Upper electrode assembly, semiconductor process chamber and semiconductor process equipment
By designing an upper electrode assembly with a radio frequency isolation ring and a gas spray head in the PEALD process equipment, combined with the positioning and adjustment module, the problem of energy crosstalk and film formation quality in the RF field is solved, and higher quality and consistency are achieved thin film deposition.
Patent Information
- Application Number
- CN202411131787.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-16
AI Technical Summary
In the existing PEALD process equipment, the problem of intra-field energy crosstalk and poor film formation quality caused by the upper electrode assembly affects the process quality.
An upper electrode assembly is designed, including a carrier, a radio frequency isolation ring and a gas spray head. The first positioning and adjustment of radio frequency energy and the concentricity of components are achieved through the first positioning and adjustment of the concentricity of components, thereby avoiding energy crosstalk in the radio frequency field. And improve the film generation quality.
It effectively reduces energy crosstalk in the radio frequency field, improves the quality and consistency of the film generation, and ensures the stability and accuracy of film formation.
Smart Images

Figure CN119020758A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of semiconductor equipment, and in particular to an upper electrode assembly, a semiconductor process chamber, and semiconductor process equipment. Background Art
[0002] Plasma Enhanced Atomic Layer Deposition (PEALD) is based on the traditional atomic layer deposition technology, which introduces plasma containing various highly active particles (plasma is obtained by radio frequency discharge of gaseous precursors), and then achieves thin film deposition through the reaction between plasma and precursors. Because the films deposited by PEALD have good conformality and precise thickness control energy, they are being used more and more widely.
[0003] In the existing PEALD process equipment, the plasma is fed into the semiconductor process chamber through the upper electrode assembly. However, in the current process, there is energy crosstalk in the RF field caused by the upper electrode assembly and unsatisfactory film quality, which seriously affects the process quality. Summary of the invention
[0004] In view of this, the present application provides an upper electrode assembly, which can not only reduce or even avoid energy crosstalk in the radio frequency field, but also adjust the concentricity between the components, so that the film quality is improved. In addition, the present application also provides a semiconductor process chamber including the above-mentioned upper electrode assembly, and a semiconductor process equipment including the semiconductor process chamber.
[0005] In order to achieve the above objectives, this application provides the following technical solutions:
[0006] An upper electrode assembly, used for being arranged in a semiconductor process chamber of a semiconductor process equipment, comprises:
[0007] A carrier, fixedly arranged on the cavity of the semiconductor process chamber and provided with a receiving hole;
[0008] A radio frequency isolation ring, carried by the carrier and at least partially located in the receiving hole, for blocking radio frequency capability;
[0009] A gas shower head, passing through the ring cavity of the radio frequency isolation ring and carried on the radio frequency isolation ring, and at least used to feed radio frequency energy into the semiconductor process chamber;
[0010] The first positioning and adjustment module includes: a fixing member, which is arranged on the supporting member and located on the outside of the RF isolation ring; a pressing member, which is connected to the fixing member and extends toward the center direction of the RF isolation ring and can cooperate with the supporting member to achieve clamping and positioning of the RF isolation ring and the gas shower head; an adjustment mechanism, which is arranged on the fixing member and can move radially along the RF isolation ring to promote the radial movement of the gas shower head.
[0011] Optionally, in the above-mentioned upper electrode assembly, a gas guide channel for guiding inert gas is provided on the carrier, and the inert gas introduced into the semiconductor process chamber by the gas guide channel is blown toward the exhaust port of the semiconductor process chamber under the guidance of the RF isolation ring and the gas shower head.
[0012] Optionally, the above-mentioned upper electrode assembly further includes a positioning module for positioning the RF isolation ring and the gas shower head. In the circumference of the accommodating hole, multiple first positioning and adjustment modules and multiple positioning modules are provided, and the first positioning and adjustment modules and the positioning modules are alternately provided in the circumference of the accommodating hole.
[0013] Optionally, in the upper electrode assembly, the fixing member is movably and / or rotatably connected to the supporting member, and drives the pressing member to reciprocately move and / or rotate to achieve positioning and releasing of the RF isolation ring and the gas shower head.
[0014] Optionally, in the above-mentioned upper electrode assembly, the adjustment mechanism includes:
[0015] A second through hole is arranged on the fixing member along the radial direction of the radio frequency isolation ring;
[0016] A movable member, one end of which extends into the second through hole and can move in the second through hole, and the other end of which is located on a side of the fixed member away from the radio frequency isolation ring and is provided with a second threaded hole;
[0017] a third threaded hole, which is arranged on the fixing member along the radial direction of the radio frequency isolation ring, and has a thread direction opposite to that of the second threaded hole;
[0018] The adjusting member comprises a screw portion threadably matched with the second threaded hole and the third threaded hole.
[0019] Optionally, in the above-mentioned upper electrode assembly, the first positioning and adjusting module further includes an insulating pad which is arranged on the fixing member and the pressing member and is used to contact the radio frequency isolation ring and the gas shower head.
[0020] Optionally, in the upper electrode assembly, the RF isolation ring comprises: a cylindrical portion, located in the accommodating hole; a first flange portion, disposed at the top end of the cylindrical portion and protruding radially outward relative to the cylindrical portion;
[0021] The gas shower head comprises: a main body portion passing through the receiving hole; a second flange portion disposed at the top end of the main body portion and protruding radially outward relative to the main body portion;
[0022] The first flange portion overlaps the edge of the accommodating hole to enable the carrier to support the RF isolation ring; the second flange portion overlaps the first flange portion to enable the carrier to support the gas shower head.
[0023] Optionally, in the above-mentioned upper electrode assembly, the gas guide channel includes:
[0024] An annular channel is arranged around the receiving hole;
[0025] An air guide hole, connecting the annular channel and the receiving hole, and a plurality of air guide holes are evenly arranged in the circumference of the receiving hole;
[0026] An inlet channel is communicated with the annular channel and forms an air inlet hole on the surface of the carrier.
[0027] A semiconductor process chamber comprises a chamber body and an upper electrode assembly arranged on the chamber body, wherein the upper electrode assembly is the above-mentioned upper electrode assembly.
[0028] Optionally, the semiconductor process chamber further includes an exhaust component disposed in the semiconductor process chamber, wherein the exhaust component includes:
[0029] a support ring surrounding the outer side of the lower electrode assembly;
[0030] an exhaust ring having an exhaust passage and supported by the support ring at the top of the support ring;
[0031] A flow control ring, supported by the support ring at the top of the support ring, and forming an exhaust port of the exhaust channel with the exhaust ring;
[0032] The second positioning and adjusting module is arranged on the top of the support ring and is used to adjust the concentricity of the support ring, the exhaust ring and the flow control ring, and to adjust the concentricity of the exhaust assembly and the upper electrode assembly.
[0033] Optionally, in the above semiconductor process chamber, the second positioning adjustment module includes:
[0034] The limiting member includes: a connection block connected to the support ring; a limiting plate connected to the connection block and used to abut against the exhaust ring; a limiting block connected to the limiting plate and used to abut against the flow control ring;
[0035] An adjusting assembly connects the support ring and the limiter and is capable of adjusting the radial spacing between the support ring and the limiter to change the concentricity between the exhaust ring and the support ring and / or change the concentricity between the flow control ring and the support ring through the limiter.
[0036] Optionally, in the above-mentioned semiconductor process chamber, a plurality of second positioning and adjustment modules are arranged on the circumference of the support ring.
[0037] Optionally, in the above-mentioned semiconductor process chamber, the flow control ring includes a plurality of flow control rings with different thicknesses, and each of the flow control rings cooperates with the exhaust ring to form exhaust ports of different sizes.
[0038] Optionally, in the above-mentioned semiconductor process chamber, under the support of the support ring, the exhaust ring extends into the space surrounded by the gas shower head, the RF isolation ring, the carrier and the cavity body of the semiconductor process chamber, and there is a gap between the exhaust ring and the RF isolation ring and the gas shower head to guide the inert gas introduced into the gas guide channel to the exhaust port of the exhaust channel.
