parts in the cabin of the attached equipment need to simulate the through-cabin layout during the test, and establish a connection relationship with the electromechanical equipment or structural parts installed in the cabin. Therefore, it is necessary to directly open a through opening on the double bottom of the floating impact platform. The maximum size of some openings will exceed half of the width of the platform. The use of welding and opening through openings will lead to changes in the material properties of the operating area and a decrease in the local strength of the platform. Even if it is repaired after the test, it will still bring hidden dangers to the platform and greatly reduce its service life. In serious cases, it will cause the platform to be directly scrapped.

[0007] (II) For attached equipment with tank penetration requirements, if the tank penetration structure fails or is damaged during the impact process, water will flow into the floating impact platform through the openings on the double bottom in a large amount in a short period of time, which may cause the platform to capsize or sink, resulting in a test safety accident.

[0008] (III) The overall mass of the floating impact platform is generally not less than 50t. The lifting lugs are usually arranged on the platform's strongest outer shell plate near the double bottom, which requires the slings to be of sufficient length. In addition, under the limited factory lifting height (generally not more than 12m), the height of the platform body (generally more than 3m) together with the height of the slings will limit the height of the space under the platform, affecting the installation of the attached equipment. When testing the attached equipment, the entire platform needs to be frequently lifted in and out of the water tank and the test room. The compression between the slings and the platform's side structure can easily cause damage to the slings or local deformation of the platform. Summary of the invention

[0009] In view of the shortcomings of the above-mentioned existing production technology, the applicant provides a ship appendage equipment impact test platform and a method of using the same, so that the appendage equipment can be easily subjected to underwater explosion impact tests, which has a wide range of applications and is safe and reliable.

[0010] The technical solution adopted by the present invention is as follows:

[0011] A ship appendage equipment impact test platform comprises a waterproof roof and a platform body, wherein the platform body is welded and manufactured with high-strength steel, and the platform body consists of a platform outer shell, an inner bottom plate, an inner side structure, a watertight bulkhead and a large opening structure, wherein a double-layer bottom structure is arranged inside the platform outer shell, and the double-layer bottom structure consists of a thick plate frame structure located at a central position and a surrounding longitudinal and transverse vertical plate cross structure, and the double-layer bottom structure has a large opening structure that passes through from top to bottom along the inner edge of the thick plate frame structure, and watertight bulkheads are symmetrically arranged on both sides of the large opening structure.

[0012] As a further improvement of the above technical solution:

[0013] The platform shell is an integrated structure.

[0014] The platform shell adopts a structure that is closed on all sides and open at the top and bottom.

[0015] A plurality of platform lifting lugs are arranged on the inner bottom plate.

[0016] The four platform lifting ears are distributed at the four corners of the inner bottom plate close to the thick plate frame structure.

[0017] A single watertight bulkhead consists of a bulkhead mounting base and a bulkhead. The bulkhead mounting base is welded to the inner bottom plate and the inner side structure. The bulkhead is fixed to the bulkhead mounting base and the inner side structure by bolts, and elastic sealing materials are arranged on the connection surface to ensure watertightness.

[0018] A waterproof ceiling installation surface and an operating passage for personnel outside the platform are arranged on the upper part of the inner side structure, and a side structure foot reinforcement rib is extended downwardly from the inner bottom of the inner side structure.

[0019] The large opening structure uses the vertical surface inside the thick plate frame structure as the main connection surface of the test fixture. The test fixture includes a double-bottom structure test fixture, a hull-simulating test fixture, and a hull-simulating test fixture on the platform outer bottom.

[0020] The outer ring of the longitudinal and transverse vertical plate cross structure is provided with outer shell plate reinforcement ribs, and the interior of the longitudinal and transverse vertical plate cross structure is provided with outer bottom plate cross reinforcement ribs.

