Basin total nitrogen control scheme making method based on Gini coefficient and water quality model

By collecting data, dividing control units, calculating pollution source contribution rates, and combining the Gini coefficient and water quality model in watershed total nitrogen management, a management plan was formulated and revised. This solved the problem of lack of implementability and pertinence in existing technologies for total nitrogen management, and achieved fair and feasible watershed total nitrogen management.

CN119005559APending Publication Date: 2024-11-22TAIYUAN UNIVERSITY OF TECHNOLOGY
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410897914.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Existing technologies neglect the feasibility of emission reduction targets for total nitrogen control, lack effective control schemes, and the Gini coefficient lacks specificity in resource allocation.

Method used

Through field investigations and sampling, basic geological information and hydrological data of the watershed are collected, control units are divided, the contribution rate of pollution sources is calculated, and an initial control plan is formulated by combining the Gini coefficient and water quality model. The plan is then corrected by the Gini coefficient to ensure fairness and feasibility.

Benefits of technology

It achieves detailed total nitrogen control targets for the watershed, taking into account temporal and spatial variations, and is convenient and targeted in management, ensuring fairness and feasibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005559A_ABST
    Figure CN119005559A_ABST
Patent Text Reader

Abstract

The invention aims to provide a Gini coefficient and water quality model-based drainage basin total nitrogen management and control scheme making method, through field investigation and sampling, actual water quality data of a research area is obtained, and basic geological information, hydrological data and hydrological station data of a river and a drainage basin thereof and detailed data of administrative regions in the drainage basin are collected and processed. By dividing control units, calculating the discharge capacity of each unit and the contribution rate of a pollution source, making an initial management and control scheme according to the pollution source, and correcting the scheme by using a Gini coefficient, the fairness of the management and control scheme is ensured. And establishing a water quality model, and adjusting the management and control scheme by setting a water quality target. Compared with existing management and control measures, the drainage basin total nitrogen management and control target and measure under the process are more detailed, the total nitrogen space-time change process and the national control section management and control target are considered, management is convenient, and practical management and control measure formulation through the process is more targeted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of total nitrogen control in a watershed, and specifically relates to a method for formulating a total nitrogen control plan for a watershed based on a Gini coefficient and a water quality model. Background Art

[0002] The actual focus of the management and control plan is on the process of total nitrogen emission allocation. In the process of total emission allocation, the allocation principle is the basis of the allocation method, which depends on the selection of allocation indicators and the rationality of the allocation results.

[0003] The principle of fairness: environmental resources are public resources and are not owned by individuals or enterprises. All members in the region share the environmental resources. The principle of efficiency: also known as the principle of minimum governance costs, emphasizes that the economic losses of pollution-discharging units in the process of pollutant reduction are minimized. The principle of environmental effectiveness: rationally utilize the water environment capacity in the process of total amount allocation, that is, maximize the satisfaction of the pollution discharge needs of pollution-discharging units, while ensuring that the water quality of regional water bodies meets the standards.

[0004] The Gini coefficient is used to measure the degree of inequality in income or wealth among residents of a country or region. In the field of environment, the Gini coefficient can be used to evaluate the fairness of resource allocation, the distribution differences of environmental pollution, and the balance of supply and demand of ecosystem services. In the process of total environmental allocation, the Gini coefficient minimization model is often used for calculation. Due to the complexity of total nitrogen control, ammonia nitrogen emission reduction measures are often used in some control measures for total nitrogen control, ignoring the feasibility of emission reduction targets and the lack of specificity of specific implementation measures.

[0005] There have been many studies on the principle of total allocation and fairness based on the Gini coefficient. These all use the Gini coefficient as a fairness indicator to allocate pollutants within the region, but they have not been implemented into specific control plans, only rough reduction targets. And the allocation of total nitrogen lacks some practicality.

[0006] Xu Hua's "Ideas and Methods for Fair Coordination in the Allocation of Total Allowable Pollutant Emissions" introduced the principle of fair coordination when studying the allocation method of total allowable emissions, targeting the shortcomings of the "one-size-fits-all" equal percentage reduction method and the minimum treatment cost method. Fairness is defined as everyone having equal rights to use resources and taking responsibility for protecting resources. Based on this, a total allocation method that focuses on efficiency and fairness and coordination is constructed.

[0007] Yu Luji's study "A method for total amount allocation of water pollutants and its optimization" proposed a method for total amount allocation of pollutants that integrates the principles of fairness and efficiency, and constructed an indicator system for total amount allocation of water pollutants. The coefficient of variation method was used to assign weights to each allocation indicator, and a new method for total amount allocation of pollutants was developed based on the regional reduction relative index.

[0008] Wang Yuan's "Application of Information Entropy in Regional Fair Allocation of Total Amount of Water Pollutants" introduces the concept of information entropy in the study of total amount allocation, and combines regional economic and natural factors to construct a planning model aimed at minimizing weighted information entropy. The model aims to formulate an initial regional allocation plan for the total amount of water pollutants based on the principle of fairness.