[0039] A semiconductor process equipment comprises a radio frequency source for generating radio frequency energy and the semiconductor process chamber mentioned above.
[0040] Optionally, in the above-mentioned semiconductor process equipment, the semiconductor process equipment includes a plurality of the semiconductor process chambers, and each of the semiconductor process chambers is provided with an upper electrode assembly, an exhaust assembly, a lower electrode assembly and a radio frequency source connected thereto, wherein:
[0041] The RF source is used to feed the RF energy generated by the RF source into the semiconductor process chamber, and the RF source has two feeding points in each of the semiconductor process chambers, and the angle formed by the line connecting the two feeding points and the center of the semiconductor process chamber is 180 degrees;
[0042] and / or,
[0043] The carrier is a plate-shaped member with two accommodating holes, the two accommodating holes are respectively located in two semiconductor process chambers, and the radio frequency sources of the two semiconductor process chambers are arranged in a mirror image with each other.
[0044] The upper electrode assembly provided by the present application realizes the assembly of the upper electrode assembly and the semiconductor process chamber by fixing a carrier on the cavity body of the semiconductor process chamber and carrying the RF isolation ring and the gas shower head on the carrier, and the upper electrode assembly also includes a first positioning and adjustment module. When the fixing part of the first positioning and adjustment module is set on the carrier, the RF energy at its position is blocked by the RF isolation ring, so the installation of the fixing part will not affect the RF energy in the RF field, thereby improving the generation quality of the thin film; one end of the clamping part of the first positioning and adjustment module is connected to the fixing part, and the other end extends toward the center direction of the RF isolation ring and thus extends into the RF field, and the clamping part can cooperate with the carrier to clamp the RF isolation ring and the gas shower head to achieve the radio frequency isolation ring. The positioning of the RF isolation ring and the gas shower head adopts a clamping and pressing positioning method instead of the bolt locking positioning method in the prior art, so there is no need to set bolts in the RF field, thereby avoiding energy crosstalk in the RF field caused by the setting of bolts, and further improving the production quality of the film; at the same time, the first positioning and adjustment module also includes an adjustment mechanism, which can radially adjust the position of the gas shower head. Even if the upper electrode assembly is not concentric due to processing errors or the movement and expansion of the gas shower head and the RF isolation ring under high-temperature processes, the gas shower head can be radially moved to a position concentric with the RF isolation ring by operating the adjustment mechanism, so that the upper electrode assembly can continue to maintain a high degree of concentricity, thereby further improving the production quality of the film. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.
[0046] Figure 1 A cross-sectional view of a portion of the structure of a semiconductor process equipment provided by an embodiment of the present application;
[0047] Figure 2 for Figure 1 A magnified view of part A;
[0048] Figure 3 is a schematic diagram of the structure of the bearing member;
[0049] Figure 4 It is a schematic diagram of the structure of the air guide channel revealed after the carrier is cut;
[0050] Figure 5 A schematic structural diagram of a first positioning and adjusting module;
[0051] Figure 6 is a cross-sectional view of a first positioning and adjusting module;
[0052] Figure 7 It is a structural schematic diagram of the circumferential arrangement of the first positioning adjustment module and the positioning module;
[0053] Figure 8 for Figure 1 A magnified view of part B;
[0054] Fig. 9 is a structural schematic diagram of a second positioning and adjusting module;
[0055] Fig.10 It is a schematic diagram of the structure of the circumferential arrangement of the second positioning and adjustment modules;
[0056] Fig.11 The diagram is a distribution diagram of radio frequency sources disposed in two adjacent semiconductor process chambers.
[0057] exist Figure 1-Figure 11 middle:
[0058] 1-semiconductor process chamber, 2-carrier, 3-accommodating hole, 4-RF isolation ring, 5-gas shower head, 6-first positioning and adjusting module, 7-gas guide channel, 8-positioning module, 9-insulating air inlet block, 10-RF shielding cover, 11-metal air inlet block, 12-support ring, 13-exhaust ring, 14-flow control ring, 15-second positioning and adjusting module, 16-RF source, 17-heating base, 18-thrust pin, 19-adjusting plate, 20-cavity, 21-connecting strip.
[0059] 401-cylindrical part, 402-first flange part;
[0060] 501-main body, 502-second flange portion;
[0061] 601-fixing member, 602-pressing member, 603-first through hole, 604-first threaded hole, 605-pressing bolt, 606-second through hole, 607-moving member, 608-second threaded hole, 609-third threaded hole, 610-adjusting member, 611-insulating pad;
[0062] 6071- push rod;
[0063] 701-annular channel, 702-air guide hole, 703-introduction channel, 704-air inlet hole;
[0064] 1301-exhaust channel, 1302-exhaust port;
[0065] 1501-limiting member, 1502-adjusting sleeve, 1503-fourth threaded hole, 1504-adjusting bolt, 1505-fifth threaded hole;
[0066] 15011-connecting block, 15012-limiting plate, 15013-limiting block;
[0067] 15041-first screw portion, 15042-second screw portion. DETAILED DESCRIPTION
[0068] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0069] In the existing PEALD process equipment, the upper electrode assembly may be non-concentric due to processing errors or movement and expansion of the components under high-temperature processes, which will affect the film quality. In addition, the current upper electrode assembly is assembled in a fixed manner, and it is impossible to adjust the concentricity between the components, resulting in unsatisfactory film quality. Moreover, the current upper electrode assembly uses bolts to achieve fixed assembly of its components (such as gas shower heads) located in the RF field. This assembly method will cause crosstalk of energy in the RF field due to the presence of bolts, which will also affect the film quality.
