Ship lift navigable ship height limit monitoring and early warning system and method
By using two cameras mounted side-by-side on the same pole and a standard measuring rod in the ship lift, combined with an image workstation to calculate the ship's height, the problems of time-consuming, labor-intensive, and complex equipment in existing technologies have been solved, realizing automated measurement and management of the height of navigable ships.
Patent Information
- Application Number
- CN202411132549.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-22
AI Technical Summary
Existing methods for measuring the height of navigable vessels using ship lifts are time-consuming and labor-intensive. Automated measurement requires complex equipment, has high installation accuracy requirements and is costly, and has poor applicability.
Two cameras mounted side-by-side on the same pole are used. With a standard measuring pole as a reference, and combined with upstream and downstream water level information, the height of the ship is obtained through an image acquisition device. The image workstation is then used to calculate whether the navigation height restriction conditions are met.
The system enables automated measurement of the height of vessels navigating via the ship lift, reducing equipment hardware requirements, improving measurement accuracy and applicability, reducing errors from human judgment, and achieving a higher level of automation in navigation management.
Smart Images

Figure CN119007501A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of ship lift operation monitoring, and in particular to a height limit monitoring and early warning system and method for ships passing through a ship lift. Background Art
[0002] With the rapid development of China's shipping industry, the number of ships passing through is increasing day by day. In inland waterway navigation, bridges, ship lifts and other facilities have restrictive requirements on the height of ships. If an over-height ship forcibly passes through, it will not only cause damage to itself, but also damage the facilities and cause serious accidents. At present, the height restrictions on ships in hydropower station ship lifts come from the requirements for ship height of upstream aqueducts and downstream pilot channel navigation facilities, and the height changes with the changes in upstream and downstream water levels. If the navigable ship is too high, it will damage the relevant equipment of the ship lift after rashly entering the ship lift, causing accidents. In addition, the requirements for navigation of the ship lift include the maximum and minimum restricted water levels for upstream and downstream navigation, the upstream restricted elevation, and the downstream restricted elevation. The above requirements and the actual water levels of the upstream and downstream jointly determine the height of the ship allowed to pass. At present, the ship lifts of hydropower stations generally use manual measurement methods, using angle rulers, tape measures, measuring rods and other auxiliary measurement methods to measure the height of ships. This method is not only time-consuming and labor-intensive, but also has low measurement accuracy. It also needs to be combined with the upstream and downstream water levels to manually calculate whether the navigation restrictions are met.
[0003] Researchers in related fields have conducted research on ship height measurement methods. The use of radar, laser ranging and other methods often requires the addition of new equipment types to the existing ship lift control system, which has high material and technical investment costs. On the basis of the existing image monitoring system, the height limit monitoring of navigable ships can be achieved by changing the installation position of the camera and the algorithm of the image workstation, which is more economical and applicable. For example, the application number is 202111233341.X, and the patent name is an invention patent for a ship optimization identification and real-time tracking method and an anti-collision warning system. It is necessary to set up multiple shore-based radars and pan-tilt cameras along the coast, which greatly increases the cost of data monitoring. The application number is 202110265771.3, and the patent name is an invention patent for a ship height measurement system and method based on a binocular camera. It is necessary to use a binocular camera to measure the height of the ship. Two cameras of exactly the same model are fixed at the same height on the same side of the shore, and the middle area of the field of view of the two cameras is ensured to overlap. The installation requirements and debugging accuracy of the camera are too high. The application number is 202211185769.6, and the patent name is an invention patent for a multi-camera ship height measurement method based on a dynamic long baseline. Three binocular cameras are required to measure the ship height. Two cameras with different baseline values in the three side-by-side cameras form a binocular shooting system, which shoots in three equal-width areas to obtain three different sets of left-view images and right-view images. The camera installation conditions are high, and it is not suitable for upstream and downstream pilot channels of hydropower stations. The application number is 202211406607.0, and the patent name is an invention patent for a ship height measurement system based on a tilt warning wide-range binocular camera. The pan-tilt control module involved uses a ball camera pan-tilt installed under the guide rails of two fixed industrial cameras. It can control the guide rails of the fixed cameras to complete the horizontal rotation. It has high requirements for the camera and increases the equipment cost. The application number is 202210781907.0, and the patent name is an invention patent for a ship height measurement and identification method based on video images. It uses a ship height calculation method based on real-time dynamic video. The camera captures the image greatly affected by the dam flood discharge fog and is not suitable for hydropower stations. Summary of the invention
[0004] The present invention aims to solve at least one of the technical problems in the prior art that the manual method of measuring the height of navigable ships via a ship lift is time-consuming and labor-intensive, and the automated method of measuring the height of navigable ships via a ship lift requires the use of complex equipment, has complex calculations, requires excessively high installation accuracy, requires large investment in transformation, and has poor applicability.
[0005] To this end, a first aspect of the present invention provides a height limit monitoring and early warning system for ships navigating via a ship lift.
[0006] A second aspect of the present invention provides a method for monitoring and warning height limits of ships passing through a ship lift.
