220kV and 110kV power transmission line cross drilling impact discharge test device
By designing a cross-drilling impact discharge test device for 220kV and 110kV transmission lines, the impact discharge characteristics are simulated by using the line-line gap structure, and the problem of being unable to effectively detect cross-drilling impact discharge in the existing technology is solved, and the stability of the power system is achieved effective experiments and measurements.
Patent Information
- Application Number
- CN202411394755.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-08
- Publication Date
- 2024-11-22
AI Technical Summary
The existing AC test base lacks effective cross-drilling and cross-drilling experimental devices, and cannot effectively detect cross-drilling impact discharge of 220kV and 110kV transmission lines, affecting the stable operation of the power system.
A cross-drilling impact discharge test device for 220kV and 110kV transmission lines was designed. The line-line gap structure of upper and lower electrodes was used to simulate the phase-operated impact discharge characteristics of power transmission lines and ultra-high voltage lines when drilling, and combined with the impact voltage generator. , impact voltage control system and meteorological parameter detection device to realize the simulation and measurement of impact discharge.
The device can stably and reliably simulate and detect the impact discharge characteristics of the transmission line and the ultra-high voltage line crossing, provide an effective experimental basis, ensure the stable operation of the power system, and reduce measurement errors through meteorological parameter detection.
Smart Images

Figure CN119001368A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of power transmission line test equipment, and in particular relates to a 220kV and 110kV power transmission line cross-drilling impulse discharge test device. Background Art
[0002] At present, the existing AC test base impulse test sites are generally equipped with UHV impulse voltage generators, voltage dividers and their measurement systems, but lack effective cross-drilling experimental equipment for 110KV and 220KV typical tower-type transmission lines. Therefore, there is an urgent need for a test device that can effectively detect cross-drilling impulse discharges of 220kV and 110kV transmission lines. Summary of the invention
[0003] In order to overcome the deficiencies in the prior art, the present invention aims to provide a 220kV and 110kV transmission line crossing impulse discharge test device. The device has stable system performance, high reliability, and strong anti-interference ability. The line-line gap structure composed of upper and lower electrodes is used to simulate the phase-to-phase operation impulse discharge characteristics of the corresponding transmission line and the ultra-high voltage line when crossing, providing an effective experimental basis for the stable operation of the power system.
[0004] In order to achieve the above object, the technical solution adopted by the present invention is:
[0005] A 220kV and 110kV transmission line cross-drilling impulse discharge test device comprises an impulse voltage generator, an impulse voltage control system, a gantry, an upper electrode and a lower electrode, wherein the upper electrode simulates a 220kV AC transmission line, and the lower electrode simulates a 110kV AC transmission line; the upper electrode and the lower electrode are arranged below the gantry through an insulator string at upper and lower intervals, and the upper electrode and the lower electrode are arranged horizontally and crosswise; the upper electrode and the lower electrode are respectively connected to corresponding impulse voltage generators, and both impulse voltage generators are connected to the impulse voltage control system, and the impulse voltage control system is used to control charging, triggering, and data acquisition.
[0006] Furthermore, the experimental device also includes a meteorological parameter detection device for measuring temperature, humidity and air pressure parameters, and the meteorological parameter detection device includes a temperature and humidity meter and an air pressure meter.
[0007] Furthermore, the measurement accuracy of the temperature and humidity measuring meter is 0.2 level; the air pressure measuring instrument adopts an empty box barometer with an accuracy of 0.2 level.
[0008] Furthermore, the upper electrode uses 2 split wires, the diameter of the 2 split wires is 10 mm, and the split spacing is 400 mm; the lower electrode uses 1 split wire, the diameter of the 1 split wire is 10 mm.
[0009] Furthermore, the ends of the upper electrode and the lower electrode are both designed with curved arcs.
[0010] Furthermore, the middle part of the upper electrode is suspended below the portal frame through a vertically arranged insulator string; and the two ends of the lower electrode are horizontally fixedly connected to two sides of the portal frame through corresponding insulator strings.
[0011] Furthermore, the size of the portal frame is 75m×75m, the length of the insulator string suspending the upper electrode is 15m; the lower electrode is 20m above the ground; and the experimental spacing between the upper electrode and the lower electrode is 6m to 10m.
[0012] Furthermore, the impulse voltage control system controls the discharge test to select a voltage waveform of 250 / 2500 μs as the test voltage waveform.