[0070] In view of the above situation in the prior art, Figure 1-Figure 11 As shown, the embodiment of the present application provides a novel upper electrode assembly, which is applied to a semiconductor process equipment suitable for performing a PEALD process. The upper electrode assembly mainly includes a carrier 2, a radio frequency isolation ring 4, a gas shower head 5 and a first positioning adjustment module 6, wherein:
[0071] The carrier 2 is the basic component for assembling the upper electrode assembly in the semiconductor process chamber 1, and is also the horizontal reference of the upper electrode assembly. The other components of the upper electrode assembly are all carried on the carrier 2. When assembled with the semiconductor process chamber 1, the carrier 2 is fixedly set on the cavity 20 that surrounds the semiconductor process chamber 1, and forms a sealed connection with the cavity 20 through a sealing ring. The portion of this sealed connection is the portion of the cavity 20 that surrounds the top opening, that is, the carrier 2 is set on the edge of the top opening of the semiconductor process chamber 1, and the upper electrode assembly provided in the present application can form the upper cover of the semiconductor process chamber 1, and the structure of the carrier 2 is, for example Figure 3 , Fig.11As shown, the carrier 2 can be set as a plate-like member, and a receiving hole 3 is opened on the plate-like member. The receiving hole 3 is concentrically arranged with the top opening of the semiconductor process chamber 1, and the diameter of the receiving hole 3 can be close to the diameter of the top opening but smaller than the diameter of the top opening, so that an annular boss protruding inward (i.e., toward the center direction of the semiconductor process chamber 1) is formed in the semiconductor process chamber 1, so that the RF isolation ring 4 and the gas shower head 5 can be arranged on the annular boss, and the carrier 2 can realize the bearing and support of the RF isolation ring 4 and the gas shower head 5;
[0072] The RF isolation ring 4 is a component for isolating RF in the semiconductor process chamber 1, and it mainly plays an insulating role. During assembly, the RF isolation ring 4 is first set on the annular boss, and at least part of the RF isolation ring 4 set on the annular boss is located in the accommodating hole 3, so that the RF isolation ring 4 can be located on the inner side of the annular boss in the radial direction (because there are multiple cylindrical, annular or disc-shaped components such as the semiconductor process chamber 1, the RF isolation ring 4, the gas shower head 5, and the support ring 12, the exhaust ring 13, the flow control ring 14, the wafer, the heating base 17 and the adjustment plate 19 described later in the present application, and these components have concentricity requirements, so the "radial" and "axial" mentioned in the present application can be the radial and axial directions of any of these components), thereby blocking the RF energy from being guided away from its setting position (or the setting position of the carrier 2), and preventing the carrier 2 from being affected by the RF energy;
[0073] The gas shower head 5 is a component for introducing process gas, precursor, etc. into the semiconductor process chamber 1, and is also the initial position for applying RF energy, that is, it is also used to feed RF energy into the semiconductor process chamber 1. One end of the assembled gas shower head 5 is connected to the outside of the semiconductor process chamber 1 through the insulating air inlet block 9 and the metal air inlet block 11 described later, and the other end is located in the semiconductor process chamber 1 and has a plurality of evenly distributed small holes. The process gas and plasma can pass through the small holes and be evenly distributed in the reaction area. During the assembly process, the gas shower head 5 passes through the annular cavity of the RF isolation ring 4, that is, the gas shower head 5, the RF isolation ring 4 and the carrier 2 are arranged in sequence from the inside to the outside in the radial direction. Since the gas shower head 5 needs to have a floating potential, the gas shower head 5 is carried on the RF isolation ring 4, specifically, it is arranged above the RF isolation ring 4, so as to realize indirect carrying of the gas shower head 5 on the carrier 2;
[0074] The first positioning and adjusting module 6 is used to adjust the concentricity of the gas shower head 5 and the radio frequency isolation ring 4 and to position the gas shower head 5 and the radio frequency isolation ring 4 on the carrier 2 after the adjustment. Figure 1 and Figure 2As shown, the first positioning and adjusting module 6 includes a fixing member 601, a pressing member 602 and an adjusting mechanism. The fixing member 601 is arranged on the carrier 2 and is located on the outside of the RF isolation ring 4. Since the RF isolation ring 4 isolates the RF field, the fixing member 601 arranged on the carrier 2 and located on the outside of the RF isolation ring 4 is not located in the RF field. The fixing member 601 itself and the connection method of the fixing member 601 on the carrier 2 will not affect the RF energy. The pressing member 602 is connected to the fixing member 601. Specifically, one end of the pressing member 602 is connected to the fixing member 601, and the other end extends toward the center direction of the RF isolation ring 4 and extends into the RF field. The part of the pressing member 602 located in the RF field can press the gas shower head 5 and the RF isolation ring 4 in the RF field, thereby cooperating with the carrier 2 to realize gas spraying. The clamping of the head 5 and the RF isolation ring 4 allows the gas shower head 5 and the RF isolation ring 4 to be clamped and positioned on the carrier 2, and the adjustment mechanism is used to adjust the radial position of the gas shower head 5. The adjustment mechanism is arranged on the fixing member 601. Since the fixing member 601 is located outside the RF field, most of the adjustment mechanism is also located outside the RF field. Even if a part of the adjustment mechanism enters the RF field due to pushing the gas shower head 5 to move radially, the impact on the RF energy will be very small (because the deviation range of the concentricity is small, the gas shower head 5 needs to move radially. The distance, which makes the distance that the adjustment mechanism enters the RF field is also small). The adjustment mechanism can move the gas shower head 5 to a position concentric with the RF isolation ring 4 by pushing the gas shower head 5 to move in the radial direction, so that the upper electrode assembly can continue to maintain high-precision concentricity.
[0075] Specifically, in the above structure, in addition to the plate-like structure, the carrier 2 can also be other structures. For example, the carrier 2 is a plurality of carrier blocks, and a plurality of carrier blocks are circumferentially arranged at the top opening of the semiconductor process chamber 1 (this structure is not shown in the figure), and these carrier blocks surround the receiving hole 3 and have a portion extending into the inner side of the semiconductor process chamber 1 to form a boss; in addition, in order to improve the structural strength and working stability, as Figure 2 , Figure 5 and Figure 6 As shown, the fixing member 601 and the pressing member 602 are configured as a block structure. In addition, the fixing member 601 and the pressing member 602 may also be other structures, such as a plate structure, a columnar structure, etc. In order to simplify the structure, reduce the number of parts, and reduce the complexity of assembly, the fixing member 601 and the pressing member 602 are also made into an integrated structure, for example, the fixing member 601 and the pressing member 602 are an integrated cast structure or an integrated machined structure.
[0076] When the above-mentioned upper electrode assembly is assembled with the semiconductor process chamber 1, the carrier 2 is first fixedly installed at the top opening of the semiconductor process chamber 1, and then the RF isolation ring 4 is installed on the carrier 2 and located in the accommodating hole 3, and then the gas shower head 5 passes through the RF isolation ring 4 and is installed on the RF isolation ring 4 and / or the carrier 2, and then the first positioning and adjustment module 6 is installed on the carrier 2; when the concentricity needs to be adjusted, the clamping member 602 is kept in a state of releasing the clamping of the gas shower head 5 and the RF isolation ring 4, and then the adjustment mechanism is operated so that the adjustment mechanism pushes the gas shower head 5 to move to a position concentric with the RF isolation ring 4, and finally the clamping member 602 is switched to a state of clamping the gas shower head 5 and the RF isolation ring 4 with the carrier 2, thereby realizing the positioning of the gas shower head 5 and the RF isolation ring 4 in a concentric position. Among them, since the fixing part 601 connecting the positioning component (i.e., the clamping part 602) is arranged outside the RF field, the clamping part 602 is used to realize the compression and positioning of the gas shower head 5 and the RF isolation ring 4 in the RF field (avoiding the use of bolts), and a first positioning adjustment module 6 is added to adjust the concentricity of the gas shower head 5 and the RF isolation ring 4 in real time, it is possible to achieve a triple improvement in the film formation quality, so that the consistency and stability of the thin film deposition are better, the improvement effect is very significant, and the production cost is also saved.
[0077] In the upper electrode assembly provided in the present application, on the basis of including the first positioning adjustment module 6, as Figure 7 As shown, it can further include a positioning module 8 for positioning the RF isolation ring 4 and the gas shower head 5, and the positioning module 8 includes a fixing member 601 and a pressing member 602. In the process of thin film deposition, in order to obtain a thin film with good performance, it is necessary to keep the gas shower head 5 and the RF isolation ring 4 always precisely concentric. In order to more stably ensure the concentric effect, the present application not only allows the first positioning and adjustment module 6 to position the RF isolation ring 4 and the gas shower head 5, but also adds a positioning module 8 specifically used for positioning the RF isolation ring 4 and the gas shower head 5. In order to simplify the structure and reduce the difficulty of processing, manufacturing and assembly of components, the positioning module 8 can adopt a structure similar to that of the first positioning and adjustment module 6, that is, the adjustment mechanism of the first positioning and adjustment module 6 is cancelled, and the fixing member 601 and the pressing member 602 are retained, so that the fixing module has the same installation method and positioning method as the first positioning and adjustment module 6, so that the influence of the positioning module 8 on the RF energy can be avoided, and the manufacturing cost of the upper electrode assembly can also be saved. Of course, without considering the above factors, the structure of the positioning module 8 can also be completely different from that of the first positioning and adjustment module 6.
