Blending system and preparation process of pellet injection coal
By designing a compounding system for pellet-blasted coal, using the waste heat of the ring cooler and gas furnace to supply heating, the problems of high cost and low efficiency in the supply of pellet-blasted coal are solved, and efficient and stable coal-fired production is achieved. Reduces procurement and operation costs and improves the operating efficiency of coal mills.
Patent Information
- Application Number
- CN202411131901.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-26
AI Technical Summary
The lack of compounding systems in the domestic supply of pellet spray coal has led to high procurement costs, high utilization rates, large performance fluctuations, and traditional boiling furnaces have low heating efficiency and high cost, complex operation, and easy to coke or shut down.
A compounding system for pellet sprayed coal is designed, including raw coal warehouse, powerful mixer, gas furnace and ring cooler. Through the waste heat utilization of the ring cooler and the heating of the gas furnace, the coal mill is efficient and stable. Operation, reduce intermediate procurement links, use automatic control system to adjust coal grinding parameters, and reduce manual operation costs.
It reduces the cost of coal-fired procurement, improves the efficiency of coal-fired utilization, reduces fluctuations in coal-fired indicators, improves the efficiency of coal mills, and achieves the stability and cost reduction of combustion, which is in line with the trend of smart manufacturing.
Smart Images

Figure CN119020586A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of pellet production methods, and more specifically, to a mixing system and a preparation process for pelletizing coal injection. Background Art
[0002] In the field of domestic chain grate-rotary kiln-ring cooler iron ore pellet production, the heating fuels for rotary kiln roasting include natural gas, coke oven gas, heavy oil, coal powder, etc. Due to the high calorific value of coal, low price and abundant resources, it is widely used in the roasting heating of pelletizing rotary kiln.
[0003] In terms of the supply of coal for pelletizing injection in China, there is no mixing system in the factory. According to the characteristic needs of pelletizing rotary kiln roasting, on the premise of meeting the purchasing indicators such as calorific value, volatile matter, and particle size, pre-mixed washed coal is directly purchased from outside to organize production. Due to the uncontrollable source of supply, the performance of the coal fluctuates greatly, which directly affects the pellet production and the cost remains high.
[0004] However, washed fine coal cannot be used directly due to its coarse particle size. It needs to go through a preparation process to be ground into a certain particle size of coal powder for injection. The conventional domestic coal preparation process consists of a raw coal bin, a coal feeder, a boiling furnace, a coal mill, a bag collector, an exhaust fan, a pulverized coal bin, a metering and pneumatic conveying device, etc. The specific preparation process is as follows: the raw coal in the raw coal bin is quantitatively fed into the coal mill through a coal feeder with a metering function, and the coal to be ground is rotated and ground into coal powder; the boiling furnace generates hot flue gas of a specific temperature by burning coal, and the hot flue gas flow is drawn into the coal mill by the exhaust fan; the hot flue gas flow dries and separates the moisture in the coal powder while feeding the coal powder into a bag collector; the collector separates the dried coal powder and the hot flue gas flow, and the coal powder is collected and fed into the pulverized coal bin below; the hot flue gas flow containing water vapor is brought into the chimney by the exhaust fan and discharged into the atmosphere; the prepared coal powder is buffered in the pulverized coal bin, and is sprayed into the burner at the kiln head of the rotary kiln through the metering and pneumatic conveying system below the pulverized coal bin, and the heat generated by the combustion is used to roast the pellets in the rotary kiln.
[0005] However, the fluidized bed furnace consumes a lot of coal for heating, and when the fluidized bed furnace is burning for heating, the furnace is prone to coking or flameout, large temperature fluctuations, long adjustment time, unstable negative pressure, high manual operation costs, low coal production efficiency, and high energy consumption. In addition, when the fluidized bed furnace is put into use, it must be heated manually by burning flammable media such as coke, which requires a huge amount of operation. When the coal mill is intermittently making coal, the fluidized bed furnace needs to be briefly turned off to keep warm, and heat and cost losses will also be generated during the insulation stage.
[0006] Therefore, it is necessary to propose a mixing system and preparation process for pelletizing coal injection to solve the above problems. Summary of the invention
[0007] The present invention provides a mixing system and a preparation process for pelletizing coal injection, so as to solve the problems of high cost of existing coal procurement and high coal utilization rate leading to high cost and serious heat loss.
[0008] According to one aspect of the present invention, a compounding system for coal injection into pellets is provided, comprising a compounding system and a calcining system.
