By introducing industrial and commercial loads and transformer converters into the photovoltaic-storage-charging-inspection system, and combining AC meter data, the real-time power of industrial and commercial loads is calculated, realizing intelligent power supply regulation during peak and off-peak hours. This solves the problem that the photovoltaic-storage-charging-inspection system cannot be compatible with industrial and commercial electricity demands, reduces electricity costs, and improves system efficiency.
Patent Information
- Application Number
- CN202410956298.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-07-17
AI Technical Summary
Existing photovoltaic, energy storage, charging, and inspection systems are not compatible with industrial and commercial electricity demands and cannot effectively adjust power supply strategies during peak and off-peak periods to optimize electricity costs.
By introducing industrial and commercial loads into the photovoltaic-storage-charging-testing system, utilizing the regulation functions of the front-end transformer and energy storage converter, and combining the data acquisition of AC meters, the real-time power demand of industrial and commercial loads is calculated. Different control strategies are adopted during peak and valley periods, prioritizing the use of energy storage batteries or external power grid to meet the power demand of industrial and commercial loads.
The photovoltaic-storage-charging-testing system has achieved compatibility with the power demand of industrial and commercial loads, reduced peak-hour electricity costs, and improved the utilization rate of the front-end transformer.
Smart Images

Figure CN119010130A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of energy storage, and in particular to a method and a terminal for a photovoltaic storage charging and testing system to be compatible with industrial and commercial electricity demand. Background Art
[0002] In recent years, with the continuous development of the energy storage industry, various forms of energy storage have emerged one after another, such as: pumped energy storage, compressed air energy storage, flywheel energy storage, electrochemical energy storage, etc. Among them, industrial and commercial energy storage and photovoltaic energy storage systems are two common and typical forms of energy storage. Among them, industrial and commercial energy storage uses peak shaving to fill valleys. During valleys, the energy storage battery is fully charged with power from the grid, and during peaks, the energy storage battery is released to the customer's AC load (such as power supply for buildings, power supply for important equipment, etc.). Normally, discharge to the grid is not allowed, and the peak-valley power difference is used to make profits. The main equipment is energy storage batteries and PCS. The difference of the photovoltaic energy storage system is that the DC bus architecture is used to add DCDC and charging piles. The energy storage battery only charges the charging piles and does not supply power to the grid or customer loads.
[0003] Most of the existing technologies are independent of each other in industrial and commercial energy storage and photovoltaic energy storage and charging system solutions, without considering the system application that photovoltaic energy storage and charging systems can be compatible with industrial and commercial energy storage. That is, photovoltaic energy storage and charging systems are used alone to charge electric vehicles, without considering the use scenario of discharging to the power grid or industrial and commercial energy storage customer loads. Even if the PCS configured in it has bidirectional charging and discharging functions, it is generally only used to charge the battery. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a method and a terminal for a photovoltaic storage charging and inspection system to be compatible with industrial and commercial electricity demand, so as to solve the problem that the photovoltaic storage charging and inspection system is not compatible with industrial and commercial electricity demand.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0006] A method for making a photovoltaic storage charging and inspection system compatible with industrial and commercial electricity demand, the method for making a photovoltaic storage charging and inspection system compatible with industrial and commercial electricity demand is applied to a photovoltaic storage charging and inspection architecture, the photovoltaic storage charging and inspection architecture includes a front-end transformer, an industrial and commercial load, an AC meter and an energy storage converter, the front-end transformer is electrically connected to an external power grid, the energy storage converter and the industrial and commercial load are electrically connected to the front-end transformer respectively, and the AC meter is used to collect power data output by the front-end transformer;
[0007] The method comprises the steps of:
[0008] S1. Obtain the collected power of the AC meter and the real-time power of the energy storage converter, and calculate the real-time power of the industrial and commercial load according to the collected power of the AC meter and the real-time power of the energy storage converter;
[0009] S2, detect the power consumption period, if the power consumption period is the peak period, execute step S3; if the power consumption period is the valley period, execute step S4;
[0010] S3, judging whether there is a charging demand in the photovoltaic storage charging and inspection system, and if there is no charging demand, controlling the energy storage battery in the photovoltaic storage charging and inspection system to supply power to the industrial and commercial load according to the real-time power of the industrial and commercial load;
[0011] S4. Determine whether there is a charging demand in the photovoltaic storage charging and inspection system. If there is a charging demand, control the front-end transformer to meet the real-time power of the industrial and commercial load and then combine with the energy storage battery in the photovoltaic storage charging and inspection system to meet the charging demand.
[0012] In order to solve the above technical problems, another technical solution adopted by the present invention is:
[0013] A terminal for a photovoltaic storage charging and inspection system compatible with industrial and commercial electricity demand includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, steps in a method for a photovoltaic storage charging and inspection system compatible with industrial and commercial electricity demand are completed.