[0007] The present invention provides a height limit monitoring and early warning system for ships passing through a ship lift, comprising:
[0008] Checkpoint platform, used for docking ships;
[0009] A standard measuring rod is set up on the side of the inspection station platform close to the ship;
[0010] A first image acquisition device is disposed on a side of the inspection station platform away from the ship, and the first image acquisition device has a first height from the inspection station platform;
[0011] A second image acquisition device is arranged in the same vertical plane as the first image acquisition device and is located at a different horizontal plane, the vertical distance between the first image acquisition device and the standard measuring rod is equal to the vertical distance between the second image acquisition device and the standard measuring rod; the second image acquisition device has a second height from the inspection station platform;
[0012] The first image acquisition device and the second image acquisition device have the same acquisition direction and are respectively used to acquire the relative height of the highest point of the ship relative to the standard measuring rod, the relative height of the highest point of the ship acquired by the first image acquisition device is defined as the first relative height, and the relative height of the highest point of the ship acquired by the second image acquisition device is defined as the second relative height;
[0013] The image workstation receives the acquisition information of the first image acquisition device and the second image acquisition device, and is used at least to calculate the actual height of the highest point of the ship based on the first height, the second height, the first relative height and the second relative height, and then determine whether the height of the ship meets the navigation height limit conditions.
[0014] The ship lift navigation ship height limit monitoring and early warning system according to the above technical solution of the present invention may also have the following additional technical features:
[0015] In the above technical solution, the first relative height is the height of the intersection of the line between the image acquisition center of the first image acquisition device and the highest point of the ship and the standard measuring rod from the inspection station platform;
[0016] The second relative height is the height from the inspection station platform to the intersection of the line between the image acquisition center of the second image acquisition device and the highest point of the ship and the standard measuring rod;
[0017] The step of calculating the actual height of the highest point of the ship according to the first height, the second height, the first relative height and the second relative height comprises:
[0018]
[0019] Among them, hx represents the actual height of the highest point of the ship, ha represents the first relative height, hb represents the second relative height, hc1 represents the first height, and hc2 represents the second height.
[0020] In the above technical solution, the highest point of the standard measuring rod is higher than the highest point of the ship; the position of the first image acquisition device is lower than the highest point of the ship, and the position of the second image acquisition device is higher than the highest point of the ship.
[0021] In the above technical solution, the inspection station platform is provided with a front end docking restriction line and a rear end docking restriction line, and a docking position is formed between the front end docking restriction line and the rear end docking restriction line, and the docking position is used to limit the docking position of the ship;
[0022] The acquisition ranges of the first image acquisition device and the second image acquisition device at least cover the parking station.
[0023] The above technical solution also includes:
[0024] A support column is arranged on the platform of the inspection station, and the first image acquisition device and the second image acquisition device are arranged at different heights of the support column;
[0025] The connecting line between the support column and the standard measuring rod is perpendicular to the ship docking edge of the inspection station platform.
[0026] The above technical solution also includes:
[0027] The first water level gauge is arranged in the upstream pilot channel of the ship lift and is used to collect upstream water level information;
[0028] The second water level gauge is arranged in the pilot channel downstream of the ship lift and is used to collect downstream water level information;
[0029] The image workstation also receives the collected information of the first water level meter and the second water level meter, and calculates the upstream limit clearance height according to the upstream water level information and the upstream limit elevation, and calculates the downstream limit clearance height according to the downstream water level information and the downstream limit elevation;
[0030] The image workstation is also used to calculate the ship's headroom height based on the actual height of the highest point of the ship and the water level at the inspection station platform;
[0031] The determining whether the height of the ship satisfies the navigation height limit condition includes: determining whether the ship's clearance height is lower than the upstream clearance height limit and / or the downstream clearance height limit.
[0032] The above technical solution also includes:
[0033] A transmission device, receiving image information acquired by the first image acquisition device and the second image acquisition device, and transmitting the image information to the image workstation;
[0034] The display device is connected to the transmission device and displays the video screen recorded with the image information.
[0035] The above technical solution also includes:
[0036] A navigation dispatching system, which is in communication with the image workstation, and is used for the navigation dispatcher to analyze and control the operation status of the ship lift according to the calculation results and warning information sent by the image workstation;
[0037] The navigation broadcasting system is connected to the navigation dispatching system for converting the control and warning information sent by the navigation dispatching system into audio information and playing it to the on-site commander of the ship lift and the navigation vessel operator.
[0038] The present invention provides a method for monitoring and warning height limit of navigable ships in a ship lift, which adopts the monitoring and warning system for monitoring and warning height limit of navigable ships in a ship lift as described in any one of the above technical solutions, and the method comprises:
[0039] Confirming that the ship is docked at a designated location on the platform of the inspection station, wherein the designated location is at least within the image acquisition measurement range of the first image acquisition device and the second image acquisition device;
[0040] Using the first image acquisition device and the second image acquisition device to respectively capture images of the ship at a set frequency; wherein the image of the ship records at least the height information of the highest point of the ship relative to the standard measuring rod;
[0041] Extracting height information of the highest point of the ship in the ship image relative to a standard measuring rod, measuring a first relative height and a second relative height; and then calculating the actual height of the highest point of the ship according to the first relative height, the second relative height, the first height, and the second height;
[0042] The actual height of the highest point of the ship is used to determine whether the height of the ship meets the navigation height limit conditions; if the navigation height limit conditions are met, a permission to pass command is issued; if the navigation height limit conditions are not met, a prohibition to pass command is issued.
