Device and method for measuring saturation adsorption of HF gas by metal fluoride particles

By designing a saturated adsorption device and method for measuring the HF gas by metal fluoride particles, the problem of lack of adsorption characteristics and mechanism research in the prior art is solved, and efficient experiments of adsorbents and industrial process optimization are achieved.

CN119000413APending Publication Date: 2024-11-22THE 404 COMPANY LIMITED CHINA NAT NUCLEAR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411081237.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

There is a lack of effective methods and guidance in the prior art to evaluate and optimize the adsorption characteristics and adsorption mechanism of metal fluoride particles during adsorption of HF gas, resulting in a lack of scientific parameter setting and performance evaluation when used in industrial production.

Method used

A saturation adsorption measurement device and corresponding measurement methods of metal fluoride particles to HF gas are designed. Through this device, the adsorption capacity can be measured easily and efficiently under different adsorption temperatures and pressures, providing experimental data to support industrial process optimization.

Benefits of technology

Fast, safe and stable adsorption experiments are achieved, adsorption balance mass, temperature and pressure data are obtained, adsorbent use guidance and performance evaluation methods are provided, and the optimization of industrial HF waste gas treatment process is supported.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119000413A_ABST
    Figure CN119000413A_ABST
Patent Text Reader

Abstract

The invention relates to a device and a method for measuring saturation adsorption of metal fluoride particles to HF gas, the device comprises an HF gas generating device and an auxiliary gas source, the HF gas generating device and the auxiliary gas source are respectively provided with a gas pressure gauge A and a gas pressure gauge B, the HF gas generating device and the auxiliary gas source are respectively connected with a stop valve A and a stop valve B, and the stop valve A and the stop valve B are connected with a pressure reducing valve through pipelines. The pressure reducing valve is connected with a stop valve C, the stop valve C is connected with a front-end drying tank, the front-end drying tank is connected with a stop valve D, the stop valve D is connected with an adsorption tower, and a gas pressure gauge C and an intrusive thermometer are arranged on the adsorption tower; the adsorption tower is connected with a stop valve E, the stop valve E is connected with a rear-end drying tank, the rear-end drying tank is connected with a stop valve F, the stop valve F is connected with a check valve, the check valve is connected with a tail gas absorption pool, and the tail gas absorption pool contains liquid and is connected with a secondary tail gas absorption pool through a pipeline.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This patent relates to the field of adsorption measurement technology, and specifically to a device and method for measuring the saturated adsorption of HF gas by metal fluoride particles. Background Art

[0002] HF waste gas is a kind of waste gas that often appears in industrial production. At present, the adsorption method is more commonly used in industry to treat HF ​​waste gas. By utilizing the difference in the adsorption characteristics of gas on solid materials and the characteristics that the adsorption amount changes with the pressure and temperature, the separation or purification of HF gas can be effectively achieved.

[0003] Metal fluorides such as NaF, MgF, KF, etc. can quickly adsorb HF gas at low temperatures. This adsorption is chemical adsorption, the reaction is rapid and reversible, and the adsorbent can be effectively reused. Therefore, metal fluoride particles have broad application prospects as adsorbents in the treatment of HF waste gas. However, there is currently insufficient research on the adsorption characteristics and adsorption mechanism of metal fluoride particles in the process of adsorbing HF gas. As a result, when metal fluoride particle adsorbents are used to treat HF ​​waste gas in industrial production, there is often no set of adsorbent usage guidance and adsorption performance evaluation methods for reference, and adsorption parameters are set and adsorption effects are evaluated based on experience. Summary of the invention

[0004] The purpose of the present invention is to provide a device for measuring the saturated adsorption effect of metal fluoride particles on HF gas. The method can conveniently and efficiently measure the adsorption capacity of metal fluoride particle adsorbent for HF gas under different adsorption temperatures and adsorption pressures, and is suitable for small-scale adsorption experiments on a laboratory scale. The device can also be used to carry out similarity experiments, thereby providing guidance and data support for the HF waste gas treatment process in industrial production.

