Fire-fighting design examination and acceptance service method and system for construction project
Through the construction and correction of three-dimensional model technology, and the automated inspection of fire protection facilities is carried out in combination with construction data, the problem of low fire protection design review and acceptance efficiency in the existing technology is solved, and the rapid and accurate fire protection facility quality inspection and report generation is achieved.
Patent Information
- Application Number
- CN202411120892.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing fire protection design review and acceptance methods for construction projects are inefficient, and traditional manual acceptance takes a long time and has a high misjudgment rate, making it difficult to quickly and accurately detect fire protection facilities quality problems in complex buildings.
Three-dimensional model technology is used to construct the fire protection design drawing information of the target construction project, correct it in combination with the project type, and receive construction data for review and acceptance, generate acceptance reports, and realize automated inspection and positioning.
The efficiency of fire protection design review and acceptance has been improved, and the quality problems of fire protection facilities are intuitively judged through three-dimensional visual technology, acceptance reports marked with specific locations are generated, and subsequent rectification has been guided, avoiding the inefficiency and misjudgment of traditional methods.
Smart Images

Figure CN119067599A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and specifically to a fire protection design review and acceptance service method, electronic equipment, system and storage medium for a construction project. Background Art
[0002] With the continuous advancement of urban modernization, large-scale infrastructure, public facilities, commercial complexes and other types of construction projects are increasing. These construction projects have long construction periods, complex processes, and a wide variety of fire protection facilities, which puts higher requirements on the review and acceptance of construction project fire protection design.
[0003] At present, the existing fire protection design review and acceptance service method for construction projects relies on engineers to design fire protection drawings, and the review and acceptance personnel conduct on-site inspections one by one according to the fire protection drawings to obtain the project acceptance report. However, in actual applications, due to the complex building structure at the construction site and the presence of various fire protection facilities at different locations, it often takes a lot of time for the review and acceptance personnel to conduct on-site inspections one by one according to the flat fire protection drawings, resulting in low efficiency in the fire protection design review and acceptance of construction projects. Summary of the invention
[0004] The present application provides a fire protection design review and acceptance service method, electronic equipment, system and storage medium for a construction project, which has the effect of improving the efficiency of the fire protection design review and acceptance of the construction project.
[0005] In the first aspect, the present application provides a fire protection design review and acceptance service method for a construction project, including: Obtain fire protection design drawing information of the target construction project; Based on the fire protection design drawing information, construct a three-dimensional model of the target construction project; Acquire the project type of the target construction project, and correct the three-dimensional model based on the project type to obtain a target three-dimensional model of the target construction project; receiving construction data of a plurality of fire protection facilities in the target construction project, and reviewing and accepting the construction data in the target three-dimensional model to determine a plurality of abnormal construction locations; Based on each of the abnormal construction locations, an acceptance report for the target construction project is generated.
[0006] In a second aspect of the present application, a fire protection design review and acceptance service system for a construction project is provided, the system comprising: An information acquisition module is used to obtain fire protection design drawing information of a target construction project; A three-dimensional model creation module is used to construct a three-dimensional model of the target construction project based on the fire protection design drawing information; obtain the project type of the target construction project, and correct the three-dimensional model in combination with the project type to obtain a target three-dimensional model of the target construction project; A review and acceptance module, used for receiving construction data of a plurality of fire protection facilities in the target construction project, and reviewing and accepting the construction data in the target three-dimensional model to determine a plurality of abnormal construction locations; The acceptance report determination module is used to generate an acceptance report for the target construction project based on each of the abnormal construction locations.
[0007] In a third aspect of the present application, an electronic device is provided, comprising a memory, a processor, and a program stored in the memory and executable on the processor, wherein the program can implement a fire protection design review and acceptance service method for a construction project when loaded and executed by the processor.
[0008] In a fourth aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the processor implements a fire protection design review and acceptance service method for a construction project.
