Engineering design management system, method, equipment, medium and program product
By using multi-level task decomposition and real-time monitoring in the engineering design management system, the problem of discrepancies between project progress and cost control has been solved, achieving close correlation and refined management of progress and cost.
Patent Information
- Application Number
- CN202410858710.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In existing technologies, there is a lack of close linkage between project schedule and cost control, resulting in a mismatch between project schedule and cost control, making it impossible to optimize schedule and cost while ensuring quality.
An engineering design management system is provided, which closely integrates design progress and cost through a multi-level task decomposition structure. It includes data storage, data interface, service integration and display modules, monitors progress and cost in real time, identifies data change behavior and generates risk warnings.
This approach achieves a close link between project progress and cost, enabling timely identification and adjustment of problems, avoiding discrepancies between schedule and cost, and improving the management efficiency and sophistication of engineering projects.
Smart Images

Figure CN119005553A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering management, and in particular to an engineering design management system, method, equipment, medium and program product. Background Art
[0002] Engineering design plays an important role in project management. The business scope of design management is no longer limited to the generation of plans and progress reports. Design managers must control the progress of design work based on the needs of on-site construction / installation while ensuring quality and within the budget cost range. Therefore, the main control elements of design management are quality, progress and cost; the goal of design management is to find the optimal solution for progress and cost while ensuring quality.
[0003] In the past, the progress and cost were controlled and managed separately, and there was a lack of close connection between them, which brought many problems. For example, when the design reached a certain stage, the accumulated actual cost was equivalent to the accumulated planned budget cost, but the actual completed work (progress) did not reach the planned amount. When the design budget was exceeded and there was still work to be completed, more expenses had to be added to complete the design work. At this time, it was too late to complete the design work within the budget and control the cost. Summary of the invention
[0004] In view of this, the present invention provides an engineering design management system, method, device, medium and program product to solve the problem that the control management of engineering progress and cost is lacking in connection, resulting in the inability to control costs within the engineering progress.
[0005] In a first aspect, the present invention provides an engineering design management system, the system comprising: a data storage module, a data interface module, a service integration module, and a display module, wherein:
[0006] Data storage module, used to store relevant data of the target project;
[0007] The data interface module is used to obtain relevant data of the target project based on the data acquisition instructions of the service integration module;
[0008] The service integration module is used to decompose the target project into tasks according to the relevant data of the target project, obtain a multi-level task decomposition structure, track the design progress and design cost based on the multi-level task decomposition structure, generate progress detection results and cost detection results, identify data change behaviors according to relevant data, and generate risk warnings;
[0009] The display module is used to display and query the relevant data of the target project, the multi-level task decomposition structure, the design progress, the design cost, the progress detection results and the cost detection results, and the risk warning.
[0010] The engineering design management system provided by the present invention, through multi-level task decomposition of the target project, closely combines the design cost and the design progress in the service integration module, timely monitors the system cost and progress status, finds problems and makes adjustments, avoids the situation where the project progress is inconsistent with the corresponding control cost, and is conducive to real-time management of the progress and cost of the entire engineering project.
[0011] In an optional implementation, the data stored in the data storage module includes:
[0012] Contract data, including contract name, design company, bill of quantities, and bill of quantities amount;
[0013] Achievement data, including design achievement file name, file page number, version number, associated file information, and document preparation unit information;
[0014] Progress data, including expected date of delivery of results, actual date of delivery of results, division of delivery phases, and costs incurred during the current project progress.
[0015] The engineering design management system provided by the present invention stores various data in the data storage module, which is convenient for calling the service integration module, improves the data processing speed, and improves the management efficiency of engineering design cost and design progress.
[0016] In an optional implementation, the data interface module includes:
[0017] The file registration section is used to register the relevant data of the target project and extract the bill of quantities, bill of quantities amount, achievement data, progress data, and registration information as file registration data;
[0018] The file connection module is used to obtain file registration data based on the data acquisition instructions of the service integration module.
[0019] The engineering design management system provided by the present invention facilitates the acquisition of various file registration data and transmits the file registration data to the service integration module, provides an interface for updating engineering data, and accurately grasps the engineering progress and cost situation by entering the file registration data in real time.