[0005] The technical scheme of the present invention is as follows: a device for measuring the saturated adsorption of HF gas by metal fluoride particles, comprising an HF gas generator and an auxiliary gas source, wherein the HF gas generator and the auxiliary gas source are respectively equipped with a gas pressure gauge A and a gas pressure gauge B, the HF gas generator and the auxiliary gas source are respectively connected to a stop valve A and a stop valve B, the stop valve A and the stop valve B are connected to a pressure reducing valve through a pipeline, the pressure reducing valve is connected to a stop valve C, the stop valve C is connected to a front-end drying tank, the front-end drying tank is connected to a stop valve D, the stop valve D is connected to an adsorption tower, and the adsorption tower is provided with a gas pressure gauge C and an interventional thermometer; the adsorption tower is connected to a stop valve E, the stop valve E is connected to a rear-end drying tank, the rear-end drying tank is connected to a stop valve F, the stop valve F is connected to a check valve, the check valve is connected to a tail gas absorption tank, the tail gas absorption tank contains liquid, and is connected to a secondary tail gas absorption tank through a pipeline, the tail gas absorption tank contains liquid, and is connected to an HF gas detector and a stop valve G;

[0006] The adsorption tower is covered with a heating and heat preservation device;

[0007] The HF gas generating device is provided with a heating device.

[0008] The liquid contained in the tail gas absorption tank and the secondary tail gas absorption tank is an alkaline solution.

[0009] The heating and heat preservation device comprises a heat preservation cover and a side wall heating assembly. The heat preservation cover wraps the adsorption tower. The side wall heating assembly is installed on the heat preservation cover. The side wall heating assembly comprises an electric heating belt, a control power supply, a temperature detector and a temperature relay.

[0010] The electric heating tape is installed on the side wall of the insulation cover through the electric heating tape fixing column.

[0011] The container and the pipeline are machined using M400 material.

[0012] The auxiliary gas source contains Ar gas.

[0013] A method for measuring the saturated adsorption of HF gas by metal fluoride particles comprises the following steps:

[0014] S1: Air tightness check;

[0015] Close stop valve G, open stop valve B, and then open stop valve C, stop valve D, stop valve E, and stop valve F in sequence to fill the device with Ar gas. If the index C on the gas pressure gauge does not change significantly, it proves that the device has good air tightness;

[0016] S2: loading a determined mass of metal fluoride adsorbent particles into an adsorption tower, burying the end probe of the interventional thermometer into the adsorbent particles; turning on the HF gas generator, and filling the HF gas source material into the HF gas generator;

[0017] S3: preheating of adsorption tower;

[0018] Set the adsorption temperature value and heating rate, and raise the temperature inside the adsorption tower under the action of the heating and heat preservation device. Observe the reading of the intervention thermometer. When the set adsorption temperature is reached, stop heating and keep warm.

[0019] S4: Turn on the heating device of the HF gas generator, adjust the opening of the pressure reducing valve and the corresponding stop valve A, stop valve C, and stop valve D, so that a certain flow of HF gas is introduced into the adsorption tower, and the adsorption of HF gas begins in the adsorption tower;

[0020] S5: When the value of pressure gauge C is stable, it proves that the adsorption is completed.

[0021] In the step S3, the adsorption temperature is 250°C and the heating rate is 1-5°C / min.

[0022] In S5, the HF gas generating device and the heating device are turned off, and the stop valve E, stop valve F, and stop valve G at the rear end of the adsorption tower are opened to discharge the HF tail gas inside the device into the tail gas absorption tank and the secondary tail gas absorption tank in sequence. When the reading of the HF gas detector returns to zero, the adsorption tower is removed and the metal fluoride adsorbent particles inside are taken out and weighed to obtain the adsorption equilibrium mass data.

[0023] In S5, when the adsorption is finished, the adsorption equilibrium pressure and the adsorption temperature data are recorded.

