Power management method for integrated configuration

By optimizing power generation arrangements and charging state target arrangements and controlling power supply in the power plant, the problems of life damage and power reduction of energy storage systems are solved, and more efficient energy management and system life extension are achieved.

CN119013866APending Publication Date: 2024-11-22GAMESA INNOVATION & TECH SL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380032904.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-02-07
Filing Date
2023-01-27
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Existing power management methods lead to continuous circulation of energy storage systems and excessive power reduction, which damages system life and increases financial losses.

Method used

By determining power generation arrangements, charging state target arrangements and power injection arrangements over a predefined time frame, controlling the power composition supplied by renewable power generation equipment and energy storage systems, optimizing energy management and control to extend the life of the energy storage system and reduce power reduce.

Benefits of technology

It effectively extends the life of the energy storage system, reduces power reduction, optimizes the power supply of power plants to public connection points, and improves the overall efficiency and financial performance of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119013866A_ABST
    Figure CN119013866A_ABST
Patent Text Reader

Abstract

A power management method for a hybrid power plant (100) having an integrated configuration, the method comprising: determining a power generation schedule (205) defining power generation of the power plant (100) during a predefined time range on the basis of forecast parameters (204); determining a state-of-charge target (207) of the energy storage system (120) during the predefined time range on the basis of the forecast parameter (204); determining a power injection schedule (206) of the power plant (100) defining a power supply to an electrical grid (140) during the predefined time range on the basis of the power generation schedule (205); wherein within the predefined time range, the method comprises: supplying power of the power plant (100) to the common connection point (101) on the basis of the power injection schedule (207), the composition of the supplied power consisting of power from the renewable power plant (110) and the energy storage system (120) is controlled on the basis of the power injection arrangement (206) and the state of charge target (207).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a power management method for a power plant comprising at least one type of renewable power generation equipment and an energy storage system. Background Art

[0002] A power plant comprising renewable power generation equipment and an energy storage system is often controlled by a power management system which determines, on the basis of some forecast parameters, within a predefined time range, a power injection schedule that can be supplied to a grid controller to which the power plant is connected. The management system transmits the determined power injection schedule to the grid controller and then receives the submitted power injection schedule from the grid controller. The submitted power injection schedule represents an obligation for the power plant management system, which then controls the supply of power from the renewable power generation equipment and from the energy storage system to a common connection point between the two and the grid during a predefined time range with the purpose of satisfying the submitted power injection schedule. Typically, the submitted power injection schedule does not allow the supply of more or less power than the power foreseen in the submitted power injection schedule within a predefined tolerable deviation margin.

[0003] However, a power management method based on maintaining a specific power injection may be disadvantageous because it tends to constantly correct the composition of the power supply, resulting in a constant cycle of the energy storage system, which is permanently charged or discharged depending on whether the renewable power generation equipment provides sufficient energy to meet the submitted power injection schedule. In addition, since the power management method disclosed in the prior art supplies the power of the power plant to the common connection point according to the submitted power injection schedule, the excess power from the power plant cannot be supplied to the common connection point, but must be reduced or stored in the energy storage system, thereby increasing the energy storage system battery.

[0004] Both disadvantages explained above result in a higher usage of the energy storage system, which has a negative impact on the life of the energy storage system, or in a reduction in the generated power, resulting in financial losses.

[0005] There may be a need to improve the lifetime of energy storage systems by means of new power management methods for power plants. Summary of the invention

[0006] This need may be met by the subject matter according to the independent claim. Advantageous embodiments of the invention are described by the dependent claims.

[0007] According to a first aspect of the present invention, there is provided a power management method for a power plant, the power plant comprising at least one type of renewable power generation equipment and an energy storage system, wherein the power plant comprises: a common connection point connecting the renewable power generation equipment and the energy storage system to a power grid. The method according to the first aspect comprises the following steps: determining a power generation schedule defining power generation of said power plant during a predefined time horizon on the basis of the forecast parameters; determining a state of charge target schedule for the energy storage system during the predefined time horizon based on the forecast parameters and based on at least one optimization parameter; determining, on the basis of the power generation arrangement and on the basis of at least one optimization parameter, a power injection arrangement of the power plant defining a power supply to the power grid during the predefined time horizon; Wherein, within the predefined time range, the method comprises: supplying power from the power plant to the point of common connection on the basis of the power injection arrangement, The composition of the supplied power consisting of power from the renewable power generation equipment and the energy storage system is controlled on the basis of the power injection schedule and the state of charge target schedule.

[0008] In this application, a power plant including at least one type of renewable power generation equipment and an energy storage system and a common connection point connecting both the renewable power generation equipment and the energy storage system to the grid is also referred to as a hybrid power plant with an integrated configuration.

[0009] An integrated configuration means that both the renewable generation equipment and the energy storage system share a common point of connection with the grid, and a power injection arrangement is established for the entire power plant, including power from both generation and storage resources.

[0010] In the present application, therefore, the point of common connection, also referred to as PCC, is the shared electrical connection point between the renewable generation equipment and the energy storage system on one side and the grid on the other side.

[0011] The energy storage system may, for example, include: one or more batteries or accumulators, which can store electrical energy in the form of chemical energy and / or mechanical energy. The renewable power generation equipment may or may not include a converter, for example for converting a DC voltage (e.g., of a battery or accumulator or photovoltaic cell) into an AC voltage having, for example, a frequency corresponding to a nominal frequency (e.g., 50 Hz or 60 Hz) of a utility grid or / and off-grid connection to a specific user or an independent network. An energy storage system comprising only batteries is defined as a battery energy storage system, also referred to as a BESS.

[0012] In the present application, the state of charge of an energy storage system is a value representing the amount of available energy of the energy storage system. This value can be expressed as a percentage of the total possible energy capacity of the storage resource, such as 80%, or as a physical value, such as in ampere hours (Ah), etc.