[0078] Further, such as Figure 7As shown, a plurality of first positioning and adjusting modules 6 and a plurality of positioning modules 8 are provided in the circumferential direction of the accommodation hole 3 , and the first positioning and adjusting modules 6 and the positioning modules 8 are alternately provided in the circumferential direction of the accommodation hole 3 . Among them, multiple first positioning and adjustment modules 6 are arranged in the circumferential direction of the accommodating hole 3, so that the gas shower head 5 can be adjusted in multiple directions in the entire circumferential direction, and more diverse eccentricity situations can be coped with. When making specific adjustments, for example, when the gas shower head 5 needs to move to the left, all the first positioning and adjustment modules 6 and all the positioning modules 8 are firstly released from the pressing and positioning of the gas shower head 5, and then the first positioning and adjustment module 6 located on the left side of the gas shower head 5 is operated, so that the adjustment mechanism on the first positioning and adjustment module 6 on the left side is separated from the gas shower head 5, so as to provide space for the gas shower head 5 to move to the left side, and then the first positioning and adjustment module 6 located on the right side of the gas shower head 5 is operated, so that the adjustment mechanism on the first positioning and adjustment module 6 on the right side pushes the gas shower head 5 to move to the left side. When the gas shower head 5 moves into place, the adjustment mechanism on the left side is also abutted against the gas shower head 5 (but it will not push the gas shower head 5 to move to the right side, and this step can also be omitted), and finally all the first positioning and adjustment modules 6 and all the positioning modules 8 press and position the gas shower head 5. Of course, in the special case where the gas shower head 5 can only deviate in one direction, only one first positioning adjustment module 6 for reverse adjustment can be provided. The plurality of positioning modules 8 arranged circumferentially can further realize the positioning of the gas shower head 5 in an all-round manner. Figure 7 As shown, four first positioning adjustment modules 6 are arranged at equal intervals in the circumferential direction of the accommodating hole 3, and four positioning modules 8 are also arranged at equal intervals, and the first positioning adjustment modules 6 and the positioning modules 8 are arranged alternately in the circumferential direction, that is, both sides of the circumferential direction of each first positioning adjustment module 6 are arranged with positioning modules 8, and both sides of the circumferential direction of each positioning module 8 are arranged with first positioning adjustment modules 6. In this way, the adjustment effect and the positioning effect can be better taken into account, not only can the gas shower head 5 be adjusted more comprehensively in multiple directions, but also the force on the gas shower head 5 can be more balanced and the positioning can be more stable.
[0079] In an optional embodiment, the fixing member 601 is movably and / or rotatably connected to the carrier 2 , and drives the pressing member 602 to reciprocate and / or rotate to achieve positioning and releasing of the RF isolation ring 4 and the gas shower head 5 . That is to say, on the basis of the above structure, the positioning and release of the RF isolation ring 4 and the gas shower head 5 can be achieved in a variety of ways. For example, the fixing member 601 and the pressing member 602 can be synchronously moved axially relative to the carrier 2, the RF isolation ring 4 and the gas shower head 5 to approach and move away from the gas shower head 5 to achieve compression and separation, or the fixing member 601 and the pressing member 602 can be synchronously rotated relative to the carrier 2, the RF isolation ring 4 and the gas shower head 5 with the connecting axis of the fixing member 601 and the carrier 2 as the center to approach and move away from the gas shower head 5 to achieve compression and separation, or the pressing member 602 can be axially moved and rotated on the fixing member 601 to achieve compression and separation of the gas shower head 5. Among them, considering the simplification of the structure, the convenience of operation and the reliability of switching, the fixing member 601 and the pressing member 602 can be synchronously moved axially relative to the carrier 2, the RF isolation ring 4 and the gas shower head 5 to approach and move away from the gas shower head 5 as the preferred positioning and release operation mode.
[0080] Specifically, in order to realize the operation mode of synchronously moving the fixing member 601 and the pressing member 602 along the axial direction to position and release the gas shower head 5, as shown in FIG. Figure 2As shown, the fixing member 601 has a first through hole 603 arranged along the axial direction of the RF isolation ring 4, and the carrier 2 has a first threaded hole 604 arranged along the axial direction of the RF isolation ring 4. The clamping bolt 605 passing through the first through hole 603 can change the depth of being screwed into the first threaded hole 604, so that the clamping member 602 can clamp or loosen the RF isolation ring 4 and the gas shower head 5. In this structure, the fixing member 601 is erected axially on the carrier 2, the clamping member 602 is connected to the top of the fixing member 601 and is located above the RF isolation ring 4 and the gas shower head 5, and the fixing member 601 is provided with a first through hole 603 that penetrates axially for the clamping bolt 605 to pass through, and at the same time, a first threaded hole 604 is opened axially at the portion of the carrier 2 for setting the fixing member 601, and the clamping bolt 605 passing through the first through hole 603 can be screwed into the first threaded hole 604 and engage with the first threaded hole 604. A threaded hole 604 is threadedly connected. As the clamping bolt 605 goes deeper into the first threaded hole 604, the clamping bolt 605 can drive the fixing member 601 and the clamping member 602 thereon to approach the carrier 2, the RF isolation ring 4 and the gas shower head 5, and finally the clamping member 602 can clamp the gas shower head 5. As the clamping bolt 605 is gradually screwed out of the first threaded hole 604, the fixing member 601 and the clamping member 602 can move upward a small amount to loosen the gas shower head 5, the clamping force is eliminated, and the positioning is released. In addition, other structures can also be used to achieve the above-mentioned clamping and loosening. For example, the fixing member 601 is fixedly set on the carrier 2, the fixing member 601 does not move relative to the carrier 2, and the clamping member 602 moves axially on the fixing member 601 through a guide rail slider and other mechanisms, so that the clamping and loosening of the gas shower head 5 are achieved only by the up and down movement of the clamping member 602.
[0081] In an optional embodiment, if Figure 5 and Figure 6As shown, the adjustment mechanism includes: a second through hole 606, which is arranged on the fixing member 601 along the radial direction of the RF isolation ring 4; a movable member 607, one end of which extends into the second through hole 606 and can move in the second through hole 606, and the other end is located on the side of the fixing member 601 away from the RF isolation ring 4 and the end is provided with a second threaded hole 608; a third threaded hole 609, which is arranged on the fixing member 601 along the radial direction of the RF isolation ring 4, and the thread direction is opposite to the thread direction of the second threaded hole 608; an adjustment member 610, which has a screw portion threadedly matched with the second threaded hole 608 and the third threaded hole 609. The moving member 607 is a member that contacts the gas shower head 5 and pushes the gas shower head 5 to move radially. The pushing part thereof may be a push rod 6071. In order to improve the movement stability and increase the contact area with the gas shower head 5, two push rods 6071 may be arranged in parallel, so that the entire moving member 607 forms a concave structure. The second threaded hole 608 may be provided at a portion of the concave structure opposite to the opening, so that the adjusting member 610 passes through the moving member 607 from the portion. The third threaded hole 609 provided on the fixing member 601 is coaxially arranged with the second threaded hole 608. The spiral directions of the threads in the two threaded holes are opposite. The adjusting member 610 may be a knob bolt for easy manual operation. The screw portion of the knob bolt extends into the third threaded hole 609 after passing through the second threaded hole 608. When the concentricity between the gas shower head 5 and the RF isolation ring 4 needs to be adjusted, since the push rod 6071 and the knob bolt are both radially arranged relative to the gas shower head 5, when the knob bolt is turned, the push rod 6071 will move forward or backward in the second through hole 606. Specifically, when the knob bolt is turned forward to screw the screw portion out of the third threaded hole 609, since the thread directions of the third threaded hole 609 and the second threaded hole 608 are opposite, the movable member 607 is driven by the screw portion to approach the fixed member 601, thereby causing the push rod 6071 to move forward or backward in the second through hole 606. The moving rod 6071 moves forward, and the advancing push rod 6071 will push the gas shower head 5 to the center position of the RF isolation ring 4 until it is concentric. When the knob bolt is rotated in the opposite direction to make its screw portion penetrate into the third threaded hole 609, the moving part 607 moves away from the fixed part 601 under the drive of the screw portion, and then the push rod 6071 moves back to move away from the center of the RF isolation ring 4 until it is separated from the gas shower head 5 and there is a certain gap between the gas shower head 5 and the gas shower head 5, so that the gas shower head 5 can move under the push of the opposite adjustment mechanism. According to the real-time concentric state of the gas shower head 5, the adjustment mechanisms of the multiple first positioning adjustment modules 6 in the circumferential direction of the accommodating hole 3 can be coordinated to adjust, so that the gas shower head 5 can be moved to a position concentric with the RF isolation ring 4 more quickly and accurately.