[0009] Wu Yueying's "Research on the Evaluation Method of Total Water Pollutant Distribution Based on Fairness" applied the concept of the Gini coefficient to the allocation of water environment capacity, and constructed a method to evaluate the fairness and rationality of the total pollutant distribution plan to quantitatively express the fairness criterion of distribution. Liu Qi's "Research on the Fairness of Total Water Pollutant Distribution Based on the Gini Coefficient" proposed a method for the inter-regional total water pollutant distribution based on the Gini coefficient. Cheng Yixin's "Total Pollutant Distribution in Plain River Network Areas Based on Entropy-Environmental Gini Coefficient Method" proposed a new single-factor environmental Gini coefficient model, and used the contribution coefficient to identify the main pollutant units that lead to unfair distribution.

[0010] YU "An environmental fairness based optimisation model for the decision-support of joint control over the water quantity and quality of a river basin" integrates three prediction modules: water consumption and pollutant discharge (WCPD), environmental Gini coefficient (EGC) and water quality (WASP) to propose a new environmental fairness based optimization model (EFOM) to provide decision-support for water resources management and water pollution control at the river basin scale.

[0011] Yang Yongjun et al. proposed a total water pollutant control strategy based on the principle of fairness and in line with the concept of "sea-land coordination" environmental management in the study of "research on the total amount of water pollutants allocated in the sea-basin based on the principle of fairness". Ye Kuangwen pointed out in the study of the spatiotemporal distribution characteristics and source analysis of nitrogen in the Songhua River Basin that the nitrogen produced by various production, life and environmental changes has different proportions in different substances through isotope fractionation, so different nitrogen pollution sources have their own specific δ 15 N-NO 3 - and δ 18 O-NO 3 - The value range is analyzed using the MixSIAR model to quantitatively identify the source, which can quantitatively identify the main source of nitrogen in the tested water body. Summary of the invention

[0012] The purpose of the present invention is to provide a method for formulating a total nitrogen control plan for a watershed based on the Gini coefficient and water quality model, which can solve the problem of ignoring the feasibility of emission reduction targets and lacking effective solutions for total nitrogen control in the prior art. From the perspective of practical implementation, the present invention combines pollution source decomposition, Gini coefficient, green contribution coefficient, and water quality model to formulate a research plan to ensure the fairness and feasibility of implementation.

[0013] To solve the above problems, the present invention adopts the following technical solutions: A method for formulating a total nitrogen control plan for a watershed based on the Gini coefficient and water quality model. Through field investigations and sampling, the actual water quality data of the study area is obtained, and basic geological information, hydrological data, hydrological station data, and detailed information on administrative areas in the basin (including the area of ​​each township, population, urban-rural population ratio, cultivated land area, and aquaculture) are collected and processed. By dividing the control unit, the pollution discharge and pollution source contribution rate of each unit are calculated, and an initial control plan is formulated according to the pollution source. The plan is revised using the Gini coefficient to ensure the fairness of the control plan. A water quality model is established, and the control plan is adjusted by setting water quality targets. The specific steps include the following: The first step is to collect basic data, including hydrological element data, digital terrain elevation, economic development, industrial pollution sources, population, land area, and land use type of the study area; The second step is to divide the control units based on administrative regions and the specific hydrological characteristics of the basin, and integrate the basic data according to the divided control units; The third step is to calculate the total nitrogen emissions of the control unit and determine the pollution source; The fourth step is to develop a control plan based on the type of pollution source; The fifth step is to establish a static Gini coefficient; The sixth step is to establish a water quality model, select modeling software, establish a water quality model for the study area, select parameters that are consistent with the actual situation and calibrate the model; The seventh step is to couple the Gini coefficient to adjust the control plan. Based on the revised plan, set water quality control targets. By adjusting the tributary input data, the water quality control targets and the dynamic simulation of water quality in the study area are achieved. The control plan is adjusted without changing the fairness in the study area.

[0014] Furthermore, the hydrological element data include flow, water level and water quality; the specific collection is as follows: the time span of tributaries is more than five years, the main stream is more than three years, and the average monthly flow is the annual average monthly average; For small watersheds without hydrological data, the hydrological analogy method is used in combination with the hydrological station data of the nearest reference watershed for estimation. In the case of hydrological data of multiple reference watersheds, the reference watershed is selected according to the underlying surface conditions and land use type. The formula of hydrological analogy method is as follows: , where Q 设 , Q 参 , annual runoff of the design basin and the reference basin, m 3 ; F 设 、F 参 , drainage area of ​​design basin and reference basin, km 2 ; X 设 , X 参 , the multi-year average rainfall of the design basin and the reference basin, mm.

[0015] Furthermore, the water quality data are collected with reference to the national and provincial controlled section data. When the number of national and provincial controlled sections in the study area does not meet the research requirements, water quality monitoring sections are set up independently and sampling and testing are carried out. The testing points are set up at the flow of tributaries into the main stream and at the outlet of the main stream sewage treatment plant. When there are industrial pollution sources directly discharging into the main stream and wetland park ecological protection buildings are built in the main stream, sampling points are added in the upstream and downstream sections, and the sampling and testing plan is carried out in accordance with the national standard surface water quality monitoring method.

[0016] Furthermore, the digital terrain elevation adopts a publicly available raster file with an accuracy of 30m, namely DEM30m; for the study area with a smaller river width, its accuracy cannot meet the research needs, and ArcGIS is used to resample the raster file and improve the accuracy through interpolation; for the lack of tributary basin area, DEM is used to calculate the basin area.

[0017] Furthermore, the data collection on economic development generally uses GDP as an indicator of the level of economic development. For studies with a minimum design unit of districts and counties and above, the economic development data of the research area is directly obtained through the work reports of district and county governments. For studies with a minimum design unit of townships, relevant information on economic development is collected based on actual conditions, including the per capita disposable income or per capita net income of townships, as an indicator of the level of economic development.