[0014] The beneficial effects of the present invention include at least: providing a method and terminal for a photovoltaic storage charging and testing system to be compatible with industrial and commercial electricity demand, by connecting industrial and commercial loads between the front-end transformer and the energy storage converter, and using the adjustment functions of the front-end transformer and the energy storage converter to jointly meet the electricity demand of the industrial and commercial loads; in the execution step, the real-time power required by the industrial and commercial loads is calculated by collecting the power data output by the front-end transformer and the real-time power of the energy storage converter through the AC meter, and different control strategies are adopted for the peak and valley periods of electricity consumption, specifically:
[0015] During peak hours, the principle is to reduce the power supply from the external power grid. When there is no charging demand for the photovoltaic storage charging and inspection system, the energy storage batteries in the photovoltaic storage charging and inspection system are mainly used to power the industrial and commercial loads, thereby reducing the electricity costs of the industrial and commercial loads. During valley hours, the principle is to give priority to the use of the external power grid. After ensuring that the demand for industrial and commercial loads is met, the front-end transformer is used to combine the surplus power with the energy storage battery to meet the charging demand of the photovoltaic storage charging and inspection system. The above method improves the utilization rate of the front-end transformer, while achieving the compatibility of the photovoltaic storage charging and inspection system with the power demand of industrial and commercial loads. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a flow chart of a method for a photovoltaic storage charging and testing system to be compatible with industrial and commercial electricity demand in an embodiment of the present invention;
[0017] Figure 2 A peak power consumption control flow chart of a method for a photovoltaic storage charging and testing system to be compatible with industrial and commercial power demand in an embodiment of the present invention;
[0018] Figure 3 A flow chart of off-peak electricity consumption control in a method for a photovoltaic storage charging and testing system to be compatible with industrial and commercial electricity demand in an embodiment of the present invention;
[0019] Figure 4 A flowchart of normal power consumption control in a method for making a photovoltaic storage charging and testing system compatible with industrial and commercial power demand in an embodiment of the present invention;
[0020] Figure 5 This is an architecture diagram of a photovoltaic storage charging and testing system compatible with industrial and commercial electricity demand in an embodiment of the present invention;
[0021] Figure 6 A schematic diagram of a terminal that is compatible with industrial and commercial electricity demand in a photovoltaic storage charging and testing system according to an embodiment of the present invention;
[0022] Description of labels:
[0023] 1. A terminal for a photovoltaic storage, charging and testing system that is compatible with industrial and commercial electricity needs; 2. Memory; 3. Processor. DETAILED DESCRIPTION
[0024] In order to explain the technical content, achieved objectives and effects of the present invention in detail, the following is an explanation in combination with the implementation modes and the accompanying drawings.
[0025] Please refer to Figure 1 and Figure 5 , a method for making a photovoltaic storage charging and inspection system compatible with industrial and commercial electricity demand, characterized in that: the method for making a photovoltaic storage charging and inspection system compatible with industrial and commercial electricity demand is applied to a photovoltaic storage charging and inspection architecture, the photovoltaic storage charging and inspection architecture includes a front-end transformer, an industrial and commercial load, an AC meter and an energy storage converter, the front-end transformer is electrically connected to an external power grid, the energy storage converter and the industrial and commercial load are electrically connected to the front-end transformer respectively, and the AC meter is used to collect power data output by the front-end transformer;
[0026] The method comprises the steps of:
[0027] S1. Obtain the collected power of the AC meter and the real-time power of the energy storage converter, and calculate the real-time power of the industrial and commercial load according to the collected power of the AC meter and the real-time power of the energy storage converter;
[0028] S2, detect the power consumption period, if the power consumption period is the peak period, execute step S3; if the power consumption period is the valley period, execute step S4;
[0029] S3, judging whether there is a charging demand in the photovoltaic storage charging and inspection system, and if there is no charging demand, controlling the energy storage battery in the photovoltaic storage charging and inspection system to supply power to the industrial and commercial load according to the real-time power of the industrial and commercial load;
[0030] S4. Determine whether there is a charging demand in the photovoltaic storage charging and inspection system. If there is a charging demand, control the front-end transformer to meet the real-time power of the industrial and commercial load and then combine with the energy storage battery in the photovoltaic storage charging and inspection system to meet the charging demand.
[0031] From the above description, it can be seen that the beneficial effects of the present invention are: by connecting the industrial and commercial load between the front-end transformer and the energy storage converter, the power demand of the industrial and commercial load is met by utilizing the adjustment functions of the front-end transformer and the energy storage converter; in the execution step, the real-time power required by the industrial and commercial load is calculated by collecting the power data output by the front-end transformer and the real-time power of the energy storage converter through the AC meter, and different control strategies are adopted for the peak and valley periods of electricity consumption, specifically:
[0032] During peak hours, the principle is to reduce the power supply from the external power grid. When there is no charging demand for the photovoltaic storage charging and inspection system, the energy storage batteries in the photovoltaic storage charging and inspection system are mainly used to power the industrial and commercial loads, thereby reducing the electricity costs of the industrial and commercial loads. During valley hours, the principle is to give priority to the use of the external power grid. After ensuring that the demand for industrial and commercial loads is met, the front-end transformer is used to combine the surplus power with the energy storage battery to meet the charging demand of the photovoltaic storage charging and inspection system. The above method improves the utilization rate of the front-end transformer, while achieving the compatibility of the photovoltaic storage charging and inspection system with the power demand of industrial and commercial loads.
