Construction method for guiding wavy curtain wall based on BIM model

The construction of wave curtain walls is guided through the BIM model, which solves the problems of high construction difficulty and poor quality, and achieves a more efficient and safer construction process, reducing cost and quality risks.

CN119021403AInactive Publication Date: 2024-11-26CHINA METALLURGICAL CONSTR ENG GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411386957.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology has problems such as difficult construction, poor quality, and waste of materials and manpower when constructing wave glass curtain walls. It is mainly because the two-dimensional CAD design drawings are difficult to clearly express complex nodes, resulting in insufficient understanding of construction personnel, resulting in leakage and misalignment. and frequent rework.

Method used

Using the construction method based on the BIM model, by establishing a three-dimensional model of the structure and anchor plate, dividing unit modules, embedding anchor plates, installing angle steel, vertical lifting and glass, fixing with bolts, simulate the construction process, and ensuring the accurate installation sequence and angle.

Benefits of technology

Simulating the construction process through BIM model reduces construction risks, improves construction quality and safety, reduces rework and material waste, and ensures the accuracy and efficiency of the project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021403A_ABST
    Figure CN119021403A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for guiding a wave-shaped curtain wall based on a BIM model, and the method comprises the steps: S1, building the BIM model, and dividing a wave-shaped structural plate into a plurality of unit modules in the length direction; s2, building an anchor plate BIM sub-model; s3, unit modules divided when the structural slab BIM model is established serve as objects, and anchor plates are sequentially embedded into the edges of the wave-shaped plates; s4, by taking the unit modules as units, the anchor plates are embedded into the edges of the plate structures, peripheral beams and shear walls; s5, transverse angle steel is installed on the anchor plate; s6, curtain wall mullions are installed in the relative gaps between the two pieces of transverse angle steel; s7, punching holes in the crossed positions of the transverse angle steel and the vertical stiles, and penetrating fixing bolts into the holes; s8, curtain wall facing glass is installed between the installed wave-shaped adjacent curtain wall mullions, the facing glass is installed in the mullion end clamping plates, and all the wave-shaped curtain walls of the outer facade of the project are installed with the divided curtain wall unit modules as the installation foundation; compared with a two-dimensional CAD design drawing, the BIM model can more visually express the design drawing intention in the technical disclosure aspect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a construction method of a wave-shaped curtain wall guided by a BIM model. Background Art

[0002] In the field of high-rise and super-high-rise housing construction, curtain walls are increasingly popular as decorative surfaces for exterior facades, especially glass curtain wall exterior wall finishes, which are not only beautiful, but also can improve the overall energy-saving effect of the building by using some special glass.

[0003] Most of the existing high-rise and super-high-rise buildings have a flat design of external glass curtain walls, that is, the glass curtain wall is designed in parallel with the main structure facade. According to previous practical experience, flat glass curtain walls have a high reflectivity to sunlight and can also focus sunlight within a certain range, increasing the ambient temperature within this range, causing certain troubles to people's daily lives.

[0004] At present, the external glass curtain walls of super high-rise buildings are designed with full consideration of the above phenomenon, and the external glass curtain walls are designed to be wavy. The size of each piece of wavy glass curtain wall is inconsistent. When sunlight shines on the glass curtain wall, there will be no reflection, which will greatly weaken the reflection effect of sunlight. It will not focus sunlight, thereby avoiding the increase of ambient temperature in a certain range outside under the sunlight.

[0005] The wavy glass curtain wall not only has the above advantages, but also has significantly stronger resistance to wind loads than the flat glass curtain wall. However, the construction difficulty of the wavy glass curtain wall is much greater than that of the flat wavy glass. The existing technology for the construction of wavy glass curtain walls can only express the design intent through two-dimensional CAD design drawings, and some extremely complex nodes need to be described and expressed through more than two section drawings.