[0018] Furthermore, the collection of the population data is based on the official permanent population data; for areas without permanent population data, the registered population data is used as the population of the area.

[0019] Furthermore, the division principles of the control units are as follows: the basin is divided into multiple control units according to the characteristics of the basin and the administrative divisions of the study area, which is convenient for pollution load distribution, implementation of water pollution control and water quality control in each administrative area, and inspection of target achievement. The data of the control unit should be easy to count and calculate, and the control units are divided by combining the tributary basins with the administrative regions; for administrative regions that contain partial basins and tributaries of the main stream, the control unit separates the main basin from the tributary basin according to the administrative region data of the next level or divides it according to the basin boundaries of the main stream and the tributaries.

[0020] Furthermore, the total nitrogen emissions of the control unit are calculated and the pollution sources are determined as follows: (1) When there are measured data, the pollution sources are divided and their contribution rates are determined by using the correlation analysis method. During the analysis, the results of the nitrate nitrogen and nitrogen and oxygen dual isotope traceability analysis are used to approximate the total nitrogen according to the actual situation. The analysis method is as follows: the measured δ 15 N-NO 3 - and δ 18 O-NO 3 - Value and δ of each pollution source 15 N-NO 3 - and δ 18 O-NO 3 - Comparative analysis of the value range can identify the main sources of nitrogen in water bodies and their contribution rates; (2) The total nitrogen emission is calculated based on the river cross-section flux. For the control unit located in the mainstream, the total nitrogen emission is determined by calculating the difference in the upstream and downstream cross-section fluxes within the control unit. The calculation formula is as follows: W i =C i ×Q i ;W i is the pollutant emission of control unit i, t / a; C i is the water quality test value of control unit i or the concentration difference between upstream and downstream of control unit, mg / L; Q i is the design flow rate, m 3 / s; (3) If there is no measured analysis data, the pollution sources, the proportion of pollution sources and the amount of pollutant emissions shall be determined according to the statistical method of industry emission quotas.

[0021] Furthermore, the method for formulating a control plan is as follows: (1) For pollution generated by production and life, different measures are selected according to the different urban and rural development. For urban areas, the focus is mainly on the treatment of industrial pollution sources and the reduction of total nitrogen concentration in effluent from local sewage treatment plants through process transformation. For rural areas, the focus is mainly on improving the sewage collection system and appropriately reducing the total nitrogen concentration in effluent from rural sewage treatment plants. (2) For non-point source pollution, agricultural-related nitrogen source control determines the control standards based on the nitrogen reduction effect of the measures adopted, including conservation tillage, organic fertilizers and carbon-based fertilizers instead of chemical fertilizers, and laying plant hedges on ridges; for non-point source pollution caused by nitrogen loss represented by soil erosion, engineering measures are adopted, such as the construction of terraces, dams, levees, sedimentation ponds, and drainage ditch engineering facilities, which can reduce water flow velocity, increase water infiltration and intercept sediment, and reduce soil erosion. Control measures are formulated by evaluating the nitrogen reduction benefits after the implementation of relevant measures; (3) For non-point source pollution, the control measures are divided according to the slope and land use type. The control methods for non-point source pollution need to be adapted to local conditions based on the field survey. For areas where traditional fertilizers are used, the method and type of fertilizer application can be changed. For soil erosion in areas with higher slopes, engineering measures such as building terraces and dams can be adopted. For soil erosion in areas with lower slopes, the method of laying plant hedges on ridges can be adopted.

[0022] (4) For animal husbandry, control standards will be established by reducing individual farming and improving the treatment of livestock excrement in farms.

[0023] Furthermore, the static Gini coefficient is established, the direction of unfair distribution of environmental resources is determined by calculating the Gini coefficient of the initial scheme, and the control unit that needs to be adjusted is determined by using the green contribution coefficient; The formula for calculating the Gini coefficient is: , where G j is the environmental Gini coefficient; j is the serial number of the evaluation index; X ij is the cumulative proportion of index j of the i-th control unit; X (i-1)j Y is the cumulative proportion of the previous control unit index j of the i-th control unit; i is the cumulative proportion of pollutant emissions from the i-th control unit; Y i-1 is the cumulative proportion of pollutant emissions of the previous control unit of the i-th control unit; The calculation formula of green contribution coefficient is: , among which, GCC j is the contribution coefficient based on the evaluation index j; M ij is the value of the evaluation index j of the i-th control unit; M j Assign the value of regional index j to the pollutant; W i is the pollutant emission of the ith control unit; W is the total regional pollutant emission; (1) Determine the resource types with absolutely unfair total nitrogen emissions based on the Gini coefficient, calculate the green contribution coefficient of the resource, and identify which control units need to improve their production and consumption patterns to reduce pressure on the environment. When the green contribution coefficient is less than 1, it means that the total nitrogen emission capacity in the region exceeds the resource ownership, and it is necessary to focus on adjusting its control plan; (2) Analyze the main pollution sources of the control units that need to be improved. For urban control units, the focus is mainly on improving sewage treatment processes and raising the effluent standards of urban domestic sewage plants; for rural control units, the focus is mainly on increasing sewage collection rates, improving rural sewage treatment plant treatment processes and large-scale farm treatment processes; (3) For control units with a contribution coefficient greater than 1, their resource levels can accommodate higher total nitrogen emissions, and the control standards can be changed by reducing the coverage of non-point source pollution control measures and lowering the effluent standards of rural sewage treatment plants.