[0043] In the above technical solution, the actual height of the highest point of the ship is calculated according to the first relative height, the second relative height, the first height and the second height, including:
[0044] The actual height of the highest point of a ship is calculated based on each captured ship image, including:
[0045]
[0046] Among them, hx represents the actual height of the highest point of the ship corresponding to the x-th captured image, ha represents the first relative height, hb represents the second relative height, hc1 represents the first height, and hc2 represents the second height;
[0047] Among all the calculation results, the maximum value is selected as the actual height of the highest point of the ship confirmed in the end, including:
[0048]
[0049] Wherein, hmax represents the actual height of the highest point of the ship finally confirmed, and n represents the number of shots by the first image acquisition device and the second image acquisition device.
[0050] In summary, due to the adoption of the above technical features, the beneficial effects of the present invention are:
[0051] The present invention provides a ship lift navigation ship height limit monitoring and early warning system and method. The system uses two cameras mounted on the same pole, takes a standard measuring pole as a reference, obtains images of a certain number of pre-navigable ships anchored in a specified area according to a set sampling frequency, and calculates the ship height according to a predetermined algorithm based on the acquired images, and judges whether the navigation height limit conditions are met in combination with the upstream and downstream water levels, upstream restricted elevation, downstream restricted elevation and other technical requirements for ship lift operation, and completes the interaction of navigation ship super-height monitoring information and early warning information broadcasting announcement in combination with the navigation dispatching system and the navigation broadcasting system.
[0052] Specifically, the present invention uses two cameras and fixed reference objects to realize automatic measurement of the height of navigable ships in the ship lift, with low requirements for equipment hardware, simple methods, and strong applicability. The present invention realizes automatic judgment of the restricted clearance height of the upstream and downstream navigation of the ship lift, and automatic judgment and alarm of whether the height of navigable ships in the upstream and downstream of the ship lift exceeds the standard, thereby improving the automation level of navigation management of the ship lift and reducing errors in manual judgment. The present invention can be based on the existing basic conditions such as the ship lift image monitoring system, navigation dispatching system, and navigation broadcasting system, and the addition of a measuring rod and two cameras can realize the judgment of excessive height of navigable ships in the ship lift. Combined with the navigation dispatching system and the navigation broadcasting system, the interaction of super-height monitoring information of navigable ships and the broadcasting of early warning information can be realized, and the implementation method is simple and low-cost.
[0053] Additional aspects and advantages of the present invention will become apparent from the following description or may be learned by practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0055] Figure 1It is a structural schematic diagram of a height limit monitoring and early warning system for navigable ships of a ship lift according to an embodiment of the present invention;
[0056] Figure 2 It is a front view of a ship lift navigation ship height limit monitoring system in a ship lift navigation ship height limit monitoring and early warning system according to an embodiment of the present invention;
[0057] Figure 3 It is a flow chart of a method for monitoring and warning height limit of a navigable ship in a ship lift according to an embodiment of the present invention;
[0058] Figure 4 It is a top view of height limit monitoring of a navigable ship in a method for monitoring and warning height limit of a navigable ship in a ship lift according to an embodiment of the present invention;
[0059] Figure 5 It is a schematic diagram of height measurement of a camera-captured image in a method for monitoring and early warning of height restrictions on navigable ships in a ship lift according to an embodiment of the present invention.
[0060] in, Figures 1 to 5 The corresponding relationship between the reference numerals and the component names is as follows:
[0061] 1. Inspection station platform; 2. Standard measuring pole; 3. Support column; 5. Video distributor; 6. Hard disk recorder; 7. Image workstation; 8. Image side Ethernet switch; 9. Combined display screen; 13. Vessel to be tested;
[0062] 121, rear stop limit line; 122, front stop limit line;
[0063] 3C1, a first image acquisition device; 3C2, a second image acquisition device;
[0064] 41. First video optical terminal; 42. Second video optical terminal;
[0065] 101. Dispatching workstation; 102. Dispatching side Ethernet switch; 103. First water level gauge; 104. Second water level gauge;
[0066] 111. Broadcast workstation; 112. Broadcast side Ethernet switch; 113. Broadcast speaker. DETAILED DESCRIPTION
[0067] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0068] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.
[0069] Refer to the following Figures 1 to 5 The following describes a height limit monitoring and early warning system for ships passing through a ship lift provided according to some embodiments of the present invention.
[0070] Some embodiments of the present application provide a height limit monitoring and early warning system for ships navigating via a ship lift.
[0071] like Figure 1 As shown, the first embodiment of the present invention proposes a height limit monitoring and early warning system for ships passing through a ship lift, which at least includes: a checkpoint platform 1, a standard measuring rod 2, a first image acquisition device 3C1, a second image acquisition device 3C2 and an image workstation 7.