[0013] Furthermore, when the impulse voltage control system controls the phase-to-phase test, the two impulse voltage generators are ignited and triggered synchronously without any delay, that is, the positive and negative operating impulse voltages applied to the two electrodes reach their peak values at the same time, and the time difference between the positive and negative polarity operating impulse voltage peak values is zero.
[0014] Furthermore, the impulse voltage control system operates the impulse test to obtain the 50% discharge voltage using the rising and falling method, and each test uses the sum of the positive and negative polarity voltages as the test voltage value, that is, U 50 =U - +U + ;
[0015] Use voltage distribution coefficient α=U - / (U - +U + ) to represent the positive and negative voltage components U + , U - the proportion of distribution;
[0016] The voltage distribution coefficient is taken into account when simulating the most severe operating overvoltage condition of a 110kV AC transmission line crossing an ultra-high voltage line:
[0017] The lower electrode simulates the situation that the upper electrode and the lower electrode have the maximum operating overvoltage of opposite polarity when the 110kV transmission line is running without a ground wire. - The required value U for 50% discharge voltage under air gap operation overvoltage of 110kV AC transmission line 50.l.r , U + The required value of 50% discharge voltage under the air gap operation overvoltage of 220kV AC transmission line is U 50.l.r .
[0018] The present invention has the following beneficial effects:
[0019] 1. During the test of the present invention, the vertical spacing d value between the upper electrode and the lower electrode is adjusted. At each determined d value, the crossing angle θ value of the projection of the two lines on the ground is changed. The line-line gap structure thus formed is used to simulate the phase-to-phase operation impulse discharge characteristic experiment when the 500kV line is drilled over the ultra-high voltage line in the case of removing the ground wire, thereby simulating the phase-to-phase operation impulse discharge characteristics when the corresponding transmission line drills over the ultra-high voltage line, providing an effective experimental basis for the stable operation of the power system.
[0020] 2. The ends of the upper electrode and the lower electrode are designed with curved arcs, which can effectively avoid abnormal discharge at the ends due to excessive field strength at the ends during the test.
[0021] 3. The upper electrode of the simulated UHV line of the present invention is suspended under the gate-type frame through a 15m composite insulator string. Both ends of the lower electrode simulating the 110kV AC transmission line are suspended on both sides of the gate-type frame through sufficiently long composite insulators, and the line electrode is 20m above the ground, making the installation and commissioning of the upper and lower electrodes more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the installation of the phase test device of the present invention;
[0023] Figure 2 This is the measured waveform diagram of the standard operating wave of the present invention. DETAILED DESCRIPTION
[0024] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not intended to limit the scope of use of the present invention.
[0025] like Figure 1-2 As shown, the present invention proposes a 220kV and 110kV transmission line cross-drilling impulse discharge test device, including an impulse voltage generator, an impulse voltage control system, a gantry, an upper electrode, a lower electrode and a meteorological parameter detection device. The upper electrode simulates a 220kV AC transmission line and uses two split conductors with a diameter of 10mm and a split spacing of 400mm. The lower electrode simulates a 110kV AC transmission line and uses one split conductor with a diameter of 10mm. The ends of the upper electrode and the lower electrode are both designed with curved arcs, which can effectively avoid abnormal discharge at the ends due to excessive field strength at the ends during the test.
[0026] The upper electrode and the lower electrode are arranged below the gantry with an upper and lower interval through an insulator string, and the upper electrode and the lower electrode are arranged horizontally and crosswise; the middle part of the upper electrode is suspended below the gantry through a vertically arranged insulator string; the two ends of the lower electrode are horizontally fixedly connected to both sides of the gantry through corresponding insulator strings.
[0027] In the specific implementation, the size of the portal frame is 75m×75m, and the upper electrode simulating the UHV line is suspended under the portal frame through a 15m composite insulator string. The two ends of the lower electrode simulating the 110kV AC transmission line are suspended on both sides of the portal frame through sufficiently long composite insulators, and the line electrode is 20m above the ground, making the installation and commissioning of the upper and lower electrodes more convenient. In view of the dispersion of the standard operating impulse test at a gap distance of 10m and above, it can be considered that after the conductor is higher than 20m, the discharge voltage quickly saturates with the increase of the conductor height. Continuing to increase the conductor height has a weak effect on the phase-to-phase flashover voltage. Therefore, the gap distance d between the two line electrodes in the test is taken as 6m~10m.