[0020] In an optional implementation, the service integration module includes:
[0021] The work breakdown section is used to build a multi-level task decomposition structure based on the relevant data of the target project, and summarize the design progress and design cost level by level based on the multi-level task decomposition structure to obtain the progress summary result and cost summary result;
[0022] The progress measurement section is used to build task milestones based on progress data. Based on the task milestones, the progress of each detailed achievement in the multi-level task decomposition structure is monitored to obtain progress measurement results.
[0023] The cost tracking section is used to allocate design estimates for each detailed result according to the bill of quantities and multi-level task breakdown structure, monitor the detailed cost of each detailed result, analyze the current work performance according to the design estimate, detailed cost and progress measurement results, and obtain work performance data;
[0024] The risk warning section is used to provide risk warnings for changes in personnel, work, contracts, and project documents during the target engineering design management process.
[0025] The engineering design management system provided by the present invention decomposes the work tasks of the engineering project, and performs progress measurement and cost tracking based on the decomposed tasks, which is conducive to accurately grasping the progress and cost of each part, timely discovering the task nodes where problems occur and handling them in a targeted and timely manner.
[0026] In an optional embodiment, the display module includes:
[0027] The visualization section is used to display the relevant data of the target project, the multi-level task decomposition structure, the design progress and the design cost;
[0028] The query module is used to provide a retrieval query interface for data in the data storage module and service integration module.
[0029] The engineering design management system provided by the present invention has a display module that displays relevant data, which is beneficial for staff to understand the status of engineering projects more intuitively and accurately, provides a query function, makes the operation more flexible, and can specifically view the real-time status of specific tasks in the project and grasp the project trends.
[0030] In a second aspect, the present invention provides an engineering design management method, which is applied to the engineering design management system of any one of the first aspects, and the method comprises:
[0031] Obtain relevant data of the target project;
[0032] Decompose the target project into tasks according to the relevant data of the target project to obtain a multi-level task decomposition structure. Based on the multi-level task decomposition structure, track the design progress and design cost, generate progress detection results and cost detection results, identify data change behaviors according to relevant data, and generate risk warnings;
[0033] The relevant data of the target project, multi-level task breakdown structure, design progress, design cost, progress inspection results, cost inspection results, and risk warnings are displayed and queried.
[0034] The engineering design management method provided by the present invention performs multi-level task decomposition on the target project, closely combines the design cost and the design progress in the service integration module, timely monitors the system cost and progress status, discovers problems and makes adjustments, avoids the situation where the project progress is inconsistent with the corresponding control cost, and is conducive to real-time management of the progress and cost of the entire engineering project.
[0035] In an optional implementation, the target project is task-decomposed according to relevant data of the target project to obtain a multi-level task decomposition structure, including:
[0036] Decompose the bill of quantities to obtain multiple design work packages;
[0037] Each design work package is decomposed to obtain multiple detailed results. The workload list-design work package-detailed results constitute a multi-level task decomposition structure.
[0038] The engineering design management method provided by the present invention makes the management unit of the engineering project more detailed by decomposing the target project into multi-level tasks, thereby improving the refined management of the engineering project.
[0039] In an optional implementation, tracking the design cost and generating the cost detection result based on the multi-level task decomposition structure includes:
[0040] Allocate design estimates for each item of work based on the bill of quantities and multi-level task breakdown structure;
[0041] Monitor the current design cost of each detailed output;
[0042] Determine the cost test results of the target project based on the design estimate of each detailed result and the current design cost.
[0043] The engineering design management method provided by the present invention allocates and monitors the design budget of each task of the project engineering, which is conducive to accurately grasping the actual cost amount of each task, tracking the design cost of the entire project engineering according to the actual cost amount of each task, and timely discovering and handling cost problems.
[0044] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the method of the above-mentioned second aspect or any corresponding embodiment thereof by executing the computer instructions.
[0045] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to cause a computer to execute the method of the second aspect or any corresponding embodiment thereof.
