Power distribution network reconstruction method based on multiple iterative calculations

Through multiple iterative calculations and local topology analysis, the automatic mode adjustment of the distribution network is achieved, solving the problems of poor timeliness and difficulty in computing in the existing technology, reducing the risk of power grid operation, and improving power supply reliability.

CN119010040APending Publication Date: 2024-11-22STATE GRID TIANJIN ELECTRIC POWER COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411138891.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The adjustment of the existing distribution network method cannot be automated, resulting in poor timeliness, reduced power supply reliability, and the inability to intelligently optimize the regional network, which is limited by the difficulty of calculation.

Method used

The distribution network reconstruction method based on multiple iterative calculations is adopted. By scanning all feeders, the load rate is judged, the supply scheme is analyzed, the target load reduction is calculated, the scheduling switch is found using multiple rules, and the local incremental topology analysis is carried out. , realize automated monitoring and implementation of transfer plans.

Benefits of technology

It reduces the workload of dispatchers, ensures timeliness, reduces the operating risks of power grids, realizes load balancing of regional feeders, avoids local optimal solutions, and improves power supply reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119010040A_ABST
    Figure CN119010040A_ABST
Patent Text Reader

Abstract

The invention relates to a power distribution network reconstruction method based on multiple iterative calculations. The method comprises the following steps: scanning all feeder lines; judging whether the load rate of the feeder line is greater than 0, if so, analyzing the next feeder line, otherwise, topologically analyzing the opposite-side line, and acquiring the load rate of the opposite-side line; calculating the load unbalance rate of the local side line and the opposite side line; judging whether the load unbalance rate is greater than a threshold value or not, and if so, recording the feeder ID; otherwise, analyzing the next feeder line, and finishing all analysis until the last feeder line is analyzed. The method solves the inconvenience that a scheme needs to be issued manually during power distribution network mode adjustment, the program is automatically monitored and executed, the workload of scheduling personnel is reduced, the timeliness is ensured, and the operation risk of the power grid is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of power grid dispatching, and in particular to a distribution network reconstruction method based on multiple iterative calculations. Background Art

[0002] With the development of power grids and society, the degree of automation of distribution networks has gradually deepened. At the same time, the access rate of diversified loads such as distributed power sources, electric vehicles, and energy storage in distribution networks has gradually increased. The existing adjustment strategy can no longer meet the requirements for rapid adjustment and optimal operation of distribution networks.

[0003] Network reconstruction is a distribution network based on automation upgrade and transformation. It monitors the load rate of distribution lines in real time, and recombines and optimizes the network operation structure by changing the open and close states of section switches and tie switches to achieve the goals of isolating faults, reducing network losses, eliminating overloads, balancing loads, and improving voltage quality.

[0004] However, the existing distribution network adjustment method has the following defects:

[0005] First, the traditional method of adjustment cannot be realized automatically. When the line load rate exceeds the limit, a manual transfer plan must be given, which cannot guarantee the timeliness of the adjustment, making the power grid unable to operate economically and reducing the reliability of power supply. At the same time, it increases the workload of the on-duty dispatcher and places higher demands on the dispatcher's professional level. Secondly, the traditional method of adjustment cannot be realized intelligently. Due to the complex structure of the distribution network and the uneven distribution of power flow, the traditional method cannot carry out balanced analysis and adjustment of the line load, and is limited by the difficulty of calculation and cannot achieve the optimal adjustment of the regional network. Summary of the invention

[0006] The purpose of the present invention is to overcome the shortcomings of the prior art and propose a distribution network reconstruction method based on multiple iterative calculations, which solves the inconvenience of manually issuing plans for distribution network mode adjustment. The program automatically monitors and executes, reduces the workload of dispatchers, ensures timeliness, and reduces the risk of power grid operation.

[0007] The present invention solves the technical problem by adopting the following technical solutions:

[0008] A distribution network reconstruction method based on multiple iterative calculations includes the following steps:

[0009] Step 1, scan all feeders;

[0010] Step 2: Determine whether the load rate of the line is greater than 0. If so, proceed to step 3; otherwise, continue to analyze the next line.

[0011] Step 3: Analyze the power transfer plan of the line on this side, find the tie switch that can transfer power, analyze the transfer plan for each tie switch, and obtain the load rate of the line on the opposite side;

[0012] Step 4: determine whether the load rate of the opposite line is greater than the threshold value. If so, analyze the next tie switch; otherwise, proceed to step 5.