[0006] After receiving the design drawings, it is difficult for construction site workers to fully understand the true intention of the design for such complex nodes. In many cases, they only rely on past experience to carry out construction, and the node details are not properly constructed, which will lead to reduced project quality. The wave-shaped glass curtain wall structure is complex in design and difficult to construct. During the construction process, the curtain wall embedded parts were missed many times, and the upper and lower layers were misaligned. The size and angle of the wave-shaped lines of the floor slab were inconsistent, and the actual production on site was reworked many times, resulting in serious waste of materials and manpower. Summary of the invention

[0007] In order to solve the above technical problems, the present invention provides a construction method of a wave-shaped curtain wall guided by a BIM model.

[0008] The present invention provides a construction method for guiding a wave-shaped curtain wall based on a BIM model, which adopts the following technical solution:

[0009] A construction method for wave curtain wall based on BIM model, the following construction steps:

[0010] Step 1: Establish a two-layer main structure BIM model according to the structural design drawings. The edge shape of the corrugated structural plate is modeled according to the design angle, and the corrugated structural plate is divided into several unit modules along the length direction;

[0011] Step 2: Create the anchor plate BIM sub-model according to the anchor plate design drawing;

[0012] Step 3: Taking the unit modules divided when establishing the structural plate BIM model as the object, embed the anchor plates into the edges of the corrugated plate in sequence;

[0013] Step 4: Using unit modules as units, embed anchor plates into the edge of the plate structure and the peripheral beams and shear walls. Do not embed all anchor plates into the edge of the plate structure.

[0014] Step 5: Install the transverse angle steel on the anchor plate and align the outer ends of the transverse angle steel;

[0015] Step 6: Install the curtain wall vertical brace in the relative gap between the two horizontal angle steels;

[0016] Step 7: Drill holes at the intersection of the horizontal angle steel and the vertical support and insert the fixing bolts. Two bolts form a group. The installation positions of the upper and lower groups of bolts should be aligned. Tighten all the nuts on the bolts.

[0017] Step 8: Install the curtain wall facing glass between the installed adjacent wave-shaped curtain wall vertical supports. The facing glass is installed in the end clamps of the vertical supports and is firmly connected and arranged along the wave-shaped outer shape of the structural plate. During the installation process, the installation angle of the curtain wall facing glass needs to be continuously adjusted according to the curtain wall vertical supports installed on the edges of the upper and lower structural plates, so that the curtain wall facing glass and the end clamps of the vertical supports are firmly fixed. The divided curtain wall unit modules are used as the installation basis to install all the wave-shaped curtain walls on the exterior facade of this project.

[0018] Optionally, in step 2, the steel plate thickness and the size of the middle circular hole, the length and size of the round steel are accurately drawn in the anchor plate BIM model to facilitate engineering quantity statistics.

[0019] Optionally, in step 3, when the anchor plates are sequentially embedded into the edges of the corrugated plates, attention should be paid to the spatial misalignment between the edges of the structural plates and the installation positions of the anchor plates.

[0020] Optionally, in step 4, be careful not to embed the anchor plate completely into the edge of the plate structure.

[0021] Optionally, in step 5, two transverse angle steels are installed, and two transverse angle steels are installed on the anchor plate. The relative gap between the two transverse angle steels should meet the curtain wall vertical support installation requirements.

[0022] Optionally, in step 6, the upper curtain wall vertical brace joints and the lower two curtain wall vertical brace joints shall not be installed at the same height, and shall be staggered by at least 1 meter according to the design drawings.

[0023] Optionally, in step 7, when there is no gap between the bolt cap and the transverse angle steel, the nut is tightened on the bolt.

[0024] Optionally, after the curtain wall facing glass and the vertical support end clamps are firmly fixed, the curtain wall lightning protection bridging is performed. Galvanized angle steel sheets are used at the joints of the upper and lower vertical supports to perform curtain wall lightning protection bridging. The upper and lower ends of the transverse angle steel are respectively fixed to the upper and lower vertical support joints.

[0025] Optionally, after the curtain wall lightning protection is bridged, a fire isolation zone is made between the curtain wall and the main structure, and a support plate is set at the bottom of the fire isolation zone and fixed to the main structure through a bracket.