[0024] Furthermore, the method for establishing the water quality model is as follows: (1) Choose to establish a one-dimensional or multi-dimensional model based on the research content and basin characteristics. A one-dimensional environmental hydraulics model is used for water quality simulation of linear water bodies in rivers and channels; a multi-dimensional water quality model is used for research that needs to consider the flow and changes of water bodies in multiple directions in addition to studying the changes of water flow and water quality parameters along a single direction; (2) In the modeling process, the rivers in the study area are generalized according to the research focus, and the point source and non-point source pollution in the tributary basin are combined, and the tributaries are treated as point sources and flow into the mainstream of the river.

[0025] Furthermore, the method for adjusting the control scheme by coupling the Gini coefficient is as follows: (1) Select appropriate water quality monitoring sections, and use provincial or national monitoring sections as monitoring points; if other regional monitoring sections are set up, sections with detailed hydrological element data should be selected; (2) The water quality targets for sections should be set in accordance with local regulations and the control ratios should be set according to local conditions; (3) Using the Gini coefficient to correct the initial strategy, adjust the upstream control unit of the section to ensure that the water quality of the section reaches the set target value; (4) Use the Gini coefficient to evaluate the fairness of the adjusted scheme. The sum of the Gini coefficients of the adjusted scheme should not exceed the sum of the Gini coefficients of the original scheme.

[0026] The beneficial effects of the present invention are as follows: Compared with existing control measures, the total nitrogen control targets and measures in the river basin under this process are more detailed, taking into account the temporal and spatial changes of total nitrogen and the control targets of national control sections. It is easy to manage, and the actual control measures formulated through this process are more targeted. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is the technical roadmap of the present invention. DETAILED DESCRIPTION

[0028] From the perspective of practical implementation, the present invention combines pollution source decomposition, Gini coefficient, green contribution coefficient and water quality model to formulate a research plan to ensure the fairness and feasibility of implementation.

[0029] Through field investigation and sampling, we obtain the actual water quality data of the study area, collect and process the basic geological information of the river and its basin, hydrological data, hydrological station data, detailed information of the administrative area in the basin (including the area of ​​each township, population and urban-rural population ratio, cultivated land area, aquaculture) and other data. By dividing the control unit, we calculate the pollution discharge of each unit and the contribution rate of the pollution source, formulate the initial control plan according to the pollution source, and use the Gini coefficient to revise the plan to ensure the fairness of the control plan. Establish a water quality model and adjust the control plan by setting water quality goals.

[0030] 1. Collect basic information In the process of formulating the control plan, in order to reasonably divide the control units, calculate the total nitrogen emissions and the Gini coefficient, and establish a water quality model, it is necessary to collect data on hydrological elements (flow, water level, water quality, etc.), digital terrain elevation (DEM), economic development (GDP or per capita disposable income), industrial pollution sources, population, land area, land use type, etc. in the study area. (1) Tributary data collection In order to ensure the accuracy of tributary data, the time span of tributary flow, water level and other hydrological data should be more than five years, and the main stream should be more than three years. The average monthly flow is the inter-annual average. For small watersheds without hydrological data, the hydrological analogy method can be used to combine the hydrological station data of the nearest reference watershed for calculation. In the case of multiple reference watershed hydrological data, the reference watershed can be selected according to the underlying surface conditions and land use type.

[0031] The formula of hydrological analogy method is as follows: , where Q 设 , Q 参 , annual runoff of the design basin and the reference basin, m 3 ; F 设 、F 参 , drainage area of ​​design basin and reference basin, km 2 ; X 设 , X 参 , the multi-year average rainfall of the design basin and the reference basin, mm.

[0032] (2) Water quality data collection Water quality data can refer to the national and provincial control section data. When the number of national and provincial control sections in the study area does not meet the research requirements, water quality monitoring sections should be set up and sampling and testing should be carried out. Testing points should be set up at the place where tributaries flow into the main stream, the outlet of the main stream sewage treatment plant, etc. When there are industrial pollution sources that directly discharge into the main stream and ecological protection buildings such as wetland parks are built in the main stream, sampling points should be added at the upstream and downstream sections. The sampling and testing plan is carried out in accordance with the national standard surface water quality monitoring method. (3) Topographic data The digital terrain elevation uses a publicly available 30 m precision raster file (DEM30 m), but for the study area with a small river width, its accuracy cannot meet the research needs. ArcGIS can be used to resample the raster file and improve the accuracy through interpolation. In the case of a lack of tributary basin area, DEM can be used to calculate the basin area.

[0033] (4) Economic development data Generally, GDP is used as an indicator of economic development level. For research with the smallest design unit at the district or county level and above, the economic development data of the research area can be directly obtained through the work reports of the district and county governments. For research with the smallest design unit at the township level, relevant information on economic development can be collected based on actual conditions, such as the per capita disposable income or per capita net income of the township, as an indicator of the level of economic development.

[0034] (5) Population data The population is generally based on the official permanent population. For areas without permanent population data, the registered population can be used as the population of the area.

[0035] 2. Divide the control unit Control units should be divided based on administrative regions and combined with the specific hydrological characteristics of the basin, and the basic data should be integrated according to the divided control units.