[0021] A ship appendage equipment impact test platform and a method of using the same, the operation process is as follows:

[0022] Step 1: Preparation;

[0023] Prepare the impact test platform for ship appendage equipment required for the test, and design and manufacture special test fixtures for the tested appendage equipment based on three basic forms;

[0024] Step 2: Remove the waterproof ceiling;

[0025] Remove the waterproof roof of the ship's appendage equipment impact test platform;

[0026] Step 3: Hoisting to the test plant;

[0027] Use a crane to lift the platform body from the test pool to the test plant through the platform lifting lugs;

[0028] Step 4: Test installation;

[0029] Install the test fixture to the large opening structure of the platform or the outer bottom plate by welding;

[0030] Use a crane to hoist the attached equipment under test into the test platform and install it in the platform body through the test fixture;

[0031] Step 5: Hoisting to the test pool;

[0032] Use a crane to hoist the platform body with the test equipment into the test pool;

[0033] Step 6: Install waterproof ceiling;

[0034] Install the waterproof roof onto the platform body;

[0035] Step 7: Pool deployment;

[0036] Drag the test platform to the test waters and position it, and deploy the detonating cable for underwater explosion;

[0037] Step 8: Experimental implementation;

[0038] Carry out underwater explosion test on the attached equipment under test according to the determined test conditions;

[0039] Step 9: The test is completed;

[0040] Tow the test platform back to the test plant;

[0041] Repeat the second and third steps to remove the test attachment from the platform body and remove the test fixture if necessary. The test is now completed.

[0042] The beneficial effects of the present invention are as follows:

[0043] The present invention has a compact and reasonable structure and is easy to operate. The main dimensions and standard test dose of the test platform meet the requirements of the heavyweight test method for floating impact platforms and their test conditions specified in the standard MIL-DTL-901E. The test platform is mainly composed of a waterproof roof and a platform body. The platform body relies on the thick plate frame structure set in the middle of the double bottom to open a large opening structure on the double bottom. The platform inner bottom plate, the inner wall of the large opening structure, and the outer bottom plate are used as the installation surface of the test device. Through three basic forms of test fixtures, the impact test requirements of various types of ship attachment equipment can be met, especially for attachment equipment with a through-cabin structure, which can fully simulate the installation and use status of the equipment on the actual ship. In addition, a pair of watertight bulkheads are set inside the platform body, which greatly enhances the anti-sinking ability of the test platform in view of the risks of the impact test of the through-cabin equipment. The platform body relies on the thick plate frame structure to set a platform lifting lug on the inner bottom plate, which reduces the overall lifting difficulty of the platform and improves the safety of operation.

[0044] The present invention can be generally used for Class A, B and C ship equipment to implement impact assessment tests and impact resistance test research in accordance with the requirements of standards such as MIL-DTL-901E, GJB150, GJB10285, etc. The platform is safe and reliable, has a wide range of applications and strong expansibility.

[0045] At the same time, the present invention also has the following advantages:

[0046] 1) Wide application scope and strong expansibility: The test platform involved in the present invention can meet the impact test requirements of various types of ship appendages through three basic forms of test fixtures by arranging a large opening structure on the double bottom. It can fully simulate the actual ship installation and use status of the equipment, and has the function of implementing impact tests on heavy ship equipment installed in the cabin. The test capability can fully cover Class A, B, and C ship equipment according to GJB150.

[0047] 2) The platform structure is stable, reliable and durable: The present invention avoids the loss and damage of the fixed structure of the test platform during the test construction, as well as the hidden dangers caused by the resulting reduction in the local structural strength of the platform, by arranging a large opening structure and three basic forms of test tooling on the test platform, thereby ensuring that the technical status of the test platform is stable and reliable during long-term use.

[0048] 3) The platform has good anti-sinking performance, which effectively ensures the safety of the test: The present invention sets watertight bulkheads on both sides of the large opening structure, which specifically reduces the risks of the impact test of the penetration equipment, greatly enhances the anti-sinking ability of the test platform, and can ensure the safety of the test.

[0049] 4) Convenient hoisting operation: The test platform involved in the present invention arranges the platform lifting ears on the inner bottom plate by relying on the thick plate frame structure in the double bottom, thereby reducing the overall hoisting difficulty and height of the platform, ensuring the height of the working space related to the attached equipment under the platform, and avoiding the risk of the lifting slings being easily damaged, which brings convenience to the test operation of the impact test of the ship's attached equipment.

