Fire hose recovery method and system, emergency equipment and machine readable storage medium
Through the coordinated cooperation of the conveying device and the belt management device, the folding and automatic plating of the water belt section and the joints are realized, which solves the problems of low water belt recycling efficiency and inconsistent plating methods in the existing technology, and improves the recycling of fire water belts The degree of intelligence and the space utilization rate of storage compartments.
Patent Information
- Application Number
- CN202411127742.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-16
AI Technical Summary
The existing fire water belt recycling devices are not intelligent enough, resulting in low water belt recycling efficiency and inconsistent plating methods, making it difficult to effectively improve the space utilization rate of the storage compartment.
The coordinated cooperation between the conveyor device and the belt management device is adopted to adjust the motion state and stroke range, and the folding of the water belt section and the automatic laying of the joints are realized, improving the degree of recycling intelligence and space utilization.
It improves the water belt recycling efficiency, saves labor intensity, and optimizes the space utilization rate of the storage compartment, realizing regular plating of the water belt and joints.
Smart Images

Figure CN119015655A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of emergency equipment, and specifically relates to a fire hose recovery method, a fire hose recovery system, emergency equipment and a machine-readable storage medium. Background Art
[0002] In order to achieve long-distance water supply, the existing hose laying fire trucks require the length of the hose to be greater than 1 km, and are generally configured to be 2 to 3 km. In order to meet the hose length requirement, the hose needs to be composed of multiple hose sections with a length of 100 m connected by joints.
[0003] When the hoses need to be recovered and stacked in the hose box, due to the insufficient intelligence of the recovery devices currently used on fire trucks, manual assistance is still required in organizing the hoses in the hose box, so that the hoses can be stacked as neatly as possible to reduce clutter. However, this process is time-consuming and labor-intensive, and due to manual intervention, the way of neatly stacking the hoses cannot be unified, and is mixed with a certain degree of randomness, making it difficult to effectively improve the utilization rate of the internal space of the hose box. Summary of the invention
[0004] The purpose of this application is to provide a fire hose recovery method and system, emergency equipment and machine-readable storage medium, which can improve the intelligence level of hose recovery, optimize and unify the stacking method of hoses, thereby saving labor intensity, improving hose recovery efficiency and space utilization of hose storage compartments.
[0005] In order to achieve the above-mentioned object, the present application provides a fire hose recovery method on the one hand, which comprises:
[0006] Using a conveying device to convey the water hose from front to back to a belt drop opening at the top rear of the belt storage compartment at a first speed V1, so that the water hose can fall into the belt storage compartment from the belt drop opening at the first speed V1;
[0007] When the joint of the water hose has not entered the conveying device and the stacking height of the water hose in the belt storage compartment is not higher than the preset height H, the belt sorting device is used to repeatedly and alternately perform the entrainment forward pulling action and the backward empty walking action at the first speed V1 within the preset front and rear stroke L0 at the inner top of the belt storage compartment, so that the first water hose segments with a length of L1 are all folded in half and stacked in the belt storage compartment, where L1=2L0;
[0008] When the joint enters the conveying device and the stacking height of the water hose in the belt storage compartment is not higher than a preset height H, the movement state of the belt sorting device is adjusted according to the moving direction of the belt sorting device and the front-to-back distance S between the belt sorting device and the joint, so that the joint falls from the belt drop port into the rear of the belt storage compartment.
[0009] In some embodiments, adjusting the motion state of the tape arranging device according to the moving direction of the tape arranging device and the front-to-rear distance S between the tape arranging device and the joint includes:
[0010] When L>2L0, the joint enters the front end of the conveying device and the tape sorting device performs the entrainment and forward pulling action, the tape sorting device is firstly made to continue to perform the entrainment and forward pulling action within the preset front and rear stroke L0 at the first speed V1, wherein L is the total conveying length of the conveying device;
[0011] When the tape arranging device has completed the current tape entrainment and forward pulling action and S>L0 / 2, calculating the length L2 of the second tape section extending from the joint to the tape drop port;
[0012] The belt arranging device is made to accelerate relative to the first speed V1 when performing the backward idling action so as to clamp the second hose section at a half length position at the belt drop port;
[0013] The belt sorting device is made to sequentially perform the entrainment forward pulling action and the backward idling action within the first corrected front and rear stroke L0' at the first speed V1, so that the second hose section can be folded and stacked below the preset height H in the belt storage compartment, wherein L2=2L0'.
[0014] In some embodiments, adjusting the motion state of the tape arranging device according to the moving direction of the tape arranging device and the front-to-rear distance S between the tape arranging device and the joint includes:
[0015] When the conveying device conveys the joint to the front top of the belt storage compartment, the belt sorting device performs the backward empty walking action, and S>L0 / 2, calculate the hose section length L3 of the third hose section extending from the joint to the hose stacking position at the rear bottom of the belt storage compartment;
[0016] The belt arranging device is made to accelerate relative to the first speed V1 while continuing to perform the current backward idling action so as to clamp the half-length position of the third hose section at the belt drop port;
[0017] The belt sorting device is enabled to sequentially perform the entrainment forward pulling action and the backward idling action within the second corrected front and rear stroke L0" at the first speed V1, so that the third water hose section can be folded and stacked below the preset height H in the belt storage compartment, where L3 = 2L0".
[0018] In some embodiments, adjusting the motion state of the tape arranging device according to the moving direction of the tape arranging device and the front-to-rear distance S between the tape arranging device and the joint includes:
[0019] When the conveying device conveys the joint to the front top of the tape storage compartment and the tape sorting device performs the backward idling action and S≤L0 / 2, the tape sorting device stops performing the current backward idling action or the tape sorting device does not perform the entrainment forward pulling action after performing the current backward idling action.
[0020] In some embodiments, the fire hose recovery method further comprises:
[0021] The water belts are stacked in a plurality of belt storage spaces respectively by using the belt sorting device and the water belts in each belt storage space are stacked to the preset height H, wherein the plurality of belt storage spaces are divided and formed in sequence along the left-right direction in the belt storage compartment;
[0022] When the water belts in each of the belt storage spaces are stacked to the preset height H, the belt sorting device is synchronously moved back and forth left and right while continuing to repeatedly and alternately perform the entrainment forward pulling action and the backward idling action.
[0023] In some embodiments, the fire hose recovery method further comprises:
[0024] When the water belts in each of the belt storage spaces are stacked to the preset height H and the belt sorting device continues to perform the backward empty walking action, when it is determined that the belt sorting device and the connector can reach the belt drop port at the same time, the belt sorting device will not perform the entrainment and forward pulling action after completing the current backward empty walking action.
[0025] The second aspect of the present application also provides a fire hose recovery system, which includes:
[0026] A belt storage compartment, wherein a belt drop opening is provided at the rear top of the belt storage compartment;
[0027] A conveying device, used for conveying the water hose from front to back to the hose drop port;
[0028] A belt handling device is arranged at the bottom of the conveying device so as to be movable forward and backward and is capable of clamping or releasing the water belt at the inner top of the belt storage compartment;
[0029] A left-right moving device, used for driving the conveying device to move left-right; and
[0030] The monitoring assembly can execute the above-mentioned fire hose recovery method by monitoring the water hose, the conveying device, the belt sorting device and the left and right moving device.