[0026] In summary, the present invention includes at least one of the following beneficial technical effects: the BIM model can simulate the construction process, allowing builders to choose the best construction plan and the construction sequence that is most suitable for the project, thereby reducing the safety, cost and quality risks of the construction process. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0028] Figure 1 Schematic diagram of the division of the unit modules of the curtain wall facade according to an embodiment of the present invention;

[0029] Figure 2 is a schematic diagram of an anchor plate according to an embodiment of the present invention;

[0030] Figure 3 This is a schematic diagram of pre-embedded anchor plates of a BIM model according to an embodiment of the present invention;

[0031] Figure 4 Schematic diagram of welding transverse angle steel on the anchor plate of the BIM model of an embodiment of the present invention;

[0032] Figure 5 Schematic diagram of staggered joints of upper and lower adjacent curtain wall vertical braces of a BIM model of an embodiment of the present invention;

[0033] Figure 6 Schematic diagram of bolt connection of an aluminum alloy frame according to an embodiment of the present invention;

[0034] Figure 7 is a schematic diagram of a wave-shaped curtain wall facing according to an embodiment of the present invention;

[0035] Figure 8 It is a schematic diagram of a lightning protection bridge connection of the vertical brace joints of the upper and lower curtain walls of the BIM model of an embodiment of the present invention;

[0036] Fig. 9 Schematic diagram of the upper and lower fire isolation zones of the BIM model of an embodiment of the present invention;

[0037] Fig.10 It is a schematic diagram of the installation construction process of the corrugated glass curtain wall according to an embodiment of the present invention. DETAILED DESCRIPTION

[0038] The following describes the embodiments of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.

[0039] The following is combined with Figure 1-10 The present invention is described in further detail.

[0040] The embodiment of the present invention discloses a construction method of a wave-shaped curtain wall guided by a BIM model.

[0041] Reference Figure 1-Figure 10 , a construction method of wave-shaped curtain wall based on BIM model, including the following construction steps:

[0042] Step 1: Establish a two-layer main structure BIM model according to the structural design drawings. The edge shape of the corrugated structural plate is modeled according to the design angle, and the corrugated structural plate is divided into several unit modules along the length direction, as shown in the attached figure. Figure 1 shown.

[0043] Step 2: According to the anchor plate design drawings, establish the anchor plate BIM sub-model, accurately draw the steel plate thickness and the size of the middle circular hole, the length and size of the round steel in the anchor plate BIM model, so as to facilitate the engineering quantity statistics, as shown in the attached Figure 2 shown.

[0044] Step 3: Taking the unit modules divided when establishing the structural plate BIM model as the object, embed the anchor plates into the edges of the corrugated plate in sequence. At this time, it should be noted that there is a spatial misalignment between the edge of the structural plate and the installation position of the anchor plate, as shown in the attached figure. Figure 3 As shown in the CAD design drawing.

[0045] Step 4: Use the unit module as a unit to embed the anchor plate into the edge of the plate structure and the outer beams and shear walls. Note that the anchor plate should not be completely embedded into the edge of the plate structure. Figure 3 As shown in the BIM model diagram.

[0046] Step 5: Install two transverse angle steels (purple components in the figure) on the anchor plate. The relative gap between the two angle steels should meet the installation requirements of the curtain wall vertical braces (green components in the figure). Because the anchor plates are embedded in the edge of the corrugated protruding structural plate, the outer beam and the shear wall, the outer ends of the transverse angle steels should be adjusted and aligned, as shown in the attached figure. Figure 4 shown.

[0047] Step 6: Install the curtain wall vertical brace (green component in the figure) in the relative gap between the two horizontal angle steels. The joints of the upper and lower curtain wall vertical braces shall not be installed at the same height. They should be staggered at least 1 meter according to the design drawings. Figure 5 shown.

[0048] Step 7: Drill holes at the intersection of the horizontal angle steel and the vertical support and insert the fixing bolts. Two bolts form a group. The installation positions of the upper and lower groups of bolts should be aligned. Tighten all the nuts on the bolts until there is no gap between the bolt cap and the horizontal angle steel. Figure 6 shown.