[0050] 5) The present invention is a test platform for carrying out impact tests on ship equipment (appendage equipment and heavy equipment) by underwater explosion, and is used to assess the impact resistance of ship equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is a schematic diagram of the structure of a floating impact platform in the prior art.

[0052] Figure 2 It is a schematic diagram of the main body structure of the floating impact platform in the prior art.

[0053] Figure 3 Schematic diagram of the main structure of a floating impact platform in the prior art (partial cross-section).

[0054] Figure 4 It is a structural schematic diagram of the present invention.

[0055] Figure 5 It is a schematic diagram of the main structure of the test platform of the present invention.

[0056] Figure 6 It is a schematic diagram of the structure of the double-layer bottom structure of the present invention.

[0057] Figure 7 It is a schematic diagram of the structure of the double-layer bottom structure of the present invention from another perspective.

[0058] Figure 8 It is a schematic diagram of the structural form of the inner side structure of the present invention.

[0059] Fig. 9 It is a schematic diagram of the structure of the watertight bulkhead of the present invention.

[0060] Fig.10 It is a schematic diagram of the structure of the watertight bulkhead of the present invention from another perspective.

[0061] Fig.11 It is a schematic diagram of the arrangement position of the platform lifting lugs of the present invention.

[0062] Fig.12 It is a schematic diagram of the installation and deployment of the ship heavy equipment installed in the cabin of the present invention on the test platform of the present invention.

[0063] Fig.13 It is a schematic diagram of the installation and deployment of the ship appendage equipment with a cabin penetration structure in the present invention on the test platform of the present invention.

[0064] Fig.14 It is a schematic diagram of the installation and deployment of the large ship appendage equipment with a cabin-penetrating structure in the present invention on the test platform of the present invention.

[0065] Fig.15 It is a structural schematic diagram of the ship heavy equipment (model) installed in the cabin of the present invention.

[0066] Fig.16 It is a structural schematic diagram of the ship appendage equipment (model) in the present invention.

[0067] Fig.17 It is a structural schematic diagram of the ship appendage equipment (model) with a cabin penetration structure in the present invention.

[0068] Fig.18 It is a structural schematic diagram of a large ship appendage equipment (model) with a cabin penetration structure in the present invention.

[0069] in:

[0070] 101. Waterproof roof; 102. Platform body; 103. Double bottom; 104. Side structure; 105. Inner bottom plate; 106. Outer bottom plate; 107. Longitudinal and transverse plate structure between double bottom;

[0071] 8. Platform shell; 9. Inner side structure; 10. Watertight bulkhead; 11. Large opening structure; 12. Inner bottom plate; 13. Thick plate frame structure; 14. Vertical and horizontal plate cross structure; 15. Shell plate reinforcement ribs; 16. Cross reinforcement ribs of outer bottom plate; 17. Waterproof ceiling installation surface; 18. Platform external personnel operation passage; 19. Side shell plate reinforcement ribs; 20. Side structure foot reinforcement ribs; 21. Bulkhead installation base; 22. Bulkhead; 23. Platform lifting lugs;

[0072] 26. Test fixtures for simulating the ship hull on the outer bottom of the platform; 27. Heavy ship equipment installed in the cabin; 28. Ship appendage equipment; 29. ​​Ship appendage equipment with through-cabin structure; 30. Large ship appendage equipment with through-cabin structure. DETAILED DESCRIPTION

[0073] The specific implementation of the present invention will be described below in conjunction with the accompanying drawings.

[0074] like Figure 1-Figure 18 As shown, the ship appendage equipment impact test platform of this embodiment includes a waterproof roof 101 and a platform body 102. The platform body 102 is made of high-strength steel by welding. The platform body 102 consists of a platform outer shell 8, an inner bottom plate 12, an inner side structure 9, a watertight bulkhead 10 and a large opening structure 11. A double-layer bottom structure is arranged inside the platform outer shell 8. The double-layer bottom structure consists of a thick plate frame structure 13 located at the center and a surrounding vertical plate cross structure 14. The double-layer bottom structure is provided with a large opening structure 11 that runs through from top to bottom along the inner edge of the thick plate frame structure 13, and watertight bulkheads 10 are symmetrically arranged on both sides of the large opening structure 11.