[0031] In some embodiments, the monitoring assembly includes:
[0032] A first sensor, used to detect whether the connector enters the front end of the conveying device;
[0033] A second sensor, used to detect whether the connector is transported to the front top of the belt storage compartment by the transport device;
[0034] A first position sensor, used for detecting whether the joint passes through the belt drop opening;
[0035] A second position sensor is used to detect the front and rear positions of the belt arranging device;
[0036] A third position sensor, used to detect the left and right positions of the conveying device;
[0037] A height sensor, used to detect the stacking height of the water hose in the hose storage compartment; and
[0038] The processor communicates with the first sensor, the second sensor, the first position sensor, the second position sensor, the third position sensor, the height sensor, the conveying device, the belt sorting device, and the left-right moving device.
[0039] In some embodiments, the conveying device includes a leading device and a taking-up device connected front and back, the taking-up device extends from the front top of the belt storage compartment to the belt drop port, the front end of the taking-up device is provided with an openable and closable front belt pressing mechanism, and the rear end of the taking-up device is provided with an openable and closable rear belt pressing mechanism.
[0040] In some embodiments, the conveying device includes a leading device and a taking-up device connected front and rear, the taking-up device extends from the front top of the belt storage compartment to the belt drop port, the leading device can be extended and retracted front and rear, and the monitoring assembly includes a length sensor for detecting the front and rear length of the leading device.
[0041] The third aspect of the present application also provides an emergency device, which includes the above-mentioned fire hose recovery system.
[0042] The fourth aspect of the present application also provides a machine-readable storage medium, on which instructions are stored, and the instructions are used to enable a machine to execute the above-mentioned fire hose recovery method.
[0043] By adopting the fire hose recovery technology of the present application, when the fire hose enters the conveying device without a joint and the stacking height of the water hose in the belt storage compartment is not higher than the preset height H, the belt sorting device and the conveying device both move at a first speed V1, and whenever the length of the water hose that falls from the belt drop port into the rear of the belt storage compartment reaches L1 / 2, the belt sorting device can clamp the water hose at the belt drop port (equivalent to the half-length position of the first water hose section with a clamping length of L1), and then move forward to perform the clamping and forward pulling action within the preset front and rear stroke L0 (equal to L1 / 2). At the same time, the conveying device still maintains conveying the water hose at the first speed V1. When the belt sorting device has gone through the preset front and rear stroke L0, the belt sorting device immediately releases the water hose, so that the first water hose section can be folded in half and stacked in the belt storage compartment. Then, the tape sorting device moves in the opposite direction and performs a backward idling action within the preset front and rear stroke L0. Similarly, the conveying device still keeps conveying the water hose at the first speed V1. When the tape sorting device reaches the tape drop port after the preset front and rear stroke L0, the length of the water hose that falls from the tape drop port to the rear of the tape storage compartment reaches L1 / 2 again. In this way, the tape sorting device can again perform the entrainment and forward pulling action within the preset front and rear stroke L0 to fold and stack the new first water hose section in half.
[0044] When a joint enters the conveying device and the stacking height of the water hose in the belt storage compartment is not higher than the preset height H, the fire hose recovery technology of the present application can adjust the movement state of the belt sorting device (such as changing speed, not performing clamping action, etc.) according to the moving direction of the belt sorting device and the front-to-back distance S between the belt sorting device and the joint, so as to adjust the timing of the belt sorting device clamping the water hose and the travel range of the belt sorting device when performing the forward pulling action and the backward idling action of the entrainment, so that the joint can finally fall from the belt drop port into the rear part of the belt storage compartment for stacking.
[0045] It can be seen that the present application can adopt different water hose recovery strategies according to whether or not a joint enters the conveying device, and automatically execute different strategies through the coordinated cooperation of the conveying device and the belt sorting device, which can not only improve the intelligence level of water hose recovery, but also optimize and unify the stacking methods of water hoses and their joints, thereby saving labor intensity, improving water hose recovery efficiency and space utilization of the belt storage compartment.
[0046] Other features and advantages of the embodiments of the present application will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] The accompanying drawings are used to provide a further understanding of the embodiments of the present application and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the embodiments of the present application, but do not constitute a limitation on the embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without creative work. In the drawings:
[0048] Figure 1 A schematic diagram of an emergency device in a specific implementation manner of the present application;
[0049] Figure 2 for Figure 1 A left partial sectional view of the emergency equipment in FIG.
[0050] Figure 3 for Figure 1 Top view of the emergency equipment in the.
[0051] Description of Reference Numerals
[0052] 10 belt storage compartment 20 conveying device
[0053] 30 belt handling device 40 first sensor
[0054] 50 second sensor 60 first position sensor
[0055] 70 second position sensor 80 height sensor
[0056] 90 processors 100 hoses
[0057] 110 connector
[0058] 101 belt drop opening 102 bottom concave position
[0059] 103 barrier structure 201 belt guide device
[0060] 202 belt taking-up device 203 front belt pressing mechanism
[0061] 204 rear belt pressing mechanism DETAILED DESCRIPTION
[0062] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. It should be understood that the specific implementation methods described herein are only used to illustrate and explain the embodiments of the present application, and are not used to limit the embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0063] It should be noted that if the embodiments of the present application involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0064] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present application, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.
[0065] Reference Figures 1 to 3 The first exemplary embodiment of the present application provides a fire hose recovery method, which includes:
[0066] The conveying device 20 is used to convey the water hose 100 from front to back to the tape drop opening 101 at the top rear of the tape storage compartment 10 at a first speed V1, so that the water hose 100 can fall into the tape storage compartment 10 from the tape drop opening 101 at the first speed V1;
[0067] When the joint 110 of the water hose 100 has not entered the conveying device 20 and the stacking height of the water hose in the belt storage compartment 10 is not higher than the preset height H, the belt sorting device 30 is used to repeatedly and alternately perform the entrainment forward pulling action and the backward empty walking action at the first speed V1 within the preset front and rear stroke L0 at the inner top of the belt storage compartment 10, so that the first water hose sections with a length of L1 are all folded and stacked in the belt storage compartment 10, where L1=2L0;
[0068] When the joint 110 enters the conveying device 20 and the stacking height of the water hose in the belt storage compartment 10 is not higher than the preset height H, the movement state of the belt sorting device 30 is adjusted according to the moving direction of the belt sorting device 30 and the front-to-back distance S between the belt sorting device 30 and the joint 110, so that the joint 110 falls from the belt drop port 101 into the rear part of the belt storage compartment 10.
[0069] It should be noted that the belt-straightening device 30 can be switched between an open state and a closed state. The belt-straightening device 30 can be switched to a closed state to clamp the water hose, or can be switched to an open state to release the water hose. The mechanism for clamping or releasing the water hose in the belt-straightening device 30 is a prior art and will not be described in detail here. The conveying device can adopt different forms such as roller conveying, which is also a prior art and will not be described in detail here.