[0082] Further, such as Figure 2 , Figure 5 and Figure 6As shown, the first positioning and adjusting module 6 also includes an insulating pad 611 arranged on the fixing member 601 and the pressing member 602, and used to contact the RF isolation ring 4 and the gas shower head 5. The function of this insulating pad 611 is to achieve insulation between the fixing member 601, the pressing member 602 and the gas shower head 5, and the RF isolation ring 4, and to block the RF energy, thereby preventing the RF energy from being abnormally discharged from the semiconductor process chamber 1 from the position where the first positioning and adjusting module 6 is set. Specifically, the insulating pad 611 is an L-shaped structure that matches the combined structural shape of the fixing member 601 and the pressing member 602, and the edge of the insulating pad 611 has a edging that wraps the fixing member 601 and the pressing member 602, as shown in FIG. Figure 5 In addition, in order to better block the radio frequency energy, the positioning module 8 also includes the same (same includes the same structure, the same material and the same connection method) insulating pad 611, so that the radio frequency energy cannot be abnormally derived from the setting position of the positioning module 8.
[0083] In an optional embodiment, if Figure 2As shown, the assembly matching structure of the carrier 2, the RF isolation ring 4 and the gas shower head 5 is as follows: the RF isolation ring 4 includes a cylindrical portion 401 and a first flange portion 402, the cylindrical portion 401 is located in the accommodating hole 3, the first flange portion 402 is arranged at the top end of the cylindrical portion 401, and protrudes radially outward relative to the cylindrical portion 401; the gas shower head 5 includes a main body portion 501 and a second flange portion 502, the main body portion 501 passes through the accommodating hole 3 (the main body portion 501 is the other part of the gas shower head 5 except the second flange portion 502), the second flange portion 502 is arranged at the top end of the main body portion 501, and protrudes radially outward relative to the main body portion 501; wherein the first flange portion 402 overlaps the edge of the accommodating hole 3 to realize the bearing of the RF isolation ring 4 by the carrier 2; the second flange portion 502 overlaps the first flange portion 402 to realize the bearing of the gas shower head 5 by the carrier 2. The RF isolation ring 4 having a first flange portion 402 and a cylindrical portion 401 is similar to a flange structure, and the first flange portion 402 protruding outward can overlap the edge of the accommodating hole 3, thereby realizing suspension on the carrier 2. At the same time, in order to ensure the isolation effect of RF energy, it needs to have a cylindrical portion 401 located in the accommodating hole 3, and preferably, the axial length of the cylindrical portion 401 is greater than or equal to the depth of the accommodating hole 3 (the depth of the accommodating hole 3 is the thickness of the plate-shaped carrier 2). The same principle also enables the gas shower head 5 to have a second flange portion 502 protruding outward. By overlapping the second flange portion 502 on the first flange portion 402, the gas shower head 5 can be suspended on the RF isolation ring 4, thereby realizing the stacking of the RF isolation ring 4 and the gas shower head 5 on the carrier 2 in sequence. This structure is not only simple in structure, but also convenient for assembling the carrier 2, the RF isolation ring 4 and the gas spray part, and can also cooperate with the pressing part 602 to facilitate the pressing and positioning of the pressing part 602, so this cooperation structure is used as the preferred structure of the present application. In addition, the assembly of the carrier 2, the RF isolation ring 4 and the gas spray part can also be achieved in other ways, such as setting the receiving hole 3 as a conical hole (large opening at the top and small opening at the bottom), setting the RF isolation ring 4 as a conical ring (large opening at the top and small opening at the bottom), and the gas spray head 5 still has a flange protruding outward, and the outer conical surface of the RF isolation ring 4 is fitted with the conical side of the receiving hole 3 to realize the bearing of the RF isolation ring 4 by the carrier 2, and the gas spray head 5 still adopts the above-mentioned overlap method, but is directly overlapped on the carrier 2, so that the assembly of the carrier 2, the RF isolation ring 4 and the gas spray part can also be achieved, and the concentric adjustment and pressing and positioning are not affected.
[0084] like Figure 1As shown, on the basis of the above structure, the upper electrode assembly provided by the present application further includes: an insulating gas inlet block 9, which is arranged at the gas inlet end of the gas shower head 5 and is connected to the gas shower head 5 to introduce gas into the gas shower head 5; a radio frequency shielding cover 10, which is passed through by the insulating gas inlet block 9 and is sealed and connected to the insulating gas inlet block 9, and the edge of the cover opening is connected to the carrier 2 to achieve the closure of the semiconductor process chamber 1 and prevent the RF energy from escaping from the semiconductor process chamber 1; a metal gas inlet block 11, which is connected to the insulating gas inlet block 9 and is connected to the insulating gas inlet block 9, and is located on the outside of the radio frequency shielding cover 10. Among them, the metal gas inlet block 11 is the initial gas inlet end of the upper electrode assembly, which can be made of aluminum; the insulating gas inlet block 9 is connected to the metal gas inlet block 11 to serve as the gas inlet channel for the process gas and plasma, and it is also used to block the RF energy from being extracted from the gas inlet position, and can be made of ceramic material; the function of the radio frequency shielding cover 10 is to prevent the RF energy in the semiconductor process chamber 1 from escaping and to avoid the RF energy crosstalk between adjacent semiconductor process chambers 1.
[0085] In an optional embodiment, if Figure 2-Figure 4 As shown, a gas guide channel 7 for guiding the inert gas is provided on the carrier 2. The inert gas introduced into the semiconductor process chamber 1 by the gas guide channel 7 is blown toward the exhaust port 1302 of the semiconductor process chamber 1 under the guidance of the RF isolation ring 4 and the gas shower head 5. Figure 2 As shown by the dotted arrow in . The present application also makes further improvements to the carrier 2, that is, a gas guide channel 7 is provided on the carrier 2 to guide the inert gas into the semiconductor process chamber 1. The reason for guiding the inert gas into the semiconductor process chamber 1 is that during the process, parasitic plasma is prone to appear in the gap between the upper electrode assembly and the cavity 20 that encloses the semiconductor process chamber 1 and cannot be discharged, which affects the processing efficiency of the plasma. The gas guide channel 7 is provided on the carrier 2, and the inert gas is introduced into the semiconductor process chamber 1. The inert gas is guided to the exhaust port 1302 of the semiconductor process chamber 1 by the radio frequency isolation ring 4 and the gas shower head 5 in the semiconductor process chamber 1, which can avoid abnormal discharge and plasma aggregation near the above-mentioned gap outside the reaction area, and also avoid the infiltration of external gas, and prevent the chemical source that is easy to react with air from reacting at the gap to produce particles that cannot be eliminated.
[0086] Specifically, Figure 4As shown, the air guide channel 7 includes: an annular channel 701, which is arranged around the accommodating hole 3; an air guide hole 702, which connects the annular channel 701 and the accommodating hole 3, and is evenly arranged in multiple numbers in the circumferential direction of the accommodating hole 3; an introduction channel 703, which is connected to the annular channel 701 and forms an air inlet hole 704 on the surface of the carrier 2. Among them, the inert gas enters the introduction channel 703 from the air inlet hole 704, enters the annular channel 701 through the guide of the introduction channel 703, and fills the annular channel 701. Since the annular channel 701 is arranged around the containing hole 3, the inert gas can be distributed in various parts of the containing hole 3 in the circumferential direction, and enters the containing hole 3 evenly through multiple air guide holes 702 that are connected to the annular channel 701 and evenly distributed in the circumferential direction, so that the gas shower head 5 and the exhaust ring 13 described later are always filled with inert gas during the process, thereby avoiding abnormal discharge and plasma aggregation near the gap, and at the same time, it can also ensure that external gas cannot penetrate, and avoid chemical sources that are easily reactive with air from reacting here to produce particles that cannot be removed and affect the final film quality.