[0009] In summary, one or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: By adopting the above technical solution, obtaining the fire protection design drawings of the construction project, building the corresponding three-dimensional model, and then correcting the model according to the project type, a high-precision target three-dimensional model can be quickly generated, laying the foundation for the subsequent facility acceptance inspection. By comparing the actual construction data with the three-dimensional model, the quality problems in the fire protection facilities can be judged intuitively and efficiently, and the abnormal construction locations with deviations can be determined. Finally, an acceptance report with the specific locations of each quality problem is formed, so that the relevant parties can view the distribution of the problems, analyze the causes and guide the subsequent standardized rectification, realizing the automated detection and positioning of the quality problems of fire protection facilities in the construction project, and using three-dimensional technology to visually review the facility data, avoiding the low efficiency and high misjudgment rate of traditional manual acceptance, and achieving the effect of improving the efficiency of the fire protection design review and acceptance of the construction project. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 It is a flowchart of a fire protection design review and acceptance service method for a construction project provided by an embodiment of the present application; Figure 2 It is a structural schematic diagram of a fire protection design review and acceptance service system for a construction project provided in an embodiment of the present application; Figure 3It is a structural schematic diagram of an electronic device provided in an embodiment of the present application.
[0011] Description of reference numerals: 300, electronic device; 301, processor; 302, communication bus; 303, user interface; 304, network interface; 305, memory. DETAILED DESCRIPTION
[0012] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.
[0013] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.
[0014] In the description of the embodiments of the present application, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.
[0015] This application embodiment provides a fire protection design review and acceptance service method for a construction project. In one embodiment, please refer to Figure 1 , Figure 1 This is a flow chart of the fire protection design review and acceptance service method for construction projects provided by the embodiment of the present application. The method can be implemented by a computer program, which can be integrated into an application or run as an independent tool application. The method can also be implemented by a single-chip microcomputer or run on a fire protection design review and acceptance service system for construction projects based on the von Neumann system. Specifically, the method can include the following steps: Step 101: Obtain fire protection design drawing information of a target construction project; and construct a three-dimensional model of the target construction project based on the fire protection design drawing information.
[0016] Among them, fire protection design drawing information refers to the data of two-dimensional design drawings that reflect the fire protection design details of the target construction project. In the embodiment of the present application, it can be understood as a CAD or drawing file including the building's floor plan, floor height, room size, location coordinates of fire protection facilities, technical specifications and other contents, which is used to provide a detailed design basis for subsequent three-dimensional modeling and fire protection design evaluation.
[0017] A three-dimensional model refers to a digital expression of a three-dimensional virtual scene containing the building structure and fire protection facility information of a target construction project, which is constructed using three-dimensional computer graphics technology based on the fire protection design drawing information of the target construction project. In the embodiment of the present application, it can be understood as a three-dimensional digital model containing the building's appearance, internal rooms, fire protection facility location and parameter details. It is used to deepen the understanding of the fire protection design plan through a visual all-round display, and provide a three-dimensional expression carrier for subsequent design evaluation, construction data acceptance, etc.
[0018] The target construction project refers to various types of construction projects under construction or completed that require fire design review and acceptance. In the embodiments of the present application, it can be understood as buildings, public places, factories, stations and other projects to be accepted that carry this method. It is used to apply this fire design review and acceptance service method to conduct comprehensive compliance inspections and assessments on its fire design plans and construction implementation to ensure that the design and construction of its fire protection system comply with fire protection regulations.
[0019] Specifically, in order to conduct fire protection design review and acceptance of the target construction project, it is first necessary to obtain the fire protection design drawing information of the target construction project. The fire protection design drawing information includes detailed design contents such as the layout structure of the building, the location and technical parameters of the fire protection facilities. Obtaining complete and accurate fire protection design drawing information is of great significance for subsequent work, which is the basic data for fire protection design review. After obtaining the fire protection design drawing information of the target construction project, the three-dimensional model of the target construction project is further constructed based on this information using three-dimensional modeling technology. The drawing information is analyzed to extract the structural information such as the size, height, and room layout of the building, and a three-dimensional contour model of the building is generated on this basis. Then, according to the location coordinates, technical specifications and other data of the fire protection facilities in the drawings, three-dimensional objects of fire protection facilities, such as fire hydrants and smoke detectors, are added to the corresponding positions in the three-dimensional model. Finally, a three-dimensional scene model containing the details of the building structure and the fire protection system layout is formed. The reason for three-dimensional modeling is that the three-dimensional model can intuitively present the internal and external structure and fire protection system layout of the building from multiple angles, which is convenient for checking the fire protection design plan and finding problems. The three-dimensional model also provides an accurate three-dimensional reference for subsequent design evaluation and construction data acceptance, improving work quality and efficiency.