[0070] In addition, the first hose section with the length L1 mentioned above does not specifically refer to a hose section at a certain position in the conveying device 20 or the hose storage compartment 10, but refers to a hose section that can be folded and stacked within a length range equal to the preset front and rear stroke L0.
[0071] More specifically, when the tape arranging device 30 is at the front end of its preset front and rear stroke L0, the front end (hereinafter referred to as the first end) of the first water hose segment is on the conveying device 20 and the rear end (hereinafter referred to as the second end) just passes through the tape drop opening 101; then, the tape arranging device 30 starts to move backward at the first speed V1, and the conveying device 20 always conveys the water hose 100 at the first speed V1; when the tape arranging device 30 moves to the rear end of its preset front and rear stroke L0 (that is, just passes through the tape drop opening 101), the second end of the first water hose segment has fallen into the tape storage compartment 10 The first hose section is stacked and stranded at the rear bottom of the belt storage compartment 10, and the half-length position (i.e., the middle position) of the first hose section just passes through the belt drop opening 101 and can be clamped by the belt sorting device 30; then, the belt sorting device 30 clamps the half-length position of the first hose section and moves forward to perform the belt entrainment and forward pulling action, so that the portion of the first hose section stacked and stranded at the rear bottom of the belt storage compartment 10 can be gradually straightened obliquely upward and forward, and at the same time, the conveying device 20 always conveys the hose 100 at the first speed V1; when the belt sorting device 30 reaches the front end of its preset front and rear stroke L0 again (refer to Figure 2 ), the first end of the first water hose section just passes through the hose drop opening 101. At this time, if the belt sorting device 30 releases the water hose and starts to move backwards, then in the process of the belt sorting device 30 moving backwards, since the conveying device 20 always conveys the water hose 100 at the first speed V1, the first water hose section as a whole can gradually fall down; when the belt sorting device 30 reaches the rearmost end of its preset front and rear stroke L0 again, the first water hose section is folded in half and placed in the belt storage compartment 10.
[0072] It can be seen that if the belt sorting device 30 is used to repeatedly and alternately perform the entrainment forward pulling action and the backward empty walking action at the first speed V1 in the preset front and rear stroke L0 at the inner top of the belt storage compartment 10, and the conveying device 20 keeps conveying the water hose 100 at the first speed V1, the first water hose segments with a length of L1 can be folded and stacked in the belt storage compartment 10. If the left and right positions of the belt sorting device 30 do not change, the next first water hose segment can be stacked on the previous first water hose segment, so as to gradually stack up until the stacking height of the water hose reaches the preset height H.
[0073] By adopting the above method, when the jointless 110 enters the conveying device 20 and the stacking height of the water hose in the belt storage compartment 10 is not higher than the preset height H, the belt sorting device 30 and the conveying device 20 both move at the first speed V1. Whenever the length of the water hose 100 that falls from the belt drop port 101 into the rear part of the belt storage compartment 10 reaches L1 / 2, the belt sorting device 30 can clamp the water hose 100 at the belt drop port 101 (equivalent to the half-length position of the first water hose section with a clamping length of L1), and then move forward to perform the entrainment and forward pulling action within the preset front and rear stroke L0 (equal to L1 / 2). At the same time, the conveying device 20 still maintains conveying the water hose 100 at the first speed V1. After the belt sorting device 30 has gone through the preset front and rear stroke L0, the belt sorting device 30 immediately releases the water hose, so that the first water hose section can be folded in half and stacked in the belt storage compartment. Then, the tape sorting device 30 moves in the opposite direction and performs a backward idling action within the preset front and rear stroke L0. Similarly, the conveying device 20 still keeps conveying the water hose 100 at the first speed V1. When the tape sorting device 30 reaches the tape drop port 101 after the preset front and rear stroke L0, the length of the water hose that falls from the tape drop port 101 into the rear part of the tape storage compartment 10 reaches L1 / 2 again. In this way, the tape sorting device 30 can again perform the entrainment and forward pulling action within the preset front and rear stroke L0 to fold and stack the new first water hose section in half.
[0074] When a joint 110 enters the conveying device 20 and the stacking height of the water hose in the belt storage compartment 10 is not higher than the preset height H, the present application can adjust the movement state of the belt sorting device 30 (such as changing speed, not performing clamping action, etc.) according to the moving direction of the belt sorting device 30 and the front-to-back distance S between the belt sorting device 30 and the joint 110, so as to adjust the timing of the belt sorting device 30 clamping the water hose and the travel range of the belt sorting device 30 when performing the front pulling action and the backward idling action of the entrainment, so that the joint 110 can finally fall from the belt drop port 101 into the rear bottom of the belt storage compartment 10 for stacking. In this way, when the stacking height of the water hose is not higher than the preset height H, it can be ensured that each joint 110 is stacked at the rear bottom of the belt storage compartment 10, so that the placement position of the joint 110 is more regular and orderly when it is not higher than the preset height H.
[0075] It can be seen that the present application can adopt different water hose recovery strategies according to whether or not the connector 110 enters the conveying device 20, and automatically execute different strategies through the coordinated cooperation of the conveying device 20 and the belt sorting device 30, which can not only improve the intelligence level of water hose recovery, but also optimize and unify the stacking methods of the water hose 100 and its connector 110, thereby saving labor intensity, improving the water hose recovery efficiency and the space utilization of the belt storage compartment 10.
[0076] In some embodiments, a bottom recess 102 is formed at the rear bottom of the storage compartment 10. The bottom recess 102 is usually provided at the rear bottom of the storage compartment 10 to facilitate operators to step on the bottom recess 102 to enter the storage compartment 10 when they need to take out the hose 100 for use or need to enter the storage compartment 10 to manually assist in stacking the hose and open the rear door of the storage compartment 10. In the present application, by adopting the above method, the bottom recess 102 can be used to stack the connector 110, thereby making more full use of the internal space of the storage compartment 10. Moreover, the depth of the bottom recess 102 can be set to be approximately the same as the height of the joint 110, so that when the joint 110 is stacked in the bottom recess 102, for example, the water hose sections without joints such as the first water hose section mentioned above can be stacked relatively flatly in the belt storage compartment 10 because the rear is supported by the joint 110 and will not fall into the bottom recess 102, so that the stacked shape is more regular, further optimizing the stacking method of the water hose sections without joints.
[0077] In some embodiments, adjusting the motion state of the tape arranging device 30 according to the moving direction of the tape arranging device 30 and the front-to-back distance S between the tape arranging device 30 and the joint 110 includes:
[0078] When L>2L0, the joint 110 enters the front end of the conveyor 20 and the tape sorting device 30 performs the entrainment and forward pulling action, the tape sorting device 30 is firstly made to continue to perform the entrainment and forward pulling action within the preset front and rear stroke L0 at the first speed V1, wherein L is the total conveying length of the conveyor 20;
[0079] When the tape arrangement device 30 has completed the current entrainment and forward pulling action and S>L0 / 2, the length L2 of the second water hose section extending from the joint 110 to the tape drop port 101 is calculated;
[0080] The belt arranging device 30 is accelerated relative to the first speed V1 when performing the backward idling action (for example, firstly accelerated at the second speed V2 and then decelerated to the first speed V1) to clamp the half length position of the second hose section at the belt drop port 101;
[0081] The belt arranging device 30 performs the entrainment forward pulling action and the backward empty walking action in sequence within the first corrected front and rear stroke L0' at the first speed V1, so that the second hose section can be folded and stacked below the preset height H in the belt storage compartment 10, wherein L2 = 2L0'.
