Bolt-sphere net rack high-altitude assembling construction method applying string structure system
By replacing traditional construction equipment with the Zhangxian system, the bolt ball netting is used to solve the problems of large workload and high cost in grid construction, and efficient and low-cost construction results are achieved, ensuring structural stability and design Require.
Patent Information
- Application Number
- CN202411242605.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-11-26
AI Technical Summary
The existing grid structure construction methods have large workload, long cycles and high costs, and cannot take into account both construction efficiency and low cost.
The bolt ball net frame with a high-altitude scattering construction method using the Zhangxian system. By assembling the starting unit on the ground and gradually hoisting it, the Zhangxian system is used instead of the traditional scaffolding or tire frame, and gradually extending to the outside to perform high-altitude scattering, adjusting the pre-tensioning value to Ensure structural stability until the entire grid structure is installed.
The construction of grids with low workload, high construction efficiency and low cost has been achieved, which has improved the utilization rate and progress of construction sites, reduced the cost of construction measures, and ensured that the structure safety meets the design requirements.
Smart Images

Figure CN119021362A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel structure construction, and in particular to a high-altitude scattered construction method for a bolt-ball grid frame using a tensioning system, which has the advantages of less workload, high construction efficiency and low construction cost. Background Art
[0002] Grid structures are widely used in large-span space structures due to their advantages of light weight, good structural performance, flexible design, and easy production and installation. The "force and shape" variation of large-span complex grid structures is complex and has many influencing factors, so it is necessary to conduct in-depth research on their design and construction technology.
[0003] As a highly statically indeterminate spatial structure, the grid structure has the advantages of small spatial force, high rigidity, light weight, and good seismic performance. At the same time, compared with the plane structure, the grid structure has more rods intersecting at the nodes, the spatial structure is complex, and its production and installation are also more complicated. So far, the more common installation methods of the grid structure mainly include: high-altitude bulk method, strip or block installation method, sliding method, and overall installation method (including overall hoisting method, overall lifting method, and overall jacking method).
[0004] In traditional grid structures, the high-altitude bulk method of full-floor scaffolding is the most common method, but it has the disadvantages of large workload and long cycle, which seriously affects the utilization of the construction site and the construction progress, and greatly increases the cost of construction measures; the high-altitude bulk method of tire frames is to arrange tire frames under the grid at a certain span. The number of tire frames needs to be determined based on a series of factors. Too many tire frames affect the site utilization and construction progress. At the same time, too many tire frames cause a burden on the cost of construction measures. Too few tire frames will affect the construction quality, making the grid unable to meet the design requirements and unable to ensure the structural safety. Its overall cost is relatively high; the overall installation method does not require the erection of brackets and has less high-altitude operations, which can greatly reduce labor costs and save construction time, but has high requirements on site and construction conditions; the sliding method requires the increase of the cost of assembling tire frames and sliding measures, and the cost is relatively high.
[0005] Therefore, it is of great practical significance to develop a grid construction method with less workload, high construction efficiency and low construction cost. Summary of the invention
[0006] Due to the above-mentioned defects in the prior art, the present invention provides a grid construction method with less workload, high construction efficiency and low construction cost, which solves the defect that the existing grid construction method cannot take into account less workload, higher construction efficiency and lower construction cost.
[0007] In order to achieve the above object, the present invention provides the following technical solutions:
[0008] A method for high-altitude loose assembly of bolted ball grid frames using a string system comprises the following steps:
[0009] (1) According to the form of the grid structure, the center position of the grid structure is selected as the starting unit position;
[0010] (2) Assemble the starting unit on the ground and complete the construction of all structural columns of the grid structure;
[0011] (3) Lift the starting unit into place;
[0012] (4) Based on the starting unit, extend outward to carry out high-altitude scattered assembly (which can effectively eliminate the cumulative construction error), and advance outward in the manner of one upper chord and one lower chord until the grid is scattered to the adjacent structural column;
[0013] (5) Installing a tensioning system on the lower side of the loose-jointed part completed in step (4) and adjusting the tensioning system to a pre-tension value, the tensioning system includes vertical rods, longitudinal cables, transverse struts and lower connecting members, the lower connecting members are ball-connected to the lower chord bolts through vertically arranged vertical rods, the lower connecting members on both sides are connected through horizontally arranged transverse struts (to ensure lateral stability of the structure during tensioning), and the lower connecting members on the same side are fixedly mounted on the longitudinal cables arranged along the span width direction, and the pre-tension value is determined by performing structural form-finding analysis using an inverse iteration method;
[0014] (6) Repeat steps (4) to (5) until the entire grid structure is installed;
[0015] (7) Unload the tensioning system and the construction is completed.