[0075] The platform housing 8 is an integrated structure.

[0076] The platform shell 8 is a structure that is closed on all sides and open at the top and bottom.

[0077] A plurality of platform lifting ears 23 are arranged on the inner bottom plate 12 .

[0078] The four platform lifting ears 23 are distributed at the four corners of the inner bottom plate 12 close to the thick plate frame structure 13 .

[0079] A single watertight bulkhead 10 is composed of a bulkhead mounting base 21 and a bulkhead 22. The bulkhead mounting base 21 is welded to the inner bottom plate 12 and the inner side structure 9. The bulkhead 22 is fixed to the bulkhead mounting base 21 and the inner side structure 9 by bolts, and elastic sealing materials are arranged on the connection surface to ensure watertightness.

[0080] A waterproof ceiling installation surface 17 and a platform external personnel operation passage 18 are arranged on the upper part of the inner side structure 9, and a side structure foot reinforcement rib 20 extends downward from the inner bottom of the inner side structure 9.

[0081] The large opening structure 11 uses the vertical surface inside the thick plate frame structure 13 as the main connection surface of the test fixture. The test fixture includes a double bottom structure test fixture, a hull simulation test fixture and a hull simulation test fixture 26 on the platform outer bottom.

[0082] The outer circle of the longitudinal and transverse vertical plate cross structure 14 is provided with an outer shell plate reinforcement rib 15 , and the interior of the longitudinal and transverse vertical plate cross structure 14 is provided with an outer bottom plate cross reinforcement rib 16 .

[0083] The ship appendage equipment impact test platform and its use method according to claim 1 of this embodiment have the following operation process:

[0084] Step 1: Preparation;

[0085] Prepare the impact test platform for ship appendage equipment required for the test, and design and manufacture special test fixtures for the tested appendage equipment based on three basic forms;

[0086] Step 2: removing the waterproof ceiling 101;

[0087] The waterproof roof 101 of the ship appendage equipment impact test platform is removed;

[0088] Step 3: Hoisting to the test plant;

[0089] Use a crane to lift the platform body 102 from the test pool to the test plant through the platform lifting lugs 23;

[0090] Step 4: Test installation;

[0091] Install the test fixture into the platform large opening structure 11 or onto the outer bottom plate 106 by welding;

[0092] Use a crane to hoist the attached equipment under test into the test platform and install it in the platform body through the test fixture;

[0093] Step 5: Hoisting to the test pool;

[0094] Use a crane to hoist the platform body with the test equipment into the test pool;

[0095] Step 6: Install waterproof ceiling 101;

[0096] Install the waterproof ceiling 101 onto the platform body;

[0097] Step 7: Pool deployment;

[0098] Drag the test platform to the test waters and position it, and deploy the detonating cable for underwater explosion;

[0099] Step 8: Experimental implementation;

[0100] Carry out underwater explosion test on the attached equipment under test according to the determined test conditions;

[0101] Step 9: The test is completed;

[0102] Tow the test platform back to the test plant;

[0103] Repeat the second and third steps to remove the test attachment from the platform body and remove the test fixture if necessary. The test is now completed.

[0104] The specific structure and function of the ship appendage equipment impact test platform described in the present invention are as follows:

[0105] First, the main dimensions of the platform and the standard test charge can meet the requirements of the heavyweight test method for floating impact platforms and test conditions specified in the standard MIL-DTL-901E.

[0106] The test platform is mainly composed of a waterproof roof 101 and a platform body 102. The platform body 102 is made of high-strength steel and is welded and composed of a platform outer shell 8, an inner bottom plate 12, an inner side structure 9, a watertight bulkhead 10 and a large opening structure 11.

[0107] The double-layer bottom structure is composed of a thick plate frame structure 13 located at the center and a surrounding vertical plate cross structure 14. The double-layer bottom structure is provided with a large opening structure 11 that passes through from top to bottom along the inner edge of the thick plate frame structure 13.