[0036] (1) Division principles The control unit can be divided into multiple control units according to the characteristics of the basin and the administrative divisions of the study area. This is convenient for pollution load distribution, implementation of water pollution control and water quality control in each administrative area, and inspection of target achievement. The data of the control unit should be easy to count and calculate. The control unit can be divided by combining the tributary basin with the administrative area. For administrative areas that include partial basins and tributaries of the main stream, the control unit can separate the main stream basin from the tributary basin based on the administrative area data of the next level or divide it according to the basin boundaries of the main stream and tributaries.

[0037] 3. Determine pollution sources and total nitrogen emissions Determine the pollution source type of the control unit based on relevant information and calculate the total nitrogen emissions.

[0038] (1) When there are measured data, the correlation analysis method can be used to divide the pollution sources and determine their contribution rates. During the analysis process, the results of the nitrate nitrogen and nitrogen and oxygen dual isotope traceability analysis can be used to approximately represent the total nitrogen according to the actual situation. The analysis method is as follows: Use the δ 15 N-NO 3 - and δ 18 O-NO 3 - Value and δ of each pollution source 15 N-NO 3 - and δ 18 O-NO 3 - By comparing and analyzing the value range, the main sources of nitrogen in water bodies and their contribution rates can be identified.

[0039] (2) Calculate the total nitrogen emission by the river section flux. For the control unit located in the mainstream, the total nitrogen emission can be determined by calculating the difference in the upstream and downstream section fluxes within the control unit. The calculation formula is as follows: W i =C i ×Q i ;W i is the pollutant emission of control unit i, t / a; C i is the water quality test value of control unit i or the concentration difference between upstream and downstream of control unit, mg / L; Q i is the design flow rate, m 3 / s.

[0040] (3) If there is no measured analysis data, the pollution sources, the proportion of pollution sources and the amount of pollutant emissions can be determined based on the statistical method of industry emission quotas.

[0041] 4. Develop an initial plan Different control plans are adopted and control standards are formulated according to the identified pollution sources.

[0042] (1) For pollution generated by production and life, different measures are selected according to the different urban and rural development. For urban areas, the focus is mainly on the treatment of industrial pollution sources and the reduction of total nitrogen concentration in effluent from local sewage treatment plants through process transformation; for rural areas, the focus is mainly on improving the sewage collection system and appropriately reducing the total nitrogen concentration in effluent from rural sewage treatment plants.

[0043] (2) For non-point source pollution, in the agricultural sector, nitrogen source control uses relevant measures to determine the nitrogen reduction effect to determine the control standards, such as conservation tillage, organic and carbon-based fertilizers instead of chemical fertilizers, and laying plant hedges on ridges. For non-point source pollution caused by nitrogen loss, represented by soil erosion, engineering measures are mainly used, such as the construction of terraces, ponds, dams, sedimentation ponds, and drainage ditch engineering facilities. The control measures are formulated by reducing water flow velocity, increasing water infiltration and intercepting sediment, and reducing soil erosion. The nitrogen reduction benefits after the implementation of relevant measures are evaluated.

[0044] (3) For non-point source pollution, the control measures can be divided according to the slope and land use type. (4) For animal husbandry, control standards can be established by reducing the number of individual farmers and improving the treatment of livestock excrement by farms. 5. Establish an initial plan for the static Gini coefficient The direction of unfair distribution of environmental resources is determined by calculating the Gini coefficient of the initial scheme, and the control unit that needs to be adjusted is determined using the green contribution coefficient.

[0045] The formula for calculating the Gini coefficient is: , where G j is the environmental Gini coefficient; j is the serial number of the evaluation index; X ij is the cumulative proportion of index j of the i-th control unit; X (i-1)j Y is the cumulative proportion of the previous control unit index j of the i-th control unit; i is the cumulative proportion of pollutant emissions from the i-th control unit; Y i-1 is the cumulative proportion of pollutant emissions of the previous control unit of the i-th control unit; The calculation formula of green contribution coefficient is: , among which, GCC j is the contribution coefficient based on the evaluation index j; M ij is the value of the evaluation index j of the i-th control unit; M j Assign the value of regional index j to the pollutant; W i is the pollutant emission of the ith control unit; W is the total regional pollutant emission.

[0046] (1) Based on the Gini coefficient, determine the resource type with absolutely unfair total nitrogen emissions, calculate the green contribution coefficient of the resource, and identify which control units need to improve their production and consumption patterns to reduce pressure on the environment. When the green contribution coefficient is less than 1, it means that the total nitrogen emission capacity in the region exceeds the resource ownership, and it is necessary to focus on adjusting its management and control plan.

[0047] (2) Analyze the main pollution sources of the control units that need to be improved. For urban control units, the focus is mainly on improving sewage treatment processes and raising the effluent standards of urban domestic sewage plants; for rural control units, the focus is mainly on increasing sewage collection rates, improving rural sewage treatment plant treatment processes and large-scale farm treatment processes.

[0048] (3) For control units with a contribution coefficient greater than 1, their resource levels can accommodate higher total nitrogen emissions, and the control standards can be changed by reducing the coverage of non-point source pollution control measures and lowering the effluent standards of rural sewage treatment plants.

[0049] 6. Build a water quality model Select appropriate modeling software, establish a water quality model for the study area, select parameters that are consistent with reality and calibrate the model.