[0013] Step 5: Calculate the target load shedding amount and the allowable transfer amount of the borrowed power line, and determine whether the target load shedding amount is less than the transfer amount. If so, proceed to the first sub-process, otherwise proceed to the second sub-process.

[0014] Moreover, the first sub-process in step 5 includes the following steps:

[0015] Step 6: Find the switch to be separated according to rule 1, and determine whether it is found. If it is found, calculate the load flow change after the transfer, and re-scan the main transformer and line load rate, otherwise proceed to step 7;

[0016] Step 7: Find the quasi-separation according to rule 2, and determine whether the quasi-separation switch is found. If the quasi-separation switch is found, set the quasi-separation switch and the fitting switch, and analyze the local incremental topology. Otherwise, proceed to the second sub-process.

[0017] Moreover, the specific implementation method of the second sub-process in step 7 is:

[0018] Step 8: Find the switch to be split according to rule 3, and determine whether the switch to be split is found. If found, proceed to the third sub-process, otherwise analyze the next route.

[0019] Moreover, the third sub-process in step 8 includes the following steps:

[0020] Step 9: Search for a transfer plan based on the opposite load, and determine whether the opposite line is transferred to this side. If so, analyze the next line, otherwise proceed to step 10;

[0021] Step 10, determine whether the opposite side borrowing power line is overloaded, if so, analyze the next line, otherwise proceed to step 11;

[0022] Step 11, determine whether the line on this side can be transferred to the opposite side, if so, proceed to step 12, otherwise analyze the next line;

[0023] Step 12: Find the quasi-split switch according to rule 2, and determine whether the quasi-split switch is found. If found, set the quasi-split switch and the fitting switch, perform local incremental topological analysis on the displaced switch, and proceed to the fourth sub-process. Otherwise, analyze the next line.

[0024] Moreover, the fourth sub-process in step 12 includes the following steps:

[0025] Step 13: Perform a second topology search on the local line, and search for the opposite line. If the local line is transferred to the opposite line and remains unchanged, proceed to step 14; if the local line is transferred to the opposite line and changes, proceed to step 17;

[0026] Step 14, determine whether the transfer amount on the opposite side is greater than the transfer amount on the local side, if so, proceed to step 15, otherwise proceed to step 16;

[0027] Step 15: The secondary transfer is successful, the transfer plan is saved, the proposed split switches and fitting switches on this side are set, and the local incremental topology analysis is performed on the displaced switches. The analysis of this line is completed, and the next line is searched;

[0028] Step 16: If the secondary transfer fails, the proposed split switch and the fitting switch on the opposite side are restored to their original mode, and a local incremental topological analysis is performed on the displaced switch. The analysis of this line is completed, and the next line is searched;

[0029] Step 17: Determine whether the opposite side is overloaded. If so, proceed to step 15; otherwise, proceed to step 16.

[0030] Moreover, the first rule in step 6 is: preferentially search from the tie switch to the main grid load, and find a switch with a transfer amount greater than the target and less than the allowable transfer amount on the opposite side as the proposed split switch.

[0031] Moreover, the second rule in step 7 is: search from the main grid load to the tie switch, and find a switch whose transfer amount is smaller than the allowable transfer amount on the opposite side as the quasi-dividing switch.

[0032] Moreover, the third rule in step 8 is: the actual transfer amount on this side is calculated as being greater than the target amount on this side, and the switch to be separated on this side is found.

[0033] The advantages and positive effects of the present invention are:

[0034] 1. The present invention scans all feeders; determines whether the load rate of the feeder is greater than 0, if less, analyzes the next feeder, otherwise topologically analyzes the opposite line and obtains the load rate of the opposite line; calculates the load imbalance rate of the line on this side and the opposite line; determines whether the load imbalance rate is greater than the threshold value, if greater, records the feeder ID; otherwise, analyzes the next feeder, and ends all analyses after the analysis of the last feeder is completed. The present invention solves the inconvenience of manually issuing a plan for adjusting the distribution network mode, and the program automatically monitors and executes, reducing the workload of dispatchers, ensuring timeliness, and reducing the risk of power grid operation.

[0035] 2. The startup judgment logic of the present invention is changed to add the feeder load imbalance rate startup condition, which plays a role in balancing the load and reducing network loss.

[0036] 3. The results of the present invention are calculated through multiple iterations, with the overall balance of regional feeders as the goal, to avoid the transfer scheme from falling into a local optimal solution.