[0072] The platform 1 of the checkpoint is used for docking ships; it is understandable that the pre-navigable ships will dock at one side of the platform 1 of the checkpoint for height limit detection. The platform 1 of the checkpoint is usually set on the river bank and is a horizontal open area. In some embodiments, the platform 1 of the checkpoint is provided with a front-end docking restriction line 122 and a rear-end docking restriction line 121, and a docking station is formed between the front-end docking restriction line 122 and the rear-end docking restriction line 121, and the docking station is used to limit the docking position of the ship. Among them, the front-end docking restriction line 122 and the rear-end docking restriction line 121 can be either a physical mark for directly providing a clear indication of the docking restriction range to the ship; or a virtual mark for identifying whether the ship is docked within the specified range, that is, within the docking station, through image information.
[0073] The standard measuring rod 2 is arranged on the side of the inspection station platform 1 close to the ship; for the convenience of detection, the standard measuring rod 2 can be marked with a scale, and then the relative height data can be read through the image. Specifically, the standard measuring rod 2 is arranged in the middle position of the inspection station platform 1 close to the shore.
[0074] The first image acquisition device 3C1 is arranged on the side of the platform 1 of the checkpoint away from the ship, and the first image acquisition device 3C1 has a first height from the platform 1 of the checkpoint; the second image acquisition device 3C2 is arranged in the same vertical plane as the first image acquisition device 3C1 and is located at different horizontal planes, and the vertical distance between the first image acquisition device 3C1 and the standard measuring rod 2 is equal to the vertical distance between the second image acquisition device 3C2 and the standard measuring rod 2; the second image acquisition device 3C2 has a second height from the platform 1 of the checkpoint. The first image acquisition device 3C1 and the second image acquisition device 3C2 can be arranged in a variety of ways, as long as they are arranged on the same straight line perpendicular to the ground. In some embodiments, a support column 3 can be arranged on the platform 1 of the checkpoint, and the support column 3 and the standard measuring rod 2 are arranged oppositely and respectively located on both sides of the platform 1 of the checkpoint, and the first image acquisition device 3C1 and the second image acquisition device 3C2 are arranged at different heights of the support column 3; the line connecting the support column 3 and the standard measuring rod 2 is perpendicular to the edge of the ship docking of the platform 1 of the checkpoint.
[0075] Among them, the first image acquisition device 3C1 and the second image acquisition device 3C2 have the same acquisition direction, and are respectively used to acquire the relative height of the highest point of the ship relative to the standard measuring rod 2, the relative height of the highest point of the ship acquired by the first image acquisition device 3C1 is defined as the first relative height, and the relative height of the highest point of the ship acquired by the second image acquisition device 3C2 is defined as the second relative height; the acquisition range of the first image acquisition device 3C1 and the second image acquisition device 3C2 at least covers the docking station.
[0076] The image workstation 7 receives the acquisition information of the first image acquisition device 3C1 and the second image acquisition device 3C2, and is used at least to calculate the actual height of the highest point of the ship based on the first height, the second height, the first relative height and the second relative height, and then determine whether the ship height meets the navigation height limit conditions.
[0077] Specifically, the image workstation 7 can measure the relative height between the highest point of the ship and the standard measuring rod 2 according to the images captured by the first image acquisition device 3C1 or the second image acquisition device 3C2. Figure 2As shown, the first relative height is the height of the intersection of the line between the image acquisition center of the first image acquisition device 3C1 and the highest point of the ship and the standard measuring rod 2 from the inspection station platform 1; the second relative height is the height of the intersection of the line between the image acquisition center of the second image acquisition device 3C2 and the highest point of the ship and the standard measuring rod 2 from the inspection station platform 1. In a specific embodiment, the first image acquisition device 3C1 and the second image acquisition device 3C2 are both cameras that can take photos and record videos, and the image acquisition center is the lens center of the camera. During the entire measurement process, the lens center is used as the reference position of the camera. For example, the first height is the height from the lens center of the first image acquisition device 3C1 to the ground of the inspection station platform 1.
[0078] Specifically, calculating the actual height of the highest point of the ship according to the first height, the second height, the first relative height, and the second relative height includes:
[0079]
[0080] Among them, hx represents the actual height of the highest point of the ship, ha represents the first relative height, hb represents the second relative height, hc1 represents the first height, and hc2 represents the second height.
[0081] In some embodiments, in order to improve calculation accuracy and system applicability, the highest point of the standard measuring rod 2 can be made higher than the highest point of the ship; the position of the first image acquisition device 3C1 can be made lower than the highest point of the ship, and the position of the second image acquisition device 3C2 can be made higher than the highest point of the ship.
[0082] After the calculation of the highest point of the ship is completed, the navigation height limit conditions can be determined in combination with the water level information.
[0083] Specifically, the system also includes a first water level gauge 103 and a second water level gauge 104; the first water level gauge 103 is arranged in the upstream navigation channel of the ship lift, and is used to collect upstream water level information; the second water level gauge 104 is arranged in the downstream navigation channel of the ship lift, and is used to collect downstream water level information; the image workstation 7 also receives the collected information of the first water level gauge 103 and the second water level gauge 104, and calculates the upstream limit clearance height according to the upstream water level information and the upstream limit elevation, and the difference between the upstream limit elevation and the upstream water level information is the upstream limit clearance height; calculates the downstream limit clearance height according to the downstream water level information and the downstream limit elevation, and the difference between the downstream limit elevation and the downstream water level information is the downstream limit clearance height. It can be understood that the upstream limit elevation and the downstream limit elevation are both known quantities, and the water level information is to be measured.