[0082] It should be noted here that, when L>2L0, the joint 110 enters the front end of the conveying device 20 and the belt sorting device 30 performs the entrainment and forward pulling action, it can be confirmed that since the conveying device 20 maintains conveying the water hose 100 at the first speed V1, if the belt sorting device 30 still completes the entrainment and forward pulling action currently within the preset front and rear stroke L0 at the first speed V1 and is at the front end of the preset front and rear stroke L0, then at that time the distance between the joint 110 and the belt drop port 101 is still greater than L0 (and usually less than 2L0), and the water hose section between the joint 110 and the belt drop port 101 at this moment is defined as the second water hose section, which is equivalent to the water hose section length L2 of the second water hose section being greater than L0 (and usually less than 2L0).
[0083] When the length L2 of the water hose section of the second water hose section is greater than L0 and less than 2L0, if the tape sorting device 30 still moves backward from the front end of the preset front-to-rear stroke L0 at the first speed V1, then before the tape sorting device 30 reaches the tape drop port 101, the half-length position (i.e., the middle position) of the second water hose section has reached the tape drop port 101. Therefore, the tape sorting device 30 cannot clamp the half-length position of the second water hose section when reaching the tape drop port 101, and thus the joint 110 cannot subsequently fall vertically from the tape drop port 101 to the rear bottom of the tape storage compartment 10.
[0084] Therefore, if the belt-straightening device 30 starts to move backward from the front end of the preset front-rear stroke L0, it needs to move at a speed greater than the first speed V1 to have a chance to clamp the half-length position of the second hose section. However, at this time, the front-rear distance S between the belt-straightening device 30 and the joint 110 must also be considered to determine whether the belt-straightening device 30 can catch up with the half-length position of the second hose section if the speed is increased. Specifically, when the front-to-back distance S is large, it means that the distance between the joint 110 and the tape drop port 101 is still far (for example, L2 is close to 2L0). Therefore, by speeding up the tape sorting device 30, the tape sorting device 30 can catch up with the half-length position of the second water hose section, thereby clamping the half-length position at the tape drop port 101; but when the front-to-back distance S is small, it means that the distance between the joint 110 and the tape drop port 101 is small (for example, L2 is only slightly larger than L0). At this time, even if the tape sorting device 30 is accelerated, the tape sorting device 30 cannot catch up with the half-length position of the second water hose section, thereby clamping the half-length position at the tape drop port 101.
[0085] Based on the actual situation, this embodiment uses L0 / 2 as the dividing point for distinguishing a larger front-to-back distance S from a smaller front-to-back distance S. Specifically, in the case of S>L0 / 2, it is determined that the belt sorting device 30 can catch up with the half-length position of the second water hose section by speeding up the belt sorting device 30. At this time, the specific value of the belt length L2 of the second water hose section can be calculated to determine the half-length position of the second water hose section, and then the speed-up amplitude of the belt sorting device 30 can be further determined, so that the belt sorting device 30 can clamp the half-length position when it moves to the belt drop port 101.
[0086] In addition, when the belt sorting device 30 clamps the second water hose section at the half-length position and performs the entrainment and forward pulling action, it is also necessary to correct the travel range of the belt sorting device 30 to ensure that when the joint 110 reaches the belt drop port 101, the belt sorting device 30 just releases the water hose and starts to move backward. To this end, in this embodiment, when the belt sorting device 30 clamps the second water hose section at the half-length position and performs the entrainment and forward pulling action and the backward empty moving action in sequence, its travel range needs to be adjusted to the first corrected front and rear travel L0', and L2 = 2L0'. In addition, when the belt sorting device 30 clamps the second water hose section at the half-length position and performs the entrainment and forward pulling action and the backward empty moving action in sequence, it can be restored to move at the first speed V1.
[0087] The following are some examples of optional embodiments that can execute the steps in this embodiment:
[0088] In an optional embodiment, the first sensor 40 is used to detect whether the joint 110 enters the front end of the conveyor 20, the second position sensor 70 is used to detect the front and rear positions of the tape arranging device 30, and the height sensor 80 is used to detect the stacking height of the water hose 100 in the tape storage compartment 10, and a processor 90 is provided to communicate with the first sensor 40, the second position sensor 70, the height sensor 80, the conveyor 20 and the tape arranging device 30, and a calculation analysis program is pre-stored in the processor 90. In addition, the total conveying length L of the conveyor 20 is constant and satisfies L>2L0, and L is pre-stored in the processor 90. The preset height H is also pre-stored in the processor 90.
[0089] When the processor 90 determines that the stacking height of the water hose in the belt storage compartment 10 is not higher than the preset height H, when the first sensor 40 detects that the joint 110 enters the front end of the conveying device 20 and the processor 90 determines that the belt sorting device 30 is performing the entrainment and forward pulling action, the processor 90 first controls the belt sorting device 30 to continue to perform the current entrainment and forward pulling action within the preset front and rear stroke L0 at the first speed V1. During this process, the processor 90 can obtain the moving distance of the belt sorting device 30 through the second position sensor 70. The moving distance of this belt sorting device 30 is equivalent to the moving distance of the synchronously moving joint 110. Therefore, when the belt sorting device 30 completes the current entrainment and forward pulling action, the position of the joint 110 can be determined, and the position of the belt sorting device 30 can be obtained by the second position sensor 70. Therefore, the processor 90 can calculate the front and rear distance S between the belt sorting device 30 and the joint 110, and further determine the size relationship between S and L0 / 2.
[0090] When it is determined that S>L0 / 2, the processor 90 can obtain the specific value of the hose length L2 of the second hose section extending from the joint 110 to the drop port 101 by calculating the difference between the total delivery length L and the moving distance of the joint 110, thereby determining the half-length position of the second hose section. In addition, when the specific value of the hose length L2 is determined, the first corrected front and rear stroke L0' can be determined according to L2=2L0'.
[0091] Then, the processor 90 automatically calculates the speed-up amplitude of the belt sorting device 30 through its calculation and analysis program, ensuring that the belt sorting device 30 accelerates relative to the first speed V1 when performing the backward idling action (for example, first accelerates at the second speed V2 and then slows down to the first speed V1) so as to clamp the second water hose section at the half-length position at the belt drop port 101.
[0092] When the tape sorting device 30 has clamped the second water hose section at the half length position at the tape drop port 101, the tape sorting device 30 performs the entrainment forward pulling action and the backward empty walking action in sequence within the first corrected front and rear stroke L0' at the first speed V1, so that the second water hose section can be folded and stacked below the preset height H in the tape storage compartment 10.