[0013] In the present application, the state of charge target is a target value that must be reached or maintained at each scheduled time interval. The target value can be expressed as a percentage of the total possible charge of the energy storage system, or as a physical value in units of Ah, etc. The state of charge target is selected in such a way that the life of the energy storage system can be extended and the charge and discharge cycles of the energy storage system are minimized.

[0014] In the present application, a state of charge target arrangement is an arrangement with a target value of the state of charge that must be maintained during a predefined time range. The state of charge target arrangement aims to control the composition of the power supplied from the power plant to the common connection point, the power supplied being the sum of the power from the renewable power generation equipment and the power from the energy storage system, the control being carried out by taking into account the following factors: keeping the supplied power within tolerable limits, avoiding any unnecessary power reduction and minimizing the cycling of the battery. The tolerable limits can be defined by market regulation and / or by the controller of the power grid. Power reduction is a waste of generated power that is neither discharged to the common connection point nor used to recharge the energy storage system.

[0015] In the present application, forecast parameters are data and / or pieces of information used to determine the generation schedule and state of charge targets during a predefined time horizon. In particular, forecast parameters are data and / or pieces of information related to a scenario and / or situation during a predefined time horizon. For example, forecast parameters provide information about weather conditions in the region of the power plant during the predefined time horizon. Thus, forecast parameters are external constraints that affect the operation of the power plant.

[0016] In the present application, an optimization parameter is a parameter used to improve or optimize the performance of a power plant. Optimization parameters are for example power curtailment and the lifetime of an energy storage system.

[0017] A power generation schedule is defined as the power generated by the renewable power generation equipment during a predefined time. For example, a power generation schedule takes into account the amount of power that can be generated by wind turbines belonging to a power plant during a predefined time period.

[0018] A power injection schedule is defined as the power supplied to the point of common connection by a power plant during a predefined time frame. The supplied power consists of the power generated by the renewable power generation equipment and the power provided (or absorbed) by the energy storage system.

[0019] According to a first aspect of the invention, an optimized energy management and control method is proposed based on optimized calculation and dispatch of power and charging state scheduling. The scheduling is calculated so as to achieve power injection while also minimizing resource reduction and maximizing the life of the energy storage system by minimizing its charging and discharging cycles. In order to achieve this, the future power generation of the renewable power generation equipment is determined on the basis of external constraints (such as weather forecasts). Then, with the purpose of improving the life and durability of the energy storage system, the charging state target schedule of the energy storage system is determined. Finally, the power supply of the power plant to the common connection point is determined, and according to the power injection schedule and the charging state target schedule, the composition of the supplied power is controlled, and the supplied power is the sum of the power generated from the renewable power generation equipment and the power provided or absorbed from the energy storage system.

[0020] Therefore, the life of the energy storage system is improved and power drawdown is reduced.

[0021] According to an embodiment of the present invention, the at least one optimization parameter is at least one of power reduction and the life of the energy storage system. Therefore, in this way, the determination of the state of charge target schedule and the power injection schedule can be achieved with the purpose of minimizing power reduction and maximizing the life of the energy storage system.

[0022] According to an embodiment of the present invention, the state of charge target arrangement is further determined on the basis of the power injection arrangement. Therefore, in this way, it is possible to optimize the life of the energy storage system also on the basis of the power supplied to the common connection point and indirectly through the power generation arrangement. For example, future power generation peaks due to favorable weather conditions (strong wind) can be taken into account for charging the energy storage system, and then the energy storage system can be discharged during subsequent periods of unfavorable weather conditions (no wind).

[0023] According to an embodiment of the invention, the at least one type of renewable power generation equipment comprises at least one wind turbine and / or at least solar panels. In this case, the method allows compensating for the influence of weather conditions on the life of the energy storage system by eliminating power generation oscillations due to variable weather conditions.

[0024] Other types of renewable power generation equipment that may be included in a power plant include turbines for hydroelectric power generation and / or systems for harvesting tidal power.

[0025] According to another embodiment of the invention, the forecast parameters comprise weather forecast parameters. In particular, these comprise wind speed, wind direction and / or solar radiation in the region of the power plant. In particular, the weather forecast parameters describe the weather conditions in the region of the power plant shortly before and / or during a predefined time range.

[0026] According to another embodiment, the forecast parameters include financial parameters and / or the submitted power injection schedule. The financial parameter may be, for example, the energy price or the change in the energy price over time. By taking into account the energy price change over time, a financial optimization of the operation of the power plant is performed. For example, it is possible to supply more power to the grid when the energy price is high and to recharge the energy storage system when the energy price is low.

[0027] The submitted power injection schedule is a power injection schedule received from a controller of the power grid. The submitted power injection schedule forces the power plant to supply a predetermined amount of power to the common connection point during a predefined time period. Therefore, the submitted power injection schedule represents the minimum value of power that must be supplied from the power plant to the common connection point during the predefined time period. The submitted power injection schedule may also have: an upper limit, representing the maximum power that can be supplied to the common connection point during the predefined time range. This upper limit may be equal to or may be greater than the value established in the submitted power injection schedule. Then, by taking into account the submitted power injection schedule as a forecast parameter, the charging state target schedule is determined by taking into account the minimum amount of power that the power plant must supply to the common injection point during the predefined time range, thereby optimizing the life of the energy storage system on the basis of the minimum power supply.

[0028] According to another embodiment, the at least one optimization parameter may be a committed power injection schedule.In this way, the power injection schedule and the state of charge target schedule are determined so as to optimize the delivery of the committed power during the predefined time frame.

[0029] According to another embodiment, the forecast parameters include the current or future availability of the renewable power generation equipment and / or the current value of the state of charge of the energy storage system.