[0009] The mixing system comprises a raw coal storage, a powerful mixer, a gas furnace, a raw coal bunker and a coal mill. Different raw coals are stored in the raw coal storage. The raw coal storage is connected to the coal mill through the powerful mixer. A bag collector is connected to the output end of the coal mill. The hot air duct of the gas furnace is connected to the coal mill.
[0010] The calcining system includes a gas furnace, a rotary kiln, an annular cooler and a chain grate. The output end of the bag collector is connected to the rotary kiln through a coal powder bin, and the output end of the rotary kiln transports the calcined pellets to the annular cooler through a chain grate.
[0011] The ring cooler is of a multi-stage structure, and a heat recovery pipe is arranged in the middle section of the ring cooler. A waste heat blower is arranged on the heat recovery pipe, and the output end of the heat recovery pipe is connected to the coal mill.
[0012] Based on the above scheme, it is preferred that the ring cooler is arranged as a 3-stage or 4-stage structure, and the heat recovery pipe is arranged on the second and third stages of the ring cooler, and the temperature of the second stage of the ring cooler is 700-1180°C, and the temperature of the third stage of the ring cooler is 260-380°C.
[0013] Preferably, the outlet of the coal mill is equipped with a temperature sensor and a pressure sensor, the heat recovery pipe is provided with a temperature sensor, a pressure sensor and a flow sensor, the bag collector is equipped with a pressure and CO sensor, and the top of the coal powder bin is equipped with a temperature and CO sensor.
[0014] Preferably, based on the above solution, the hot air duct of the gas furnace and the heat return pipe are provided with cut-off valves.
[0015] Preferably, based on the above scheme, the raw coal warehouse includes a coal storage yard, an electronic fence is provided in the coal storage yard, the electronic fence divides the coal storage yard into a plurality of coal warehouses, a feed hopper is provided at the bottom of each coal warehouse, and an output end of the feed hopper is connected to the high-power mixer through a batching belt scale.
[0016] Preferably, based on the above scheme, the output end of the batching belt scale is connected to the intensive mixer via a converging belt, and the intensive mixer is connected to the raw coal bin via a belt conveyor.
[0017] Preferably, based on the above scheme, the intensive mixer is of a vertical structure, a feed port is arranged on the top of the intensive mixer, and a discharge port is arranged on the bottom of the intensive mixer, and raw coals of different qualities can be fully mixed by fast-rotating stirring blades.
[0018] Preferably, based on the above scheme, the coal mill is connected with an induced draft fan, and the waste heat fan and the induced draft fan are driven by variable frequency, and the rotation speed can be adjusted according to the wind pressure demand.
[0019] Preferably, based on the above scheme, the central burner and pipeline adopt a multi-channel structure, which can not only spray coal and gas for mixed combustion, but also burn different fuels separately.
[0020] The preparation process of a pelletizing coal injection compounding system of the present invention comprises the following steps:
[0021] Step 1, prepare different raw coals in proportion in a raw coal warehouse, and mix them through a powerful mixer to form mixed coal;
[0022] Step 2, introducing the mixed coal into the raw coal bin for transfer and storage, and then introducing it into the coal mill, using the heat generated by the gas furnace and / or the heat introduced by the heat recovery pipe output by the ring cooler to provide thermal energy for the coal mill;
[0023] Step 4: The output end of the coal mill is collected and transported to the coal powder bin through a bag collector. The coal powder in the coal powder bin is quantitatively injected and introduced into the rotary kiln through a Roots blower.
[0024] The present invention provides a pelletizing coal mixing system and a preparation process thereof, which introduces the waste heat of the ring cooler into the coal mill to provide heat for the coal mill and fully realizes the waste heat utilization. At the same time, the traditional boiling furnace is replaced with a gas furnace, and natural gas or blast furnace gas is used for combustion and heating. The temperature and pressure of the hot flue gas are adjusted according to the thermal energy demand of the coal mill, and the adjustment is faster and the combustion is more stable.
[0025] Compared with the prior art, the present invention has the following advantages:
[0026] 1. By reducing the intermediate procurement links, coal that meets the index requirements is purchased directly from the coal origin, and coal is blended on site, which greatly reduces the procurement cost and also reduces the fluctuation of coal index.