[0093] In another optional embodiment, the conveying device 20 includes a leading device 201 and a taking-up device 202 connected front and back, the taking-up device 202 is arranged from the front top of the belt storage compartment 10 to the belt drop port 101, and the leading device 201 can be extended and retracted front and back. Therefore, the front and back length of the taking-up device 202 is known and constant, the front and back length of the leading device 201 is variable, and the total conveying length L of the conveying device 20 is the sum of the front and back length of the taking-up device 202 and the front and back length of the leading device 201, and L is also variable. In addition, in this optional embodiment, a length sensor is provided for detecting the front and back length of the leading device 201, and the length sensor communicates with the processor 90. By pre-storing the front and back length of the taking-up device 202 in the processor 90, and the processor 90 obtains the front and back length of the leading device 201 from the length sensor in real time, the processor 90 can automatically calculate the total conveying length L of the conveying device 20.
[0094] It can be seen that the difference between the above two optional embodiments is only the different methods of determining the total conveying length L, and the other settings are the same. Both optional embodiments can realize the second water hose section being folded in half and stacked, while ensuring that the joint 110 falls vertically to the rear bottom of the belt storage compartment 10.
[0095] In some embodiments, adjusting the motion state of the tape arranging device 30 according to the moving direction of the tape arranging device 30 and the front-to-back distance S between the tape arranging device 30 and the joint 110 includes:
[0096] When the conveying device 20 conveys the joint 110 to the front top of the belt storage compartment 10, the belt sorting device 30 performs a backward empty movement, and S>L0 / 2, calculate the hose section length L3 of the third hose section extending from the joint 110 to the hose stacking position at the rear bottom of the belt storage compartment 10;
[0097] The belt arranging device 30 is accelerated relative to the first speed V1 when continuing to perform the current backward idling action (for example, firstly accelerated at the second speed V2 and then decelerated to the first speed V1) to clamp the half length position of the third hose section at the belt drop port 101;
[0098] The belt handling device 30 performs the entrainment forward pulling action and the backward idling action in sequence within the second corrected front and rear stroke L0" at the first speed V1, so that the third water hose section can be folded and stacked below the preset height H in the belt storage compartment 10, where L3=2L0".
[0099] It should be noted that, when the conveying device 20 conveys the joint 110 to the front top of the belt storage compartment 10, the belt sorting device 30 is performing a backward empty movement and S>L0 / 2, the water hose section extending from the joint 110 to the water hose stacking position at the rear bottom of the belt storage compartment 10 is defined as the third water hose section, and the length of the third water hose section is L3. Since S>L0 / 2, it means that the distance between the belt sorting device 30 and the belt drop port 101 is not greater than L0 / 2, so by speeding up the belt sorting device 30, the belt sorting device 30 can catch up with the half-length position of the third water hose section, thereby clamping the half-length position at the belt drop port 101.
[0100] In addition, when the tape sorting device 30 clamps the half-length position of the third water hose section and performs the entrainment and forward pulling action, it is also necessary to correct the travel range of the tape sorting device 30 to ensure that when the joint 110 reaches the tape drop port 101, the tape sorting device 30 just releases the water hose and starts to move backward. To this end, in the present embodiment, when the tape sorting device 30 clamps the half-length position of the third water hose section and performs the entrainment and forward pulling action and the backward empty moving action in sequence, its travel range needs to be adjusted to the second corrected front and rear travel L0", and L3 = 2L0". In addition, when the tape sorting device 30 clamps the half-length position of the third water hose section and performs the entrainment and forward pulling action and the backward empty moving action in sequence, it can be restored to move at the first speed V1.
[0101] The following is an example of an optional embodiment in which the steps in this embodiment can be executed:
[0102] In an optional embodiment, the second sensor 50 is used to detect whether the joint 110 is transported to the front top of the tape storage compartment 10 by the conveying device 20, the second position sensor 70 is used to detect the front and rear positions of the tape sorting device 30, and the height sensor 80 is used to detect the stacking height of the water hose 100 in the tape storage compartment 10, and a processor 90 is provided to communicate with the second sensor 50, the second position sensor 70, the height sensor 80, the conveying device 20 and the tape sorting device 30, and a calculation analysis program is pre-stored in the processor 90. The preset height H is also pre-stored in the processor 90.
[0103] When the processor 90 determines that the stacking height of the water hoses in the tape storage compartment 10 is not higher than the preset height H, when the second sensor 50 detects that the connector 110 is transported to the front top of the tape storage compartment 10 by the conveying device 20, the processor 90 determines that the tape sorting device 30 is performing a backward idling action, and the processor 90 determines the front and rear distance S determined by the front and rear positions of the connector 110 (located at the front top of the tape storage compartment 10, the position of which is known) and the front and rear positions of the tape sorting device 30 obtained from the second position sensor 70 satisfy S>L0 / 2, the processor 90 first calculates the water hose section length L3 of the third water hose section extending from the connector 110 to the water hose stack at the rear bottom of the tape storage compartment 10.
[0104] It is known that when the connector 110 is at the front top of the tape storage compartment 10, the front-to-back distance between the connector 110 and the tape drop port 101 is equivalent to the front-to-back distance between the front top of the tape storage compartment 10 and the tape drop port 101, and the front-to-back distance between the front top of the tape storage compartment 10 and the tape drop port 101 is a known quantity determined according to the structure of the tape storage compartment 10. Therefore, the front-to-back distance between the connector 110 and the tape drop port 101 (i.e., equivalent to the length of the water hose section between the connector 110 and the tape drop port 101) can be pre-stored in the processor 90 as a known quantity. As for the length of the water hose section extending from the belt drop port 101 to the water hose stacking position at the rear bottom of the belt storage compartment 10, it is actually equivalent to the front-to-back distance between the belt sorting device 30 and its front end L0 formed by the preset front and rear. Therefore, the processor 90 only needs to obtain the front-to-back distance traveled by the belt sorting device 30 from the front end L0 formed by the preset front and rear to the current position through the second position sensor 70, which is equivalent to the length of the water hose section extending from the belt drop port 101 to the water hose stacking position at the rear bottom of the belt storage compartment 10.
[0105] Therefore, when the length of the hose section between the joint 110 and the belt drop port 101 and the length of the hose section extending from the belt drop port 101 to the hose stack at the bottom of the belt storage compartment 10 are determined, the specific value of the hose section length L3 of the third hose section can be obtained by summing the two, thereby determining the half-length position of the third hose section. In addition, when the specific value of the hose section length L3 is determined, the second corrected front and rear stroke L0" can be determined according to L3=2L0".
[0106] Then, the processor 90 automatically calculates the speed-up amplitude of the belt sorting device 30 through its calculation and analysis program, ensuring that the belt sorting device 30 accelerates relative to the first speed V1 when performing the backward idling action (for example, first accelerates at the second speed V2 and then slows down to the first speed V1) so as to clamp the half-length position of the third water hose section at the belt drop port 101.