[0050] (1) Choose to establish a one-dimensional or multi-dimensional model based on the research content and basin characteristics. For water quality simulation of linear water bodies such as rivers and channels, a one-dimensional environmental hydraulic model is generally used. For research that needs to consider the flow and changes of water bodies in multiple directions in addition to studying the changes of water flow and water quality parameters along a single direction, a multi-dimensional water quality model is generally used.

[0051] (2) In the modeling process, according to the research focus, the rivers in the study area can be generalized, and the point source and non-point source pollution in the tributary basin can be combined to treat the tributaries as point sources and merge into the mainstream of the river.

[0052] 7. Coupling the Gini coefficient to adjust the control plan Based on the revised plan, water quality control targets are set, and the water quality control targets and water quality dynamic simulation in the study area are achieved by adjusting the tributary input data. The control plan is adjusted without changing the fairness in the study area.

[0053] (1) Select appropriate water quality monitoring sections. Generally, provincial or national monitoring sections are used as monitoring points. If other regional monitoring sections are set up, sections with detailed hydrological element data should be selected.

[0054] (2) The setting of cross-section water quality targets should refer to local specific regulations and the control ratio should be set according to local conditions.

[0055] (3) The initial strategy is corrected using the Gini coefficient to adjust the upstream control unit of the section to ensure that the water quality of the section reaches the set target value.

[0056] (4) Use the Gini coefficient to evaluate the fairness of the adjusted scheme. The sum of the Gini coefficients of the adjusted scheme should not exceed the sum of the Gini coefficients of the original scheme.

[0057] Precautions (1) According to the division of control units, the smallest administrative unit for collecting data should be reasonably selected. The accuracy of the data has a direct impact on the subsequent plan formulation and verification.

[0058] (2) During the water quality data monitoring process, the experimental operation process must be standardized to ensure the test results. The sampling period must cover the entire time period of the river (flood season, normal water season, and dry season), and sampling should be carried out multiple times.

[0059] (3) The collection of pollution source information should be comprehensive and accurate to ensure that potential pollution sources in the entire study area are covered, so as to facilitate the subsequent classification of pollution sources and analysis of pollution contribution rates.

[0060] (4) When calculating total nitrogen emissions and the contribution rate of approved pollution sources, if there are no relevant analysis results, the classification method for calculating industry emission quotas can be used as a reference. However, the level of detail and accuracy of statistical data directly affect the results, and the emission quota does not take into account the absorption and transformation of pollutants within the control unit, which will produce certain errors.

[0061] (5) When formulating control measures for pollution sources, it is necessary to consider the actual situation, combine the investigation results with the control measures, and preliminarily formulate feasible control methods. The set standards should not exceed the achievable range, and the economic cost issue needs to be considered.

[0062] (6) The sophistication of the model has a direct impact on the coupling of the Gini coefficient, so during the application process, the model accuracy can be appropriately improved and other influencing factors in the environment can be added, such as sedimentation, rainfall, wind speed, etc.

[0063] Example Taking the total nitrogen control in the upper reaches of Fenhe Reservoir as an example, the study area was divided into control units, the contribution rate of pollution sources in each tributary was analyzed, and HEC-RAS was used for water quality modeling.

[0064] Using the results of nitrate nitrogen and oxygen isotope pollution source analysis, the pollution sources were reclassified into point sources and scattered discharge, fertilizers, and soil sources. Different control methods were designed for different pollution sources. The Technical Specifications for Rural Domestic Pollution Control (HJ572-2010), Technical Specifications for Village and Town Water Supply Projects (SL310-2019), Shanxi Provincial Urban Wastewater Treatment Plant Pollutant Emission Standards (DB14 / 1928-2019) and plant hedges were used to formulate different control ratios for different sand reduction and nitrogen control effects on high and low slopes, and different reduction control ratios were adopted for different control units. The environmental Gini coefficient was introduced, and the Gini coefficient was used to analyze the fairness of the research method based on land area, population size, and per capita disposable income, and compared with the Gini coefficient of the control plan. The results show that the total nitrogen emissions in the study area based on the Gini coefficient of population and per capita disposable income have exceeded the warning value, showing serious unfairness. The control scheme can slightly reduce the overall Gini coefficient of the study area, but it exacerbates the unfairness of total nitrogen emissions in the study area. Therefore, the control scheme needs to be revised. For units that need strict control, the control standards are raised. For urban control units, the local sewage treatment plant is mainly used to improve the standards of the sewage treatment plant, and the total nitrogen discharged from the sewage plant of the control unit is set according to the requirements of the local environmental water function zoning. Other control units are rural areas that adopt the laying of sewage collection pipes to improve their sewage collection rate; control units that reduce the control standards can adopt the method of reducing the coverage rate of plant hedges or appropriately raising the discharge standards of rural sewage plants. The water quality model simulation shows that the average simulated total nitrogen concentration of the Jingle hydrological station section under the static control scheme is reduced by 1.116 mg / L, with a reduction of 27.5%. By setting the water quality target value of the section, the static control scheme of the upstream control unit of the section is adjusted in combination with the Gini coefficient. After the adjustment, the average total nitrogen concentration of the section is reduced by 1.4 mg / L. Under the scheme of coupling water quality model, the overall Gini coefficient of the study area decreased by 3.91%, and the water quality control target was achieved under the premise of improving the fairness of the study area. It provides ideas for water quality section monitoring and total nitrogen treatment in the study area based on the water quality target of the section.