[0084] The image workstation 7 is also used to calculate the ship's clearance height according to the actual height of the highest point of the ship and the water level at the checkpoint platform 1; specifically, if the checkpoint platform 1 is located upstream, the upstream water level information is taken as the water level at the checkpoint platform 1, and if the checkpoint platform 1 is located downstream, the downstream water level information is taken as the water level at the checkpoint platform 1. Similarly, the ship's clearance height is the difference between the actual height of the highest point of the ship and the water level at the checkpoint platform 1.
[0085] The determination of whether the height of the ship meets the navigation height limit condition includes: determining whether the ship's clearance height is lower than the upstream clearance limit and / or the downstream clearance limit. The navigation height limit condition is met only when the ship's clearance height is lower than both the upstream clearance limit and the downstream clearance limit.
[0086] In some embodiments, the ship lift navigation height limit monitoring and warning system further includes: a transmission device and a display device. The transmission device receives the image information collected by the first image acquisition device 3C1 and the second image acquisition device 3C2, and transmits the image information to the image workstation 7; the display device is connected to the transmission device, and displays the video screen recorded by the image information.
[0087] In some embodiments, the ship lift navigation vessel height limit monitoring and warning system further includes: a navigation dispatching system and a navigation broadcasting system. The navigation dispatching system is connected to the image workstation 7 in communication, and the navigation dispatching system is used for the navigation dispatcher to analyze and control the operation status of the ship lift according to the calculation results and warning information sent by the image workstation 7; the navigation broadcasting system is connected to the navigation dispatching system in communication, and the navigation broadcasting system is used to convert the control and warning information sent by the navigation dispatching system into audio information and play it to the on-site commander of the ship lift and the navigation vessel operator.
[0088] In a specific embodiment, the transmission device includes a first video optical terminal 41, a second video optical terminal 42, a video distributor 5, a hard disk recorder 6 and an image side Ethernet switch 8; the display device includes a combined display screen 9; the general aviation dispatch system includes a dispatch side Ethernet switch 102 and a dispatch workstation 101; the general aviation broadcast system includes a broadcast side Ethernet switch 112, a broadcast workstation 111 and a broadcast speaker 113.
[0089] The signal transmission process in the height limit monitoring and early warning system for ships in the ship lift is as follows: the first image acquisition device 3C1 and the second image acquisition device 3C2 are connected to the first video optical terminal 41 through a video cable. The first video optical terminal 41 converts the electrical signal of the image acquisition device into an optical signal, and sends the optical signal to the second video optical terminal 42 through an optical cable. The second video optical terminal 42 then converts the optical signal into an electrical signal, and sends it to the video distributor 5 through a video cable. The video distributor 5 sends the signal to the hard disk recorder 6 and the combined display screen 9 through the video cable. The hard disk recorder 6 is used to store the video data collected by the first image acquisition device 3C1 and the second image acquisition device 3C2. The combined display screen 9 is used to display the video screen distributed by the video distributor 5, that is, to switch the display screen of the first image acquisition device 3C1 or the second image acquisition device 3C2. The hard disk recorder 6 is connected to the image side Ethernet switch 8 through a network cable. The image side Ethernet switch 8 is connected to the image workstation 7 through a network cable to realize the connection and control of the image workstation 7 with the hard disk recorder 6 and the video distributor 5. The image workstation 7 can read the video data in the hard disk recorder 6, retrieve the image of the first image acquisition device 3C1 or the second image acquisition device 3C2, calculate the height of the ship, determine whether the height of the navigable ship exceeds the standard, and transmit the result to the navigation dispatching system and the navigation broadcasting system through the network. That is, it is transmitted to the dispatching workstation 101 of the navigation dispatching system through the image side Ethernet switch 8 and the dispatching side Ethernet switch 102, and transmitted to the broadcasting workstation 111 of the navigation broadcasting system through the image side Ethernet switch 8 and the broadcasting side Ethernet switch 112. The dispatching workstation 101 can receive the calculation results and alarm information sent by the image workstation 7 for the navigation dispatcher to monitor and control the operation of the ship lift. The broadcasting workstation 111 can receive the control and alarm information of the dispatching workstation 101, and convert the control and alarm information into audio information and play it to the on-site commander of the ship lift and the navigable ship operator through the broadcasting speaker 113. The upstream water level meter and the downstream water level meter are connected to the dispatching workstation 101 of the navigation dispatching system through cables, and can measure the upstream and downstream water levels of the ship lift in real time. The upstream and downstream water level information of the ship lift can be sent to the image workstation 7 through the network for calculation of the actual headroom height of the ship, the upstream limit headroom height and the downstream limit headroom height.