[0033] In an embodiment of the present invention, step S1 specifically includes the following steps:
[0034] Get the collected power P of the AC meter m and the real-time power P of the energy storage converter a , the real-time power P of the industrial and commercial load is calculated according to the following formula f =P m -P a .
[0035] From the above description, it can be seen that since the power demand of industrial and commercial loads changes in real time, it is difficult to measure directly. Therefore, the power data of the front-end transformer and the energy storage converter are used for calculation. The specific principle is: in actual use, the power of the front-end transformer is first guaranteed to be used for the customer's AC load, and the remaining part is then given to the photovoltaic storage and energy storage system. That is, the power output of the front-end transformer collected by the AC meter is supplied to the photovoltaic storage and energy storage system and the industrial and commercial load. The difference between the two can be used to obtain the real-time power P of the industrial and commercial load. f .
[0036] Please refer to Figure 2 In an embodiment of the present invention, step S3 specifically includes the following steps:
[0037] S31, obtaining the state of charge of the energy storage battery in the photovoltaic storage charging and testing system, if the state of charge meets the preset threshold, proceeding to step S32; otherwise, proceeding to step S33;
[0038] S32, determining whether there is a charging demand in the photovoltaic storage charging and inspection system, and if there is no charging demand, controlling the energy storage battery in the photovoltaic storage charging and inspection system to supply power to the industrial and commercial load according to the real-time power of the industrial and commercial load;
[0039] S33, determining whether there is a charging demand in the photovoltaic storage charging and inspection system, and if there is a charging demand, controlling the front-end transformer to meet the real-time power of the industrial and commercial load to meet the charging demand of the photovoltaic storage charging and inspection system.
[0040] From the above description, it can be seen that since the energy storage battery of the photovoltaic storage charging and inspection system has a poor state of charge, different control strategies are adopted for the energy storage battery with sufficient state of charge and poor state of charge, specifically:
[0041] When it is peak time and the energy storage battery is sufficiently charged, step S32 specifically includes the following steps:
[0042] S321, determining whether there is a charging demand in the photovoltaic storage charging and inspection system, and if so, controlling the energy storage battery of the photovoltaic storage charging and inspection system to preferentially meet the charging demand; if there is no charging demand, executing the next step;
[0043] S322, determine the maximum transmission power P of the energy storage battery b Can it meet the real-time power P of industrial and commercial loads? f , if it can be satisfied, then the transmission power of the energy storage battery is controlled to be equal to P f If it cannot be met, the energy storage battery is controlled to transmit at the maximum power P b Transmit and combine with the front-end transformer to obtain power from the external power grid.
[0044] That is, the principle is that the solar storage charging and detection system gives priority to meeting the charging needs within the system. When there is no charging demand in the system, the power of the solar storage charging and detection system is used to supply power to the industrial and commercial loads. During the process, if P b Unable to meet P f , the energy storage battery is controlled to operate at the maximum transmission power, and the surplus power is supplemented by the front-end transformer from the external power grid to reduce the cost of peak electricity consumption.
[0045] Preferably, the step S322 further includes the steps of:
[0046] When it is detected that the photovoltaic storage charging and detection system supplies power to the industrial and commercial load, the collected power P of the AC meter is detected in real time. m If P is detected m If the value is less than 0 and the duration exceeds the preset time, an alarm will be triggered.
[0047] From the above description, it can be seen that when the photovoltaic storage charging and testing system discharges to the outside, it detects in real time whether a reverse current occurs. If a reverse current fault occurs, the discharge is stopped to prevent the remaining power from being connected to the grid. Specifically, the preset duration ranges from 8 to 15 seconds, preferably 10 seconds.
[0048] When the energy storage battery is in a peak period and the state of charge is poor, step S33 specifically includes the following steps:
[0049] S331. Obtain the maximum transmission power P of the front-end transformer t ;
[0050] S332, calculate and obtain the maximum power P that the front-end transformer can supply to the photovoltaic storage charging and testing system at the current stage g =P t -(P m -P a );
[0051] S333, determining the maximum power P supplied to the optical storage charging and testing system g Whether the requested power P can meet the charging demand v If it cannot be satisfied, the output power of the optical storage charging and testing system is limited to P g If it can be satisfied, then the output power of the optical storage charging and testing system is limited to P v .