[0107] When the tape sorting device 30 has clamped the third water hose section at the half length position at the tape drop port 101, the tape sorting device 30 performs the entrainment forward pulling action and the backward empty walking action in sequence within the second corrected front and rear stroke L0" at the first speed V1, so that the third water hose section can be folded and stacked below the preset height H in the tape storage compartment 10.
[0108] In some embodiments, adjusting the motion state of the tape arranging device 30 according to the moving direction of the tape arranging device 30 and the front-to-back distance S between the tape arranging device 30 and the joint 110 includes:
[0109] When the conveying device 20 conveys the joint 110 to the front top of the tape storage compartment 10 and the tape sorting device 30 performs the backward empty movement and S≤L0 / 2, the tape sorting device 30 stops performing the current backward empty movement or the tape sorting device 30 does not perform the entrainment forward pulling action after completing the current backward empty movement.
[0110] It should be noted that, when the conveying device 20 conveys the joint 110 to the front top of the belt storage compartment 10, the belt sorting device 30 is performing a backward idling action and S≤L0 / 2, since S≤L0 / 2, it means that the distance between the belt sorting device 30 and the belt drop port 101 is greater than L0 / 2. Therefore, by speeding up the belt sorting device 30, the belt sorting device 30 still cannot catch up with the half-length position of the third water hose section, and thus cannot clamp the half-length position at the belt drop port 101.
[0111] To this end, in this embodiment, the tape arranging device 30 can stop executing the current backward empty movement, or the tape arranging device 30 can stop executing the entrainment and forward pulling movement after executing the current backward empty movement, so that the joint 110 can fall vertically from the tape drop opening 101 to the rear bottom of the tape storage compartment 10. The situation described in this embodiment generally occurs when the last hose section is recovered.
[0112] The following is an example of an optional embodiment in which the steps in this embodiment can be executed:
[0113] In an optional embodiment, the second sensor 50 is used to detect whether the joint 110 is transported to the front top of the tape storage compartment 10 by the conveying device 20, the first position sensor 60 is used to detect whether the joint 110 passes through the tape drop port 101, the second position sensor 70 is used to detect the front and rear positions of the tape sorting device 30, and the height sensor 80 is used to detect the stacking height of the water hose 100 in the tape storage compartment 10, and a processor 90 is provided to communicate with the second sensor 50, the first position sensor 60, the second position sensor 70, the height sensor 80, the conveying device 20 and the tape sorting device 30, and a calculation analysis program is pre-stored in the processor 90. The preset height H is also pre-stored in the processor 90.
[0114] When the processor 90 determines that the stacking height of the water hose in the tape storage compartment 10 is not higher than the preset height H, when the second sensor 50 detects that the connector 110 is transported to the front top of the tape storage compartment 10 by the conveying device 20, the processor 90 determines that the tape sorting device 30 is performing a backward empty walking action, and the processor 90 determines the front and rear distance S determined by the front and rear positions of the connector 110 (located at the front top of the tape storage compartment 10, the position of which is known) and the front and rear positions of the tape sorting device 30 obtained from the second position sensor 70 satisfy S≤L0 / 2, the processor 90 controls the tape sorting device 30 to stop performing the current backward empty walking action, or controls the tape sorting device 30 not to perform the entrainment forward pulling action after performing the current backward empty walking action, so that the connector 110 can fall vertically from the tape drop port 101 to the rear bottom of the tape storage compartment 10.
[0115] When the connector 110 passes through the tape drop port 101 , the first position sensor 60 may feed back a signal to the processor 90 , and the processor 90 then performs subsequent actions according to the actual situation.
[0116] In some embodiments, the fire hose retrieval method further comprises:
[0117] The water hoses 100 are stacked in the plurality of belt storage spaces respectively by using the belt arrangement device 30 and the water hoses 100 in each belt storage space are stacked to a preset height H, wherein the plurality of belt storage spaces are divided and formed in sequence along the left-right direction in the belt storage compartment 10;
[0118] When the water hoses 100 in each belt storage space are stacked to a preset height H, the belt arranging device 30 is synchronously reciprocated left and right while continuing to repeatedly and alternately perform the entrainment forward pulling action and the backward idling action.
[0119] It should be noted that the plurality of tape storage spaces may be divided by the physical structure in the tape storage compartment 10. For example, a plurality of baffle structures 103 are sequentially arranged in the left-right direction in the tape storage compartment 10, and the tape storage spaces are formed between adjacent baffle structures 103. Alternatively, the plurality of tape storage spaces may also be divided in advance by the processor 90 in its program. When the processor 90 controls the tape handling device 30 to handle the tape, the processor 90 may control the tape handling device 30 to move left and right to different left and right positions, and different tape storage spaces correspond to the positions directly below these different left and right positions.
[0120] It can be seen from the steps of this embodiment that before the stacking height of the water hoses in each storage space reaches the preset height H, the water hoses are preferentially stacked in the storage space where the stacking height of the water hoses has not reached the preset height H. When the stacking height of the water hoses in all storage spaces reaches the preset height H, the stacked water hoses can form a relatively flat support surface at the preset height H, so that the belt sorting device 30 can repeatedly and alternately perform the entrainment forward pulling action and the backward idling action and synchronously move back and forth left and right, so as to realize a "Z"-shaped water hose stacking method on the support surface.
[0121] In the case of "Z" shaped hose stacking, the connector 110 does not have to be stacked at the rear bottom of the storage compartment 10, for example, Figure 3 The two joints 110 located at the front of the belt storage compartment 10 are stacked in a "Z"-shaped hose stacking manner.
[0122] The following is an example of an optional embodiment in which the steps in this embodiment can be executed:
[0123] In an optional embodiment, the belt sorting device 30 is arranged at the bottom of the conveying device 20 so as to be movable forward and backward. The conveying device 20 and the belt sorting device 30 can be driven to move synchronously left and right by a left and right moving device (not marked in the figure, for example, a lead screw nut mechanism arranged left and right can be used). The left and right positions of the conveying device 20 can be detected by a third position sensor (not marked in the figure). The stacking height of the water hose 100 in the belt storage compartment 10 can be detected by a height sensor 80, and a processor 90 is provided to communicate with the third position sensor, the height sensor 80, the conveying device 20 and the belt sorting device 30. The preset height H is pre-stored in the processor 90.
[0124] Before the height sensor 80 detects that the stacking height of the water hoses in all the belt storage spaces has reached the preset height H, the processor 90 controls the left and right moving devices (and based on the real-time feedback of the third position sensor) to drive the conveying device 20 and the belt sorting device 30 to move synchronously to the top of the belt storage space where the stacking height of the water hoses has not reached the preset height H, and preferentially stacks the water hoses in this belt storage space.
[0125] When the height sensor 80 detects that the stacking height of the water hoses in all the belt storage spaces has reached the preset height H, the processor 90 controls the belt sorting device 30 to move back and forth left and right while continuing to repeatedly and alternately perform the forward pulling action and the backward empty walking action according to the detection result of the height sensor 80, thereby realizing a "Z"-shaped water hose stacking method.