[0030] In the present application, the availability of renewable power generation equipment is defined as the renewable power generation equipment of the power plant that can be used to generate electricity. For example, it is possible that a part of the power generation equipment cannot be used shortly before and / or during a predefined time range, so that the power generation capacity of the renewable power generation equipment is reduced. By taking this into account, a more accurate power generation schedule and a more accurate state of charge target schedule can be determined.

[0031] According to another embodiment, during the predefined time range, the method further comprises: updating the power generation schedule, the state of charge target schedule and the power injection schedule on the basis of updated forecast parameters collected during the predefined time range. Accordingly, it is possible to recalculate the power generation schedule, the power injection schedule and the state of charge target schedule during the predefined time range in order to further optimize the life of the energy storage system.

[0032] The updating may be performed only once during the predefined time range (e.g. after half of the predefined time range), or the updating may be performed multiple times during the predetermined time range. If the updating is performed multiple times during the predetermined time range, the updating may be performed at regular or irregular time intervals. In this way, the state of charge target schedule is adapted to sudden external conditions, such as weather and / or energy pricing. The forecast parameters and thus the generation schedule, the power injection schedule and the state of charge target schedule should be updated as often as possible during the predefined time range in order to better react to variable external conditions that affect the power generation from the renewable power generation equipment.

[0033] According to another embodiment, the state of charge target arrangement has a value that is constant in time. This means that the charge level of the energy storage system remains constant over the entire predefined time range. In this way, any cycle including charging or discharging of the energy storage system is avoided over the entire predefined time range, thereby improving the life of the energy storage system.

[0034] However, it may also be the case that the state of charge target defined by the state of charge target arrangement for the predefined time horizon is not a value constant over time, but a variable value. This means that on the basis of the forecast parameters, the at least one optimization parameter and preferably the power injection arrangement, the state of charge target of the energy storage system is set to a decreasing value and / or an increasing value during the predefined time horizon.

[0035] It may be the case, for example, that on the basis of the forecast parameter and the at least one optimization parameter, during a first time period within the predefined time range the state of charge target is a reduced value, and in a second time period within the predefined time range the state of charge target is an increased value. An arrangement of the state of charge targets with respect to a variable state of charge target within the predefined time range is particularly useful for effectively compensating for variable weather conditions and / or power peaks in the power grid while optimizing the lifetime of the energy storage system.

[0036] According to another embodiment, the state of charge target arrangement is a battery level range of the energy storage device to be achieved. The battery level range is defined as a range included between a lower and an upper state of charge value. By controlling the state of charge within a specific range, the method only requires correcting the composition of the supplied power when the state of charge drops below the lower state of charge value or rises above the upper state of charge value.

[0037] According to another embodiment, during the predefined time range, the method further comprises the following steps: measuring a present value of a state of charge of the energy storage system; comparing a present value of the state of charge to a state of charge target of the state of charge target arrangement; The composition of the supplied power consisting of power from the renewable power generation equipment and the energy storage system is controlled also on the basis of a comparison between a current value of the state of charge and a state of charge target of the state of charge target arrangement.

[0038] According to this embodiment, the method thus provides a completely closed feedback and regulation loop for finely controlling the state of charge of the energy storage system, so that the state of charge target established in the state of charge target arrangement can be achieved more effectively, since the composition of the supplied power is changed in accordance with the comparison between the current value of the state of charge and the state of charge target of the state of charge target arrangement. If, for example, the current state of charge is less than the state of charge foreseen in the state of charge target arrangement, the power supplied from the energy storage system is reduced. Conversely, if the current state of charge value is higher than the state of charge value foreseen in the state of charge target, the power supplied from the energy storage system is increased.

[0039] According to a further embodiment, during the predefined time range, the method includes the following two steps: recalculating the power generation arrangement, the power injection arrangement and the charging state target arrangement based on the updated forecast parameters; and measuring the current value of the charging state of the energy storage system, comparing the current value of the charging state with the charging state target of the charging state target arrangement, and controlling the composition of the supplied power consisting of power from the renewable power generation equipment and the energy storage system based on the comparison between the current value of the charging state and the charging state target of the charging state target arrangement.

[0040] According to another embodiment, before the predefined time range, the method further comprises the following steps: transmitting the power injection schedule to a controller of the electrical grid; receiving a submitted power injection schedule from a controller of the grid based on the transmitted power injection schedule; An adjusted power injection schedule is determined based on the submitted power injection schedule, the updated forecast parameters, and the at least one optimization parameter.

[0041] In addition, during the predefined time range, the method further comprises the following steps: The power of the power plant is supplied to the common connection point based on an adjusted power injection schedule, and the composition of the supplied power consisting of power from the renewable power generation equipment and the energy storage system is controlled based on the adjusted power injection schedule and the charging state target schedule.

[0042] According to this embodiment, the power injection schedule is supplied to the controller of the power grid, which responds by sending the bound submitted power injection schedule. Then, an adjusted power injection schedule is determined based on the bound submitted power injection schedule, the updated parameters and the at least one optimized parameter. Preferably, an adjusted state of charge target schedule is also determined based on the adjusted injection schedule, the updated forecast parameters and the at least one optimized parameter.

[0043] The adjusted power injection schedule must at least satisfy the power supply requested with the submitted power injection schedule. It is also possible to supply more power than defined in the submitted power injection schedule if the submitted power injection schedule allows it. There may or may not be an upper limit on the power supply, allowing the method to supply as much power as possible to the common connection point.

[0044] According to a further embodiment of the invention, the method further comprises the step of activating and / or deactivating at least part of the renewable power generation equipment of the power plant on the basis of a comparison between the measured current value of the state of charge and the state of charge target schedule.