[0065] Compared with existing control measures, the total nitrogen control targets and measures in the river basin under this process are more detailed, taking into account the temporal and spatial changes of total nitrogen and the control targets of national control sections. It is easy to manage, and the actual control measures formulated through this process are more targeted.

Claims

1. A method for formulating a total nitrogen control plan for a watershed based on the Gini coefficient and water quality model, characterized by: The steps include: The first step is to collect basic data, including hydrological element data, digital terrain elevation, economic development, industrial pollution sources, population, land area, and land use type of the study area; The second step is to divide the control units based on administrative regions and the specific hydrological characteristics of the basin, and integrate the basic data according to the divided control units; The third step is to calculate the total nitrogen emissions of the control unit and determine the pollution source; The fourth step is to develop a control plan based on the type of pollution source; Step 5: Establish a static Gini coefficient; The sixth step is to establish a water quality model, select modeling software, establish a water quality model for the study area, select parameters that are consistent with the actual situation and calibrate the model; The seventh step is to couple the Gini coefficient to adjust the control plan. Based on the revised plan, set water quality control targets. By adjusting the tributary input data, the water quality control targets and the dynamic simulation of water quality in the study area are achieved. The control plan is adjusted without changing the fairness in the study area.

2. According to claim 1, a method for formulating a watershed total nitrogen control plan based on the Gini coefficient and water quality model is characterized by: The hydrological element data include flow, water level and water quality; the specific collection is as follows: the time span of tributaries is more than five years, the main stream is more than three years, and the monthly average flow is the annual monthly average; For small watersheds without hydrological data, the hydrological analogy method is used in combination with the hydrological station data of the nearest reference watershed for estimation. In the case of hydrological data of multiple reference watersheds, the reference watershed is selected according to the underlying surface conditions and land use type. The formula of hydrological analogy method is as follows: , where Q 设 , Q 参 , annual runoff of the design basin and the reference basin, m 3 ; F 设 、F 参 , drainage area of ​​design basin and reference basin, km 2 ; X 设 , X 参 , the multi-year average rainfall of the design basin and the reference basin, mm; The water quality data collection mentioned above refers to the national and provincial controlled section data. When the number of national and provincial controlled sections in the study area does not meet the research requirements, water quality monitoring sections are set up by themselves and sampling and testing are carried out. The testing points are set up at the place where tributaries flow into the main stream and at the outlet of the main stream sewage treatment plant. When there are industrial pollution sources that directly discharge into the main stream and wetland park ecological protection buildings are built in the main stream, sampling points are added at the upstream and downstream sections. The sampling and testing plan is carried out in accordance with the national standard surface water quality monitoring method; The digital terrain elevation adopts a publicly available raster file with an accuracy of 30m, namely DEM30m; for the study area with a smaller river width, its accuracy cannot meet the research needs, and ArcGIS is used to resample the raster file and improve the accuracy through interpolation; for the lack of tributary basin area, DEM is used to calculate the basin area.

3. According to claim 1, a method for formulating a watershed total nitrogen control plan based on the Gini coefficient and water quality model is characterized by: The data collection on economic development generally uses GDP as an indicator of the level of economic development. For studies with a minimum design unit of districts and counties and above, the economic development data of the research area is directly obtained through the work reports of district and county governments. For studies with a minimum design unit of townships, relevant information on economic development is collected based on actual conditions, including the per capita disposable income or per capita net income of townships, as an indicator of the level of economic development.

4. The method for formulating a watershed total nitrogen control plan based on the Gini coefficient and water quality model according to claim 1, characterized in that: The collection of the population data is based on the official permanent population number; for areas without permanent population data, the registered population number is used as the population number of the area.

5. The method for formulating a watershed total nitrogen control plan based on the Gini coefficient and water quality model according to claim 1, characterized in that: The division principles of the control units are as follows: the basin is divided into multiple control units according to the characteristics of the basin and the administrative divisions of the study area, which is convenient for pollution load distribution, implementation of water pollution control and water quality control in each administrative area, and inspection of target achievement. The data of the control unit should be easy to count and calculate, and the control units are divided by combining the tributary basins with the administrative regions; for administrative regions that contain partial basins and tributaries of the main stream, the control unit separates the main basin from the tributary basin according to the administrative region data of the next level or divides it according to the basin boundaries of the main stream and the tributaries.

6. The method for formulating a watershed total nitrogen control plan based on the Gini coefficient and water quality model according to claim 1, characterized in that: The method for calculating the total nitrogen emissions of the control unit and determining the pollution sources is as follows: (1) When there are measured data, the correlation analysis method is used to divide the pollution sources and determine their contribution rates. During the analysis process, the results of the nitrate nitrogen and nitrogen and oxygen dual isotope traceability analysis are used to approximately represent the total nitrogen according to the actual situation. The analysis method is as follows: Use the δ 15 N-NO3 - and δ 18 O-NO3 - Value and δ of each pollution source 15 N-NO3 - and δ 18 O-NO3 - Comparative analysis of the value range can identify the main sources of nitrogen in water bodies and their contribution rates; (2) The total nitrogen emission is calculated based on the river cross-section flux. For the control unit located in the mainstream, the total nitrogen emission is determined by calculating the difference in the upstream and downstream cross-section fluxes within the control unit. The calculation formula is as follows: W i =C i ×Q i ;W i is the pollutant emission of control unit i, t / a; C i is the water quality test value of control unit i or the concentration difference between upstream and downstream of control unit, mg / L; Q i is the design flow rate, m 3 / s; (3) If there is no measured analysis data, the pollution sources, the proportion of pollution sources and the amount of pollutant emissions shall be determined according to the statistical method of industry emission quotas.