[0037] 4. The power transfer scheme of the present invention comprehensively considers the protection configuration and power supply reliability, and conforms to the actual operation status of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is the mainstream flow chart of the present invention;

[0039] Figure 2 is the first sub-flow chart of the present invention;

[0040] Figure 3 is the second sub-flow chart of the present invention;

[0041] Figure 4 is the third sub-flow chart of the present invention;

[0042] Figure 5 This is the fourth sub-flow chart of the present invention. DETAILED DESCRIPTION

[0043] The present invention is further described in detail below with reference to the accompanying drawings.

[0044] A distribution network reconstruction method based on multiple iterative calculations, such as Figures 1 to 5 The following steps are shown:

[0045] Step 1, scan all feeders;

[0046] Step 2: Determine whether the load rate of the line is greater than 0. If so, proceed to step 3; otherwise, continue to analyze the next line.

[0047] Step 3: Analyze the power transfer plan of the line on this side, find the tie switch that can transfer power, analyze the transfer plan for each tie switch, and obtain the load rate of the line on the opposite side;

[0048] Step 4: determine whether the load rate of the opposite line is greater than the threshold value. If so, analyze the next tie switch; otherwise, proceed to step 5.

[0049] Step 5: Calculate the target load shedding amount and the allowable transfer amount of the borrowed power line, and determine whether the target load shedding amount is less than the transfer amount. If so, proceed to the first sub-process, otherwise proceed to the second sub-process.

[0050] The first sub-process includes the following steps:

[0051] Step 6: Find the switch to be separated according to rule 1, and determine whether it is found. If it is found, calculate the load flow change after the transfer, and re-scan the main transformer and line load rate, otherwise proceed to step 7;

[0052] Step 7: Find the quasi-separation according to rule 2, and determine whether the quasi-separation switch is found. If the quasi-separation switch is found, set the quasi-separation switch and the fitting switch, and analyze the local incremental topology. Otherwise, proceed to the second sub-process.

[0053] The specific implementation method of the second sub-process is:

[0054] Step 8: Find the switch to be split according to rule 3, and determine whether the switch to be split is found. If found, proceed to the third sub-process, otherwise analyze the next route.

[0055] The third sub-process includes the following steps:

[0056] Step 9: Search for a transfer plan based on the opposite load, and determine whether the opposite line is transferred to this side. If so, analyze the next line, otherwise proceed to step 10;

[0057] Step 10, determine whether the opposite side borrowing power line is overloaded, if so, analyze the next line, otherwise proceed to step 11;

[0058] Step 11, determine whether the line on this side can be transferred to the opposite side, if so, proceed to step 12, otherwise analyze the next line;

[0059] Step 12: Find the quasi-split switch according to rule 2, and determine whether the quasi-split switch is found. If found, set the quasi-split switch and the fitting switch, perform local incremental topological analysis on the displaced switch, and proceed to the fourth sub-process. Otherwise, analyze the next line.

[0060] The fourth sub-process includes the following steps:

[0061] Step 13: Perform a second topology search on the local line, and search for the opposite line. If the local line is transferred to the opposite line and remains unchanged, proceed to step 14; if the local line is transferred to the opposite line and changes, proceed to step 17;

[0062] Step 14, determine whether the transfer amount on the opposite side is greater than the transfer amount on the local side, if so, proceed to step 15, otherwise proceed to step 16;

[0063] Step 15: The secondary transfer is successful, the transfer plan is saved, the proposed split switches and fitting switches on this side are set, and the local incremental topology analysis is performed on the displaced switches. The analysis of this line is completed, and the next line is searched;

[0064] Step 16: If the secondary transfer fails, the proposed split switch and the fitting switch on the opposite side are restored to their original mode, and a local incremental topological analysis is performed on the displaced switch. The analysis of this line is completed, and the next line is searched;

[0065] Step 17: Determine whether the opposite side is overloaded. If so, proceed to step 15; otherwise, proceed to step 16.

[0066] The main process of the present invention is:

[0067] Step 1: Analyze the power transfer plan of the line on this side and find the contact switch that can transfer power;

[0068] Step 2: Analyze the possible transfer options for each tie switch;

[0069] Step 3: Calculate the target load reduction:

[0070] The larger value of the target load reduction calculated by the threshold value and the target load reduction calculated by the average load rate shall be the final target load reduction;

[0071] Step 4: Determine the transfer quantity allowed by the route:

[0072] Allowable transfer capacity = maximum allowable load of the line - current load of the line.