[0126] In some embodiments, the fire hose retrieval method further comprises:
[0127] When the water hoses 100 in each tape storage space are stacked to a preset height H and the tape sorting device 30 continues to perform the backward empty walking action, when it is determined that the tape sorting device 30 and the joint 110 can reach the tape drop port 101 at the same time, the tape sorting device 30 will not perform the entrainment and forward pulling action after completing the current backward empty walking action.
[0128] Through the steps of this embodiment, the interference between the tape arranging device 30 and the connector 110 can be avoided, thereby ensuring that the connector 110 can fall vertically from the tape drop opening 101 to the rear bottom of the tape storage compartment 10.
[0129] For example, whether the connector 110 reaches the tape drop port 101 can be detected by the first position sensor 60, and the front and rear positions of the tape sorting device 30 can be detected by the second position sensor 70. By setting the processor 90 to communicate with the first position sensor 60, the second position sensor 70, the conveying device 20 and the tape sorting device 30, the processor can control the tape sorting device 30 not to perform the entrainment forward pulling action after completing the current backward idling action when it is determined that the tape sorting device 30 and the connector 110 can reach the tape drop port 101 at the same time.
[0130] The second exemplary embodiment of the present application also provides a fire hose recovery system, which includes:
[0131] A belt storage compartment 10, wherein a belt drop opening 101 is provided at the rear top of the belt storage compartment 10;
[0132] The conveying device 20 is used to convey the water hose 100 from front to back to the belt drop port 101;
[0133] The belt handling device 30 is movably disposed at the bottom of the conveying device 20 and can clamp or release the water hose 100 at the inner top of the belt storage compartment 10;
[0134] A left-right moving device, used to drive the conveying device 20 to move left-right; and
[0135] The monitoring assembly can execute the above-mentioned fire hose recovery method by monitoring the water hose 100, the conveying device 20, the belt sorting device 30 and the left and right moving device.
[0136] It should be noted that the present application does not limit the specific composition of the monitoring assembly, as long as it can monitor the water hose 100, the conveying device 20, the belt sorting device 30 and the left and right moving device to execute the above-mentioned fire hose recovery method.
[0137] In some embodiments, the monitoring assembly includes:
[0138] The first sensor 40 is used to detect whether the connector 110 enters the front end of the conveying device 20;
[0139] The second sensor 50 is used to detect whether the connector 110 is transported to the front top of the belt storage compartment 10 by the transport device 20;
[0140] A first position sensor 60 is used to detect whether the connector 110 passes through the tape drop port 101;
[0141] A second position sensor 70, used to detect the front and rear positions of the belt arranging device 30;
[0142] A third position sensor, used to detect the left and right position of the conveying device 20;
[0143] A height sensor 80 for detecting the stacking height of the water hose 100 in the storage compartment 10; and
[0144] The processor 90 communicates with the first sensor 40 , the second sensor 50 , the first position sensor 60 , the second position sensor 70 , the third position sensor, the height sensor 80 , the conveying device 20 , the belt arranging device 30 , and the left-right moving device.
[0145] In some embodiments, the conveying device 20 includes a leading device 201 and a taking-up device 202 connected front and back, the taking-up device 202 extends from the front top of the belt storage compartment 10 to the belt drop port 101, the leading device 201 can be extended and retracted front and back, and the monitoring assembly includes a length sensor for detecting the front and rear length of the leading device 201.
[0146] In some embodiments, the conveying device 20 includes a leading device 201 and a taking-up device 202 connected front and back, the taking-up device 202 extends from the front top of the belt storage compartment 10 to the belt drop port 101, the front end of the taking-up device 202 is provided with an openable and closable front belt pressing mechanism 203, and the rear end of the taking-up device 202 is provided with an openable and closable rear belt pressing mechanism 204.
[0147] When the joint 110 enters the front end of the leading device 201, the front belt pressing mechanism 203 is opened to disengage from the water hose 100, and the rear belt pressing mechanism 204 is kept closed to press the water hose 100. This can ensure that the front belt pressing mechanism 203 avoids the joint 110 when it is conveyed to the front end of the belt collecting device 202 (i.e., the front top of the belt storage compartment 10), and the closed state of the rear belt pressing mechanism 204 can ensure the stable conveyance of the water hose 100.
[0148] When the joint 110 passes through the front end of the belt collecting device 202, the front belt pressing mechanism 203 is immediately closed to press the water hose 100, and the rear belt pressing mechanism 204 is opened to disengage from the water hose 100, to ensure that the rear belt pressing mechanism 204 avoids the joint 110 when it is conveyed to the rear end of the belt collecting device 202, thereby ensuring that the joint 110 can pass through the belt drop port 101, and at the same time, the closed state of the front belt pressing mechanism 203 is used to ensure the stable conveyance of the water hose 100.
[0149] Finally, it should be noted that in the preparation stage before recycling the water hose 100, the following operations are usually required:
[0150] The leader 201 is extended forward, and the top of the storage compartment 10 is opened;
[0151] The hose 100 is manually placed on the leading device 201 and the taking-up device 202 (the first joint is usually placed on the leading device 201 or the taking-up device 202), and the rear end of the hose 100 passes through the drop port 101, and the rear pressing mechanism 204 presses the hose 100;
[0152] The belt arranging device 30 is moved to an initial position in the front-to-back direction (usually the front end of the preset front-to-back stroke L0) and is in an open state. Whether the belt arranging device 30 is in the initial position in the front-to-back direction can be detected by the second position sensor 70;
[0153] The conveying device 20 (including the leading device 201 and the taking-up device 202 ) is moved to an initial position in the left-right direction. Whether the conveying device 20 is in the initial position in the left-right direction can be detected by a third position sensor.
[0154] The third exemplary embodiment of the present application further provides an emergency device, such as a hose laying fire truck, etc. The emergency device includes the above-mentioned fire hose recovery system.
[0155] The fourth exemplary embodiment of the present application further provides a machine-readable storage medium, on which instructions are stored, and the instructions are used to enable a machine to execute the above-mentioned fire hose recovery method.
[0156] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.
[0157] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0158] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0159] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0160] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0161] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0162] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0163] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0164] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.
Claims
1. Fire hose recovery method, It is characterized in that include: Using a conveying device (20) to convey a water hose (100) from front to back at a first speed V1 to a belt drop opening (101) at the top rear of a belt storage compartment (10), so that the water hose (100) can drop from the belt drop opening (101) into the belt storage compartment (10) at the first speed V1; When the joint (110) of the water hose (100) has not entered the conveying device (20) and the stacking height of the water hose in the belt storage compartment (10) is not higher than a preset height H, a belt sorting device (30) is used to repeatedly and alternately perform a forward entrainment and a backward empty movement at the top of the belt storage compartment (10) at the first speed V1 within a preset forward and backward stroke L0, so that each first water hose section with a length of L1 is folded in half and stacked in the belt storage compartment (10), wherein L1=2L0; When the joint (110) enters the conveying device (20) and the stacking height of the water hose in the belt storage compartment (10) is not higher than a preset height H, the movement state of the belt sorting device (30) is adjusted according to the moving direction of the belt sorting device (30) and the front-to-back distance S between the belt sorting device (30) and the joint (110), so that the joint (110) falls from the belt drop port (101) into the rear part of the belt storage compartment (10).