[0087] In addition, an embodiment of the present application further provides a semiconductor process chamber 1, which includes the above-mentioned upper electrode assembly.
[0088] In addition, the semiconductor process chamber 1 also includes a lower electrode assembly, which includes: a heating base 17 constituting a lower electrode, which is used to provide support for the wafer and the required process temperature; an ejector pin 18 (or pin needle) supporting the heating base 17, the ejector pin 18 passes through the heating base 17, and the heating base 17 can be raised and lowered on the ejector pin 18. When the heating base 17 is in the original position, the robot can quickly place the wafer on the ejector pin 18. When the process is running, the heating base 17 will rise on the ejector pin 18 to make the wafer fit the heating base 17; the ejector pin 18 is arranged on an adjustment plate 19, the adjustment plate 19 is arranged at the bottom of the semiconductor process chamber 1, and a plurality of leveling bolts are arranged on the circumference of the adjustment plate 19. By raising and lowering the leveling bolts at different positions, the leveling of the adjustment plate 19 can be achieved, thereby leveling the ejector pin 18 on the adjustment plate 19 and the heating base 17 on the ejector pin 18.
[0089] like Figure 1 as well as Figure 8-Figure 10As shown, the semiconductor process chamber 1 also includes an exhaust assembly arranged in the semiconductor process chamber 1 and located at the bottom of the upper electrode assembly, and the exhaust assembly includes: a support ring 12, which is arranged in the semiconductor process chamber 1 and surrounds the outer side of the lower electrode assembly of the semiconductor process chamber 1; an exhaust ring 13, which has an exhaust channel 1301 and is supported by the support ring 12 at the top of the support ring 12; a flow control ring 14, which is supported by the support ring 12 at the top of the support ring 12 and forms an exhaust port 1302 of the exhaust channel 1301 with the exhaust ring 13; a second positioning adjustment module 15, which is arranged at the top of the support ring 12 and is used to adjust the concentricity of the support ring 12, the exhaust ring 13 and the flow control ring 14, and adjust the concentricity of the exhaust assembly and the upper electrode assembly. Among them, the exhaust ring 13 is used to form an exhaust channel 1301 to exhaust the reaction waste gas and by-products in the semiconductor process chamber 1; the flow control ring 14 can change the size of the exhaust port 1302 of the exhaust channel 1301, thereby realizing the adjustment of the exhaust flow of the reaction waste gas and by-products; the support ring 12 is used to support the exhaust ring 13 and the flow control ring 14, so that the exhaust ring 13 is arranged close to the gas shower head 5, and the support ring 12, the flow control ring 14 and the exhaust ring 13 are all around the outside of the lower electrode assembly, and have a radial gap with the heating base 17. On this basis, the semiconductor process chamber 1 provided by the present application is also provided with a second positioning adjustment module 15, which can avoid the influence of processing errors and possible movement and expansion of components under high-temperature processes, ensure that the exhaust ring 13, the flow control ring 14, and the support ring 12 are highly concentric, so that the radial gap between them and the heating base 17 is equally wide at all parts of the circumference of the heating base 17, so that the air flow field in the semiconductor process chamber 1 can be ensured to be more stable during the process operation. Moreover, the second positioning and adjustment module 15 can coordinately achieve high concentricity with the upper electrode assembly by adjusting the concentricity of the exhaust ring 13, the flow control ring 14, and the support ring 12, thereby ensuring high concentricity of the entire reaction area, ensuring the stability of the airflow field and the plasma field, and ensuring the quality of the film.
[0090] Specifically, Figure 8 and Fig. 9As shown, the second positioning and adjustment module 15 includes: a limit member 1501, which further includes: a connecting block 15011 used to connect with the support ring 12, and a fourth threaded hole 1503 is opened on the connecting block 15011; a limit plate 15012 connected to the connecting block 15011 and used to abut against the exhaust ring 13; a limit block 15013 connected to the limit plate 15012 and used to abut against the flow control ring 14; an adjustment component, which connects the support ring 12 and the limit member 1501, and can adjust the radial spacing between the support ring 12 and the limit member 1501, so as to change the concentricity of the exhaust ring 13 and the support ring 12 through the limit member 1501, and / or change the concentricity of the flow control ring 14 and the support ring 12. Specifically, the adjustment component includes: an adjustment sleeve 1502, which has an external thread on its outer wall and an internal thread on its inner wall, and is connected to the fourth threaded hole 1503 through the external thread; an adjustment bolt 1504, which is arranged in the adjustment sleeve 1502 and includes a first screw portion 15041 and a second screw portion 15042 coaxially connected to the first screw portion 15041, the pitch of the second screw portion 15042 is smaller than the pitch of the first screw portion 15041, and the diameter of the second screw portion 15042 is smaller than the diameter of the first screw portion 15041 to avoid interference between the thread on the second screw portion 15042 and the internal thread; wherein the first screw portion 15041 is threadedly connected to the internal thread, and the second screw portion 15042 can be threadedly connected to the fifth threaded hole 1505 opened on the support ring 12. In this structure, the limit member 1501 is the basic component of the second positioning and adjustment module 15, the adjusting sleeve 1502 and the adjusting bolt 1504 are both arranged on the limit member 1501, and the limit member 1501 includes a limit plate 15012 that cooperates with the exhaust ring 13, a limit block 15013 that cooperates with the flow control ring 14, and a connecting block 15011 that cooperates with the support ring 12. The adjusting sleeve 1502 is connected to the fourth threaded hole 1503 on the connecting block 15011 through an external thread to realize the connection between the adjusting sleeve 1502 and the limit member 1501, and the first screw portion 15041 of the adjusting bolt 1504 is threadedly connected to the adjusting sleeve 1502 by cooperating with the internal thread. The second screw portion 15042 of the adjusting bolt 1504 is screwed into the fifth threaded hole 1505 opened on the support ring 12 to realize the connection of the entire second positioning and adjustment module 15 on the support ring 12.During assembly, the adjusting bolt 1504 is first passed through the adjusting sleeve 1502, specifically, the first screw portion 15041 is screwed to connect with the internal thread of the adjusting sleeve 1502, and then the adjusting bolt 1504 is screwed continuously to allow the second screw portion 15042 to enter the fifth threaded hole 1505 and connect with the fifth threaded hole 1505. During the screwing process, since the pitch of the first screw portion 15041 is greater than the pitch of the second screw portion 15042, when the adjusting bolt 1504 rotates at the same angle, the axial distance moved by the adjusting sleeve 1502 on the first screw portion 15041 is greater than the distance the second screw portion 15042 penetrates into the fifth threaded hole 1505, so that the limit member 1501 can quickly abut against or move away from the exhaust ring 13, the flow control ring 14 and the support ring 12. When adjusting the concentricity of the exhaust ring 13, the flow control ring 14 and the support ring 12, keep the adjusting bolt 1504 fixed, but rotate the adjusting sleeve 1502. By rotating the adjusting sleeve 1502, the axial movement on the adjusting bolt 1504 can be achieved through the internal thread cooperating with the adjusting bolt 1504. This axial movement is specifically in the radial direction of the support ring 12, thereby driving the limit member 1501 to move in the radial direction of the support ring 12, so that the radial movement of the limit member 1501 can be used to push the exhaust ring 13 and the flow control ring 14 to move radially relative to the support ring 12, so as to adjust the solid concentricity; when the adjusting sleeve 1502 is not rotated, the second positioning adjustment module 15 realizes the positioning of the exhaust ring 13 and the flow control ring 14 through the threaded connection between the adjusting bolt 1504 and the fifth threaded hole 1505.
[0091] Furthermore, it is preferred that the spiral directions of the external thread and the internal thread of the adjusting sleeve 1502 are opposite. By such an arrangement, for example, when the adjusting sleeve 1502 is rotated away from the support ring 12, the limit member 1501 can be brought close to the support ring 12, thereby achieving a slight adjustment of the distance between the limit member 1501 and the support ring 12.