[0046] In a fifth aspect, the present invention provides a computer program product, comprising computer instructions for causing a computer to execute the method of the second aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0048] Figure 1 is a schematic diagram of the structure of an engineering design management system according to an embodiment of the present invention;
[0049] Figure 2 is a schematic diagram of the structure of another engineering design management system according to an embodiment of the present invention;
[0050] Figure 3 is a schematic diagram of a multi-level task decomposition structure in an engineering design management system according to an embodiment of the present invention;
[0051] Figure 4 is a flow chart of an engineering design management method according to an embodiment of the present invention;
[0052] Figure 5 is a flow chart of another engineering design management method according to an embodiment of the present invention;
[0053] Figure 6 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0054] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0055] The embodiments of the present invention provide an engineering design management system, method, device, medium and program product, which achieve the effect of comprehensive management of project engineering by closely linking design progress and design cost through clear hierarchical division, progress measurement and cost tracking.
[0056] According to an embodiment of the present invention, an engineering design management system embodiment is provided, such as Figure 1 As shown, the system includes: a data storage module, a data interface module, a service integration module, and a display module.
[0057] The data storage module is used to store relevant data of the target project.
[0058] Specifically, the data storage module is used to store the relevant data of the target project locally, so as to facilitate the call of the engineering design management system and provide data support for it. The relevant data may include the contract content entered at the beginning of the target project, such as the specific construction content, construction period, total cost, construction plan, etc. of the target project, the specific progress of each construction content during the construction process, and the design cost corresponding to the progress, etc., which are only used as examples, but not limited to this.
[0059] The data interface module is used to obtain relevant data of the target project based on the data acquisition instructions of the service integration module.
[0060] Specifically, the data interface module serves as an interface for data transmission. The data interface module can enter relevant data into the data storage module of the engineering design management system through the data interface module. It can also provide an access interface for the service integration module to access the data storage module, and call the relevant data in the data storage module based on the data acquisition instructions of the service integration module.
[0061] The service integration module is used to decompose the target project into tasks according to the relevant data of the target project to obtain a multi-level task decomposition structure. Based on the multi-level task decomposition structure, it tracks the design progress and design cost, generates progress detection results and cost detection results, identifies data change behavior according to relevant data, and generates risk warnings.
[0062] Specifically, the service integration module is a function realization module of the engineering design management system. By calling the relevant data in the data storage module, the entire project is decomposed, and cost tracking and progress calculation are performed based on the project decomposition results. The progress of the project is monitored based on the cost tracking data and progress calculation data, which is conducive to timely discovery and handling of problems. After identifying the content change behavior in the engineering design management system based on the relevant data obtained in real time, the scope of influence of the change behavior is determined, the risk of the change behavior is identified and a risk warning is formed, which is sent to the corresponding person in charge according to the scope of influence of the change behavior, which is only an example, but not limited to this.
[0063] The display module is used to display and query the relevant data of the target project, the multi-level task decomposition structure, the design progress, the design cost, the progress detection results and the cost detection results, and the risk warning.
[0064] Specifically, the display module can be a human-computer interaction interface, as an example only, but not limited to this, for displaying or querying various data of the target project, including but not limited to the relevant data of the target project in the data storage module, the multi-level task decomposition structure, design progress, design cost, progress detection results and cost detection results in the service integration module. For risk warnings, they are displayed on the affected human-computer interaction interface according to the impact scope corresponding to the change behavior determined by the service integration module, as an example only, but not limited to this.
[0065] The engineering design management system provided in this embodiment, through multi-level task decomposition of the target project, closely combines the design cost and design progress in the service integration module, timely monitors the system cost and progress status, discovers problems and makes adjustments, avoids the situation where the project progress is inconsistent with the corresponding control cost, and is conducive to real-time management of the progress and cost of the entire engineering project.
[0066] In some optional embodiments, such as Figure 2 As shown, the data stored in the data storage module includes:
[0067] Contract data, including contract name, design unit, bill of quantities, and bill of quantities amount.
[0068] Specifically, contract data refers to the relevant data of the design contract, which includes the contract name, design unit, bill of quantities, bill of quantities amount, etc. The contract data is called by the service integration module through the data interface module, and the service integration module performs work decomposition, cost tracking, etc. based on it.
[0069] Achievement data, including design achievement file name, file page number, version number, related file information, and document preparation unit information.
[0070] Progress data, including expected date of delivery of results, actual date of delivery of results, division of delivery phases, and costs incurred during the current project progress.