[0045] According to a second aspect of the present invention, there is provided an apparatus for managing a power plant, wherein the power plant comprises renewable power generation equipment, an energy storage system, and a common connection point connecting the renewable power generation equipment and the energy storage system to a power grid. The apparatus according to this aspect of the present invention comprises an energy management system and a local power plant controller. The energy management system is configured to: determining a power generation schedule defining power generation of said power plant during a predefined time horizon on the basis of the forecast parameters; determining a state of charge target schedule for the energy storage system during the predefined time horizon based on the forecast parameter and at least one optimization parameter; and A power injection schedule of the power plant defining a power supply to the grid is determined during the predefined time horizon on the basis of the power generation schedule and at least one optimization parameter.

[0046] During the predefined time range, the local power plant controller is configured to: supplying power from the power plant to the point of common connection; and On the basis of the power injection schedule and the state of charge target schedule, the composition of the supplied power consisting of power from the renewable power generation equipment and the energy storage system is controlled.

[0047] According to a specific embodiment of the present invention, the energy management system includes a bid forecast calculation unit and an engine unit.

[0048] The bid forecast calculation unit is configured to: determining a power generation schedule defining power generation of said power plant during a predefined time horizon on the basis of the forecast parameters; determining a state of charge target for the energy storage system during the predefined time horizon based on the forecast parameter and at least one optimization parameter; determining, on the basis of the power generation schedule and at least one optimization parameter, a power injection schedule of the power plant defining a power supply to the power grid during the predefined time horizon; transmitting the power injection schedule to a controller of the electrical grid; and A submitted power injection schedule is received from a controller of the power grid based on the power injection schedule.

[0049] The engine unit is configured to determine an adjusted power injection schedule based on the submitted power injection schedule, the updated forecast parameters and at least one optimization parameter. The submitted power injection schedule may also be received from the engine unit.

[0050] In this embodiment, the local power plant controller is configured to control the composition of the supplied power consisting of power from the renewable power generation equipment and the energy storage system based on the adjusted power injection schedule and the state of charge target schedule.

[0051] The bidding forecast calculation unit according to this embodiment can be configured to: determine or calculate the power injection schedule and / or the state of charge target schedule; and supply them to the energy market through the controller of the power grid. The power injection schedule and / or the state of charge target schedule can be optimized before being supplied to increase the financial income of the power plant (energy arbitrage) and / or to achieve a specific state of charge target value (time offset). If the supplied power injection and / or state of charge target schedule are not optimized before supply, they are determined on the basis of forecast parameters (natural forecast).

[0052] When predictability is requested, an engine unit, also referred to as a power delivery engine, according to this embodiment is activated. Predictability, also referred to as capacity firming, is defined as the limitation of the supplied power by a lower limit and / or an upper limit. Predictability is often given as a parameter from a grid controller, which requires from the operator of the power plant a minimum and / or maximum amount of power to be injected into the grid during a predefined time frame. During this phase, the power injection schedule and / or the state of charge target schedule are recalculated on the basis of updated forecast data and at least one optimization parameter in order to meet the guaranteed / allowed power supply to the grid as established by the submitted injection schedule received from the controller of the grid.

[0053] The engine unit may be configured to determine an adjusted power injection schedule based on updated parameters collected as close as possible to the predefined time range, for example 5 minutes before the start of the predefined time range. In addition, the engine unit determines the adjusted power injection schedule based on at least one optimized parameter.

[0054] The engine unit may be configured to determine an adjusted state of charge target schedule based on the updated forecast parameters, the adjusted power injection schedule, and the at least one optimization parameter.

[0055] In this way, deviations from the permitted injectable power, which could lead to penalties for the operator of the power plant, are avoided and the energy storage system is optimized with regard to market requirements.

[0056] According to this embodiment, therefore, a power plant with renewable power generation equipment provided with storage equipment may exhibit the characteristics of a conventional or dispatchable power plant, the power output of which depends on external factors such as the weather, wherein it is possible to select the optimal power injection during a predefined time range and deliver it accordingly.

[0057] According to a further embodiment, the bid forecast calculation unit is configured to update the power injection schedule and the state of charge target schedule during the predefined time range at regular or irregular intervals. In this way, the device can better react to sudden external factors that affect the power generation by the renewable power generation equipment.

[0058] The engine unit may also be configured to update the adjusted power injection schedule and / or the adjusted state of charge target schedule at regular or irregular time intervals during the predefined time range.

[0059] According to a third aspect of the invention, a power plant is provided with an apparatus at least as described above.

[0060] It should be noted that the device according to the second aspect of the present invention may include any of the features disclosed in the method according to the first aspect of the present invention, and vice versa, the method according to the first aspect of the present invention may include any of the features disclosed in the device according to the second aspect of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 A power plant according to an exemplary embodiment of the invention is shown.

[0062] Figure 2 An apparatus according to an exemplary embodiment of the invention is shown.

[0063] Figure 3 An apparatus according to another exemplary embodiment of the present invention is shown, wherein the energy management system comprises a bid forecast calculation unit and an engine unit.

[0064] Figures 4a and 4b show a possible schematic way of operation of the device.

[0065] Figure 5 A schematic representation of the method according to the invention is shown. DETAILED DESCRIPTION

[0066] The illustrations in the drawings are schematically. It should be noted that in different figures, similar or identical elements are provided with the same reference signs or with reference signs, which are different from the corresponding reference signs only within the first digit.

[0067] Figure 1 A power plant 100 according to an embodiment of the present invention is shown. The power plant 100 comprises renewable power generation equipment 110, an energy storage system 120 and an apparatus 130 for managing the power plant 100. The power plant 100 is connected to a power grid 140 via a common connection point 101. In this embodiment, the renewable power generation equipment 110 is of two types: on one side, there are wind turbines 111a, 111b, 11bc forming a wind farm 111, and on the other side, there are solar panels 112a, 112b, 112c forming a solar farm 112.