[0052] From the above description, it can be seen that when the peak time is reached and the energy storage battery is not in good charge state, only the front-end transformer can be used to charge the industrial and commercial loads and the photovoltaic storage charging and testing system. The implementation principle is that the output power of the front-end transformer gives priority to meeting the industrial and commercial loads, and the surplus power is used to charge the photovoltaic storage charging and testing system. When the surplus power is not enough to meet the charging demand of the photovoltaic storage charging and testing system, the output power of the photovoltaic storage charging and testing system is limited to P g .
[0053] Please refer to Figure 3 In an embodiment of the present invention, the step S4 specifically includes the steps of:
[0054] S41, obtaining the state of charge of the energy storage battery in the photovoltaic storage charging and testing system, if the state of charge meets the preset threshold, proceeding to step S42; otherwise, proceeding to step S43;
[0055] S42, determining whether there is a charging demand in the photovoltaic storage charging and inspection system, and if there is a charging demand, controlling the front-end transformer to meet the real-time power of the industrial and commercial load and then combining with the energy storage battery in the photovoltaic storage charging and inspection system to jointly meet the charging demand;
[0056] S43, judging whether there is a charging demand in the photovoltaic storage charging and inspection system, if there is a charging demand, controlling the front-end transformer to meet the real-time power of the industrial and commercial load before meeting the charging demand; if there is no charging demand, controlling the front-end transformer to meet the real-time power of the industrial and commercial load before charging the energy storage battery.
[0057] From the above description, it can be seen that since the energy storage battery of the photovoltaic storage charging and inspection system has a poor state of charge, different control strategies are adopted for the energy storage battery with sufficient state of charge and poor state of charge, specifically:
[0058] When it is valley time and the state of charge of the energy storage battery is sufficient, the step S42 specifically includes the following steps:
[0059] S421. Obtain the maximum transmission power P of the front-end transformer t ;
[0060] S422, calculate and obtain the maximum power P that the front-end transformer can supply to the photovoltaic storage charging and testing system at the current stage g =P t -(P m -P a );
[0061] S423, determining the maximum power P supplied to the optical storage charging and testing system g and the maximum transmission power P of the energy storage battery b The sum of the power P and the charging demand can meet the charging demand. v If it cannot be satisfied, the output power of the optical storage charging and testing system is limited to P g +P b If it can be satisfied, then the output power of the optical storage charging and testing system is limited to P v .
[0062] That is, at the current stage, due to the low electricity price, the external power grid is used for power supply first, and the energy storage battery of the photovoltaic storage charging and inspection system is prohibited from supplying power to the industrial and commercial loads. That is, after the front-end transformer is used to meet the demand of the industrial and commercial loads, how much surplus power can be supplied to the photovoltaic storage charging and inspection system (P g ), and then calculate P g +P b Whether the charging demand can be met and adjustments are made according to step S423.
[0063] When it is valley time and the state of charge of the energy storage battery is not good, the step S43 specifically includes the following steps:
[0064] S431, determine whether there is a charging demand in the light storage charging detection system, if there is no charging demand, control the front-end transformer to charge the energy storage battery, and control the charging power to be equal to P g; If there is a need for charging, proceed to the next step;
[0065] S432, determining the maximum power P supplied to the optical storage charging and testing system g Whether the requested power P can meet the charging demand v If it cannot be satisfied, the output power of the optical storage charging and testing system is limited to P g If the demand can be met, the output power of the optical storage charging and testing system is limited to P v , and use the remaining power to charge the energy storage battery.
[0066] From the above description, it can be seen that at the current stage, the energy storage battery cannot supply power and relies entirely on the power transmission of the external power grid. The specific control process is to control the front-end transformer to give priority to meeting the industrial and commercial loads and transmit the remaining power to the photovoltaic storage charging and testing system. During the process, if P g If the charging demand can be met, the remaining power is used to charge the energy storage battery.
[0067] Please refer to Figure 6 A terminal for a photovoltaic storage charging and inspection system compatible with industrial and commercial electricity demand includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps in a method for a photovoltaic storage charging and inspection system compatible with industrial and commercial electricity demand are completed.
[0068] The present invention provides a method and terminal for a photovoltaic storage charging and testing system to be compatible with industrial and commercial electricity demand, which is mainly used for the photovoltaic storage charging and testing system to supply power to industrial and commercial loads. The following is a specific description in conjunction with an embodiment:
[0069] Please refer to Figure 1 and Figure 5 , Embodiment 1 of the present invention is:
[0070] A method for making a photovoltaic storage charging and inspection system compatible with industrial and commercial electricity demand, characterized in that: the method for making a photovoltaic storage charging and inspection system compatible with industrial and commercial electricity demand is applied to a photovoltaic storage charging and inspection architecture, the photovoltaic storage charging and inspection architecture includes a front-end transformer, an industrial and commercial load, an AC meter and an energy storage converter, the front-end transformer is electrically connected to an external power grid, the energy storage converter and the industrial and commercial load are electrically connected to the front-end transformer respectively, and the AC meter is used to collect power data output by the front-end transformer;
[0071] The method comprises the steps of:
[0072] S1. Obtain the collected power of the AC meter and the real-time power of the energy storage converter, and calculate the real-time power of the industrial and commercial load according to the collected power of the AC meter and the real-time power of the energy storage converter;
[0073] S2, detect the power consumption period, if the power consumption period is the peak period, execute step S3; if the power consumption period is the valley period, execute step S4;
[0074] S3, judging whether there is a charging demand in the photovoltaic storage charging and inspection system, if there is no charging demand, controlling the energy storage battery in the photovoltaic storage charging and inspection system to supply power to the industrial and commercial loads according to the real-time power of the industrial and commercial loads;
[0075] S4. Determine whether there is a charging demand in the photovoltaic storage charging and inspection system. If there is a charging demand, control the front-end transformer to meet the real-time power of the industrial and commercial load and then combine with the energy storage battery in the photovoltaic storage charging and inspection system to meet the charging demand.