[0090] In a specific embodiment, the navigation dispatch system includes a dispatch workstation 101, a local control unit LCU, a plant-level server, a touch screen, a network device, etc., which usually realizes the monitoring and control of the electrical equipment, mechanical equipment, and navigable ships of the ship lift. This embodiment only reflects part of the functions of the navigation dispatch system related to the height limit monitoring of the ship lift navigable ships. Similarly, the navigation broadcast system includes a broadcast workstation 111, a broadcast speaker 113, a power amplifier, a partition controller, a mixer, a microphone, a network device, etc., which usually receives instructions from the navigation dispatch system to automatically play navigation notice information, or the dispatcher operates to issue navigation notice information.
[0091] Other embodiments of the present invention provide a method for monitoring and warning of height restrictions on ships navigable via a ship lift.
[0092] The second embodiment of the present invention provides a method for monitoring and warning the height limit of a navigable ship in a ship lift, which uses the monitoring and warning system for monitoring and warning the height limit of a navigable ship in a ship lift as described in any of the above embodiments to perform monitoring and warning, and the method includes:
[0093] Confirm that the ship is docked at a designated position of the inspection station platform 1, wherein the designated position is at least within the image acquisition measurement range of the first image acquisition device 3C1 and the second image acquisition device 3C2;
[0094] The first image acquisition device 3C1 and the second image acquisition device 3C2 are used to respectively capture images of the ship at a set frequency; wherein the image of the ship records at least the height information of the highest point of the ship relative to the standard measuring rod 2;
[0095] Extracting height information of the highest point of the ship in the ship image relative to the standard measuring rod 2, measuring a first relative height and a second relative height; and then calculating the actual height of the highest point of the ship according to the first relative height, the second relative height, the first height and the second height; the calculating the actual height of the highest point of the ship according to the first relative height, the second relative height, the first height and the second height includes:
[0096] The actual height of the highest point of a ship is calculated based on each captured ship image, including:
[0097]
[0098] Among them, hx represents the actual height of the highest point of the ship corresponding to the x-th captured image, ha represents the first relative height, hb represents the second relative height, hc1 represents the first height, and hc2 represents the second height;
[0099] Among all the calculation results, the maximum value is selected as the actual height of the highest point of the ship confirmed in the end, including:
[0100]
[0101] Wherein, hmax represents the actual height of the highest point of the ship finally confirmed, and n represents the number of shots by the first image acquisition device and the second image acquisition device.
[0102] The actual height of the highest point of the ship is used to determine whether the height of the ship meets the navigation height limit conditions; if the navigation height limit conditions are met, a permission to pass command is issued; if the navigation height limit conditions are not met, a prohibition to pass command is issued.
[0103] In a specific embodiment, Figure 3 As shown, the method for monitoring and warning height limit of ships passing through a ship lift includes steps S1-S11.
[0104] S1. The dispatcher notifies the ship to be tested 13 to berth at the designated position of the inspection station platform 1, i.e., between the rear end berthing limit line 121 and the front end berthing limit line 122, through the broadcast workstation 111 of the navigation broadcast system and the broadcast loudspeaker 113. Figure 4 As shown, the designated position is the image acquisition measurement range of the first image acquisition device 3C1 and the second image acquisition device 3C2. Since the two image acquisition devices are fixed and do not need to be rotated, the measurement range can be preset with the rear end docking limit line 121 and the front end docking limit line 122, and marked on the river bank of the inspection station, providing a clear indication of the docking limit range for the ship.
[0105] S2. The vessel enters the inspection station along the specified waterway and docks at the designated location, that is, between the front end docking restriction line 122 and the rear end docking restriction line 121.
[0106] S3: The first image acquisition device 3C1 and the second image acquisition device 3C2 are automatically calibrated to ensure that the ship image can be clearly acquired.
[0107] S4: The first image acquisition device 3C1 and the second image acquisition device 3C2 take pictures and upload them to the navigation image monitoring system server, i.e., the image workstation 7. The server automatically identifies the edge contour of the ship through image recognition technology based on the images taken and uploaded by the first image acquisition device 3C1 and the second image acquisition device 3C2, and determines whether the bow and stern of the ship are in the measurable area, i.e., between the rear end docking limit line 121 and the front end docking limit line 122. If both the bow and stern of the ship are within the measurable area, it is considered that the ship is within the measurable area, and step S7 is executed. Otherwise, it is considered unmeasurable, and step S5 is executed.
[0108] S5. When the ship is not within the measurable area, the image workstation 7 sends a warning message of "ship berthing beyond the limit" to the dispatch workstation 101 of the navigation dispatch system through the network.
[0109] S6. After the dispatcher confirms the operation on the dispatch workstation 101, the dispatch workstation 101 of the navigation dispatch system transmits the alarm information of "ship berthing beyond the limit" to the broadcast workstation 111 of the navigation broadcast system through the network. The broadcast workstation 111 sends a voice message, which is played to the on-site commander of the ship lift and the navigation ship operator through the broadcast loudspeaker 113, notifying the ship to be tested 13 to adjust the berthing position, and the ship re-executes step S2.
[0110] S7: When the ship is within the measurable area, the first image acquisition device 3C1 and the second image acquisition device 3C2 simultaneously capture images at a set frequency and send them to the image workstation 7. The frequency setting method includes:
[0111] Collection frequency f: collect ship images at a frequency of f times per minute;
[0112] Number of collections n: a total of n ship images are collected for calculation;
[0113] The values of f and n are set according to the influence of wind speed, waves, etc. on the ship height measurement. According to engineering experience, f = 60 and n = 10 are generally taken.