[0027] 2. After the new ring cooler waste heat utilization process is put into use, the boiling furnace or gas furnace is only used for heating in the initial stage of production. During normal production, the waste heat of the ring cooler is fully utilized to replace it, saving the amount of coal used in the boiling furnace.
[0028] 3. After the new type of ring cooler waste heat utilization process is put into use, the automatic control system can automatically adjust the coal grinding parameters and can quickly and automatically adjust when encountering disturbances. When the boiling furnace is heating, there will be no temperature drop caused by coking, coal supply fluctuations and other factors, and the adjustment time will not be long, resulting in coal mill reduction and low-load operation. The coal grinding efficiency has been improved by more than 15%.
[0029] 4. Gas furnaces replace boiling furnaces. In the short period of time when the production line starts production, when the ring cooler has no excess heat supply, the gas furnace is relied on for heating. The advantages of gas furnaces are stable combustion, remote operation, and direct cancellation of on-site operation positions, which meets the trend of smart manufacturing. At the same time, because of the reduction of human operation factors and the full avoidance of the problem of easy coking or flameout during coal combustion, the stable control of the heat supply of the pulverizer is achieved, and the coal making efficiency is improved. Although the cost of using gas for heating is slightly higher, it is only used for a short time, and the cost of combustion and heating is slightly increased. However, when the pulverizer is shut down intermittently, there is no need to turn off the flame for insulation, which avoids the consumption of coal in this stage and reduces the manual baking of coke for the boiling furnace. These have correspondingly reduced material and labor costs. Through this transformation, the overall cost has not only not increased, but has slightly decreased. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:
[0031] Figure 1 It is a structural schematic diagram of a mixing system for pelletizing coal injection of the present invention;
[0032] Description of Figure Numbers:
[0033] 1 Mixing system, 101 raw coal storage, 102 coal grab, 103 batching bin, 104 batching belt scale, 105 converging belt, 106 strong mixer, 107 belt conveyor; 201 gas burner, 202 gas furnace, 203 cooling valve, 204 regulating valve, 205 regulating valve, 206 cooling valve, 207 waste heat fan, 208 switching valve, 209 switching valve, 211 raw coal bin, 212 coal feeder, 213 coal mill, 214 negative pressure pipeline, 215 bag collector, 216 induced draft fan, 217 chimney, 218 pulverized coal bin, 219 negative pressure dust collector, 221 ring balance, 222 conveying pipeline, 223 central burner, 224 rotary kiln. DETAILED DESCRIPTION
[0034] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0035] It should be understood that when used in this specification and the appended claims, the term "comprising" indicates the presence of described features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or collections.
[0036] In order to simplify the drawings, only the parts related to the present invention are schematically shown in each figure, and they do not represent the actual structure of the product. In addition, in order to simplify the drawings and facilitate understanding, in some figures, only one of the parts with the same structure or function is schematically drawn or marked. In this article, "one" not only means "only one", but also means "more than one".
[0037] It should be further understood that the term “and / or” used in the specification and appended claims refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0038] In the embodiments shown in the drawings, the indications of directions (such as up, down, left, right, front and back) used to explain the structure and movement of the various components of the present invention are not absolute but relative. These descriptions are appropriate when these components are in the positions shown in the drawings. If the descriptions of the positions of these components change, the indications of these directions also change accordingly.
[0039] In addition, in the description of the present application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0040] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the specific implementation methods of the present invention will be described below with reference to the accompanying drawings. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings and other implementation methods can be obtained based on these drawings without creative work.
[0041] See also Figure 1 The present invention provides a pelletizing coal injection compounding system 1, comprising a compounding system 1 and a calcining system.
[0042] The mixing system 1 includes a raw coal warehouse 101 , a strong mixer 106 , a gas furnace 202 , a raw coal bin 211 and a coal mill 213 .
[0043] The raw coal warehouse 101 includes a coal storage yard, in which an electronic fence is arranged, and the electronic fence divides the coal storage yard into multiple coal warehouses. Raw coal of different qualities is stored in the raw coal warehouse 101. A feed hopper and a coal grab 102 are arranged at the bottom of each coal warehouse. The output end of the batching belt scale 104 is connected to the strong mixer 106 through a converging belt 105, and the output end of the feed hopper is connected to the strong mixer 106 through the batching belt scale 104 through the converging belt 105. The strong mixer 106 is connected to the raw coal bin 211 through a belt conveyor 107.