[0076] That is, in this embodiment, the industrial and commercial load is connected between the front-end transformer and the energy storage converter, and the regulation functions of the front-end transformer and the energy storage converter are used to jointly meet the power demand of the industrial and commercial load; in the execution step, the real-time power required by the industrial and commercial load is calculated by collecting the power data output by the front-end transformer and the real-time power of the energy storage converter through the AC meter, and different control strategies are adopted for the peak and valley periods of electricity consumption, specifically:
[0077] During peak hours, the principle is to reduce the power supply from the external power grid. When there is no charging demand for the photovoltaic storage charging and inspection system, the energy storage batteries in the photovoltaic storage charging and inspection system are mainly used to power the industrial and commercial loads, thereby reducing the electricity costs of the industrial and commercial loads. During valley hours, the principle is to give priority to the use of the external power grid. After ensuring that the demand for industrial and commercial loads is met, the front-end transformer is used to combine the surplus power with the energy storage battery to meet the charging demand of the photovoltaic storage charging and inspection system. The above method improves the utilization rate of the front-end transformer, while achieving the compatibility of the photovoltaic storage charging and inspection system with the power demand of industrial and commercial loads.
[0078] Embodiment 2 of the present invention is:
[0079] Based on the first embodiment, step S1 specifically includes the following steps:
[0080] Get the collected power P of the AC meter m and the real-time power P of the energy storage converter a , the real-time power P of the industrial and commercial load is calculated according to the following formula f =P m -P a In actual use, the power of the front-end transformer is first guaranteed to be used for the customer's AC load, and the remaining part is then given to the photovoltaic storage and energy storage system. That is, the power output of the front-end transformer collected by the AC meter is supplied to the photovoltaic storage and energy storage system and the industrial and commercial load. The difference between the two can be used to obtain the real-time power P of the industrial and commercial load. f .
[0081] Please refer to Figure 2 , Embodiment 3 of the present invention is:
[0082] Based on the second embodiment, step S3 specifically includes the following steps:
[0083] S31, obtaining the state of charge of the energy storage battery in the photovoltaic storage charging and testing system, if the state of charge meets the preset threshold, proceeding to step S32; otherwise, proceeding to step S33;
[0084] When it is peak time and the energy storage battery is sufficiently charged, step S32 specifically includes the following steps:
[0085] S321, determining whether there is a charging demand in the photovoltaic storage charging and inspection system. If there is a charging demand, controlling the energy storage battery of the photovoltaic storage charging and inspection system to preferentially meet the charging demand; if there is no charging demand, executing the next step;
[0086] S322, determine the maximum transmission power P of the energy storage battery b Can it meet the real-time power P of industrial and commercial loads? f , if it can be satisfied, then the transmission power of the energy storage battery is controlled to be equal to P f If it cannot be met, the energy storage battery is controlled to transmit at the maximum power P b Transmit and combine with the front-end transformer to obtain power from the external power grid.
[0087] That is, the principle is that the solar storage charging and detection system gives priority to meeting the charging needs within the system. When there is no charging demand in the system, the power of the solar storage charging and detection system is used to supply power to the industrial and commercial loads. During the process, if P b Unable to meet P f , the energy storage battery is controlled to operate at the maximum transmission power, and the surplus power is supplemented by the front-end transformer from the external power grid to reduce the cost of peak electricity consumption.
[0088] Specifically, step S322 further includes the steps of:
[0089] When it is detected that the solar storage charging and testing system is supplying power to the industrial and commercial loads, the collected power P of the AC meter is detected in real time. m If P is detected m If the value is less than 0 and the duration exceeds the preset time, an alarm will be triggered.
[0090] From the above description, it can be seen that when the photovoltaic storage charging and testing system discharges to the outside, it detects in real time whether a reverse current occurs. If a reverse current fault occurs, the discharge is stopped to prevent the remaining power from being connected to the grid.