[0024] The remarkable effects of the present invention are: it has the characteristics of safety and stability, convenient operation, high experimental efficiency, easy data reading, etc., and the device can be used to quickly obtain relevant data such as the adsorption equilibrium mass, adsorption equilibrium temperature and adsorption equilibrium pressure of the loaded adsorption material by conducting adsorption experiments, so as to obtain adsorption model theoretical models such as the adsorption isotherm in the adsorption process, and then obtain a guiding adsorbent use method and an adsorbent performance evaluation method, and can provide guidance and data support for the HF waste gas treatment process in industrial production. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of a device for measuring the saturation adsorption of HF gas by metal fluoride particles;

[0026] Figure 2 It is a schematic diagram of the adsorption tower and the heating and heat preservation device;

[0027] In the figure: gas pressure gauge A1, gas pressure gauge B2, stop valve A3, stop valve B4, stop valve C5, pressure reducing valve 6, stop valve D7, gas pressure gauge C8, interventional thermometer 9, stop valve E10, stop valve F11, check valve 12, HF gas detector 13, stop valve G14, HF gas generator 15, auxiliary gas source 16.

[0028] Front-end drying tank (gas buffer bottle) 17, adsorption tower 18, rear-end drying tank 19, tail gas absorption tank 20, and stage tail gas absorption tank 21;

[0029] Insulation cover 22, electric heating tape 23, electric heating tape fixing column 24. DETAILED DESCRIPTION

[0030] Many specific details are described in the following description to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways than those described herein, and those skilled in the art can make similar generalizations without violating the connotation of the present application, so the present application is not limited by the specific implementation disclosed below.

[0031] The terms used in one or more embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit one or more embodiments of the present application. The singular forms of "a", "said" and "the" used in one or more embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings. It should also be understood that the term "and / or" used in one or more embodiments of the present application refers to and includes any or all possible combinations of one or more associated listed items.

[0032] It should be understood that, although the terms first, second, etc. may be used to describe various information in one or more embodiments of the present application, such information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of one or more embodiments of the present application, the first may also be referred to as the second, and similarly, the second may also be referred to as the first.

[0033] like Figure 1 As shown, a device for measuring the saturated adsorption of HF gas by metal fluoride particles comprises an HF gas generator 15 and an auxiliary gas source 16. The HF gas generator 15 and the auxiliary gas source 16 are respectively equipped with a gas pressure gauge A1 and a gas pressure gauge B2. The HF gas generator 15 and the auxiliary gas source 16 are respectively connected to a stop valve A3 and a stop valve B4. The stop valve A3 and the stop valve B4 are connected to a pressure reducing valve 6 through a pipeline. The pressure reducing valve 6 is connected to a stop valve C5. The stop valve C5 is connected to a front-end drying tank 17 (i.e., a gas buffer bottle). The front-end drying tank 17 is connected to a stop valve D7. The stop valve D7 is connected to the adsorption tower 18, and the adsorption tower 18 is provided with a gas pressure gauge C8 and an interventional thermometer 9; the adsorption tower 18 is connected to the stop valve E10, the stop valve E10 is connected to the rear-end drying tank 19, the rear-end drying tank 19 is connected to the stop valve F11, the stop valve F11 is connected to the check valve 12, the check valve 12 is connected to the tail gas absorption tank 20, the tail gas absorption tank 20 contains liquid (the liquid is an alkaline solution such as sodium carbonate), and is connected to the secondary tail gas absorption tank 21 through a pipeline, the tail gas absorption tank 21 contains liquid, and is connected to the HF gas detector 13 and the stop valve G14;

[0034] The interior of the HF gas source 15 is filled with sodium hydrogen fluoride powder;

[0035] like Figure 2 As shown, the adsorption tower 18 is covered with a heating and heat preservation device, which includes a heat preservation cover 22 and a side wall heating assembly. The heat preservation cover 22 wraps the adsorption tower 18, and a side wall heating assembly is installed on the heat preservation cover 22. The side wall heating assembly includes an electric heating belt 23, a control power supply, a temperature detector, and a temperature relay; and the electric heating belt 23 is installed on the side wall of the heat preservation cover 22 through an electric heating belt fixing column 24;

[0036] Each container and pipeline is machined using M400 material.

[0037] A method for measuring the saturated adsorption of HF gas by metal fluoride particles comprises the following steps:

[0038] S1: Air tightness check;

[0039] Close the stop valve G14, open the stop valve B4, and then open the stop valve C5, stop valve D7, stop valve E10, and stop valve F11 in sequence to allow the Ar gas to fill each pipeline and container in the device in turn, and observe the changes in the pointer reading of the gas pressure gauge C8. If the pointer reading does not change significantly after maintaining the pressure for a long time, it can be proved that the device has good airtightness. Otherwise, the leaking part needs to be adjusted.