[0049] Step 8: Install the curtain wall facing glass between the installed wave-shaped adjacent curtain wall vertical supports. The facing glass is installed in the clamping plate at the end of the vertical support, firmly connected and arranged along the wave-shaped outer shape of the structural plate. During the installation process, the installation angle of the curtain wall facing glass needs to be constantly adjusted according to the curtain wall vertical supports installed on the edges of the upper and lower structural plates, so that the curtain wall facing glass and the clamping plate at the end of the vertical support are firmly fixed, as shown in the attached figure. Figure 7 shown.

[0050] Step 9: Use galvanized angle steel sheets to bridge the curtain wall lightning protection at the joints of the upper and lower vertical supports. The upper and lower ends of the horizontal angle steel are fixed to the upper and lower vertical support joints respectively, as shown in the attached figure. Figure 8 shown.

[0051] Step 10: According to the design requirements, use rock wool as a fireproof isolation belt between the curtain wall and the main structure. Use a 1.5 thick galvanized steel plate as a support plate at the bottom of the rock wool and fix it to the main structure with a bracket, as shown in the attached Fig. 9 shown.

[0052] Step 11: Based on the divided curtain wall unit modules, install the entire wave curtain wall of the exterior facade of this project, as shown in the attached Fig.10 shown.

[0053] By using the BIM model to guide the construction of the external wavy glass curtain wall of this project, we can discover problems with component elevations and dimensions in the design drawings in advance, and then contact the design unit to make adjustments and modifications in advance.

[0054] By simulating some nodes of the curtain wall through the BIM model, the design intent that is difficult to express in two-dimensional CAD drawings can be clearly expressed, and the construction personnel can understand it intuitively and clearly.

[0055] The BIM model can be used to directly measure the actual size and offset angle of the external glass of the wavy curtain wall, which facilitates the assembly of unit glass curtain wall components and reduces the risk of errors and rework.

[0056] Through the 3D browsing function of the BIM model, the more complex node methods of the glass and aluminum alloy frame of the curtain wall unit can be displayed intuitively from all directions, which is convenient for processing and production.

[0057] The curtain wall nodes are displayed through three-dimensional models, so that on-site workers can intuitively understand the design intent, reduce the probability of errors during construction, and ensure construction quality.

[0058] Through the BIM model, construction workers can compare and understand the 2D CAD design drawings and 3D models. Even if there are errors in the 2D CAD design drawings, they can be discovered in advance before construction, avoiding rework and rectification in the later stage, thus saving the project time and cost to a great extent.

[0059] By simulating dangerous and major super-high-rise facade curtain wall projects through the BIM model, we can identify safety hazards in the curtain wall construction process in advance, formulate emergency response measures in advance, and ensure construction safety.

[0060] The BIM model can be used to count the usage of special-shaped components in the curtain wall, and the total number and volume of any component can be directly calculated, which is convenient for material usage statistics.

[0061] The BIM model can directly count the usage of the built model and automatically generate a detailed usage list of the building model.

[0062] The BIM model can intuitively express the design intent that is difficult to express in two-dimensional CAD design drawings through three-dimensional models, allowing builders to understand the design intent more directly and accurately.

[0063] The BIM model can simulate the construction process, allowing builders to choose the best construction plan and the most suitable construction sequence for the project, thereby reducing safety, cost and quality risks in the construction process.

[0064] The BIM model simulates the construction process in advance, and can intuitively describe the problems existing in the professional design drawings in advance. Even if there are very hidden problems in the design drawings, they can be discovered intuitively without having to wait until the actual construction site reaches this step to discover them. The goal of saving subsequent construction costs and expenses can be achieved through early optimization.

[0065] Compared with two-dimensional CAD design drawings, BIM models can more intuitively express the intention of design drawings in terms of technical briefing. In particular, they can better help operators with low knowledge levels to clarify process construction requirements and facilitate the control of construction quality.

[0066] The BIM model can simulate the surrounding environment of the proposed building in advance, that is, establish a virtual environment to simulate the indoor sunlight, lighting and layout of the proposed building, and perceive the user's living satisfaction after the project is completed in advance.

[0067] This article uses specific examples to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core ideas. The above are only preferred implementation methods of the present invention. It should be pointed out that due to the limitations of textual expression, there are objectively infinite specific structures. For ordinary technicians in this technical field, without departing from the principles of the present invention, they can also make several improvements, modifications or changes, and can also combine the above technical features in an appropriate manner; these improvements, modifications, changes or combinations, or the direct application of the inventive concept and technical solution to other occasions without improvement, should be regarded as the protection scope of the present invention.