7. The method for formulating a watershed total nitrogen control plan based on the Gini coefficient and water quality model according to claim 1, characterized in that: The following are the methods for formulating a control plan: (1) For pollution generated by production and life, different measures are selected according to the different urban and rural development. For urban areas, the focus is mainly on the treatment of industrial pollution sources and the reduction of total nitrogen concentration in effluent from local sewage treatment plants through process transformation. For rural areas, the focus is mainly on improving the sewage collection system and appropriately reducing the total nitrogen concentration in effluent from rural sewage treatment plants. (2) For non-point source pollution, in the agricultural sector, nitrogen source control uses relevant measures to reduce nitrogen and determine control standards, including conservation tillage, organic fertilizers and carbon-based fertilizers instead of chemical fertilizers, and laying plant hedges on ridges. For non-point source pollution caused by nitrogen loss, represented by soil erosion, engineering measures are adopted, such as the construction of terraces, dams, levees, sedimentation ponds, and drainage ditch facilities, to control soil erosion by reducing water flow velocity, increasing water infiltration, intercepting sediment, and reducing soil erosion. The nitrogen reduction benefits after the implementation of relevant measures are evaluated to formulate control measures. (3) For non-point source pollution, use slope and land use type to classify control measures standards; (4) For animal husbandry, control standards will be established by reducing individual farming and improving the treatment of livestock excrement in farms.

8. The method for formulating a watershed total nitrogen control plan based on the Gini coefficient and water quality model according to claim 1, characterized in that: The static Gini coefficient is established, and the direction of unfair distribution of environmental resources is determined by calculating the Gini coefficient of the initial scheme, and the control unit that needs to be adjusted is determined by using the green contribution coefficient; The formula for calculating the Gini coefficient is: , where G j is the environmental Gini coefficient; j is the serial number of the evaluation index; X ij is the cumulative proportion of index j of the i-th control unit; X (i-1)j Y is the cumulative proportion of the previous control unit index j of the i-th control unit; i is the cumulative proportion of pollutant emissions from the i-th control unit; Y i-1 is the cumulative proportion of pollutant emissions of the previous control unit of the i-th control unit; The calculation formula of green contribution coefficient is: , among which GCC j is the contribution coefficient based on the evaluation index j; M ij is the value of the evaluation index j of the i-th control unit; M j Assign the value of regional index j to the pollutant; W i is the pollutant emission of the ith control unit; W is the total regional pollutant emission; (1) Determine the resource types with absolutely unfair total nitrogen emissions based on the Gini coefficient, calculate the green contribution coefficient of the resource, and identify which control units need to improve their production and consumption patterns to reduce pressure on the environment. When the green contribution coefficient is less than 1, it means that the total nitrogen emission capacity in the region exceeds the resource ownership, and it is necessary to focus on adjusting its control plan; (2) Analyze the main pollution sources of the control units that need to be improved. For urban control units, the focus is mainly on improving sewage treatment processes and raising the effluent standards of urban domestic sewage plants; for rural control units, the focus is mainly on increasing sewage collection rates, improving rural sewage treatment plant treatment processes and large-scale farm treatment processes; (3) For control units with a contribution coefficient greater than 1, their resource levels can accommodate higher total nitrogen emissions, and the control standards can be changed by reducing the coverage of non-point source pollution control measures and lowering the effluent standards of rural sewage treatment plants.

9. The method for formulating a watershed total nitrogen control plan based on the Gini coefficient and water quality model according to claim 1, characterized in that: The method for establishing the water quality model is as follows: (1) Choose to establish a one-dimensional or multi-dimensional model based on the research content and basin characteristics: a one-dimensional environmental hydraulic model is used for water quality simulation of rivers and channel linear water bodies; a multi-dimensional water quality model is used for research that needs to consider the flow and changes of water bodies in multiple directions in addition to studying the changes of water flow and water quality parameters along a single direction; (2) In the modeling process, the rivers in the study area are generalized according to the research focus, and the point source and non-point source pollution in the tributary basin are combined, and the tributaries are treated as point sources and flow into the mainstream of the river.

10. The method for formulating a watershed total nitrogen control plan based on the Gini coefficient and water quality model according to claim 1, characterized in that: The method for adjusting the control scheme by coupling the Gini coefficient is as follows: (1) Select appropriate water quality monitoring sections, and use provincial or national monitoring sections as monitoring points; if other regional monitoring sections are set up, sections with detailed hydrological element data should be selected; (2) The water quality targets for sections should be set in accordance with local regulations and the control ratios should be set according to local conditions; (3) Using the Gini coefficient to correct the initial strategy, adjust the upstream control unit of the section to ensure that the water quality of the section reaches the set target value; (4) The Gini coefficient is used to evaluate the fairness of the adjusted scheme. The sum of the Gini coefficients of the adjusted scheme should not exceed the sum of the Gini coefficients of the original scheme.

Citation Information

Cited By

  • Regional total nitrogen non-point source pollution intensity analysis method

    CN120870494A