[0091] When the energy storage battery is in a peak period and the state of charge is poor, step S33 specifically includes the following steps:
[0092] S331. Obtain the maximum transmission power P of the front-end transformer t ;
[0093] S332. Calculate and obtain the maximum power P that the front-end transformer can supply to the photovoltaic storage charging and testing system at the current stage g =P t -(Pm -P a );
[0094] S333, determine the maximum power P supplied to the optical storage charging and testing system g Whether the requested power P can meet the charging demand v If it cannot be satisfied, the output power of the optical storage charging and testing system is limited to P g If it can be satisfied, then the output power of the optical storage charging and testing system is limited to P v .
[0095] From the above description, it can be seen that when the peak time is reached and the energy storage battery is not in good charge state, only the front-end transformer can be used to charge the industrial and commercial loads and the photovoltaic storage charging and testing system. The implementation principle is that the output power of the front-end transformer gives priority to meeting the industrial and commercial loads, and the surplus power is used to charge the photovoltaic storage charging and testing system. When the surplus power is not enough to meet the charging demand of the photovoltaic storage charging and testing system, the output power of the photovoltaic storage charging and testing system is limited to P g .
[0096] Please refer to Figure 3 , Embodiment 4 of the present invention is:
[0097] On the basis of the second embodiment, in the embodiment of the present invention, step S4 specifically includes the steps of:
[0098] S41, obtaining the state of charge of the energy storage battery in the photovoltaic storage charging and testing system, if the state of charge meets the preset threshold, proceeding to step S42; otherwise, proceeding to step S43;
[0099] When it is valley time and the state of charge of the energy storage battery is sufficient, step S42 specifically includes the following steps:
[0100] S421. Obtain the maximum transmission power P of the front-end transformer t ;
[0101] S422, calculate and obtain the maximum power P that the front-end transformer can supply to the photovoltaic storage charging and testing system at the current stage g =P t -(P m -P a );
[0102] S423, determine the maximum power P supplied to the optical storage charging and testing system g and the maximum transmission power P of the energy storage battery b Whether the sum can meet the charging demand of the requested power P v If it cannot be satisfied, the output power of the optical storage charging and testing system is limited to P g +P b If it can be satisfied, then the output power of the optical storage charging and testing system is limited to P v .
[0103] That is, at the current stage, due to the low electricity price, the external power grid is used for power supply first, and the energy storage battery of the photovoltaic storage charging and inspection system is prohibited from supplying power to the industrial and commercial loads. That is, after the front-end transformer is used to meet the demand of the industrial and commercial loads, how much surplus power can be supplied to the photovoltaic storage charging and inspection system (P g ), and then calculate P g +P b Whether the charging demand can be met and adjustments are made according to step S423.
[0104] When it is valley time and the state of charge of the energy storage battery is not good, step S43 specifically includes the following steps:
[0105] S431, determine whether there is a charging demand in the light storage charging detection system. If there is no charging demand, control the front-end transformer to charge the energy storage battery and control the charging power to be equal to P g ; If there is a need for charging, proceed to the next step;
[0106] S432, determine the maximum power P supplied to the optical storage charging and testing system g Whether the requested power P can meet the charging demand v If it cannot be satisfied, the output power of the optical storage charging and testing system is limited to P g If the demand can be met, the output power of the optical storage charging and testing system is limited to P v , and use the remaining power to charge the energy storage battery.
[0107] That is, the energy storage battery cannot supply power at the current stage and relies entirely on the power transmission of the external power grid. The specific control process is to control the front-end transformer to give priority to the industrial and commercial loads and transmit the remaining power to the photovoltaic storage charging and inspection system. During the process, if P g If the charging demand can be met, the remaining power is used to charge the energy storage battery.
[0108] Please refer to Figure 4 , Embodiment 5 of the present invention is:
[0109] On the basis of the second embodiment, step S2 further includes the following steps: if the power usage period is normal (normal power usage period), then executing step S5:
[0110] S51, obtaining the state of charge of the energy storage battery in the photovoltaic storage charging and testing system, if the state of charge meets the preset threshold, proceeding to step S52; otherwise, proceeding to step S53;
[0111] When the energy storage battery is normally charged sufficiently, step S52 specifically includes the following steps:
[0112] S521, determining whether there is a charging demand in the photovoltaic storage charging and inspection system. If there is a charging demand, controlling the energy storage battery of the photovoltaic storage charging and inspection system to preferentially meet the charging demand; if there is no charging demand, executing the next step;
[0113] S522, determine the maximum transmission power P of the energy storage battery b Can it meet the real-time power P of industrial and commercial loads? f , if it can be satisfied, then the transmission power of the energy storage battery is controlled to be equal to P f If it cannot be met, the energy storage battery is controlled to transmit at the maximum power P b Transmit and combine with the front-end transformer to obtain power from the external power grid.
[0114] That is, the principle is that the solar storage charging and detection system gives priority to meeting the charging needs within the system. When there is no charging demand in the system, the power of the solar storage charging and detection system is used to supply power to the industrial and commercial loads. During the process, if P b Unable to meet P f , the energy storage battery is controlled to operate at the maximum transmission power, and the surplus power is supplemented by the front-end transformer from the external power grid, reducing the cost of normal electricity consumption.