[0108] One set of watertight bulkheads 10 is arranged on both sides of the large opening structure along the bow and stern directions of the test platform. Each set of watertight bulkheads 10 consists of a bulkhead mounting base 21 and a bulkhead 22. The bulkhead mounting base 21 is welded to the inner bottom plate 12 and the inner side structure 9. The bulkhead 22 is fixed to the bulkhead mounting base 21 and the inner side structure 9 by bolts, and elastic sealing materials are arranged on the connection surface to ensure watertightness.

[0109] The inner bottom plate 12 is provided with four platform lifting lugs 23 above the four corners of the thick plate frame structure 13 for overall lifting of the test platform.

[0110] The large opening structure 11 uses the vertical surface inside the thick plate frame structure 13 as the main connecting surface of the test fixture. The test fixture has three basic forms: a test fixture in the form of a double-bottom structure, a test fixture simulating a ship hull, and a test fixture 26 simulating a ship hull on the outer bottom of the platform.

[0111] The large opening structure 11 is installed in a test fixture in the form of a double bottom structure, and the bulkhead 22 in the test platform is removed. The test platform can be used to perform impact tests on the ship heavy equipment 27 and the ship appendage equipment 28 installed in the cabin. The ship heavy equipment 27 installed in the cabin is installed on the inner bottom plate 12 of the test platform, and the ship appendage equipment 28 is installed on the installation surface of the test fixture in the form of a double bottom structure close to the outer bottom plate 106.

[0112] The large opening structure 11 is installed in a test fixture simulating a ship hull, and a bulkhead 22 is installed in the test platform. The test platform can be used to perform impact tests on a ship appendage equipment 29 with a through-cabin structure, which is installed on a test fixture 25 simulating a ship hull.

[0113] The test fixture 26 simulating the hull on the outer bottom of the platform is installed on the outer bottom plate 106 of the test platform, and a bulkhead 22 is installed inside the test platform. The test platform can be used to implement impact tests on large ship appendage equipment 30 with a through-cabin structure. The large ship appendage equipment 30 with a through-cabin structure is installed on the test fixture 26 simulating the hull on the outer bottom of the platform, and its cabin structure enters the interior of the test platform through a large opening structure.

[0114] The structure of the ship appendage equipment impact test platform in this embodiment is as follows Figure 4 As shown, the main dimensions meet the requirements of the standard MIL-DTL-901E standard floating shock platform, and the main specifications are as follows:

[0115] a) The platform is 8.59m long (standard requirement is 28 feet), 4.87m wide (standard requirement is 16 feet), and the platform body is 2m high (standard requirement is 6 feet).

[0116] b) The internal space of the platform is 8m long (standard requirement is 26 feet) and 4.33m wide (standard requirement is 14 feet)

[0117] c) The height of the double bottom 3 of the platform is 0.9m (the standard requirement is 3 feet).

[0118] d) The standard test charge of the platform is 33kgTNT, which is equivalent to the 27kgHBX-1 required by the standard.

[0119] e) The large opening structure 11 on the double bottom 3 of the platform has a length and a width of 3.6 m.

[0120] f) The overall mass of the platform fixed structure is approximately 40t (excluding the waterproof roof).

[0121] g) The height of the watertight bulkhead 10 inside the platform is 1.02m, and the distance between the two watertight bulkheads 10 is 3.63m.

[0122] This embodiment combines the following four typical structural forms of ship equipment to illustrate its use effect:

[0123] Fig.15 The model shown is a ship equipment 27 installed in the cabin, which is 5.5m long, 2m wide and 2.2m high. The length direction of the equipment is consistent with the bow and stern direction of the actual ship. When installed on the actual ship, it is fixed by a device at the bottom. The overall mass is 10t, which is a heavy ship equipment.

[0124] Fig.16 The model shown is a ship appendage equipment 28, which has a diameter of 1m and a height of 0.6m, and has no through-cabin structure. When installed on a real ship, it is installed and fixed through the top surface of the equipment, and the overall mass is 200kg.