[0092] In addition, a hexagonal countersunk hole is provided at the end of the adjusting sleeve 1502 to facilitate the screwing operation thereof.
[0093] like Fig.10 As shown, multiple second positioning and adjustment modules 15 are also provided in the circumferential direction of the support ring 12, so that the concentricity of the exhaust ring 13, the flow control ring 14, and the support ring 12 can be adjusted in multiple directions. Further, when multiple second positioning and adjustment modules 15 are provided in the circumferential direction, they are only distributed within an angle range of 180 degrees in the circumferential direction, and the interval angle between two adjacent ones is 90 degrees. In this way, while the concentricity of the exhaust ring 13, the flow control ring 14, and the support ring 12 can be precisely adjusted, the number of second positioning and adjustment modules 15 can be reduced, and the structure of the semiconductor process chamber 1 can be simplified.
[0094] The flow control ring 14 includes a plurality of flow control rings 14 of different thicknesses, and each flow control ring 14 cooperates with the exhaust ring 13 to form exhaust ports 1302 of different sizes. In other words, the size of the exhaust port 1302 is adjusted by replacing flow control rings 14 of different thicknesses.
[0095] In the prior art, the process gas flow area of the semiconductor process chamber 1 is sealed by a sealing ring, which not only requires regular maintenance, but also has the risk of failure of the sealing ring, resulting in radio frequency crosstalk between the two semiconductor process chambers 1. However, in the above-mentioned exhaust assembly in the semiconductor process chamber 1 provided by the present application, no sealing ring is provided between the exhaust ring 13, the flow control ring 14 and the support ring 12, thereby avoiding the situation where corrosive gas corrodes the sealing ring or external gas penetrates and generates particles at the sealing ring, reducing maintenance costs and improving the stability of process operation.
[0096] For the aforementioned inert gas introduction path, Figure 2 As shown, under the support of the support ring 12, the exhaust ring 13 extends into the space surrounded by the gas shower head 5, the RF isolation ring 4, the carrier 2 and the cavity 20 of the semiconductor process chamber 1, and there is a gap between the exhaust ring 13 and the RF isolation ring 4 and the gas shower head 5 to guide the inert gas introduced by the gas guide channel 7 to the exhaust port 1302 of the exhaust channel 1301, as shown in FIG. Figure 2 As shown by the dotted arrow in . That is to say, after the inert gas enters the containing hole 3, it will flow to the exhaust port 1302 of the exhaust channel 1301 along the gap between the exhaust ring 13 and the RF isolation ring 4, and the gap between the exhaust ring 13 and the gas shower head 5, and form an air curtain at the exhaust port 1302 to isolate the reaction gas, thereby avoiding abnormal discharge and plasma aggregation near the gap, and at the same time, it can also ensure that the outside gas cannot penetrate, and avoid the chemical source that is easy to react with the air to react here to produce particles that cannot be eliminated and affect the final film quality.
[0097] In addition, the embodiment of the present application also provides a semiconductor process equipment, which includes the semiconductor process chamber 1 described above, and also includes a radio frequency source for generating radio frequency energy, and the radio frequency source is arranged outside the semiconductor process chamber 1. Fig.11As shown, the semiconductor process equipment provided by the present application includes a plurality of semiconductor process chambers 1, and each semiconductor process chamber 1 is provided with an upper electrode assembly, an exhaust assembly, a lower electrode assembly and a radio frequency source 16 connected thereto, wherein: the radio frequency source 16 is used to feed the radio frequency energy generated by the radio frequency source into the semiconductor process chamber 1, and in the specific setting, the radio frequency source 16 has two feeding points in each semiconductor process chamber 1, and the angle formed by the line connecting the two feeding points and the center (or axis) of the semiconductor process chamber 1 is 180 degrees; and / or, the carrier 2 is a plate-shaped member with two accommodating holes 3, and the two accommodating holes 3 are respectively located in two semiconductor process chambers 1, and the radio frequency sources 16 of the two semiconductor process chambers 1 are mirrored to each other. In this structure, the radio frequency source 16 feeds radio frequency energy into the semiconductor process chamber 1. In order to avoid mutual crosstalk of radio frequency fields between multiple chambers, a radio frequency shielding cover 10 is provided on the entire upper electrode assembly, and the radio frequency source 16 passes through the radio frequency shielding cover 10 and feeds radio frequency energy to the gas shower head 5, thereby realizing energy feeding. In the present application, in order to further ensure the symmetry of energy feeding, the RF source 16 of each semiconductor process chamber 1 has two feeding points, and the two feeding points are symmetrically arranged 180° about the center of the semiconductor process chamber 1 inside the RF shielding cover 10. Specifically, the RF source 16 feeds RF energy into the semiconductor process chamber 1 through the connecting bar 21, and the two ends of this connecting bar 21 are two feeding points. Since the connecting bar 21 is semicircular, the angle between its two ends is 180 degrees, and in the specific setting, the semicircular connecting bar 21 is also concentric with the semiconductor process chamber; at the same time, the carrier 2 is set to be plate-shaped, and it has two accommodating holes 3, each accommodating hole 3 is correspondingly arranged in a semiconductor process chamber 1, and each semiconductor process chamber 1 is provided with an RF source 16, and the RF sources 16 arranged in the two semiconductor process chambers 1 are mirrored. In this way, the energy crosstalk between the semiconductor process chambers 1 can be reduced.
[0098] The working process of the semiconductor process equipment is as follows: before entering the process, determine the process position height that the heating base 17 needs to be in under the atmospheric environment, and adjust the relative level of the ejector pin 18 and the heating base 17 through the adjustment plate 19; combine the corresponding finished product sizes of the semiconductor process chamber 1, the exhaust ring 13, the flow control ring 14 and the support ring 12, and determine the maximum allowable eccentricity between the exhaust ring 13, the flow control ring 14 and the support ring 12 according to the temperature required for the process reaction, adjust the second positioning adjustment module 15 to ensure that the exhaust ring 13, the flow control ring 14 and the support ring 12 are precisely concentric, and after reaching the expected adjustment, adjust the second positioning adjustment module 15 according to the current concentricity. state, by rotating the adjustment member 610, the gas shower head 5 is pushed to move radially accordingly, so as to realize the precise concentricity of the upper electrode assembly, the wafer and the lower electrode assembly; then the heating base 17 is lowered to the wafer transfer position, and after the semiconductor process chamber 1 enters the vacuum environment, the heating base 17 starts to heat up and ensures the final process; after the robot places the wafer on the ejector pin 18, the heating base 17 starts to rise to the process position, and at the same time, the inert gas enters the reaction area through the carrier 2 to ensure that the gap between the gas shower head 5 and the exhaust ring 13 is filled with the inert gas, and then the process gas is introduced into the semiconductor process chamber 1 to carry out the corresponding process reaction.
[0099] The basic principles of the present application are described above in conjunction with specific embodiments. However, it should be noted that the advantages, strengths, effects, etc. mentioned in the present application are only examples and not limitations, and it cannot be considered that these advantages, strengths, effects, etc. are required by each embodiment of the present application. In addition, the specific details disclosed above are only for the purpose of illustration and ease of understanding, not for limitation, and the above details do not limit the present application to being implemented by adopting the above specific details.
[0100] The block diagrams of the devices, apparatuses, equipment, and systems involved in this application are only illustrative examples and are not intended to require or imply that they must be connected, arranged, and configured in the manner shown in the block diagram. As will be appreciated by those skilled in the art, these devices, apparatuses, equipment, and systems can be connected, arranged, and configured in any manner. Words such as "including", "comprising", "having", etc. are open words, referring to "including but not limited to", and can be used interchangeably with them. The words "or" and "and" used here refer to the words "and / or" and can be used interchangeably with them, unless the context clearly indicates otherwise. The words "such as" used here refer to the phrase "such as but not limited to", and can be used interchangeably with them.
[0101] It should also be noted that in the apparatus, device and method of the present application, each component or each step can be decomposed and / or recombined. Such decomposition and / or recombination should be regarded as equivalent solutions of the present application.