[0073] 4.1 The first case: the target load shedding is less than the allowable transfer-in amount, and it is possible to achieve the transfer-out target. The actual transfer amount on this side is calculated as less than the allowable transfer-in amount on the opposite side. Here, two rules are used to search for the proposed switch;

[0074] Rule 1: Prioritize the search from the tie switch to the main grid load, and find a switch with a load greater than the target transfer amount and less than the allowable transfer amount on the opposite side as the proposed split switch;

[0075] If the proposed split switch cannot be found under Rule 1, then Rule 2 is used: search from the main grid load to the tie switch, and find a switch with a smaller transfer capacity than the opposite side as the proposed split switch;

[0076] 4.1.1 After finding the switch to be split, perform the following operations;

[0077] 4.1.2 Update the load of the outgoing and incoming lines; update the status of the proposed split switches and fitting switches;

[0078] 4.1.3 Rescan the load rate of the main transformer and the line; recalculate the line load deviation rate; if the switch state changes, it is necessary to re-search the local topology;

[0079] 4.1.4 Exit the analysis of this line directly and search for the next line. That is, only one plan is given for a line, and there are multiple transfer plans for this line. After finding an execution plan, search for the next line (it must be based on the operation mode of this search);

[0080] 4.2 The second case: If no transfer solution is found for the tie switch, consider secondary transfer of the opposite line;

[0081] The target outflow is greater than the allowed inflow. The transfer may cause overload on the opposite side. Only part of the target can be transferred out, and the transfer target cannot be achieved. The only way is to transfer part of the opposite side line first, and then transfer the load of the local line.

[0082] 4.2.1 Analyze the actual transfer quantity on this side based on the target quantity on this side;

[0083] Rule 3: The actual transfer quantity on this side is calculated as being greater than the target quantity on this side, and the switch to be split on this side is found;

[0084] 4.2.2 Analysis of secondary power transfer scheme: analysis of power transfer scheme for opposite line;

[0085] Search for the power transfer plan for the opposite line;

[0086] 4.2.3 Calculate the allowable transfer volume of the opposite belt line, the allowable transfer volume of the local belt line, and the actual transfer volume of the local belt line according to the target;

[0087] The actual transfer amount on this side according to the target should be less than the allowable transfer amount on this side and the opposite side. If the actual transfer amount on this side according to the target is greater than the allowable transfer amount on this side and the opposite side, analyze the next contact switch;

[0088] Search for the switch on the opposite side to be split, and transfer out according to the maximum amount that can be transferred on the opposite side. Transfer according to the maximum allowable transfer-in amount;

[0089] Therefore, here we only search for the proposed split switch of the opposite line according to rule 2;

[0090] 4.2.4 The other side finds a supply transfer solution;

[0091] When the switch state changes, the local topology search needs to be performed again, which will affect the subsequent incremental topology analysis.

[0092] Re-analyze the local power transfer plan based on the secondary power transfer plan;

[0093] Step 4: Re-analyze the transfer plan on the local side based on the secondary transfer plan;

[0094] Secondary topology analysis and power transfer scheme on this side;

[0095] Determine whether the line transferred from this side to the other side has changed;

[0096] Determine whether the secondary supply transfer plan is effective;

[0097] (1) After the transfer to the opposite side, the route from this side to the opposite side remains unchanged;

[0098] The amount actually transferred out of the opposite side is greater than the amount transferred from the local side to the opposite side. The opposite side will not be overloaded and the solution is effective. The amount actually transferred out of the opposite side is less than the amount transferred from the local side to the opposite side, and the local side still cannot transfer to the opposite side;

[0099] After the transfer to the opposite side, the line transferred from this side to the opposite side has changed, that is, the connecting part between the opposite side line and the local line has been transferred to other lines through secondary transfer.

[0100] After completing the load transfer analysis of a line in the "Snowflake Network", the system will re-analyze the network load based on the changes in the mode. If the "Snowflake Network" can still meet the conditions for starting network reconstruction, a second network reconstruction analysis will be conducted. Finally, the final mode will be determined through multiple iterations, and the corresponding mode adjustment plan will be given.

[0101] It should be emphasized that the embodiments described in the present invention are illustrative rather than restrictive. Therefore, the present invention includes but is not limited to the embodiments described in the specific implementation manner. Any other implementation manners derived by those skilled in the art based on the technical solution of the present invention also fall within the scope of protection of the present invention.