[0115] Preferably, step S522 further includes the steps of:
[0116] When it is detected that the solar storage charging and testing system is supplying power to the industrial and commercial loads, the collected power P of the AC meter is detected in real time. m If P is detected m If the value is less than 0 and the duration exceeds the preset time, an alarm will be triggered.
[0117] From the above description, it can be seen that when the photovoltaic storage charging and testing system discharges to the outside, it detects in real time whether a reverse current occurs. If a reverse current fault occurs, the discharge is stopped to prevent the remaining power from being connected to the grid.
[0118] When the state of charge of the energy storage battery is poor, step S53 specifically includes the following steps:
[0119] S531. Obtain the maximum transmission power P of the front-end transformer t ;
[0120] S532, calculate and obtain the maximum power P that the front-end transformer can supply to the photovoltaic storage charging and testing system at the current stage g =P t -(P m -P a );
[0121] S533, determine the maximum power P supplied to the optical storage charging and testing system g Whether the requested power P can meet the charging demand v If it cannot be satisfied, the output power of the optical storage charging and testing system is limited to Pg If it can be satisfied, then the output power of the optical storage charging and testing system is limited to P v .
[0122] S534: If it is detected that the solar storage charging inspection system has no charging demand, then g Charge the energy storage battery.
[0123] When the energy storage battery is not in good charge state, the front-end transformer can only be used to charge the industrial and commercial loads and the photovoltaic storage charging and testing system. The implementation principle is that the output power of the front-end transformer is used to meet the industrial and commercial loads first, and the surplus power is used to charge the photovoltaic storage charging and testing system. When the surplus power is not enough to meet the charging demand of the photovoltaic storage charging and testing system, the output power of the photovoltaic storage charging and testing system is limited to P g .
[0124] Please refer to Figure 6 The sixth embodiment of the present invention is: a terminal 1 of a photovoltaic storage charging and inspection system compatible with industrial and commercial electricity demand, including a memory 2, a processor 3, and a computer program stored in the memory 2 and executable on the processor 3. When the processor 2 executes the computer program, the steps in any one of the methods of the photovoltaic storage charging and inspection system compatible with industrial and commercial electricity demand in embodiments one to five are completed.
[0125] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent transformations made using the contents of the present invention's specification and drawings, or directly or indirectly applied in related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A method for making a photovoltaic storage charging and testing system compatible with industrial and commercial electricity demand, characterized by: The method for making the photovoltaic storage charging and detection system compatible with the industrial and commercial electricity demand is applied to a photovoltaic storage charging and detection architecture, which includes a front-end transformer, an industrial and commercial load, an AC meter and an energy storage converter, wherein the front-end transformer is electrically connected to an external power grid, the energy storage converter and the industrial and commercial load are electrically connected to the front-end transformer respectively, and the AC meter is used to collect power data output by the front-end transformer; The method comprises the steps of: S1. Obtain the collected power of the AC meter and the real-time power of the energy storage converter, and calculate the real-time power of the industrial and commercial load according to the collected power of the AC meter and the real-time power of the energy storage converter; S2, detect the power consumption period, if the power consumption period is the peak period, execute step S3; if the power consumption period is the valley period, execute step S4; S3, judging whether there is a charging demand in the photovoltaic storage charging and inspection system, and if there is no charging demand, controlling the energy storage battery in the photovoltaic storage charging and inspection system to supply power to the industrial and commercial load according to the real-time power of the industrial and commercial load; S4. Determine whether there is a charging demand in the photovoltaic storage charging and inspection system. If there is a charging demand, control the front-end transformer to meet the real-time power of the industrial and commercial load and then combine with the energy storage battery in the photovoltaic storage charging and inspection system to meet the charging demand.
2. According to claim 1, a method for making a photovoltaic storage charging and testing system compatible with industrial and commercial electricity demand is characterized by: The step S1 specifically includes the following steps: Get the collected power P of the AC meter m and the real-time power P of the energy storage converter a , the real-time power P of the industrial and commercial load is calculated according to the following formula f =P m -P a .
3. The method for making a photovoltaic storage charging and testing system compatible with industrial and commercial electricity demand according to claim 2, characterized in that: The step S3 specifically comprises the following steps: S31, obtaining the state of charge of the energy storage battery in the photovoltaic storage charging and testing system, if the state of charge meets the preset threshold, proceeding to step S32; otherwise, proceeding to step S33; S32, determining whether there is a charging demand in the photovoltaic storage charging and inspection system, and if there is no charging demand, controlling the energy storage battery in the photovoltaic storage charging and inspection system to supply power to the industrial and commercial load according to the real-time power of the industrial and commercial load; S33, determining whether there is a charging demand in the photovoltaic storage charging and inspection system, and if there is a charging demand, controlling the front-end transformer to meet the real-time power of the industrial and commercial load to meet the charging demand of the photovoltaic storage charging and inspection system.