[0071] Specifically, progress data refers to the data generated during the progress of the project, including but not limited to: the expected submission date of the results, the actual submission date of the results, the division of the results submission stages, the costs incurred during the current project progress, etc. Progress data provides data support for cost tracking and progress measurement in the service integration module.
[0072] The engineering design management system provided in this embodiment stores various data in the data storage module, which is convenient for calling the service integration module, improves the data processing speed, and improves the management efficiency of the design cost and design progress.
[0073] In some optional embodiments, such as Figure 2 As shown, the data interface module includes:
[0074] The file registration section is used to register the relevant data of the target project and extract the bill of quantities, bill of quantities amount, achievement data, progress data, and registration information as file registration data.
[0075] Specifically, the function of the file registration section is to systematically register different data in the data storage module and extract useful data from the registered data. When the registered data is contract data, the bill of quantities and the bill of quantities amount are extracted from the contract data, and the total contract amount can be obtained based on the bill of quantities amount. The file registration section can also collect registration information, including: registration unit, registration personnel, number of registered files and file names, etc., set file status and file type, including: valid, invalid, deleted, paper media, disk media, optical media, etc., just as an example, but not limited to this.
[0076] The file connection module is used to obtain file registration data based on the data acquisition instructions of the service integration module.
[0077] Specifically, the file connection module obtains the file registration data according to the data acquisition instruction of the service integration module, and transmits the file registration data to the service integration module for use. For example, the service integration module calls the contract data, decomposes the design task according to the bill of quantities in the contract data, and builds the work progress monitoring by calling the progress data to realize the monitoring of the progress of each work.
[0078] The engineering design management system provided in this embodiment facilitates the acquisition of various file registration data and transmits the file registration data to the service integration module, provides an interface for updating engineering data, and can accurately grasp the project progress and cost situation by entering the file registration data in real time.
[0079] In some optional embodiments, such as Figure 2 As shown, the service integration module includes:
[0080] The work breakdown section is used to build a multi-level task decomposition structure based on the relevant data of the target project, and summarize the design progress and design cost level by level based on the multi-level task decomposition structure to obtain the progress summary results and cost summary results.
[0081] Specifically, the work breakdown module builds a three-level task decomposition structure based on the relevant data in the data storage module, such as Figure 3 As shown, the bill of quantities in the contract data is decomposed into an engineering structure, and the engineering items corresponding to each bill of quantities are decomposed into multiple workloads, and each workload is coded accordingly. Then, each workload in the engineering breakdown structure is decomposed to obtain multiple design work packages, and each design work package is decomposed to obtain multiple detailed results. Under the three-level task decomposition structure, the progress and design cost of the entire design system can be summarized layer by layer from the detailed results layer upward, and finally summarized at the engineering breakdown structure layer to obtain the progress summary results and cost summary results.
[0082] The progress measurement module is used to build task milestones based on progress data. Based on the task milestones, the progress of each detailed achievement in the multi-level task decomposition structure is monitored to obtain progress measurement results.
[0083] Specifically, the progress measurement module uses the progress data and achievement data in the data storage module to construct the design work package milestones at the design work package level according to the achievement submission stage division in the progress data. It should be noted that the milestone is equivalent to the engineering stage. Each milestone is set with a project completion percentage value, which indicates the progress status when the corresponding milestone is completed. When the user enters the actual completion date according to a milestone, the corresponding milestone is completed. Each milestone has a code, which is equivalent to the engineering stage code. It is related to fields such as progress, forecast, and actual completion date. It is used to measure the progress of the project. When the engineering stage work represented by the milestone code is completed, the corresponding percentage of the progress of the project will be automatically updated. Based on the milestones of the design work package, the progress of each detailed achievement of the design work package is monitored. When there is no progress data update of the achievement data set, the progress of each detailed achievement is updated and summarized upward to the engineering breakdown structure layer.
[0084] The cost tracking section is used to allocate design estimates for each detailed result according to the bill of quantities and multi-level task breakdown structure, and monitor the detailed cost of each detailed result. According to the design estimate, detailed cost and progress estimation results, the existing work performance is analyzed to obtain work performance data.