[0068] Wind turbines 111a, 111b, 111c are electrically connected to power line 115d via power lines 115a, 115b, 115c, respectively, and are electrically connected to wind farm connection point 113 through power line 115d. Wind farm connection point 113 electrically connects wind turbines 111a, 111b, 111c to power lines 104a, 104d, 104e, and through these electrical connections to a common connection point 101, so that the electrical energy generated in wind farm 111 can be distributed to power grid 140.

[0069] In a similar manner, solar panels 112a, 112b, 112c are electrically connected to power line 116d via power lines 116a, 116b, 116c, respectively, and are electrically connected to solar field connection point 114 through power line 116d. Solar field connection point 114 electrically connects solar panels 112a, 112b, 112c to power lines 104b, 104d, 104e, and through these electrical connections to a common connection point 101, so that the electrical energy generated in the solar field 112 can be distributed to the power grid 140.

[0070] The energy storage system 120 includes a plurality of batteries 120a, 120b, 120c. These are electrically connected to a power line 122d via power lines 122a, 122b, 122c, and are electrically connected to an energy storage system connection point 121 through the power line 122d. The energy storage system connection point 121 connects the energy storage system 120 to the power lines 104c, 104d of the power plant 100. When the batteries are discharged, power is supplied from the energy storage system 120 through the energy storage system connection point 121 to the power lines 104c, 104d, 104e, and through these to the common connection point 101 and ultimately to the grid 140. When the battery is charged, power is supplied from the wind farm 111 and / or the solar farm 112 through the power lines 104d, 104c to the energy storage system connection point 121, and power is supplied through the energy storage system connection point 121 to the power line connecting the energy storage system connection point 121 with the batteries 120a, 120b and 120c for charging them.

[0071] Figure 2 The device 130 described in detail in the control of the wind farm 111, the solar farm 112 and the energy storage system 120 via feedback and regulation loops represented by lines 102a, 102b, 102c. In particular, each of these three components of the power plant 100 is separately controlled and regulated by the device 130. In particular, the device 130 is configured to: regulate power, connect or disconnect any of the wind turbines 111a, 11b, 11c and / or the solar panels 112a, 112b, 112c.

[0072] If the wind turbine or solar panel is connected, it provides electric power to be distributed to the grid 140 or the energy storage system 120. In contrast, if the solar panel is disconnected, it does not provide electric power to the grid 140 or the energy storage system 120.

[0073] The device 130 is also configured to regulate the power supply or to completely connect or disconnect the entire wind farm 111 and / or the entire solar farm 112 by enabling or disabling power distribution via the wind farm connection point 113 or the solar farm connection point 114. In order to control the wind farm connection point 113 and the solar farm connection point 114, dedicated signal lines 103a and 103b are provided, which are sent to the controller of each wind and solar power generation resource as a power reference set point for each of its power regulators.

[0074] Furthermore, the device 130 is configured to regulate the power flow, connect or disconnect the energy storage system 120. If the energy storage system 120 is connected, the batteries 120a, 120b, 120c can be charged or discharged, depending on the settings provided by the device 130 for controlling the energy storage system connection point 121. The device 130 controls the energy storage system connection point 121 via a dedicated signal line 103c. It may also be the case that one or more batteries are connected and one or more batteries are disconnected, so that the batteries 120a, 120b, 120c can be controlled separately by the device 130. Moreover, the device 130 is configured to control the common connection point 101 via a dedicated signal line 103d, wherein these signals are sent to the controller of the storage system as a power reference set point.

[0075] It is to be noted that each of the connection points 113, 114, 121 and the common connection point 101 is not only used to fully connect or fully disconnect the two power lines or the power line 104e and the grid 140, but they can partially connect or partially disconnect the two power lines or the power line 104e and the grid 140, thereby allowing a reduced amount of electric power to be transmitted through it. In addition to the connection and disconnection of the power lines, the signals transmitted through 103a, 103b, 103c are also sent to the controllers of each wind power, solar power generation and storage resource as a power reference set point for each of its power regulators.

[0076] from Figure 1 It is clearly visible how the device 130 controls the entire power plant 100 and its power supply to the common injection point 101. The supplied power, being the sum of the power generated by the renewable power generation equipment 110 and the power coming from the energy storage system 120, and its composition are also controlled by the device 130 with the following purposes: on this side, to meet the requests for the supplied power and on this side, to optimize the life of the energy storage system 120 by minimizing its charging and discharging cycles on the basis of external factors that influence the power generation and the power consumption.

[0077] Figure 2The apparatus 130 is shown in a detailed manner. The apparatus 130 comprises a forecast service system 201 , an energy management system 202 and a local power plant controller 203 .

[0078] The forecast service system 201 retrieves forecast parameters 204, such as weather forecast data, from a source external to the device 130, such as the Internet. The forecast parameters 204 are then passed to the energy management system 202.

[0079] The energy management system 202 is configured to determine a power generation schedule 205 of the power plant 100 during a predefined time horizon based on the forecast parameters 204. In addition, the energy management system 202 determines a state of charge target schedule 207 of the energy storage system 120 during the predefined time horizon based on the forecast parameters 204 and at least one optimization parameter, such as the lifetime or power reduction of the energy storage system 120.

[0080] In addition, the energy management system 202 also determines a power injection schedule 206 for the power plant 100 during the predefined time range. The power injection schedule 206 defines the power supply of the power plant 100 to the grid 140 during the predefined time range. The power injection schedule 206 is determined on the basis of the power generation schedule 205 and on the basis of at least one optimization parameter.

[0081] In a preferred embodiment of the present invention, the SOC target schedule 207 is determined by the energy management system 202 after the power injection schedule 206 , and the SOC target schedule 207 is determined not only based on the forecast parameter 204 and at least one optimization parameter but also based on the power injection schedule 206 .