[0040] S2: Open the cover of the adsorption tower 18, fill the determined mass of metal fluoride adsorbent particles into the adsorption tower 18, ensure that the end probe of the interventional thermometer 9 is buried in the adsorbent particles, and close the cover of the adsorption tower 18; open the HF gas generator 15, fill the HF gas source material into the gas generator, and close and tighten the end cover of the gas generator;

[0041] S3: preheating of the adsorption tower 18;

[0042] Start the PLC temperature control device, set the adsorption temperature value and heating rate and other parameters (considering the existence of desorption temperature, set the maximum adsorption temperature of the device to 250°C, and the heating rate to 1-5°C / min continuously adjustable), start the heating mode, and increase the internal temperature of the adsorption tower 18 under the action of the heating and insulation device, observe the degree of the intervention thermometer 9, and when the set adsorption temperature is reached, the heating mode stops and enters the circulation insulation stage.

[0043] S4: Ensure that all valves in the device are in a closed state, start the gas source heating device, heat the HF gas generating device 15, and observe the change in the pointer reading of the barometer 1. When a change occurs, it proves that HF ​​gas is generated, and adjust the opening of the pressure reducing valve 6 and the corresponding stop valve A3, stop valve C5, and stop valve D7 to allow a certain flow of HF gas to be introduced into the adsorption tower 18. At this time, the adsorption tower 18 begins to adsorb HF gas at a certain adsorption temperature.

[0044] S5: Observe the changes in the pointer reading of the pressure gauge C8 on the adsorption tower. When the pointer gradually rises from zero to a stable value, it proves that the adsorption of HF gas by the metal fluoride adsorbent particles has ended and the particles have reached saturated adsorption. At this time, record the adsorption equilibrium pressure and adsorption temperature data. Turn off the HF gas generator 15 and each heating source, open the stop valve E10, stop valve F11, and stop valve G14 at the rear end of the adsorption tower 18, and discharge the HF tail gas inside the device into the tail gas absorption tank 20 and the secondary tail gas absorption tank 21 in turn. The check valve 12 can effectively prevent the liquid in the tail gas absorption tank 20 from flowing back into the rear end gas dryer tank 19. Observe the changes in the reading of the HF gas detector 13. When the displayed degree returns to zero, it proves that the residual HF tail gas inside the device has been absorbed. At this time, remove the adsorption tower 18 and take out the internal metal fluoride adsorbent particles and weigh them to obtain the adsorption equilibrium mass data.

[0045] The above description is only a preferred embodiment of this patent and is not intended to limit this patent. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of this patent should be included in the scope of protection of this patent.

[0046] It should be noted that, for the above-mentioned method embodiments, for the sake of simplicity of description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described action sequence, because according to the present application, certain steps can be performed in other sequences or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0047] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0048] The preferred embodiments of the present application disclosed above are only used to help explain the present application. The optional embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of the present application. The present application selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present application, so that those skilled in the art can understand and use the present application well.

Claims

1. A device for measuring the saturation adsorption of HF gas by metal fluoride particles, characterized in that: The invention comprises an HF gas generating device (15) and an auxiliary gas source (16). The HF gas generating device (15) and the auxiliary gas source (16) are respectively provided with a gas pressure gauge A (1) and a gas pressure gauge B (2). The HF gas generating device (15) and the auxiliary gas source (16) are respectively connected to a stop valve A (3) and a stop valve B (4). The stop valve A (3) and the stop valve B (4) are respectively connected to a pressure reducing valve (6) through a pipeline. The pressure reducing valve (6) is connected to a stop valve C (5). The stop valve C (5) is connected to a front-end drying tank (17). The front-end drying tank (17) is connected to a stop valve D (7). The stop valve D (7) is connected to an adsorption tower ( 18), a gas pressure gauge C (8) and an interventional thermometer (9) are provided on the adsorption tower (18); the adsorption tower (18) is connected to a stop valve E (10), the stop valve E (10) is connected to a rear drying tank (19), the rear drying tank (19) is connected to a stop valve F (11), the stop valve F (11) is connected to a check valve (12), the check valve (12) is connected to a tail gas absorption tank (20), the tail gas absorption tank (20) contains liquid and is connected to a secondary tail gas absorption tank (21) through a pipeline, the secondary tail gas absorption tank (21) contains liquid and is connected to an HF gas detector (13) and a stop valve G (14); The adsorption tower (18) is covered with a heating and heat preservation device; The HF gas generating device (15) is provided with a heating device.