[0114] S8. Image workstation 7 calculates the height of the ship in the following manner:
[0115] See again Figure 2 At the construction site, the standard measuring rod 2, the first image acquisition device 3C1, the second image acquisition device 3C2 and the support column 3 are all fixedly installed. It can be measured on site that the height of the first image acquisition device 3C1 is hc1, the height of the second image acquisition device 3C2 is hc2, and the distance between the support column 3 and the standard measuring rod 2 is d. Each time the first image acquisition device 3C1 and the second image acquisition device 3C2 capture the image at the same time. Figure 5 As shown, the image workstation 7 can measure the relative heights between the highest point of the ship and the standard measuring rod 2, namely the first relative height ha and the second relative height hb, respectively, based on the images captured by the first image acquisition device 3C1 or the second image acquisition device 3C2.
[0116] according to Figure 2 The geometric relationship shown can be used to calculate the actual height of the highest point of the ship:
[0117]
[0118] Among them, hx represents the actual height of the highest point of the ship corresponding to the xth captured image; the actual height of the highest point of the ship corresponding to the remaining (n-1) captured images is calculated in the same way. Among all the calculation results, the maximum value is selected as the final confirmed actual height of the highest point of the ship, including:
[0119]
[0120] Wherein, hmax represents the actual height of the highest point of the ship finally confirmed, and n represents the number of shots by the first image acquisition device and the second image acquisition device.
[0121] S9, the image workstation 7 determines whether the ship height hmax meets the navigation limit condition. The method for determining the navigation limit condition is as follows:
[0122] Determine the actual clearance height hs of the ship, that is, the difference between hmax and the water level at platform 1 of the checkpoint. If the checkpoint is located upstream, the upstream water level is taken as the checkpoint water level, otherwise the downstream water level is taken. The upstream water level and the downstream water level can be obtained through the upstream water level gauge and the downstream water level gauge, and sent to the dispatching workstation 101101 of the navigation dispatching system, and then sent to the image workstation 7 via the network.
[0123] Determine the upstream limit clearance height hs1, which is the difference between the upstream limit elevation and the upstream water level;
[0124] Determine the downstream limit clearance height hs2, which is the difference between the downstream limit elevation and the downstream water level;
[0125] The actual clearance height hs of the ship must be less than both the upstream limit clearance height hs1 and the downstream limit clearance height hs2.
[0126] If hmax meets the navigation height limit condition, step S10 is executed; otherwise, step S11 is executed.
[0127] S10. When the actual clearance height hs of the ship is less than both the upstream limit clearance height hs1 and the downstream limit clearance height hs2, the image workstation 7 sends an "allow passage" instruction to the dispatch workstation 101 of the navigation dispatch system through the network. After confirmation by the dispatcher, the dispatch workstation 101 transmits the "allow passage" instruction to the broadcast workstation 111 of the navigation broadcast system through the network. The broadcast workstation 111 sends a voice message, which is played to the on-site commander of the ship lift and the navigation ship operator through the broadcast loudspeaker 113, notifying that the ship is allowed to enter the ship lift.
[0128] S11. When the actual clearance height hs of the ship is greater than or equal to the upstream limit clearance height hs1 and the downstream limit clearance height hs2, the image workstation 7 sends a "no passage" instruction to the dispatch workstation 101 of the navigation dispatch system through the network. After confirmation by the dispatcher, the dispatch workstation 101 transmits the "no passage" instruction to the broadcast workstation 111 of the navigation broadcast system through the network. The broadcast workstation 111 sends a voice message and plays it to the on-site commander of the ship lift and the navigation ship operator through the broadcast speaker 113, notifying that the ship is prohibited from entering the ship lift.
[0129] In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0130] Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A height limit monitoring and early warning system for ships passing through a ship lift, characterized in that: include: Checkpoint platform, used for docking ships; A standard measuring rod is set up on the side of the inspection station platform close to the ship; A first image acquisition device is disposed on a side of the inspection station platform away from the ship, and the first image acquisition device has a first height from the inspection station platform; A second image acquisition device is arranged in the same vertical plane as the first image acquisition device and is located at a different horizontal plane, the vertical distance between the first image acquisition device and the standard measuring rod is equal to the vertical distance between the second image acquisition device and the standard measuring rod; the second image acquisition device has a second height from the inspection station platform; The first image acquisition device and the second image acquisition device have the same acquisition direction and are respectively used to acquire the relative height of the highest point of the ship relative to the standard measuring rod, the relative height of the highest point of the ship acquired by the first image acquisition device is defined as the first relative height, and the relative height of the highest point of the ship acquired by the second image acquisition device is defined as the second relative height; The image workstation receives the acquisition information of the first image acquisition device and the second image acquisition device, and is used at least to calculate the actual height of the highest point of the ship based on the first height, the second height, the first relative height and the second relative height, and then determine whether the height of the ship meets the navigation height limit conditions.