[0082] The energy management system 202 then transmits the power injection schedule 206 and the state of charge target schedule 207 to the local power plant controller 203. The local power plant controller 203 receives both the power injection schedule 206 and the state of charge target schedule 207 and saves them together as a target schedule 208.

[0083] During a predefined time range, the local power plant controller 203 supplies power to the common connection point 101 and therefore to the power grid 140, and controls the composition of the supplied power consisting of power from the renewable power generation equipment 110 and the energy storage system 120 on the basis of the target schedule 208 (that is, on the basis of both the power injection schedule 206 and the charging state target schedule 207).

[0084] The energy management system 202 may also be configured to retrieve updated forecast parameters 204' from the forecast service system 201 during a predefined time range. Based on the updated forecast parameters 204', the energy management system may update the generation schedule 205, the power injection schedule 206, and the state of charge target schedule 207. The updated power injection schedule 206' and the updated state of charge target schedule 207' determined on the basis of the updated generation schedule 205' are transmitted to the local power plant controller 203, where they are saved as an updated target schedule 208'. The updated target schedule 208' is then used to supply power to the common connection point 101 and control the composition of the supplied power formed by the power determined by the renewable power generation equipment 110 and the power supplied by the energy storage system 120. In this way, it is possible to take into account the volatile weather and / or economic conditions, and it is possible to use it to optimize the life of the energy storage system 120.

[0085] Figure 3 Shows Figure 2 Another exemplary embodiment of an energy management system 202 included in the device 130 of .

[0086] According to this embodiment, the energy management system 202 comprises a bid forecast calculation unit 301 and an engine unit 302. The bid forecast calculation unit 301 determines a power generation arrangement 303 on the basis of the forecast parameters 204. The bid forecast calculation unit 301 is further configured to determine a state of charge target arrangement 305 of the energy storage system 120 during a predefined time range on the basis of the forecast parameters 204 and at least one optimization parameter. Furthermore, a power injection arrangement 304 is determined on the basis of the power generation arrangement 303 and at least one optimization parameter. This power injection arrangement 304 is transmitted from the energy management system 202 to the controller 141 of the power grid.

[0087] Therefore, in the bid forecast calculation unit 301, a power injection schedule 304 is determined and supplied to the grid 140, that is to say to the electrical market. The electrical market can then accept the power injection schedule 304 as transmitted by the energy management system 202, or request a different power supply during a predefined time range as the power supply determined in the power injection schedule 304.

[0088] The energy management system 202 then receives a submitted power injection schedule 306 from the controller 141 of the power grid. The submitted power injection schedule 306 defines the minimum power that the power plant 100 must supply to the common connection point 101 during the predefined time range. The submitted power injection schedule 306 may also have an upper limit, defining the maximum power that the power plant 100 can supply to the common connection point 101 during the predefined time range. Such an upper limit may be the same as the minimum power supply defined by the submitted power injection schedule 306, or may be different from it.

[0089] The engine unit 302 of the power management system then determines an adjusted power injection schedule 307 on the basis of the submitted power injection schedule 306 , the updated forecast parameters 308 , the at least one optimization parameter and optionally the state of the power plant.

[0090] The adjusted power injection schedule 307 and the state of charge target schedule 305 are then transmitted from the energy management system 202 to the local power plant controller 203 where they form a target schedule 309 on the basis of which the composition of the power supplied by the power plant 100 to the point of common connection 101 is controlled.

[0091] According to a preferred embodiment, the engine unit 302 also determines an adjusted state of charge target schedule 310 based on the updated parameters 308, the at least one optimization parameter, and the adjusted power injection schedule 307. In this way, the state of charge target schedule of the energy storage system 120 can be optimized based on the adjusted power injection schedule 307, thereby achieving the submitted power injection schedule 306 and improving the life of the energy storage system 120 while minimizing the reduction of resources.

[0092] 4a and 4b show possible schematic ways of operating the device 130 .

[0093] In FIG. 4a , the forecast service system 201 provides forecast parameters 204 to the bid forecast calculation unit 301 of the energy management system 202 (step S40). The forecast parameters 204 may include a power generation forecast based on weather forecast parameters (natural forecast), a price forecast for energy prices (financial forecast), or a state of charge target (time offset) of the energy storage system 120. The bid forecast calculation unit 301 determines a power generation schedule 205 based on the forecast parameters 204. It also determines a state of charge target schedule 207 based on the forecast parameters 204 and at least one optimization parameter. Finally, it also determines a power injection schedule 206 based on the power generation schedule 205 and at least one optimization parameter (step S44). The state of charge target schedule 207 and the power injection schedule 206 are sent to the local power plant controller 203 together with a power injection boundary defining a lower limit or an upper limit of the power injection to the common connection point 101, if necessary (also step S44). The local power plant controller has: a state of charge target unit 401 configured to control the composition of the supplied power from the energy storage system 120 (step S451) and from the renewable power generation equipment (step S452) defined by the power injection schedule 206, and add them (step S453) to calculate the supplied power. The grid power regulation unit 402 then regulates the power supplied to the common connection point 101 according to any possible restriction requirements imposed by the controller 141 of the grid (S46).