[0016] The installation sequence of the string system is: install vertical rods → lower connector part I → longitudinal cables → lower connector part II → transverse braces.
[0017] The method for high-altitude scattered assembly of a bolt-ball grid frame using a tensioning system of the present invention has a reasonable step design, takes the center of the grid frame as a starting unit for ground assembly, and simultaneously adopts a suitable temporary tensioning system to replace the role of a scaffold or a cradle, and the structural columns, the tensioning system, the starting unit and the installed structure jointly provide rigidity and support for the scattered assembly unit, which ensures the construction quality while improving the utilization rate of the construction site and accelerating the construction progress, saving the construction measures cost to a certain extent, and is more suitable for projects where the lower structure has been built, or the lower structure and the foundation have insufficient bearing capacity, and there is no condition for arranging a cradle under the grid frame, and has good application prospects.
[0018] As the preferred technical solution:
[0019] The above-mentioned method for high-altitude scattered construction of bolt-ball grid using a tension string system simultaneously carries out high-altitude scattered construction in multiple directions to speed up the grid installation progress.
[0020] In the above-mentioned method for high-altitude scattered assembly construction of a bolt-ball grid frame using a tensioned string system, the starting unit is assembled in sequence according to the order of the lower chord member, the diagonal web member, and the upper chord member. Before assembly, the assembly support position and the lower chord projection line are laid out at the assembly site, and the size is checked after the assembly is completed.
[0021] A method for high-altitude loose assembly of bolt ball grid frame using a string system as described above, wherein a bolt ball ear plate is welded on the lower string bolt ball and a bolt ball ear plate through hole is opened on the bolt ball ear plate;
[0022] Both ends of the vertical rod are provided with vertical rod ear plates, and the vertical rod ear plate is provided with vertical rod ear plate through holes;
[0023] The lower chord bolt ball is fixedly connected to the vertical rod by bolts.
[0024] According to the above-mentioned method for high-altitude loose assembly of bolt ball grid frame using a string system, the lower connector comprises a lower connector part I and a lower connector part II, the lower connector part I and the lower connector part II have the same structure and are symmetrically arranged, the bottom of the lower connector part I is provided with a strip groove I, the top of the lower connector part II is provided with a strip groove II matching the strip groove I, and after the lower connector part I and the lower connector part II are matched, the strip groove I and the strip groove II enclose a strip groove matching the longitudinal cable;
[0025] A lower connecting member vertical ear plate is provided on the top of the lower connecting member part I, and a lower connecting member vertical ear plate through hole is opened on the lower connecting member vertical ear plate, and the vertical rod is fixedly connected to the lower connecting member part I by bolts;
[0026] The lower connecting member is provided with lower connecting member horizontal ear plates on both sides perpendicular to the arrangement direction of the strip grooves, and the lower connecting member horizontal ear plate through holes are opened on the lower connecting member horizontal ear plate;
[0027] Both ends of the transverse support rod are provided with transverse support rod ear plates, and transverse support rod ear plate through holes are opened on the transverse support rod ear plates;
[0028] The transverse support rod is fixedly connected to the lower connecting piece by bolts.
[0029] In the above-mentioned method for high-altitude loose assembly of bolt-ball grid frames using a tensioned string system, the strip grooves I and II are both U-shaped grooves and the cross-section of the strip grooves is circular.
[0030] In the above-mentioned method for high-altitude loose assembly of bolt ball grid frame using the string system, the four corners of the lower connecting member part I and the lower connecting member part II are provided with lower connecting member fixing angle blocks, and the lower connecting member fixing angle block through holes are opened on the lower connecting member fixing angle blocks;
[0031] The lower connecting member fixing bolts are sequentially passed through the matching lower connecting member fixing angle block through holes and are threadedly connected with the lower connecting member fixing nuts to fix the lower connecting member part I and the lower connecting member part II.