[0044] When in use, raw coal of different qualities is grabbed into different batching bins 103, and the batching belt scale 104 connects the upstream batching bin 103 and the downstream converging belt 105. According to the required proportion of raw coal of different qualities, the raw coal is accurately distributed from the batching bin to the downstream converging belt 105, and then transported to the high-power mixer 106.
[0045] Among them, the powerful mixer 106 adopts a vertical structure, with feeding at the top and discharging at the bottom, and the fast-rotating stirring blades fully mix the raw coals of different qualities.
[0046] It should be noted that the electronic fence can be adjusted according to the number of coal types, and a buffer bin can be added next to the coal storage bin to fill different types of coal. The number of buffer bins is generally 1 to 2 more than the coal type partitions, which are used as backup in case of failure. A supporting belt scale is set under the buffer bin; after the different types of coal are measured by the belt scale, they are aggregated to the downstream belt, and then aggregated to the strong mixer 106 through the downstream belt for sufficient mixing and stirring, and then transported to the coal mill 213 by the downstream belt.
[0047] The heat of the coal mill 213 is provided partly by the heat generated by the gas furnace 202 and partly by the waste heat of the ring cooler. The coal mill 213 is externally connected to an induced draft fan 216, and the output end of the coal mill 213 is connected to a bag collector 215. The hot air duct of the gas furnace 202 is connected to the coal mill 213.
[0048] The calcining system of the present invention comprises a gas furnace 202, a rotary kiln 224, an annular cooler and a chain grate. The output end of the bag collector 215 is connected to the rotary kiln 224 through a coal powder bin 218. A chain grate is arranged inside the rotary kiln 224 to transport the calcined pellets to the annular cooler.
[0049] The ring cooler has a multi-stage structure, and a heat recovery pipe is arranged in the middle section of the ring cooler. A waste heat blower 207 is arranged on the heat recovery pipe, and its output end is connected to the coal mill 213.
[0050] The coal mill 213 grinds the raw coal into coal powder, and the coal powder produced in the grinding process is dried by the hot flue gas provided by the annular cooler and the gas furnace 202. The induced draft fan 216 connected to the coal mill 213 generates negative pressure when working, and sends the coal powder to the bag collector 215 through the negative pressure pipeline 214, and discharges the tail flue gas into the atmosphere through the chimney 217. The bag collector 215 separates the coal powder from the hot flue gas, and the collected coal powder is sent to the downstream coal powder bin 218. The negative pressure dust collector 219 is used to ensure that when the coal powder falls into the coal powder bin 218, the coal powder bin 218 always maintains a negative pressure to prevent the flue gas carrying the coal powder from overflowing.
[0051] It should be noted that the annular cooler of the present invention is set as a 3-stage or 4-stage structure, and the heat recovery pipe is set on the second and third stages of the annular cooler, and the temperature of the second stage of the annular cooler is 700-1180°C, and the temperature of the third stage of the annular cooler is 260-380°C. By installing branch pipes and valves on the heat recovery pipes of these two stages, the hot flue gas of the two branch pipes is merged into one pipe, and the merged pipe is provided with valves and cold air valves. Cut-off valves are installed on each pipe for alternating use under different working conditions. When starting production, the annular cooler has no excess heat, and the gas furnace 202 and its hot air pipe are used for heating. In normal production, the annular cooler and its hot air pipe are used for heating to achieve the purpose of utilizing waste heat and reducing energy consumption.
[0052] If the induced draft fan 216 in the original coal powder preparation area has no load margin, an additional induced draft fan 216 must be installed between the coal mill 213 and the annular cooler to relay the hot flue gas from the annular cooler into the induced draft duct and then send it to the coal mill 213.
[0053] The outlet of the coal mill 213 is equipped with a temperature sensor and a pressure sensor, the heat recovery pipe of the ring cooler is equipped with a temperature sensor, a pressure sensor and a flow sensor, and the hot air duct of the gas furnace 202 and the heat recovery pipe of the ring cooler are equipped with a cut-off valve. The bag collector 215 is equipped with a pressure and CO sensor. The top of the coal powder bin 218 is equipped with a temperature and CO sensor. The Roots blower and the conveying pipeline 222 are equipped with flow and pressure sensors. These sensors provide data support for the system operation to ensure the safe and stable operation of the system.