2. The fire hose recycling method according to claim 1, It is characterized in that Adjusting the motion state of the tape arranging device (30) according to the moving direction of the tape arranging device (30) and the front-to-rear distance S between the tape arranging device (30) and the joint (110) comprises: When L>2L0, the joint (110) enters the front end of the conveying device (20) and the tape sorting device (30) performs the entrainment and forward pulling action, the tape sorting device (30) is firstly made to continue to perform the entrainment and forward pulling action within the preset front and rear stroke L0 at the first speed V1, wherein L is the total conveying length of the conveying device (20); When the tape arrangement device (30) has completed the current tape entrainment and forward pulling action and S>L0 / 2, calculating the length L2 of the second tape section extending from the joint (110) to the tape drop port (101); The belt arranging device (30) is made to accelerate relative to the first speed V1 when performing the backward idling action so as to clamp the second hose section at a half-length position at the belt drop port (101); The belt sorting device (30) is caused to sequentially perform the entrainment forward pulling action and the backward idling action within the first corrected front and rear stroke L0' at the first speed V1, so that the second hose section can be folded and stacked below the preset height H in the belt storage compartment (10), wherein L2=2L0'.
3. The fire hose recycling method according to claim 1, It is characterized in that Adjusting the motion state of the tape arranging device (30) according to the moving direction of the tape arranging device (30) and the front-to-rear distance S between the tape arranging device (30) and the joint (110) comprises: When the conveying device (20) conveys the joint (110) to the front top of the belt storage compartment (10), the belt sorting device (30) performs the backward empty walking action, and S>L0 / 2, calculate the hose section length L3 of the third hose section extending from the joint (110) to the hose stacking position at the rear bottom of the belt storage compartment (10); The belt arranging device (30) is made to accelerate relative to the first speed V1 while continuing to perform the current backward idling action so as to clamp the third hose section at a half-length position at the belt drop port (101); The belt sorting device (30) is configured to sequentially perform the entrainment forward pulling action and the backward idling action within the second corrected front and rear stroke L0" at the first speed V1, so that the third water hose section can be folded and stacked below the preset height H in the belt storage compartment (10), wherein L3 = 2L0".
4. The fire hose recycling method according to claim 1, It is characterized in that Adjusting the motion state of the tape arranging device (30) according to the moving direction of the tape arranging device (30) and the front-to-rear distance S between the tape arranging device (30) and the joint (110) comprises: When the conveying device (20) conveys the joint (110) to the front top of the tape storage compartment (10), the tape sorting device (30) performs the backward idling action and S≤L0 / 2, the tape sorting device (30) stops performing the current backward idling action or the tape sorting device (30) does not perform the entrainment forward pulling action after completing the current backward idling action.
5. The fire hose recovery method according to any one of claims 1 to 4, It is characterized in that The fire hose recovery method also includes: The water belts (100) are stacked in a plurality of belt storage spaces respectively by using the belt sorting device (30) and the water belts (100) in each of the belt storage spaces are stacked to the preset height H, wherein the plurality of belt storage spaces are divided and formed in sequence along the left-right direction in the belt storage compartment (10); When the water belts (100) in each of the belt storage spaces are stacked to the preset height H, the belt arranging device (30) is synchronously moved back and forth left and right while continuing to repeatedly and alternately perform the entrainment forward pulling action and the backward idling action.
6. The fire hose recovery method according to claim 5, It is characterized in that The fire hose recovery method also includes: When the water belts (100) in each of the belt storage spaces are stacked to the preset height H and the belt sorting device (30) continues to perform the backward empty walking action, when it is determined that the belt sorting device (30) and the joint (110) can reach the belt drop port (101) at the same time, the belt sorting device (30) does not perform the entrainment and forward pulling action after completing the current backward empty walking action.
7. Fire hose recovery system, It is characterized in that include: A belt storage compartment (10), wherein a belt drop opening (101) is provided at the rear top of the belt storage compartment (10); A conveying device (20) for conveying the water hose (100) from front to back to the hose drop port (101); A belt handling device (30) is arranged at the bottom of the conveying device (20) so as to be movable forward and backward and is capable of clamping or releasing the water belt (100) at the inner top of the belt storage compartment (10); A left-right moving device, used for driving the conveying device (20) to move left-right; and The monitoring assembly can execute the fire hose recovery method according to any one of claims 1 to 6 by monitoring the water hose (100), the conveying device (20), the belt sorting device (30) and the left and right moving device.
8. The fire hose recovery system according to claim 7, It is characterized in that The monitoring assembly comprises: A first sensor (40) for detecting whether the connector (110) enters the front end of the conveying device (20); a second sensor (50) for detecting whether the connector (110) is transported to the front top of the belt storage compartment (10) by the transport device (20); A first position sensor (60) for detecting whether the joint (110) passes through the tape drop opening (101); A second position sensor (70) for detecting the front and rear positions of the belt arranging device (30); a third position sensor, used for detecting the left and right positions of the conveying device (20); A height sensor (80) for detecting the stacking height of the water hose (100) in the hose storage compartment (10); and The processor (90) communicates with the first sensor (40), the second sensor (50), the first position sensor (60), the second position sensor (70), the third position sensor, the height sensor (80), the conveying device (20), the belt sorting device (30) and the left-right moving device.
9. The fire hose recovery system according to claim 7, It is characterized in that The conveying device (20) comprises a leading device (201) and a taking-up device (202) connected front and rear, the taking-up device (202) extending from the front top of the belt storage compartment (10) to the belt drop opening (101), the front end of the taking-up device (202) being provided with an openable and closable front belt pressing mechanism (203), and the rear end of the taking-up device (202) being provided with an openable and closable rear belt pressing mechanism (204).
10. The fire hose recovery system according to claim 7, It is characterized in that The conveying device (20) comprises a leading device (201) and a taking-up device (202) connected front and rear, the taking-up device (202) extending from the front top of the belt storage compartment (10) to the belt drop opening (101), the leading device (201) being capable of being extended and retracted front and rear, and the monitoring assembly comprising a length sensor for detecting the front and rear length of the leading device (201).
11. Emergency equipment, It is characterized in that Comprising a fire hose recovery system according to any one of claims 7 to 10.
12. Machine-readable storage medium, It is characterized in that The machine-readable storage medium stores instructions for causing a machine to execute the fire hose recovery method according to any one of claims 1 to 6.
Citation Information
Patent Citations
Water hose recovery control method and device and fire fighting truck
CN113069704A
Control method and device for water hose laying vehicle, storage medium and processor
CN116036526A
Method and system for preventing pulling and winding of water hose
CN116059573A
Control method and control system for water hose vehicle, processor and water hose vehicle
CN116077867A
Method and device for determining recovery length of water hose, storage medium and processor
CN116182686A