4. The method for making a photovoltaic storage charging and testing system compatible with industrial and commercial electricity demand according to claim 3, characterized in that: The step S32 specifically includes the following steps: S321, determining whether there is a charging demand in the photovoltaic storage charging and inspection system, and if so, controlling the energy storage battery of the photovoltaic storage charging and inspection system to preferentially meet the charging demand; if there is no charging demand, executing the next step; S322, determine the maximum transmission power P of the energy storage battery b Can it meet the real-time power P of industrial and commercial loads? f , if it can be satisfied, then the transmission power of the energy storage battery is controlled to be equal to P f If it cannot be met, the energy storage battery is controlled to transmit at the maximum power P b Transmit and combine with the front-end transformer to obtain power from the external power grid.
5. The method for making a photovoltaic storage charging and testing system compatible with industrial and commercial electricity demand according to claim 4, characterized in that: The step S322 further includes the steps of: When it is detected that the photovoltaic storage charging and detection system supplies power to the industrial and commercial load, the collected power P of the AC meter is detected in real time. m If P is detected m If the value is less than 0 and the duration exceeds the preset time, an alarm will be triggered.
6. The method for making a photovoltaic storage charging and testing system compatible with industrial and commercial electricity demand according to claim 3, characterized in that: The step S33 specifically includes the following steps: S331. Obtain the maximum transmission power P of the front-end transformer t ; S332, calculate and obtain the maximum power P that the front-end transformer can supply to the photovoltaic storage charging and testing system at the current stage g =P t -(P m -P a ); S333, determining the maximum power P supplied to the optical storage charging and testing system g Whether the requested power P can meet the charging demand v If it cannot be satisfied, the output power of the optical storage charging and testing system is limited to P g If it can be satisfied, then the output power of the optical storage charging and testing system is limited to P v .
7. The method for making a photovoltaic storage charging and testing system compatible with industrial and commercial electricity demand according to claim 2, characterized in that: The step S4 specifically comprises the following steps: S41, obtaining the state of charge of the energy storage battery in the photovoltaic storage charging and testing system, and if the state of charge meets the preset threshold, proceeding to step S42; Otherwise, proceed to step S43; S42, determining whether there is a charging demand in the photovoltaic storage charging and inspection system, and if there is a charging demand, controlling the front-end transformer to meet the real-time power of the industrial and commercial load and then combining with the energy storage battery in the photovoltaic storage charging and inspection system to jointly meet the charging demand; S43, determine whether there is a charging demand in the photovoltaic storage charging and testing system. If there is a charging demand, control the front-end transformer to meet the real-time power of the industrial and commercial load before meeting the charging demand; if there is no charging demand, control the front-end transformer to meet the real-time power of the industrial and commercial load before charging the energy storage battery.
8. The method for making a photovoltaic storage charging and testing system compatible with industrial and commercial electricity demand according to claim 7, characterized in that: The step S42 specifically includes the following steps: S421. Obtain the maximum transmission power P of the front-end transformer t ; S422, calculate and obtain the maximum power P that the front-end transformer can supply to the photovoltaic storage charging and testing system at the current stage g =P t -(P m -P a ); S423, determining the maximum power P supplied to the optical storage charging and testing system g and the maximum transmission power P of the energy storage battery b The sum of the power P and the charging demand can meet the charging demand. v If it cannot be satisfied, the output power of the optical storage charging and testing system is limited to P g +P b If it can be satisfied, then the output power of the optical storage charging and testing system is limited to P v .
9. The method for making a photovoltaic storage charging and testing system compatible with industrial and commercial electricity demand according to claim 8, characterized in that: The step S43 specifically includes the following steps: S431, determine whether there is a charging demand in the light storage charging detection system, if there is no charging demand, control the front-end transformer to charge the energy storage battery, and control the charging power to be equal to P g ; If there is a need for charging, proceed to the next step; S432, determining the maximum power P supplied to the optical storage charging and testing system g Whether the requested power P can meet the charging demand v If it cannot be satisfied, the output power of the optical storage charging and testing system is limited to P g If the demand can be met, the output power of the optical storage charging and testing system is limited to P v , and use the remaining power to charge the energy storage battery.
10. A terminal for a photovoltaic storage charging and testing system compatible with industrial and commercial electricity demand, characterized by: The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps in the method for making a photovoltaic storage charging and testing system compatible with industrial and commercial electricity demand as described in any one of claims 1 to 9 are completed.
Citation Information
Patent Citations
Optical storage charging station energy scheduling method and terminal for automobile charging reservation
CN115593266A
Power control method and control device for direct-current optical storage and charging system and storage medium
CN115622123A
Logic selection method and architecture of optical storage charging inspection system
CN117081142A
Method of Controlling of Battery Energy Storage System of Power System with High Dynamic Loads
US20230294544A1