[0054] When in use, the temperature and pressure of the coal mill 213 can be controlled by installing a temperature sensor and a pressure sensor at the outlet of the coal mill 213 to ensure efficient and stable operation of the coal mill 213. The temperature of the coal mill 213 is too high to prevent the coal powder from catching fire, and the temperature is too low to prevent the coal powder from being insufficiently dried and easily blocked. The outlet pressure (negative pressure) is too high, the coal powder is adsorbed on the bag and cannot be vibrated off, and the outlet negative pressure is too small, resulting in low coal production efficiency.
[0055] A gas burner 201 is installed in the gas furnace 202 of the present invention, and a cooling air valve 203 and a switching valve 209 are provided on the outlet pipe of the gas furnace 202 to be connected with the coal mill 213, and a waste heat fan 207 is provided on the heat return pipe of the ring cooling fan, and a switching valve 208 and a regulating valve 204 / 205 are provided on the heat return pipe to provide the coal mill 213 with the heat required for its operation.
[0056] When the pelletizing production line starts running, the gas burner and its combustion-supporting fan 201 work, generating hot flue gas in the gas furnace 202, which is sent to the coal mill 213 through the pipeline. The cooling air valve 203 on the pipeline adjusts the hot flue gas temperature according to demand. When the pelletizing production line is running normally, the waste heat fan 207 works to generate negative pressure, extracting hot flue gas from the heat recovery pipe of the second / third stage of the ring cooler to provide heat for the coal mill 213. The regulating valve 204 / 205 and the cooling valve 206 on the heat recovery pipe adjust the hot flue gas temperature according to demand.
[0057] It should be noted that, in the present invention, a coal feeder 212 is arranged between the raw coal bin 211 and the coal mill 213, and a ring balance 221 is arranged between the coal powder bin 218 and the rotary kiln 224 for controlling the coal output amount of the coal powder bin 218. At the same time, a conveying pipeline 222 with a built-in Roots blower is used to convey the coal powder to the rotary kiln 224, and the rotary kiln 224 has a built-in central burner 223.
[0058] Among them, the central burner 223 adopts a multi-channel structure, which can be used to spray coal and gas for mixed combustion, or to burn different fuels separately; the waste heat fan 207 and the induced draft fan 216 adopt variable frequency drive, and the speed can be adjusted according to the wind pressure requirements; the high-power mixer 106 adopts a vertical structure, with feeding at the top and discharging at the bottom, and the rapidly rotating stirring blades fully mix the raw coal of different qualities.
[0059] The preparation process of a pelletizing coal injection compounding system 1 of the present invention comprises the following steps:
[0060] Step 1, different raw coals are prepared in proportion in the raw coal storage 101, and mixed by a powerful mixer 106 to form mixed coal;
[0061] Step 2, introducing the mixed coal into the raw coal bin 211 for transfer and storage, and then introducing it into the coal mill 213, using the heat generated by the gas furnace 202 and / or the heat introduced by the heat recovery pipe output by the ring cooler to provide thermal energy for the coal mill 213;
[0062] Step 4: the output end of the coal mill 213 is collected and transported to the coal powder bin 218 through the bag collector 215. The coal powder in the coal powder bin 218 is quantitatively injected and introduced into the rotary kiln 224 through the Roots blower.
[0063] The present invention provides a pelletizing coal injection compounding system 1 and a preparation process thereof, which introduces the waste heat of the ring cooler into the coal mill 213 to provide heat for the coal mill 213, thereby fully realizing the waste heat utilization. At the same time, the traditional boiling furnace is replaced with a gas furnace 202, which uses natural gas or blast furnace gas to burn and supply heat. The temperature and pressure of the hot flue gas are adjusted according to the thermal energy demand of the coal mill, and the adjustment is faster and the combustion is more stable.
[0064] Compared with the prior art, the present invention has the following advantages:
[0065] The present invention reduces the intermediate procurement links, directly purchases coal that meets the index requirements from the coal origin, and mixes the coal on site, which greatly reduces the procurement cost and also reduces the fluctuation of coal index.
[0066] After the ring cooler waste heat utilization process of the present invention is put into use, the boiling furnace or gas furnace 202 is used for heating only in the initial stage of production. During normal production, the waste heat of the ring cooler is fully utilized to replace it, saving the amount of coal used in the boiling furnace.
[0067] After the ring cooler waste heat utilization process of the present invention is put into use, the automatic control system can automatically adjust and control the coal grinding parameters, and can quickly and automatically adjust when encountering disturbances. When the boiling furnace is heating, there will be no temperature drop caused by coking, coal supply fluctuations and other factors, and the adjustment time will be long, resulting in the coal mill 213 reducing and low-load operation. The coal grinding efficiency is improved by more than 15%.