[0032] In the above-mentioned method for high-altitude loose assembly of bolt-ball grid frames using a tension string system, the unloading of the tension string system refers to the staged unloading of the tension string system.
[0033] In the above-mentioned method for high-altitude loose assembly of bolted ball grid frame using a string system, the steps for determining the pre-tension value are as follows:
[0034] (1) The structural dimensions before prestressing are taken as the dimensions of the prestressed equilibrium state, and the finite element model is established using the dimensions of the prestressed equilibrium state as the approximate dimensions of the lofted state;
[0035] (2) Applying the initial strain method to apply cable prestress and conduct numerical analysis to obtain an approximate prestress equilibrium state;
[0036] (3) Add the difference between the coordinates of the approximate prestressed equilibrium state obtained in the previous step and the coordinates of the lofted state to the original finite element model node coordinates, update the approximate lofted state coordinate nodes, remodel, and perform cable tension simulation again;
[0037] (4) Repeat the above steps and iterate cyclically until the coordinate difference between the approximate prestressed equilibrium state and the prestressed equilibrium state is less than the design accuracy. At this time, the approximate prestressed equilibrium state can be regarded as the prestressed equilibrium state, and the approximate lofting state obtained through cyclic iteration is regarded as the required lofting state.
[0038] Through iteration, not only the geometric dimensions of the lofted state can be obtained, but also the initial strain that should be applied to each cable segment can be obtained, thereby completing the structural morphology analysis.
[0039] The above technical solution is only a feasible technical solution of the present invention, and the protection scope of the present invention is not limited thereto. Those skilled in the art can reasonably adjust the specific design according to actual needs.
[0040] The above invention has the following advantages or beneficial effects:
[0041] (1) The bolt-ball grid high-altitude scattered construction method using the string system of the present invention can calculate the prestress required to be applied to each cable through construction design, ensuring that the construction process is safe and reliable and meets the expected design requirements;
[0042] (2) The bolt ball grid high-altitude scattered construction method using the string system of the present invention saves the lower site and improves the construction efficiency compared with the full-floor scaffolding scheme;
[0043] (3) The high-altitude scattered construction method of the bolt ball grid frame using the string system of the present invention reduces the additional stress during construction compared to the scheme of arranging the support frame at intervals. After the construction is completed, the structure is more in line with the designed stress state and meets the design requirements;
[0044] (4) The present invention provides a method for constructing a bolted ball grid frame at high altitude by applying a string tensioning system. The temporary string tensioning device has a simple structure, is reusable, and has great versatility.
[0045] (5) The method for high-altitude scattered assembly of bolt-ball grid frames using a tensioning system of the present invention has a reasonable step design. The structural columns, the tensioning system, the starting unit and the installed structure jointly provide rigidity and support for the scattered assembly units. The structure has good structural stability, less overall workload, low cost and high operation efficiency, and has good application prospects. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] The present invention and its features, appearance and advantages will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings. The same reference numerals indicate the same parts in all the drawings. The drawings are not drawn to scale, and emphasis is placed on illustrating the subject matter of the present invention.
[0047] Figure 1 Schematic diagram of the installation sequence and direction of each part of the grid structure ( Figure 1 The numbers in the middle represent the installation order);
[0048] Figure 2 This is a schematic diagram for high-altitude splicing (between adjacent structural columns);
[0049] Figure 3 for Figure 2 Partial magnified image;
[0050] Figure 4 This is the exploded view of the components at the connection point of the lower connector;
[0051] Figure 5 Figure 1 is a step diagram for determining the pre-tension value;
[0052] Among them, 1 is a structural column, 2 is a string system, 2.1 is a vertical rod, 2.2 is a longitudinal cable, 2.3 is a transverse strut, 2.4 is a lower connector part I, 2.5 is a lower connector part II, 2.6 is a vertical rod ear plate, 2.7 is a transverse strut ear plate, 2.8 is a lower connector vertical ear plate, 2.9 is a lower connector horizontal ear plate, 2.10 is a lower connector fixed angle block, 3 is a bolt ball grid loose assembly part, 3.1 is a lower chord member, 3.2 is a diagonal web member, 3.3 is an upper chord member, 3.4 is a lower chord bolt ball, and 3.5 is a bolt ball ear plate. DETAILED DESCRIPTION
[0053] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but they are not intended to limit the present invention.