[0102] The above description of the disclosed aspects is provided to enable any person skilled in the art to make or use the present application. Various modifications to these aspects will be readily apparent to those skilled in the art, and the general principles defined herein may be applied to other aspects without departing from the scope of the present application. Therefore, the present application is not intended to be limited to the aspects shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
[0103] It should be understood that the qualifiers "first", "second", "third", "fourth", "fifth" and "sixth" used in the description of the embodiments of the present application are only used to more clearly explain the technical solutions and cannot be used to limit the scope of protection of the present application.
[0104] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present application to the forms disclosed herein. Although multiple example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.
Claims
1. An upper electrode assembly, characterized in that: Used to be arranged in a semiconductor process chamber of a semiconductor process equipment, comprising: A carrier, fixedly arranged on the cavity of the semiconductor process chamber and provided with a receiving hole; A radio frequency isolation ring, carried by the carrier and at least partially located in the receiving hole, for blocking radio frequency energy; A gas shower head, passing through the ring cavity of the radio frequency isolation ring and carried on the radio frequency isolation ring, and at least used to feed radio frequency energy into the semiconductor process chamber; The first positioning and adjustment module includes: a fixing member, which is arranged on the supporting member and located on the outside of the RF isolation ring; a pressing member, which is connected to the fixing member and extends toward the center direction of the RF isolation ring and can cooperate with the supporting member to achieve clamping and positioning of the RF isolation ring and the gas shower head; an adjustment mechanism, which is arranged on the fixing member and can move radially along the RF isolation ring to promote the radial movement of the gas shower head.
2. The upper electrode assembly according to claim 1, characterized in that: The carrier is provided with a gas guide channel for guiding the inert gas. The inert gas introduced into the semiconductor process chamber by the gas guide channel is blown toward the exhaust port of the semiconductor process chamber under the guidance of the RF isolation ring and the gas shower head.
3. The upper electrode assembly according to claim 1, characterized in that: It also includes a positioning module for positioning the RF isolation ring and the gas shower head. In the circumference of the accommodating hole, a plurality of the first positioning and adjustment modules and the positioning modules are provided, and the first positioning and adjustment modules and the positioning modules are alternately provided in the circumference of the accommodating hole.
4. The upper electrode assembly according to any one of claims 1 to 3, characterized in that: The fixing member is movably and / or rotatably connected to the bearing member, and drives the pressing member to reciprocately move and / or rotate to achieve positioning and releasing of the radio frequency isolation ring and the gas shower head.
5. The upper electrode assembly according to claim 1, characterized in that: The regulating mechanism comprises: A second through hole is arranged on the fixing member along the radial direction of the radio frequency isolation ring; A movable member, one end of which extends into the second through hole and can move in the second through hole, and the other end of which is located on a side of the fixed member away from the radio frequency isolation ring and is provided with a second threaded hole; a third threaded hole, which is arranged on the fixing member along the radial direction of the radio frequency isolation ring, and has a thread direction opposite to that of the second threaded hole; The adjusting member comprises a screw portion threadably matched with the second threaded hole and the third threaded hole.
6. The upper electrode assembly according to claim 1 or 5, characterized in that: The first positioning and adjusting module further includes an insulating pad which is arranged on the fixing member and the pressing member and is used for contacting the radio frequency isolation ring and the gas shower head.
7. The upper electrode assembly according to claim 1, 2, 3 or 5, characterized in that: The radio frequency isolation ring comprises: a cylindrical portion, located in the accommodating hole; a first flange portion, arranged at the top end of the cylindrical portion and protruding radially outward relative to the cylindrical portion; The gas shower head comprises: a main body portion passing through the receiving hole; a second flange portion disposed at the top end of the main body portion and protruding radially outward relative to the main body portion; The first flange portion overlaps the edge of the accommodating hole to enable the carrier to support the RF isolation ring; the second flange portion overlaps the first flange portion to enable the carrier to support the gas shower head.
8. The upper electrode assembly according to claim 2, characterized in that: The air guide channel comprises: An annular channel is arranged around the receiving hole; An air guide hole, connecting the annular channel and the receiving hole, and a plurality of air guide holes are evenly arranged in the circumference of the receiving hole; An inlet channel is communicated with the annular channel and forms an air inlet hole on the surface of the carrier.
9. A semiconductor process chamber, characterized in that: It comprises a cavity and an upper electrode assembly arranged on the cavity, and the upper electrode assembly is the upper electrode assembly according to any one of claims 1-8.
10. The semiconductor process chamber according to claim 9, characterized in that: Also included is an exhaust assembly disposed in the semiconductor process chamber, the exhaust assembly comprising: a support ring surrounding the outer side of the lower electrode assembly; an exhaust ring having an exhaust passage and supported by the support ring at the top of the support ring; A flow control ring, supported by the support ring at the top of the support ring, and forming an exhaust port of the exhaust channel with the exhaust ring; The second positioning and adjusting module is arranged on the top of the support ring and is used to adjust the concentricity of the support ring, the exhaust ring and the flow control ring, and to adjust the concentricity of the exhaust assembly and the upper electrode assembly.
11. The semiconductor process chamber according to claim 10, characterized in that: The second positioning adjustment module includes: The limiting member includes: a connection block connected to the support ring; a limiting plate connected to the connection block and used to abut against the exhaust ring; a limiting block connected to the limiting plate and used to abut against the flow control ring; An adjusting assembly connects the support ring and the limiter and is capable of adjusting the radial spacing between the support ring and the limiter to change the concentricity between the exhaust ring and the support ring and / or change the concentricity between the flow control ring and the support ring through the limiter.
12. The semiconductor process chamber according to claim 10 or 11, characterized in that: A plurality of second positioning and adjusting modules are arranged on the circumference of the support ring.
13. The semiconductor process chamber according to claim 10, wherein: The flow control rings include a plurality of flow control rings with different thicknesses, and each flow control ring cooperates with the exhaust ring to form exhaust ports of different sizes.
14. The semiconductor process chamber according to claim 10, wherein: Supported by the support ring, the exhaust ring extends into the space surrounded by the gas shower head, the RF isolation ring, the carrier and the cavity, and a gap is provided between the exhaust ring, the RF isolation ring and the gas shower head to guide the inert gas introduced into the gas guide channel to the exhaust port of the exhaust channel.
15. A semiconductor process equipment, characterized in that: The invention comprises a radio frequency source and a semiconductor process chamber as claimed in any one of claims 9 to 14.
16. The semiconductor process equipment according to claim 15, characterized in that: The semiconductor process equipment comprises a plurality of semiconductor process chambers, and each of the semiconductor process chambers is provided with an upper electrode assembly, an exhaust assembly, a lower electrode assembly and the radio frequency source connected thereto, wherein: The RF source is used to feed RF energy into the semiconductor process chamber, and the RF source has two feeding points in each semiconductor process chamber, and the angle formed by the line connecting the two feeding points and the center of the semiconductor process chamber is 180 degrees; and / or, The carrier is a plate-shaped member with two accommodating holes, the two accommodating holes are respectively located in the two semiconductor process chambers, and the radio frequency sources of the two semiconductor process chambers are arranged in a mirror image with each other.
Citation Information
Patent Citations
Novel edge etching reaction device and edge etching method
CN111627844A
Plasma treatment device
CN113035679A
Upper electrode assembly and semiconductor process chamber
CN114823257A
Installation adjusting device and semiconductor process equipment
CN117954299A
Semiconductor process equipment
CN216998572U
Cited By
Radio frequency loop adjusting system, adjusting method and semiconductor device process machine table
CN119626882A
Plasma enhanced atomic layer deposition apparatus and method
CN120575157A
Semiconductor growth equipment provided with spraying assembly
CN121575479A
Semiconductor growth equipment equipped with spray components
CN121575479B
Upper electrode assembly, semiconductor process chamber, and semiconductor processing device
WO2026037138A1