[0085] Specifically, the cost tracking section mainly includes three functional parts: design work budget allocation, actual detailed cost recording, and work performance analysis. Design work budget allocation refers to the allocation of design budget to each detailed result according to the bill of quantities and multi-level task breakdown structure during the engineering design phase. Actual detailed cost recording refers to the recording and monitoring of the actual detailed cost of each detailed result during the construction process, recording the detailed cost of the design budget within a certain period of time, and recording the increase in approved bill of quantities items and design budget costs. Work performance analysis refers to the analysis method used to analyze work performance in combination with the progress measurement results and cost tracking. The earned value analysis method is preferred as an example only, but not limited to this. According to the analysis results, it is judged whether the project progress is lagging or whether the project cost is overrun.
[0086] The risk warning section is used to provide risk warnings for changes in personnel, work, contracts, and project documents during the target engineering design management process.
[0087] Specifically, the function of the risk warning section is to issue risk warnings for changes in personnel, work content, contracts, project documents, etc. during the engineering design management process, and send risk warnings to relevant responsible personnel. Content changes involve changes to relevant data in the data storage module, file registration data in the data interface module, and changes to the multi-level task decomposition structure and corresponding progress measurement results and cost tracking results in the service integration module. After the risk warning section identifies content changes in the engineering design management system, it determines the scope of the change, identifies the risks of the change and forms a risk warning, which is sent to the relevant person in charge based on the scope of the change, obtains the corresponding change processing request, and forms a change log after the change request is processed. Risk monitoring reports are regularly formed based on the change log.
[0088] The engineering design management system provided in this embodiment decomposes the work tasks of the engineering project, and performs progress measurement and cost tracking based on the decomposed tasks, which is conducive to accurately grasping the progress and cost of each part, promptly discovering the task nodes where problems occur and handling them in a targeted and timely manner.
[0089] In some optional embodiments, such as Figure 2 As shown, the display module includes:
[0090] The visualization section is used to display the relevant data of the target project, the multi-level task decomposition structure, the design progress and the design cost.
[0091] Specifically, when the visualization module is displayed, the data can be displayed in the form of a chart or text, which is only used as an example but not limited to this.
[0092] The query module is used to provide a retrieval query interface for data in the data storage module and service integration module.
[0093] Specifically, the query section can be a direct query by keyword or a query can be performed by entering a corresponding section according to the query content through a navigation module, which is only taken as an example but is not limited thereto.
[0094] The engineering design management system provided in this embodiment has a display module that displays relevant data, which is beneficial for staff to understand the status of engineering projects more intuitively and accurately, provides query functions, makes operations more flexible, and can specifically view the real-time status of specific tasks in the project and grasp the project trends.
[0095] The engineering design management system in this embodiment is presented in the form of functional units, where the units refer to ASIC (Application Specific Integrated Circuit) circuits, processors and memories that execute one or more software or fixed programs, and / or other devices that can provide the above functions.
[0096] According to an embodiment of the present invention, an embodiment of an engineering design management method is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0097] In this embodiment, a method for engineering design management is provided, which can be used in the above-mentioned engineering design management system. Figure 4 is a flow chart of an engineering design management method according to an embodiment of the present invention. Figure 4 As shown, the process includes the following steps:
[0098] Step S401, obtaining relevant data of the target project.
[0099] Specifically, obtain the relevant data of the target project from the data storage module of the engineering design management system. For the specific content of the relevant data, please refer to Figure 2 The data storage module of the illustrated embodiment will not be described in detail here.
[0100] Step S402: Decompose the target project into tasks according to the relevant data of the target project to obtain a multi-level task decomposition structure. Based on the multi-level task decomposition structure, track the design progress and design cost, generate progress detection results and cost detection results, identify data change behaviors according to relevant data, and generate risk warnings. For details, please refer to Figure 2 The functional description corresponding to the service integration module of the illustrated embodiment will not be repeated here.
[0101] Step S403: Display and query the relevant data of the target project, multi-level task breakdown structure, design progress, design cost, progress test results and cost test results, and risk warnings. Figure 2 The functional description corresponding to the display module of the illustrated embodiment will not be repeated here.
[0102] The engineering design management method provided in this embodiment, through multi-level task decomposition of the target project, closely combines the design cost and design progress in the service integration module, timely monitors the system cost and progress status, discovers problems and makes adjustments, avoids the situation where the project progress is inconsistent with the corresponding control cost, and is conducive to real-time management of the progress and cost of the entire engineering project.