Claims

1. A construction method for a wave-shaped curtain wall based on a BIM model, characterized in that: The construction steps include: Step 1: Establish a two-layer main structure BIM model according to the structural design drawings. The edge shape of the corrugated structural plate is modeled according to the design angle, and the corrugated structural plate is divided into several unit modules along the length direction; Step 2: Create the anchor plate BIM sub-model according to the anchor plate design drawing; Step 3: Taking the unit modules divided when establishing the structural plate BIM model as the object, embed the anchor plates into the edges of the corrugated plate in sequence; Step 4: Using unit modules as units, embed anchor plates into the edge of the plate structure and the peripheral beams and shear walls. Do not embed all anchor plates into the edge of the plate structure. Step 5: Install the transverse angle steel on the anchor plate and align the outer ends of the transverse angle steel; Step 6: Install the curtain wall vertical brace in the relative gap between the two horizontal angle steels; Step 7: Drill holes at the intersection of the horizontal angle steel and the vertical support and insert the fixing bolts. Two bolts form a group. The installation positions of the upper and lower groups of bolts should be aligned. Tighten all the nuts on the bolts. Step 8: Install the curtain wall facing glass between the installed adjacent wave-shaped curtain wall vertical supports. The facing glass is installed in the end clamps of the vertical supports and is firmly connected and arranged along the wave-shaped outer shape of the structural plate. During the installation process, the installation angle of the curtain wall facing glass needs to be continuously adjusted according to the curtain wall vertical supports installed on the edges of the upper and lower structural plates, so that the curtain wall facing glass and the end clamps of the vertical supports are firmly fixed. The divided curtain wall unit modules are used as the installation basis to install all the wave-shaped curtain walls on the exterior facade of this project.

2. The method for guiding the construction of a wave-shaped curtain wall based on a BIM model according to claim 1, characterized in that: In step 2, the steel plate thickness, the size of the middle circular hole, and the length and size of the round steel are accurately drawn in the anchor plate BIM model to facilitate engineering quantity statistics.

3. The construction method of the wave-shaped curtain wall guided by the BIM model according to claim 1, characterized in that: In step 3, when the anchor plates are embedded into the edges of the corrugated plates in sequence, attention should be paid to the spatial misalignment between the edges of the structural plates and the installation positions of the anchor plates.

4. The method for constructing a wave-shaped curtain wall based on a BIM model according to claim 1, characterized in that: In step 4, be careful not to embed the anchor plate completely into the edge of the plate structure.

5. The method for constructing a wave-shaped curtain wall based on a BIM model according to claim 1, characterized in that: In step 5, two transverse angle steels are installed on the anchor plate, and the relative gap between the two transverse angle steels should meet the curtain wall vertical support installation requirements.

6. The method for constructing a wave-shaped curtain wall based on a BIM model according to claim 3, characterized in that: In step 6, the vertical brace joints of the upper curtain wall and the vertical brace joints of the lower two curtain walls must not be installed at the same height and must be staggered by at least 1 meter according to the design drawings.

7. The method for constructing a wave-shaped curtain wall based on a BIM model according to claim 6, characterized in that: In step 7, when there is no gap between the bolt cap and the transverse angle steel, the nut is tightened onto the bolt.

8. The construction method of the wave-shaped curtain wall guided by the BIM model according to claim 1, characterized in that: After the curtain wall facing glass and the vertical support end clamps are firmly fixed, the curtain wall lightning protection bridging is carried out. Galvanized angle steel sheets are used to make curtain wall lightning protection bridging at the joints of the upper and lower vertical supports. The upper and lower ends of the horizontal angle steel are respectively fixed on the upper and lower vertical support joints.

9. The method for constructing a wave-shaped curtain wall based on a BIM model according to claim 9, characterized in that: After the curtain wall lightning protection is bridged, a fire isolation zone is made between the curtain wall and the main structure. A support plate is set at the bottom of the fire isolation zone and fixed to the main structure through a bracket.