2. The height limit monitoring and early warning system for ships passing through a ship lift according to claim 1 is characterized in that: The first relative height is the height from the inspection station platform to the intersection of the line between the image acquisition center of the first image acquisition device and the highest point of the ship and the standard measuring rod; The second relative height is the height from the inspection station platform to the intersection of the line between the image acquisition center of the second image acquisition device and the highest point of the ship and the standard measuring rod; The step of calculating the actual height of the highest point of the ship according to the first height, the second height, the first relative height and the second relative height comprises: Among them, hx represents the actual height of the highest point of the ship, ha represents the first relative height, hb represents the second relative height, hc1 represents the first height, and hc2 represents the second height.
3. The height limit monitoring and early warning system for ships passing through a ship lift according to claim 2 is characterized in that: The highest point of the standard measuring rod is higher than the highest point of the ship; the position of the first image acquisition device is lower than the highest point of the ship, and the position of the second image acquisition device is higher than the highest point of the ship.
4. The height limit monitoring and early warning system for ships passing through a ship lift according to claim 1 is characterized in that: The inspection station platform is provided with a front end docking restriction line and a rear end docking restriction line, and a docking position is formed between the front end docking restriction line and the rear end docking restriction line, and the docking position is used to limit the docking position of the ship; The acquisition ranges of the first image acquisition device and the second image acquisition device at least cover the parking station.
5. The height limit monitoring and early warning system for ships passing through a ship lift according to claim 1 is characterized in that: Also includes: A support column is arranged on the platform of the inspection station, and the first image acquisition device and the second image acquisition device are arranged at different heights of the support column; The connecting line between the support column and the standard measuring rod is perpendicular to the ship docking edge of the inspection station platform.
6. The height limit monitoring and early warning system for ships passing through a ship lift according to claim 1 is characterized in that: Also includes: The first water level gauge is arranged in the upstream pilot channel of the ship lift and is used to collect upstream water level information; The second water level gauge is arranged in the pilot channel downstream of the ship lift and is used to collect downstream water level information; The image workstation also receives the collected information of the first water level meter and the second water level meter, and calculates the upstream limit clearance height according to the upstream water level information and the upstream limit elevation, and calculates the downstream limit clearance height according to the downstream water level information and the downstream limit elevation; The image workstation is also used to calculate the ship's headroom height based on the actual height of the highest point of the ship and the water level at the inspection station platform; The determining whether the height of the ship satisfies the navigation height limit condition includes: determining whether the ship's clearance height is lower than the upstream clearance height limit and / or the downstream clearance height limit.
7. The ship lift navigation vessel height limit monitoring and early warning system according to claim 1 is characterized in that: Also includes: A transmission device, receiving image information acquired by the first image acquisition device and the second image acquisition device, and transmitting the image information to the image workstation; The display device is connected to the transmission device and displays the video screen recorded with the image information.
8. The height limit monitoring and early warning system for ships passing through a ship lift according to claim 1 is characterized in that: Also includes: A navigation dispatching system, which is in communication with the image workstation, and is used for the navigation dispatcher to analyze and control the operation status of the ship lift according to the calculation results and warning information sent by the image workstation; The navigation broadcasting system is connected to the navigation dispatching system for converting the control and warning information sent by the navigation dispatching system into audio information and playing it to the on-site commander of the ship lift and the navigation vessel operator.
9. A method for monitoring and warning height limit of ships passing through a ship lift, characterized in that: The method of using the ship lift navigation ship height limit monitoring and early warning system as claimed in any one of claims 1 to 8 to perform monitoring and early warning includes: Confirming that the ship is docked at a designated location on the platform of the inspection station, wherein the designated location is at least within the image acquisition measurement range of the first image acquisition device and the second image acquisition device; Using the first image acquisition device and the second image acquisition device to respectively capture images of the ship at a set frequency; wherein the image of the ship records at least the height information of the highest point of the ship relative to the standard measuring rod; Extracting height information of the highest point of the ship in the ship image relative to a standard measuring rod, measuring a first relative height and a second relative height; and then calculating the actual height of the highest point of the ship according to the first relative height, the second relative height, the first height, and the second height; The actual height of the highest point of the ship is used to determine whether the height of the ship meets the navigation height limit conditions; if the navigation height limit conditions are met, a permission to pass command is issued; if the navigation height limit conditions are not met, a prohibition to pass command is issued.
10. The method for monitoring and warning height limit of ships passing through a ship lift according to claim 9, characterized in that: The method of calculating the actual height of the highest point of the ship according to the first relative height, the second relative height, the first height and the second height comprises: The actual height of the highest point of a ship is calculated based on each captured ship image, including: Among them, hx represents the actual height of the highest point of the ship corresponding to the x-th captured image, ha represents the first relative height, hb represents the second relative height, hc1 represents the first height, and hc2 represents the second height; Among all the calculation results, the maximum value is selected as the actual height of the highest point of the ship confirmed in the end, including: Wherein, hmax represents the actual height of the highest point of the ship finally confirmed, and n represents the number of shots by the first image acquisition device and the second image acquisition device.
Citation Information
Cited By
Ship navigation height measuring method, device, equipment and medium
CN120063138A