[0094] According to FIG. 4b, the forecast service system 201 provides the forecast parameters 204 to the bid forecast calculation unit (step S40). The forecast parameters 204 may include a power generation forecast based on weather forecast parameters (natural forecast), a price forecast for energy prices (financial forecast), or a state of charge purpose (time offset) of the energy storage system 120. The bid forecast calculation unit 301 determines the power generation arrangement 205. It further determines the power injection arrangement 206 on the basis of the power generation arrangement 205 and at least one optimization parameter, and the power injection arrangement 206 is transmitted to the controller 141 of the power grid 140 (step S41). The controller 141 of the power grid 140 may also be a user or trader acting on the energy market. The controller 141 of the power grid 140 sends the submitted power injection arrangement 306 to the engine unit 302 (step S42), and the submitted power injection arrangement 306 may or may not have the maximum allowable injectable power. The engine unit 302 then determines an adjusted state of charge target 310 and an adjusted power injection schedule 307 based on the submitted power injection schedule 306, the updated forecast parameters 308 provided by the forecast service unit in step S43, and at least one optimization parameter, which are transmitted to the local power plant controller 203 together with any maximum allowable injectable power (if provided) (step S44). The local power plant controller controls the composition of the supplied power from the energy storage system 120 (step S451) and from the renewable power generation equipment (step S452) defined by the adjusted power injection schedule 307 through the state of charge target unit 401, and adds them (step S453) to calculate the supplied power. The grid power regulation unit 402 then regulates the power supplied to the common connection point 101 according to any possible restriction requirements imposed by the grid controller 141 (S46).

[0095] Figure 5 A power management method of a power plant 100 according to the present invention is schematically shown.

[0096] In a first step S50 , forecast parameters 204 are collected from the forecast service system 201 .

[0097] The forecast parameters 204 may be of different types. For example, it is possible that the forecast parameters 204 are weather forecast data for the region in which the power plant 100 is located. For example, the forecast parameters 204 may be related to wind speed, wind direction, precipitation and / or solar radiation. If the renewable power generation equipment 110 includes a system for harvesting tidal energy, the forecast parameters 204 may also provide information related to the tides.

[0098] However, the forecast parameters 204 may also be related to financial data (such as energy prices) and / or parameters providing information related to energy markets (such as requested power supply or power injection schedules), which the operator of the power plant 100 submits to the controller 141 of the grid during the bidding process.

[0099] Furthermore, forecast parameters 204 may provide information related to power plant 100. In particular, forecast parameters 204 may relate to the state of charge of energy storage system 120 and / or the availability of one or more portions of renewable power generation equipment 110.

[0100] The forecast parameters 204 may relate to a current time frame. However, preferably, the forecast parameters 204 relate to information during a predefined time frame.

[0101] In a second step S51 , the energy management system 202 determines a power generation schedule 205 on the basis of the forecast parameters 204 for a predefined time horizon.

[0102] In a third step S52, the energy management system 202 determines a power injection schedule 206 for a predefined time horizon based on the generation schedule 205 and at least one optimization parameter, such as the lifetime or power reduction of the energy storage system 120. Furthermore, in the same step, the energy management system 202 also determines a state of charge target schedule 207 for a predefined time horizon based on the forecast parameter 204 and at least one optimization parameter.

[0103] In a preferred embodiment, the state of charge target schedule 207 is also determined based on the power injection schedule 206 (step S521) so that the power injection schedule 206 that determines the power that must be supplied from the power plant 100 during the predefined time range is better considered in the state of charge target schedule 207.

[0104] The state of charge target schedule 207 determined in step S52 or step S521 may have a constant value for the entire predefined time range, for example, a certain amount of state of charge of the energy storage system 120 that must be maintained. It may also be the case that the state of charge target schedule 207 is a range with a minimum and a maximum value. In this case, the method allows the charge level of the energy storage system 120 to move within certain boundaries.

[0105] It may also be the case that the state of charge target arrangement 207 has a value that is not constant within the predefined time range, but a variable value. In this case, the method takes into account variable conditions that determine the variable output of the renewable power generation equipment 110, such as variable weather conditions and / or variable energy prices. It may be the case, for example, that the state of charge target arrangement 207 has a decreasing value of the state of charge during a first time period of the predefined time range, and has an increasing value in a second time period of the predefined time range that comes after the first time period.

[0106] In the fourth step S53, the power injection schedule 206 and the charging state target schedule 207, which together form the target schedule 208, are used by the local power plant controller 203 to supply power to the common connection point 101 according to the power injection schedule 206 (step S531), and on this basis, the composition of the supplied power is controlled in such a way that the energy storage system 120 reaches the charging state target schedule 207 (step S532).

[0107] According to an embodiment of the present invention, during a predefined time period, updated forecast parameters 204' are collected by the forecast service system 201 and elaborated by the energy management system 202 to determine an updated power generation schedule 205'. On this basis and on the basis of at least one optimized parameter, an updated power injection schedule 206' is determined. In addition, an updated state of charge target schedule 207' is also determined on the basis of the updated parameters 204', at least one optimized parameter and preferably also on the basis of the updated power injection schedule 206'. The updated power injection schedule 206' and the updated state of charge target schedule 207', which together form an updated target schedule 208', are transmitted to the local power plant controller 203, which then supplies power from the power plant 100 to the common connection point 101 and controls the composition of the supplied power according to the updated target schedule 208'.

[0108] In this case, steps S50 to S532 are repeated every time the forecast parameters are updated.

[0109] The updated target schedule 208 ′ may be provided at regular or irregular time intervals during the predefined time range.

[0110] according to Figure 5, the method finally has a feedback and regulation step S54, in which the current value of the state of charge is measured and compared with the state of charge target of the state of charge target arrangement 207. If necessary, the composition of the supplied power is adjusted on the basis of the comparison result. That is, if the current state of charge is less than the state of charge foreseen by the state of charge target arrangement 207, the energy storage system 120 is charged. On the contrary, if the current state of charge value is higher than the state of charge value foreseen by the state of charge target arrangement 207, the energy storage system 120 is discharged.

[0111] It should be noted that the term "comprising" does not exclude other elements or steps, and the use of the article "a" or "an" does not exclude a plurality. Moreover, elements described in association with different embodiments may be combined. It should also be noted that the reference signs in the claims should not be understood as limiting the scope of the claims.