[0054] Example 1
[0055] A method for high-altitude loose assembly of bolted ball grid frames using a string system comprises the following steps:
[0056] (1) According to the form of grid structure (such as Figure 1 The grid structure shown in the figure) selects the center position of the grid structure as the starting unit position;
[0057] (2) Assemble the starting unit on the ground and complete the construction of all structural columns 1 of the grid structure;
[0058] (3) The starting unit is hoisted into place. The starting unit is assembled in the order of the lower chord member 3.1, the diagonal web member 3.2, and the upper chord member 3.3. Before assembly, the assembly support position and the projection line of the lower chord member are laid out at the assembly site. After the assembly is completed, the size is checked;
[0059] (4) Extend outward from the starting unit to perform high-altitude scattered puzzles (such as Figure 2 As shown in the figure), the loose assembly is pushed outward in the form of one upper chord and one lower chord, and high-altitude loose assembly construction is carried out synchronously in multiple directions until the grid is loosely assembled to the adjacent structural column 1 (the assembly order is as follows Figure 1 shown);
[0060] (5) Install the string system 2 on the lower side of the loose assembly part 3 completed in step (4) (install in the order of vertical rod 2.1→lower connecting member part I2.4→longitudinal cable 2.2→lower connecting member part II 2.5→transverse brace 2.3) and adjust the string system 2 to the pre-tension value. Figures 3-4 As shown, it comprises a vertical rod 2.1, a longitudinal cable 2.2, a transverse strut 2.3 and a lower connecting member, wherein the lower connecting member is connected to the lower chord bolt ball 2.4 through the vertically arranged vertical rod 2.1, and the lower connecting members on both sides are connected through the horizontally arranged transverse strut 2.3, and the lower connecting member on the same side is fixedly mounted on the longitudinal cable 2.2 arranged along the span width direction;
[0061] Specifically, a bolt ball ear plate 3.5 is welded on the lower chord bolt ball 3.4 and a bolt ball ear plate through hole is opened on the bolt ball ear plate 3.5, and both ends of the vertical rod 2.1 are provided with vertical rod ear plates 2.6 and vertical rod ear plates 2.6 are opened with vertical rod ear plate through holes, and the lower chord bolt ball 3.5 is fixedly connected with the vertical rod 2.1 by bolts;
[0062] The lower connector includes a lower connector part I 2.4 and a lower connector part II 2.5. The lower connector part I 2.4 and the lower connector part II 2.5 have the same structure and are symmetrically arranged. A strip groove I is opened at the bottom of the lower connector part I 2.4, and a strip groove II matching the strip groove I is opened at the top of the lower connector part II 2.5. After the lower connector part I 2.4 and the lower connector part II 2.5 are matched, the strip groove I and the strip groove II form a strip groove matching the longitudinal cable 2.2 (the strip groove I and the strip groove II are both U-shaped grooves and the cross-section of the strip groove is circular). A lower connector vertical ear plate 2.8 is provided at the top of the lower connector part I 2.4, and a lower connector vertical ear plate through hole is opened on the lower connector vertical ear plate 2.8. The vertical rod 2.1 is connected to the lower connector part I 2.4 is fixedly connected by bolts, and lower connecting member horizontal ear plates 2.9 are provided on both sides of the lower connecting member perpendicular to the arrangement direction of the strip grooves, and lower connecting member horizontal ear plates 2.9 are provided with lower connecting member horizontal ear plate through holes, and lower connecting member fixing angle blocks 2.10 are provided on the four corners of the lower connecting member part I 2.4 and the lower connecting member part II 2.5, and lower connecting member fixing angle blocks 2.10 are provided with lower connecting member fixing angle block through holes, and lower connecting member fixing bolts are sequentially passed through the matching lower connecting member fixing angle block through holes 2.10 and threadedly connected with the lower connecting member fixing nuts to fix the lower connecting member part I 2.4 and the lower connecting member part II 2.5;
[0063] Both ends of the transverse brace 2.3 are provided with transverse brace ear plates 2.7, and transverse brace ear plate through holes are opened on the transverse brace ear plates 2.7. The transverse brace 2.3 is fixedly connected to the lower connecting piece by bolts;
[0064] The pre-tension value is determined by performing structural form-finding analysis using the inverse iteration method. The steps are as follows (e.g. Figure 5 shown):
[0065] (1) The structural dimensions before prestressing are taken as the dimensions of the prestressed equilibrium state, and the finite element model is established using the dimensions of the prestressed equilibrium state as the approximate dimensions of the lofted state;