[0028] The upper electrode and the lower electrode are connected to corresponding impulse voltage generators respectively, and both impulse voltage generators are connected to an impulse voltage control system. The impulse voltage control system is used to control charging, triggering, and data acquisition.
[0029] The meteorological parameter detection device is used to measure the temperature, humidity and air pressure parameters. The accuracy of its measurement will directly affect the correction of the test results. The meteorological parameter detection device includes a temperature and humidity meter and a barometer. In order to ensure the accuracy of the meteorological parameter measurement and reduce the measurement error, the measurement accuracy of the temperature and humidity meter is 0.2 level; the barometer uses an empty box barometer with an accuracy of 0.2 level.
[0030] The impulse voltage control system adopts an impulse voltage automatic control system based on optical fiber isolation and computer control technology, which can realize full digitization of functions such as charging, triggering, and data acquisition. The system has the characteristics of stable performance, high reliability, strong anti-interference ability, and good data repeatability. Specifically, the 7500kV impulse voltage of the ultra-high voltage AC test system in the existing technology can be used to generate a positive polarity operating impulse voltage, and the 4800kV mobile impulse voltage generator can be used to generate a negative polarity operating impulse test voltage. The impulse voltage control system controls the discharge test and selects a 250 / 2500μs voltage waveform as the test voltage waveform.
[0031] During the phase-to-phase operation impulse test, the time difference ΔT will be generated because the time when each phase has the maximum voltage to ground is different. As the time difference ΔT increases, the phase-to-phase operation impulse discharge voltage tends to decrease. In order to obtain the discharge voltage when the maximum phase-to-phase operation impulse occurs, ΔT=0 is taken during the test of this device. Therefore, it is necessary to ensure that the two impulse voltage generators are ignited and triggered synchronously without delay.
[0032] When the impulse voltage control system controls the phase-to-phase test, the two impulse voltage generators of the device are ignited and triggered synchronously without delay, that is, the positive and negative operating impulse voltages applied to the two electrodes reach the peak values at the same time, and the time difference ΔT between the peak values of the positive and negative polarity operating impulse voltages is zero.
[0033] According to the test method of GB / T 16927.1-1997 "High Voltage Test Technology", the impulse voltage control system of the present invention adopts the up-down method to obtain the 50% discharge voltage in the operation impulse test, wherein the operation impulse is pressurized 40 times, and the sum of the positive and negative polarity voltages is used as the test voltage value for each test, that is, U 50 =U - +U + .
[0034] Generally, the voltage distribution coefficient α=U - / (U - +U + ) to represent the positive and negative voltage components U + , U - distribution ratio.
[0035] The interphase positive polarity operation impulse discharge test device for the cross-crossing of 220kV AC and 110kV AC transmission lines provided by the present invention takes into account the most serious operation overvoltage condition of the lower electrode simulating the 110kV AC transmission line crossing the UHV line:
[0036] The lower electrode simulates the situation that the upper electrode and the lower electrode have the maximum operating overvoltage of opposite polarity when the 110kV transmission line is running without a ground wire. - The required value U for 50% discharge voltage under air gap operation overvoltage of 110kV AC transmission line 50.l.r , U + The required value of 50% discharge voltage under the air gap operation overvoltage of 220kV AC transmission line is U 50.l.r .
[0037] During the test of the present invention, the distance d of the line-line gap (i.e., the vertical spacing between the upper electrode and the lower electrode) is adjusted. At each determined d value, the intersection angle θ of the projection of the two lines on the ground is changed. θ can take three typical angles of 0°, 45°, and 90°. The line-line gap structure thus formed is used to simulate the phase-to-phase operation impulse discharge characteristic experiment when the 500kV line is drilled over the UHV line in the case of removing the ground wire. When measuring the test gap distance, the distance between the wires of different voltage levels is directly measured on the test piece by the operator using a tape measure using an aerial work engineering vehicle. The test distance can be accurately guaranteed by measuring before and after the test.
[0038] Obviously, the embodiments described above are only some embodiments of the present application, rather than all embodiments. The preferred embodiments of the present application are given in the accompanying drawings, but they do not limit the patent scope of the present application. The present application can be implemented in many different forms. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present application more thorough and comprehensive. Although the present application is described in detail with reference to the aforementioned embodiments, for those skilled in the art, it is still possible to modify the technical solutions recorded in the aforementioned specific implementation methods, or to perform equivalent replacement of some of the technical features therein. Any equivalent structure made using the contents of the specification and drawings of this application, directly or indirectly used in other related technical fields, is similarly within the scope of patent protection of this application.