2. The device for measuring the saturation adsorption of HF gas by metal fluoride particles according to claim 1, characterized in that: The liquid contained in the tail gas absorption tank (20) and the secondary tail gas absorption tank (21) is an alkaline solution.

3. The device for measuring the saturation adsorption of HF gas by metal fluoride particles according to claim 1, characterized in that: The heating and heat-insulating device comprises a heat-insulating cover (22) and a side wall heating assembly. The heat-insulating cover (22) wraps the adsorption tower (18). The side wall heating assembly is installed on the heat-insulating cover (22). The side wall heating assembly comprises an electric heating belt (23), a control power supply, a temperature detector, and a temperature relay.

4. The device for measuring the saturation adsorption of HF gas by metal fluoride particles according to claim 3, characterized in that: The electric heating belt (23) is installed on the side wall of the heat preservation cover (22) through the electric heating belt fixing column (24).

5. The device for measuring the saturation adsorption of HF gas by metal fluoride particles according to claim 3, characterized in that: The container and the pipeline are machined using M400 material.

6. The device for measuring the saturation adsorption of HF gas by metal fluoride particles according to claim 3, characterized in that: The auxiliary gas source (16) contains Ar gas.

7. A method for measuring the saturation adsorption of HF gas by metal fluoride particles, using the saturation adsorption measuring device for HF gas by metal fluoride particles as claimed in claim 6, characterized in that: The following steps are involved: S1: Air tightness check; Close stop valve G (14), open stop valve B (4), and then open stop valve C (5), stop valve D (7), stop valve E (10), and stop valve F (11) in sequence to fill the device with Ar gas. If the index of gas pressure gauge C (8) does not change significantly, it proves that the device has good airtightness. S2: loading a determined mass of metal fluoride adsorbent particles into an adsorption tower (18), burying the end probe of an interventional thermometer (9) into the adsorbent particles; opening the HF gas generator (15), and filling the HF gas source material into the HF gas generator (15); S3: preheating the adsorption tower (18); The adsorption temperature value and the heating rate are set, and the temperature inside the adsorption tower (18) is raised under the action of the heating and heat preservation device, and the temperature of the intervention thermometer (9) is observed. When the set adsorption temperature is reached, the heating is stopped and the temperature is kept warm; S4: Turn on the heating device of the HF gas generating device (15), adjust the opening of the pressure reducing valve (6) and the corresponding stop valve A (3), stop valve C (5), and stop valve D (7), so that a certain flow rate of HF gas is introduced into the adsorption tower (18), and at this time, the adsorption of HF gas begins in the adsorption tower (18); S5: When the value of the pressure gauge C (8) stabilizes, it proves that the adsorption is completed.

8. The method for measuring the saturation adsorption of HF gas by metal fluoride particles according to claim 7, characterized in that: In the step S3, the adsorption temperature is 250°C and the heating rate is 1-5°C / min.

9. The method for measuring the saturation adsorption of HF gas by metal fluoride particles according to claim 7, characterized in that: In S5, the HF gas generating device (15) and the heating device are turned off, and the stop valve E (10), the stop valve F (11), and the stop valve G (14) at the rear end of the adsorption tower (18) are opened to discharge the HF tail gas inside the device into the tail gas absorption tank (20) and the secondary tail gas absorption tank (21) in sequence. When the reading of the HF gas detector (13) returns to zero, the adsorption tower (18) is removed and the metal fluoride adsorbent particles inside are taken out and weighed to obtain adsorption equilibrium mass data.

10. The method for measuring the saturation adsorption of HF gas by metal fluoride particles according to claim 7, characterized in that: In S5, when the adsorption is finished, the adsorption equilibrium pressure and adsorption temperature data are recorded.