[0066] (2) Applying the initial strain method to apply cable prestress and conduct numerical analysis to obtain an approximate prestress equilibrium state;
[0067] (3) Add the difference between the coordinates of the approximate prestressed equilibrium state obtained in the previous step and the coordinates of the lofted state to the original finite element model node coordinates, update the approximate lofted state coordinate nodes, remodel, and perform cable tension simulation again;
[0068] (4) Repeat the above steps and iterate cyclically until the coordinate difference between the approximate prestress equilibrium state and the prestress equilibrium state is less than the design accuracy. At this time, the approximate prestress equilibrium state can be regarded as the prestress equilibrium state, and the approximate lofting state obtained by cyclic iteration is regarded as the required lofting state;
[0069] (6) Repeat steps (4) to (5) until the entire grid structure is installed;
[0070] (7) The string system is unloaded in stages and the construction is completed.
[0071] It has been verified that the high-altitude scattered construction method of the bolt-ball grid frame using the tensioning system of the present invention can calculate the prestress that needs to be applied to each cable through construction design, thereby ensuring that the construction process is safe and reliable and meeting the expected design requirements; compared with the full-floor scaffolding scheme, the lower site is saved and the construction efficiency is improved; compared with the scheme of arranging support frames at intervals, the additional construction stress is reduced, and after the construction is completed, the structure is more in line with the designed stress state and meets the design requirements; the temporary tensioning device has a simple structure, is reusable, and has great versatility; the step sequence design is reasonable, and the structural columns, the tensioning system, the starting unit, and the installed structure jointly provide rigidity and support for the scattered units, the structure has good stability, the overall workload is small, the cost is low, the operation efficiency is high, and the application prospect is good.
[0072] Those skilled in the art should understand that those skilled in the art can implement variations by combining the prior art and the above embodiments, which will not be described in detail here. Such variations do not affect the essential content of the present invention, and will not be described in detail here.
[0073] The above describes the preferred embodiments of the present invention. It should be understood that the present invention is not limited to the above-mentioned specific embodiments, and the devices and structures that are not described in detail should be understood to be implemented in a common manner in the art; any technician familiar with the art can use the above-disclosed methods and technical contents to make many possible changes and modifications to the technical solutions of the present invention without departing from the scope of the technical solutions of the present invention, or modify them into equivalent embodiments of equivalent changes, which does not affect the essential content of the present invention. Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solutions of the present invention are still within the scope of protection of the technical solutions of the present invention.
Claims
1. A method for high-altitude loose assembly of bolted ball grid frames using a string system. Features: The following steps are involved: (1) According to the form of the grid structure, the center position of the grid structure is selected as the starting unit position; (2) Assemble the starting unit on the ground and complete the construction of all structural columns of the grid structure; (3) Lift the starting unit into place; (4) Based on the starting unit, the grid is extended outward to carry out high-altitude scattered assembly, with one upper chord and one lower chord advancing outward until the grid is scattered to the adjacent structural column; (5) Installing a string system on the lower side of the loose-jointed part completed in step (4) and adjusting the string system to a pre-tension value, the string system includes vertical rods, longitudinal cables, transverse struts and lower connecting members, the lower connecting members are ball-connected to the lower chord bolts through vertically arranged vertical rods, the lower connecting members on both sides are connected through horizontally arranged transverse struts, and the lower connecting members on the same side are fixedly mounted on the longitudinal cables arranged along the span width direction, and the pre-tension value is determined by performing structural form-finding analysis using an inverse iteration method; (6) Repeat steps (4) to (5) until the entire grid structure is installed; (7) Unload the tensioning system and the construction is completed.