Claims
1. A 220kV and 110kV transmission line cross-drilling impulse discharge test device, characterized in that: It includes an impulse voltage generator, an impulse voltage control system, a gantry, an upper electrode and a lower electrode, wherein the upper electrode simulates a 220kV AC transmission line, and the lower electrode simulates a 110kV AC transmission line; the upper electrode and the lower electrode are arranged below the gantry through an insulator string with upper and lower intervals, and the upper electrode and the lower electrode are arranged horizontally and crosswise; the upper electrode and the lower electrode are respectively connected to the corresponding impulse voltage generators, and the two impulse voltage generators are both connected to the impulse voltage control system, and the impulse voltage control system is used to control charging, triggering, and data acquisition.
2. The 220kV and 110kV transmission line cross-drilling impulse discharge test device according to claim 1 is characterized in that: It also includes a meteorological parameter detection device for measuring temperature, humidity and air pressure parameters, and the meteorological parameter detection device includes a temperature and humidity measuring meter and an air pressure measuring instrument.
3. The 220kV and 110kV transmission line cross-drilling impulse discharge test device according to claim 2 is characterized in that: The measurement accuracy of the temperature and humidity measuring meter is 0.2 level; the air pressure measuring instrument adopts an empty box barometer with an accuracy of 0.2 level.
4. The 220kV and 110kV transmission line cross-drilling impulse discharge test device according to claim 1 is characterized in that: The upper electrode uses 2 split wires, the diameter of the 2 split wires is 10mm, and the split spacing is 400mm; the lower electrode uses 1 split wire, the diameter of the 1 split wire is 10mm.
5. The 220kV and 110kV transmission line cross-drilling impulse discharge test device according to claim 4 is characterized in that: The ends of the upper electrode and the lower electrode are both designed with curved arcs.
6. The 220kV and 110kV transmission line cross-drilling impulse discharge test device according to claim 2 is characterized in that: The middle part of the upper electrode is suspended below the door frame through a vertically arranged insulator string; the two ends of the lower electrode are horizontally fixedly connected to the two sides of the door frame through corresponding insulator strings.
7. The 220kV and 110kV transmission line cross-drilling impulse discharge test device according to claim 6 is characterized in that: The size of the portal frame is 75m×75m, the length of the insulator string suspending the upper electrode is 15m; the lower electrode is 20m above the ground; the experimental spacing between the upper electrode and the lower electrode is 6m to 10m.
8. The 220kV and 110kV transmission line cross-drilling impulse discharge test device according to claim 1 is characterized in that: The impulse voltage control system controls the discharge test to select a voltage waveform of 250 / 2500 μs as the test voltage waveform.
9. The 220kV and 110kV transmission line cross-drilling impulse discharge test device according to claim 1 is characterized in that: When the impulse voltage control system controls the phase-to-phase test, the two impulse voltage generators are ignited and triggered synchronously without delay, that is, the positive and negative operating impulse voltages applied to the two electrodes reach peak values at the same time, and the time difference between the positive and negative polarity operating impulse voltage peak values is zero.
10. The 220kV and 110kV transmission line cross-drilling impulse discharge test device according to claim 1 is characterized in that: The impulse voltage control system operates the impulse test to obtain the 50% discharge voltage using the rising and falling method. The sum of the positive and negative polarity voltages is used as the test voltage value for each test, i.e., U 50 =U - +U + ; Use voltage distribution coefficient α=U - / (U - +U + ) to represent the positive and negative voltage components U + , U - the proportion of distribution; The voltage distribution coefficient is taken into account when simulating the most severe operating overvoltage condition of a 110kV AC transmission line crossing an ultra-high voltage line: The lower electrode simulates the situation that the upper electrode and the lower electrode have the maximum operating overvoltage of opposite polarity when the 110kV transmission line is running without a ground wire. - The required value U for 50% discharge voltage under air gap operation overvoltage of 110kV AC transmission line 50.l.r , U + The required value of 50% discharge voltage under the air gap operation overvoltage of 220kV AC transmission line is U 50.l.r .