[0103] In this embodiment, a method for engineering design management is provided, which can be used in the above-mentioned engineering design management system. Figure 5 is a flow chart of an engineering design management method according to an embodiment of the present invention. Figure 5 As shown, the process includes the following steps:
[0104] Step S501, obtain relevant data of the target project. Figure 4 Step S401 of the illustrated embodiment will not be described in detail here.
[0105] Step S502, decomposing the target project into tasks according to the relevant data of the target project to obtain a multi-level task decomposition structure, tracking the design progress and design cost based on the multi-level task decomposition structure, and generating progress detection results and cost detection results.
[0106] Specifically, the above step S502 includes:
[0107] Step S5021, decomposing the bill of quantities into work to obtain multiple design work packages.
[0108] Specifically, a three-level task decomposition structure is constructed based on the relevant data in the data storage module, such as Figure 3 As shown, the bill of quantities in the contract data is decomposed into a project structure, and the project items corresponding to each bill of quantities are decomposed into multiple workloads, and each workload is coded accordingly, and then each workload in the project breakdown structure is decomposed to obtain multiple design work packages. For example, a work task list is used as a workload, and multiple design work packages obtained by decomposing it include: basic configuration, circuit design, DC power supply system, lighting system, etc., which are only used as examples, but not limited to this.
[0109] Step S5022, decompose each design work package to obtain multiple detailed results, and the workload list-design work package-detailed results constitute a multi-level task decomposition structure.
[0110] Specifically, each design work package is decomposed to obtain multiple detailed results. For example, the lighting system is a design work package, and the multiple detailed results obtained by decomposing it include: a first lighting system, a second lighting system, a third lighting system, etc., which are only used as examples but are not limited to this.
[0111] Step S5023, allocating a design estimate to each detailed achievement according to the bill of quantities and the multi-level task breakdown structure.
[0112] Specifically, the design budget is allocated according to the bill of quantities in the design contract, including: the design budget allocation quantity, allocation amount, predicted allocation quantity, predicted allocation amount, etc., which are examples only, but not limited to this. The design budget is allocated at the work structure decomposition layer in multiple task decomposition structures, that is, the design detailed results budget is allocated to each work package, as shown in Table 1, which is an example of the budget allocation of detailed results of the work package, which is only an example, but not limited to this.
[0113] Table 1
[0114]
[0115] Step S5024, monitoring the current design cost of each detailed achievement.
[0116] Specifically, the amount changes are monitored based on the design budget and work structure decomposition layer, including the cumulative actual cost quantity, the cumulative actual cost amount, the cumulative payment quantity, and the cumulative payment amount, and the current design cost is determined based on the monitoring results.
[0117] Step S5025, determining the cost detection result of the target project based on the design budget of each detailed result and the current design cost.
[0118] Specifically, the design estimate and current design cost of each detailed result are compared. If the current design cost is higher than the design estimate, it means that according to the current project progress, there is an overspending in the project cost. This is only an example, but not limited to this.
[0119] The engineering design management method provided in this embodiment makes the management unit of the engineering project more refined by decomposing the target project into multi-level tasks, thereby improving the refined management of the engineering project. The design budget of each task of the project is allocated and monitored, which is conducive to accurately grasping the actual cost amount of each task, tracking the design cost of the entire project according to the actual cost amount of each task, and timely discovering and handling cost problems.
[0120] Step S503: Display and query the relevant data of the target project, the multi-level task breakdown structure, the design progress, the design cost, the progress test results and the cost test results. Figure 4 Step S403 of the illustrated embodiment will not be described in detail here.
[0121] The engineering design management method provided in this embodiment, through multi-level task decomposition of the target project, closely combines the design cost and design progress in the service integration module, timely monitors the system cost and progress status, discovers problems and makes adjustments, avoids the situation where the project progress is inconsistent with the corresponding control cost, and is conducive to real-time management of the progress and cost of the entire engineering project.
[0122] The embodiment of the present invention also provides a computer device having the above Figure 1 The engineering design management system shown.
[0123] See also Figure 6 , Figure 6 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 6 As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 6 A processor 10 is taken as an example.
[0124] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0125] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.