[0125] Fig.17 The model shown is a ship appendage equipment 29 with a through-cabin structure, with a maximum diameter of 2.2 m and a height of 2.72 m. The dark-marked part in the figure is the through-cabin structure, with a diameter of 2 m and an overall mass of 5 t.

[0126] Fig.18 The model shown is a large ship appendage equipment 30 with a through-cabin structure, which is 3m long, 3m wide and 4.05m high. The length direction of the equipment is consistent with the bow and stern direction of the actual ship. The dark-marked part in the figure is the through-cabin structure. The length and width of the through-cabin structure are both 2.7m, and the overall mass is 15t.

[0127] In actual working process:

[0128] Before the test, the waterproof roof 101 of the ship appendage equipment impact test platform of this embodiment is removed, and the platform body 102 is hoisted from the pool into the test workshop through the platform lifting lugs 23.

[0129] Fig.15 When the heavy ship equipment 27 installed in the test cabin is tested, the bulkhead 22 is removed from the platform body 102, and a test fixture in the form of a double bottom structure is installed in the large opening structure 11. Then, the platform body 2 is hoisted into the test pool, and then the heavy ship equipment 27 installed in the test cabin is hoisted into the platform and fixed on the inner bottom plate 5.

[0130] Fig.16 When the ship appendage equipment 28 shown in the figure is being tested and installed, the bulkhead 22 may not be installed inside the platform body 2, and a test fixture in the form of a double bottom structure is added to the large opening structure 11, and then the ship appendage equipment 28 is installed on the test fixture in the middle of the platform outer bottom plate 6, and finally the platform body 2 equipped with the test equipment is hoisted into the test water tank.

[0131] Fig.17When the ship appendage equipment 29 with a cabin penetration structure shown in the figure is being tested for installation, a bulkhead 22 should be installed inside the platform body 2, and a test fixture 25 simulating the hull should be installed in the large opening structure 11 of the double bottom 4. The test fixture should open an opening structure according to the cabin penetration requirements of the equipment, and then the ship appendage equipment 29 with a cabin penetration structure should be installed on the test fixture in the middle of the platform outer bottom plate 6, and finally the platform body 2 equipped with the test equipment should be hoisted into the test water tank.

[0132] Fig.18 When the large-scale ship appendage equipment 30 with a cabin penetration structure shown in the figure is tested for installation, a bulkhead 22 should be installed inside the platform body 2. The test adopts a test fixture 26 simulating the hull on the outer bottom of the platform. The test fixture is welded to the outer bottom plate 6 of the test platform and an opening structure is opened according to the cabin penetration requirements of the equipment. Then, the large-scale ship appendage equipment 30 with a cabin penetration structure is installed on the test fixture, and it is ensured that the cabin structure of the equipment can enter the interior of the test platform through the large opening structure. Finally, the platform body 2 equipped with the test equipment is hoisted into the test water tank.

[0133] After the test installation is completed, the test measurement instruments and the accompanying test equipment or devices required by the test equipment are deployed in the test platform under the premise of ensuring the stability of the test platform floating platform. When the test platform uses watertight bulkheads 10, the above instruments and equipment or devices are deployed in the areas at both ends of the platform, and relevant anti-impact protection measures are taken.

[0134] After the deployment inside the test platform is completed, the waterproof roof 101 is installed on the platform body 102, and then the test platform is towed to the test water area and positioned. Fig.15 The test equipment shown is subjected to underwater explosion shock test on the test platform according to the working conditions specified in GJB150. Figures 15 to 18 The equipment under test shown is subjected to underwater explosion shock test on the test platform according to the working conditions specified in GJB150 or GJB10285. After the test is completed, the test platform is towed back to the test plant, and the equipment under test is removed from the test platform, and the test is completed.

[0135] The above description is an explanation of the present invention, not a limitation of the present invention. The scope of the present invention is defined in the claims. Any form of modification may be made within the scope of protection of the present invention.