[0068] The present invention uses a gas furnace 202 to replace a boiling furnace. In the short period of time when the production line starts production, when the ring cooler has no excess heat supply, the gas furnace 202 is relied on for heat supply. The gas furnace 202 has the advantages of stable combustion, remote operation, and direct cancellation of the configuration of the on-site operation post, which meets the trend requirements of smart manufacturing.
[0069] On the other hand, the present invention reduces human operation factors and fully avoids the problem of easy coking or flameout during coal combustion, realizes stable control of the heat supply of the coal mill 213, and improves the coal making efficiency. Although the cost of using gas for heating is slightly high, it is only used for a short time, and the combustion heating cost is slightly increased. However, when the coal mill 213 is shut down intermittently, there is no need to turn off the flame for heat preservation, which avoids the consumption of coal in this stage, and reduces the link of artificial baking of coke for boiling furnace, which reduces the material and labor costs accordingly. Through this transformation, the overall cost has not only not increased, but has slightly decreased.
[0070] Finally, the method of the present application is only a preferred implementation scheme and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
[0071] Finally, the method of the present application is only a preferred implementation scheme and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A mixing system for pelletizing coal injection, It is characterized in that Including compounding system and calcining system, The mixing system comprises a raw coal storage, a powerful mixer, a gas furnace, a raw coal bunker and a coal mill. Different raw coals are stored in the raw coal storage. The raw coal storage is connected to the coal mill through the powerful mixer. A bag collector is connected to the output end of the coal mill. The hot air duct of the gas furnace is connected to the coal mill. The calcining system includes a gas furnace, a rotary kiln, an annular cooler and a chain grate. The output end of the bag collector is connected to the rotary kiln through a coal powder bin, and the output end of the rotary kiln transports the calcined pellets to the annular cooler through a chain grate. The ring cooler is of a multi-stage structure, and a heat recovery pipe is arranged in the middle section of the ring cooler. A waste heat blower is arranged on the heat recovery pipe, and the output end of the heat recovery pipe is connected to the coal mill.
2. A compounding system for pelletizing coal injection as claimed in claim 1, It is characterized in that The ring cooler is configured as a 3-stage or 4-stage structure, and the heat recovery pipe is configured on the second and third stages of the ring cooler. The temperature of the second stage of the ring cooler is 700-1180°C, and the temperature of the third stage of the ring cooler is 260-380°C.
3. A compounding system for pelletizing coal injection as claimed in claim 1, It is characterized in that The outlet of the coal mill is equipped with a temperature sensor and a pressure sensor, and the heat recovery pipe is provided with a temperature sensor, a pressure sensor and a flow sensor.
4. A compounding system for pelletizing coal injection as claimed in claim 1, It is characterized in that The hot air duct of the gas furnace and the heat return pipe are provided with cut-off valves.
5. A compounding system for pelletizing coal injection as claimed in claim 1, It is characterized in that The raw coal warehouse includes a coal storage yard, in which an electronic fence is arranged. The electronic fence divides the coal storage yard into a plurality of coal warehouses. A feed hopper is arranged at the bottom of each coal warehouse, and an output end of the feed hopper is connected to the high-power mixer through a batching belt scale.
6. A compounding system for pelletizing coal injection as claimed in claim 5, It is characterized in that The output end of the batching belt scale is connected to the intensive mixer through a converging belt, and the intensive mixer is connected to the raw coal bin through a belt conveyor.
7. A compounding system for pelletizing coal injection according to claim 1, It is characterized in that The powerful mixer is of a vertical structure, with a feed port disposed on the top and a discharge port disposed on the bottom, and raw coals of different qualities can be fully mixed by rotating stirring blades.
8. A preparation process for a pelletizing coal injection compounding system, It is characterized in that The following steps are involved: Step 1, prepare different raw coals in proportion in a raw coal warehouse, and mix them through a powerful mixer to form mixed coal; Step 2, introducing the mixed coal into the raw coal bin for transfer and storage, and then introducing it into the coal mill, using the heat generated by the gas furnace and / or the heat introduced by the heat recovery pipe output by the ring cooler to provide thermal energy for the coal mill; Step 3: The output end of the coal mill is collected and transported to the coal powder bin through a bag collector. The coal powder in the coal powder bin is quantitatively injected and introduced into the rotary kiln through a Roots blower.