[0126] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0127] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0128] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.
[0129] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0130] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.
[0131] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. An engineering design management system, characterized in that: The system includes: a data storage module, a data interface module, a service integration module, and a display module, wherein: Data storage module, used to store relevant data of the target project; A data interface module, used to obtain relevant data of a target project based on a data acquisition instruction of the service integration module; A service integration module is used to decompose the target project into tasks according to the relevant data of the target project to obtain a multi-level task decomposition structure, track the design progress and design cost based on the multi-level task decomposition structure, generate progress detection results and cost detection results, identify data change behaviors according to relevant data, and generate risk warnings; The display module is used to display and query the relevant data of the target project, the multi-level task decomposition structure, the design progress, the design cost, the progress detection results and the cost detection results, and the risk warning.
2. The system according to claim 1, characterized in that The data stored in the data storage module includes: Contract data, including contract name, design company, bill of quantities, and bill of quantities amount; Achievement data, including design achievement file name, file page number, version number, associated file information, and document preparation unit information; Progress data, including expected delivery date of results, actual delivery date of results, division of delivery phases, and costs incurred during the current project progress.
3. The system according to claim 1, characterized in that The data interface module comprises: The file registration section is used to register the relevant data of the target project and extract the bill of quantities, bill of quantities amount, achievement data, progress data, and registration information as file registration data; The file connection module is used to obtain the file registration data based on the data acquisition instruction of the service integration module.
4. The system according to claim 2, characterized in that The service integration module includes: A work decomposition section is used to construct a multi-level task decomposition structure according to the relevant data of the target project, and summarize the design progress and design cost level by level based on the multi-level task decomposition structure to obtain a progress summary result and a cost summary result; The progress measurement module is used to construct task milestones according to the progress data, monitor the progress of each detailed achievement in the multi-level task decomposition structure based on the task milestones, and obtain the progress measurement results; The cost tracking section is used to allocate design estimates for each detailed result according to the bill of quantities and multi-level task breakdown structure, monitor the detailed cost of each detailed result, analyze the current work performance according to the design estimate, detailed cost and progress measurement results, and obtain work performance data; The risk warning section is used to provide risk warnings for changes in personnel, work, contracts, and project documents during the target engineering design management process.
5. The system according to claim 1, characterized in that The display module comprises: The visualization section is used to display the relevant data of the target project, the multi-level task decomposition structure, the design progress and the design cost; The query module is used to provide a retrieval query interface for data in the data storage module and service integration module.
6. A method for engineering design management, characterized in that: The method is applied to the engineering design management system according to any one of claims 1 to 5, and the method comprises: Obtain relevant data of the target project; Decomposing the target project into tasks according to the relevant data of the target project to obtain a multi-level task decomposition structure, tracking the design progress and design cost based on the multi-level task decomposition structure, generating progress detection results and cost detection results, identifying data change behaviors according to the relevant data and generating risk warnings; The relevant data of the target project, multi-level task breakdown structure, design progress, design cost, progress detection results and cost detection results, and risk warnings are displayed and queried.
7. The method according to claim 6, characterized in that The target project is task-decomposed according to the relevant data of the target project to obtain a multi-level task decomposition structure, including: Decompose the bill of quantities to obtain multiple design work packages; Each design work package is decomposed to obtain multiple detailed results. The workload list-design work package-detailed results constitute a multi-level task decomposition structure.
8. The method according to claim 6, characterized in that Tracking the design cost and generating cost detection results based on the multi-level task decomposition structure includes: Allocate design estimates for each item of work based on the bill of quantities and multi-level task breakdown structure; Monitor the current design cost of each detailed output; Determine the cost test results of the target project based on the design estimate of each detailed result and the current design cost.
9. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the method according to any one of claims 6 to 8 by executing the computer instructions.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the method according to any one of claims 6 to 8.
11. A computer program product, characterized in that The method comprises computer instructions for causing a computer to execute the method according to any one of claims 6 to 8.
Citation Information
Patent Citations
System for managing construction project contracting
CN102955982A
BIM5D-based project construction fine management method
CN110991882A
Multi-project management system and method suitable for agile development mode in big data environment
CN111291994A
Project engineering archive management system based on digital cloud computing
CN114358731A