Claims

1. A distribution network reconstruction method based on multiple iterative calculations, characterized in that: The following steps are involved: Step 1, scan all feeders; Step 2: Determine whether the load rate of the line is greater than 0. If so, proceed to step 3; otherwise, continue to analyze the next line. Step 3: Analyze the power transfer plan of the line on this side, find the tie switch that can transfer power, analyze the transfer plan for each tie switch, and obtain the load rate of the line on the opposite side; Step 4: determine whether the load rate of the opposite line is greater than the threshold value. If so, analyze the next tie switch; otherwise, proceed to step 5. Step 5: Calculate the target load shedding amount and the allowable transfer amount of the borrowed power line, and determine whether the target load shedding amount is less than the transfer amount. If so, proceed to the first sub-process, otherwise proceed to the second sub-process.

2. A distribution network reconstruction method based on multiple iterative calculations according to claim 1, characterized in that: The first sub-process in step 5 includes the following steps: Step 6: Find the switch to be separated according to rule 1, and determine whether it is found. If it is found, calculate the load flow change after the transfer, and re-scan the main transformer and line load rate, otherwise proceed to step 7; Step 7: Find the quasi-separation according to rule 2, and determine whether the quasi-separation switch is found. If the quasi-separation switch is found, set the quasi-separation switch and the fitting switch, and analyze the local incremental topology. Otherwise, proceed to the second sub-process.

3. A distribution network reconstruction method based on multiple iterative calculations according to claim 2, characterized in that: The specific implementation method of the second sub-process in step 7 is: Step 8: Find the switch to be split according to rule 3, and determine whether the switch to be split is found. If found, proceed to the third sub-process, otherwise analyze the next route.

4. The method for power distribution network reconstruction based on multiple iterative calculations according to claim 3 is characterized in that: The third sub-process in step 8 includes the following steps: Step 9: Search for a transfer plan based on the opposite load, and determine whether the opposite line is transferred to this side. If so, analyze the next line, otherwise proceed to step 10; Step 10, determine whether the opposite side borrowing power line is overloaded, if so, analyze the next line, otherwise proceed to step 11; Step 11, determine whether the line on this side can be transferred to the opposite side, if so, proceed to step 12, otherwise analyze the next line; Step 12: Find the quasi-split switch according to rule 2, and determine whether the quasi-split switch is found. If found, set the quasi-split switch and the fitting switch, perform local incremental topological analysis on the displaced switch, and proceed to the fourth sub-process. Otherwise, analyze the next line.

5. A distribution network reconstruction method based on multiple iterative calculations according to claim 4, characterized in that: The fourth sub-process in step 12 includes the following steps: Step 13: Perform a second topology search on the local line, and search for the opposite line. If the local line is transferred to the opposite line and remains unchanged, proceed to step 14; if the local line is transferred to the opposite line and changes, proceed to step 17; Step 14, determine whether the transfer amount on the opposite side is greater than the transfer amount on the local side, if so, proceed to step 15, otherwise proceed to step 16; Step 15: The secondary transfer is successful, the transfer plan is saved, the proposed split switches and fitting switches on this side are set, and the local incremental topology analysis is performed on the displaced switches. The analysis of this line is completed, and the next line is searched; Step 16: If the secondary transfer fails, the proposed split switch and the fitting switch on the opposite side are restored to their original mode, and a local incremental topological analysis is performed on the displaced switch. The analysis of this line is completed, and the next line is searched; Step 17: Determine whether the opposite side is overloaded. If so, proceed to step 15; otherwise, proceed to step 16.

6. A distribution network reconstruction method based on multiple iterative calculations according to claim 2, characterized in that: The first rule in step 6 is: preferentially search from the tie switch to the main grid load, and find a switch with a larger transfer amount than the target transfer amount and smaller than the allowable transfer amount on the opposite side as the proposed split switch.

7. A distribution network reconstruction method based on multiple iterative calculations according to claim 2, characterized in that: The second rule in step 7 is: search from the main grid load to the tie switch, and find a switch with a smaller transfer amount than the opposite side's allowable transfer amount as the quasi-dividing switch.

8. The method for power distribution network reconstruction based on multiple iterative calculations according to claim 3, characterized in that: The third rule in step 8 is: the actual transfer quantity on this side is calculated as being greater than the target quantity on this side, and the switch to be split on this side is found.