2. A method for high-altitude loose assembly of bolt-ball grid frames using a string system according to claim 1, It is characterized in that High-altitude splicing construction is carried out simultaneously in multiple directions.
3. A method for high-altitude loose assembly of bolt-ball grid frames using a string system according to claim 1, It is characterized in that The starting unit is assembled in sequence according to the order of the lower chord member, the diagonal web member, and the upper chord member. Before assembly, the assembly support position and the lower chord projection line are laid out at the assembly site, and the size is checked after the assembly is completed.
4. A method for high-altitude loose assembly of bolted ball grid frames using a string system according to claim 1, It is characterized in that A bolt ball ear plate is welded on the lower chord bolt ball and a bolt ball ear plate through hole is opened on the bolt ball ear plate; Both ends of the vertical rod are provided with vertical rod ear plates, and the vertical rod ear plate is provided with vertical rod ear plate through holes; The lower chord bolt ball is fixedly connected to the vertical rod by bolts.
5. A method for high-altitude loose assembly of bolted ball grid frames using a string system according to claim 4, It is characterized in that The lower connector includes a lower connector part I and a lower connector part II. The lower connector part I and the lower connector part II have the same structure and are symmetrically arranged. The bottom of the lower connector part I is provided with a strip groove I, and the top of the lower connector part II is provided with a strip groove II matching the strip groove I. After the lower connector part I and the lower connector part II are matched, the strip groove I and the strip groove II enclose a strip groove matching the longitudinal cable. A lower connecting member vertical ear plate is provided on the top of the lower connecting member part I, and a lower connecting member vertical ear plate through hole is opened on the lower connecting member vertical ear plate, and the vertical rod is fixedly connected to the lower connecting member part I by bolts; The lower connecting member is provided with lower connecting member horizontal ear plates on both sides perpendicular to the arrangement direction of the strip grooves, and the lower connecting member horizontal ear plate through holes are opened on the lower connecting member horizontal ear plate; Both ends of the transverse support rod are provided with transverse support rod ear plates, and transverse support rod ear plate through holes are opened on the transverse support rod ear plates; The transverse support rod is fixedly connected to the lower connecting piece by bolts.
6. A method for high-altitude loose assembly of bolted ball grid frames using a string system according to claim 5, It is characterized in that The strip groove I and the strip groove II are both U-shaped grooves and the cross-section of the strip grooves is circular.
7. A method for high-altitude loose assembly of bolted ball grid frames using a string system according to claim 5, It is characterized in that The four corners of the lower connector part I and the lower connector part II are provided with lower connector fixing angle blocks, and the lower connector fixing angle blocks are provided with lower connector fixing angle block through holes; The lower connecting member fixing bolts are sequentially passed through the matching lower connecting member fixing angle block through holes and are threadedly connected with the lower connecting member fixing nuts to fix the lower connecting member part I and the lower connecting member part II.
8. The method for high-altitude loose assembly of bolt-ball grid frames using a string system according to claim 1, It is characterized in that The unloading of the string system refers to the staged unloading of the string system.
9. The method for high-altitude loose assembly of bolt-ball grid frame using a string system according to claim 1, It is characterized in that The steps for determining the pre-tension value are as follows: (1) The structural dimensions before prestressing are taken as the dimensions of the prestressed equilibrium state, and the finite element model is established using the dimensions of the prestressed equilibrium state as the approximate dimensions of the lofted state; (2) Applying the initial strain method to apply cable prestress and perform numerical analysis to obtain an approximate prestress equilibrium state; (3) Add the difference between the coordinates of the approximate prestressed equilibrium state obtained in the previous step and the coordinates of the lofted state to the original finite element model node coordinates, update the approximate lofted state coordinate nodes, remodel, and perform cable tension simulation again; (4) Repeat the above steps and iterate cyclically until the coordinate difference between the approximate prestressed equilibrium state and the prestressed equilibrium state is less than the design accuracy. At this time, the approximate prestressed equilibrium state can be regarded as the prestressed equilibrium state, and the approximate lofting state obtained through cyclic iteration is regarded as the required lofting state.