Claims

1. A ship appendage equipment impact test platform, comprising a waterproof roof (101) and a platform body (102), wherein the platform body (102) is welded and manufactured using high-strength steel, and is characterized in that: The platform body (102) is composed of a platform outer shell (8), an inner bottom plate (12), an inner side structure (9), a watertight bulkhead (10) and a large opening structure (11). A double-layer bottom structure is arranged inside the platform outer shell (8). The double-layer bottom structure is composed of a thick plate frame structure (13) located at the center and a surrounding longitudinal and transverse vertical plate cross structure (14). The double-layer bottom structure is provided with a large opening structure (11) that passes through from top to bottom along the inner edge of the thick plate frame structure (13). Watertight bulkheads (10) are symmetrically arranged on both sides of the large opening structure (11).

2. The ship appendage equipment impact test platform according to claim 1, characterized in that: The platform shell (8) is an integrated structure.

3. The impact test platform for ship appendage equipment according to claim 1, characterized in that: The platform shell (8) is a structure that is closed on all sides and open at the top and bottom.

4. The impact test platform for ship appendage equipment according to claim 1, characterized in that: A plurality of platform lifting ears (23) are arranged on the inner bottom plate (12).

5. The impact test platform for ship appendage equipment according to claim 4, characterized in that: Four platform lifting ears (23) are distributed at four corners of the inner bottom plate (12) close to the thick plate frame structure (13).

6. The ship appendage equipment impact test platform according to claim 1, characterized in that: A single watertight bulkhead (10) is composed of a bulkhead mounting base (21) and a bulkhead (22), wherein the bulkhead mounting base (21) is welded to an inner bottom plate (12) and an inner side structure (9), and the bulkhead (22) is fixed to the bulkhead mounting base (21) and the inner side structure (9) by bolts, and an elastic sealing material is arranged on the connection surface to ensure watertightness.

7. The ship appendage equipment impact test platform according to claim 1, characterized in that: The upper part of the inner side structure (9) is provided with a waterproof ceiling installation surface (17) and an operating passage (18) for personnel outside the platform, and the inner bottom of the inner side structure (9) is provided with a side structure foot reinforcement rib (20) extending downward.

8. The ship appendage equipment impact test platform according to claim 1, characterized in that: The large opening structure (11) uses the vertical surface inside the thick plate frame structure (13) as the main connection surface of the test fixture, and the test fixture includes a test fixture in the form of a double-layer bottom structure, a test fixture simulating a ship hull, and a test fixture simulating a ship hull on the outer bottom of the platform.

9. The ship appendage equipment impact test platform according to claim 1, characterized in that: The outer ring of the longitudinal and transverse vertical plate intersection structure (14) is provided with an outer shell plate reinforcement rib (15), and the interior of the longitudinal and transverse vertical plate intersection structure (14) is provided with an outer bottom plate cross reinforcement rib (16).

10. A ship appendage equipment impact test platform and a method of using the same as claimed in claim 1, characterized in that: The operation process is as follows: Step 1: Preparation; Prepare the impact test platform for ship appendage equipment required for the test, and design and manufacture special test fixtures for the tested appendage equipment based on three basic forms; Step 2: Remove the waterproof ceiling (101); The waterproof roof (101) of the ship appendage equipment impact test platform is removed; Step 3: Hoisting to the test plant; Using a crane, the platform body (102) is lifted from the test pool to the test plant through the platform lifting lugs (23); Step 4: Test installation; The test fixture is installed in the platform large opening structure (11) or on the outer bottom plate (106) by welding; the attached device to be tested is hoisted into the test platform by a crane, and installed in the platform body by the test fixture; Step 5: Hoisting to the test pool; Use a crane to hoist the platform body with the test equipment into the test pool; Step 6: Install the waterproof ceiling (101); Installing the waterproof roof (101) onto the platform body; Step 7: Pool deployment; Drag the test platform to the test waters and position it, and deploy the detonating cable for underwater explosion; Step 8: Experimental implementation; Carry out underwater explosion test on the attached equipment under test according to the determined test conditions; Step 9: The test is completed; Tow the test platform back to the test plant; Repeat the second and third steps to remove the test attachment from the platform body and remove the test fixture if necessary. The test is now completed.

Citation Information

Cited By

  • Test system and method for simulating real-scale ship broadside structure collision

    CN119666297A