Claims

1. A method for power management of a power plant (100), the power plant (100) comprising at least one type of renewable power generation equipment (110) and an energy storage system (120), wherein the power plant (100) comprises a common connection point (101) connecting the renewable power generation equipment (100) and the energy storage system (120) to a power grid (140), the method comprising: determining a power generation schedule (205) defining power generation of the power plant (100) during a predefined time horizon based on forecast parameters (204), wherein the forecast parameters (204) include the submitted power injection schedule; determining a state of charge target schedule (207) for the energy storage system (120) during the predefined time frame based on the forecast parameter (204) and at least one optimization parameter; determining a power injection schedule (206) of the power plant (100) defining a power supply to the power grid (140) during the predefined time frame on the basis of the power generation schedule (205) and at least one optimization parameter; Wherein, within the predefined time range, the method comprises: supplying power from the power plant (100) to the point of common connection (101) on the basis of the power injection arrangement (206), The composition of the supplied power consisting of power from the renewable power generation equipment (110) and the energy storage system (120) is controlled on the basis of the power injection schedule (206) and the state of charge target schedule (207).

2. The method according to claim 1, wherein the state of charge target schedule (207) is also determined on the basis of the power injection schedule (206).

3. A method according to claim 1 or 2, wherein the at least one type of renewable power generation equipment (110) includes at least one wind turbine (111a, 111b, 111c) and / or at least solar panels (112a, 112b, 112c).

4. The method according to any of the preceding claims, wherein the forecast parameters (204) comprise weather forecast parameters, in particular wind speed, wind direction and / or solar radiation in the region of the power plant (100).

5. The method according to any of the preceding claims, wherein the forecast parameters (204) include financial parameters.

6. The method according to any of the preceding claims, wherein the forecast parameter (204) comprises a current availability of the renewable power generation equipment (110) and / or a current value of a state of charge of the energy storage system (120).

7. The method according to any one of the preceding claims, wherein during the predefined time range, the method further comprises: The generation schedule (205), the state of charge target schedule (207) and the power injection schedule (206) are updated based on the updated forecast parameters (204') collected during the predefined time frame.

8. The method of claim 7, wherein the updating is performed at regular or irregular time intervals.

9. The method according to any of the preceding claims, wherein the state of charge target schedule (207) has a value that is constant over time.

10. The method according to any of the preceding claims, wherein the state of charge target schedule (207) is a battery level range of the energy storage device (120) to be achieved.

11. The method according to any one of the preceding claims, wherein within the predefined time range, the method further comprises: measuring a current value of the state of charge of the energy storage system (120); comparing the current value of the state of charge with the current value of the state of charge according to the state of charge target schedule (207); Based on a comparison between the current value of the state of charge and the current value of the state of charge according to the state of charge target schedule (207), the composition of the supplied power consisting of power from the renewable power generation equipment (110) and the energy storage system (120) is controlled.

12. The method according to any one of the preceding claims, wherein the method further comprises: Before the predefined time frame: transmitting the power injection schedule (304) to a controller (141) of the power grid (140); receiving a submitted power injection schedule (306) from a controller (141) of the power grid (140) based on the transmitted power injection schedule (206); Determining an adjusted power injection schedule (307) based on the submitted power injection schedule (306), the updated forecast parameter (308) and at least one optimization parameter; During the predefined time range, the method comprises: supplying power from the power plant (100) to the point of common connection (101) based on the adjusted power injection schedule (307), Based on the adjusted power injection schedule (307) and the state of charge target schedule (305), the composition of the supplied power consisting of power from the renewable power generation equipment (110) and the energy storage system (120) is controlled.

13. An apparatus (130) for managing a power plant (100), wherein the power plant (100) comprises a renewable power generation equipment (110), an energy storage system (120), and a common connection point (101) connecting the renewable power generation equipment (110) and the energy storage system (120) to a power grid (140), wherein the apparatus comprises: The energy management system (202) is configured to: determining a power generation schedule (205) defining power generation of the power plant (100) during a predefined time horizon based on forecast parameters (204), wherein the forecast parameters (204) include the submitted power injection schedule; determining a state of charge target schedule (207) for the energy storage system (120) during the predefined time frame based on the forecast parameter (204) and at least one optimization parameter; as well as determining a power injection schedule (206) of the power plant (100) defining a power supply to the power grid (140) during the predefined time frame on the basis of the power generation schedule (205) and at least one optimization parameter; The local power plant controller (203) is configured to: supplying power from the power plant (100) to the point of common connection (101) based on the power injection arrangement (206); and Based on the power injection schedule (206) and the state of charge target schedule (207), the composition of the supplied power consisting of power from the renewable power generation equipment (110) and the energy storage system (120) is controlled; during the predefined time range.

14. The apparatus (130) of claim 13, wherein the energy management system (202) comprises: The bid forecast calculation unit (301) is configured to: determining a power generation schedule (303) defining power generation of the power plant (110) during a predefined time range based on the forecast parameters (204); determining a state of charge target schedule (305) for the energy storage system (120) during the predefined time frame based on the forecast parameter (204) and at least one optimization parameter; determining a power injection schedule (304) of the power plant (100) defining a power supply to the power grid (140) during the predefined time frame on the basis of the power generation schedule (303) and at least one optimization parameter; transmitting the power injection schedule (304) to a controller (141) of the power grid (140); and receiving a submitted power injection schedule (306) from a controller (141) of the power grid (140) based on the power injection schedule (304); The engine unit (302) is configured to: determine an adjusted power injection schedule (307) based on the submitted power injection schedule (306), the updated forecast parameter (308) and at least one optimization parameter; The local power plant controller (203) is configured to control the composition of the supplied power consisting of power from the renewable power generation equipment (110) and the energy storage system (120) based on the adjusted power injection schedule (307) and the charging state target schedule (305).

15. Power plant (100) comprising at least one type of renewable power generation equipment (110), an energy storage system (120) and a device (130) according to claim 13 or 14.