[0020] Based on the above embodiment, as an optional embodiment, in step 101: constructing a three-dimensional model of the target construction project based on the fire protection design drawing information, this step may also include the following steps: Step 201: Determine the building structure characteristics, fire equipment configuration characteristics and evacuation channel layout characteristics in the fire design drawing information.
[0021] Among them, building structure characteristics, fire equipment configuration characteristics and evacuation channel layout characteristics refer to the key technical information about the building structure, fire equipment settings and evacuation channel layout extracted from the fire design drawings. In the embodiment of the present application, it can be understood as the size, height, room layout of the building, the location, specification parameters of the fire equipment and the number, size, exit location of the evacuation channel, etc., which are used to provide structural characteristics and fire facility configuration characteristics that conform to actual engineering conditions as a modeling basis for constructing an accurate three-dimensional fire design model.
[0022] Specifically, the layout structure of the building is retrieved according to the fire design drawings, such as the number of rooms, room size, floor height and other building size information, as well as the building outline line information, which are used to determine the building structure characteristics. Then, the location coordinates, technical specifications, performance parameters and other information of various fire-fighting equipment contained in the fire design drawings are extracted, such as the discharge flow and model of the fire hydrant, the coverage area of the smoke detector, etc., which are used to determine the configuration characteristics of the fire-fighting equipment. Finally, the number, length, width, exit location and other information of the evacuation passages in the fire design drawings are found out, which determine the layout characteristics of the evacuation passages. The purpose of determining the three types of feature information item by item is to accurately reflect the specific conditions of the building structure, fire-fighting equipment and evacuation passages in the three-dimensional model in the future, and ensure that the three-dimensional model can truly reflect the fire design details of the actual project. Only by correctly extracting key feature information as the basis for modeling can the three-dimensional model achieve the expected simulation effect and provide an accurate reference for subsequent evaluation and acceptance.
[0023] Step 202: Create an initial three-dimensional model of the target construction project based on the building structure characteristics.
[0024] Among them, the initial three-dimensional model refers to a preliminary three-dimensional digital model that only contains the building structure features but does not contain the details of fire-fighting equipment and evacuation passages before the completion of the three-dimensional fire protection design model. In the embodiment of the present application, it can be understood as a simplified three-dimensional model that only reflects the building's outer contour and internal room layout.
[0025] Specifically, the plane outline of the building and the length, width, height and other dimension structural characteristic parameters of each room are imported into the 3D modeling software. In the software, basic geometric bodies such as cubes and polyhedrons are combined to generate a 3D model of the main body of the building's appearance. At the same time, the internal layout structure of the building such as walls and rooms is constructed inside the main body according to the room size characteristics. Thus, an initial 3D model is formed that only contains the overall structural information of the building but does not include internal details. The purpose of creating the initial 3D model in this way is to first build the overall 3D structural framework of the building so that the fire protection facility model can be further added on this basis. The initial model containing the main structural information can quickly determine the 3D outline and internal layout partition of the building, which is conducive to the subsequent addition of detailed models such as fire protection equipment and evacuation passages in different areas, so as to improve the refinement of the 3D model layer by layer, and finally realize the construction of the 3D model of fire protection design.
[0026] Step 203: Based on the position coordinates corresponding to the fire equipment configuration features and the evacuation channel layout features, the fire equipment configuration features and the evacuation channel layout features are mapped to the corresponding spatial positions in the initial three-dimensional model to obtain a three-dimensional model of the target construction project.
[0027] Among them, the position coordinate refers to a numerical value representing the precise position of a point in space. In the embodiment of the present application, it can be understood as the three-dimensional spatial coordinate value (x, y, z) of the end point and turning point of the fire-fighting equipment or evacuation passage marked in the fire-fighting design drawing. It is used to accurately map the three-dimensional model of the fire-fighting equipment or evacuation passage to the appropriate position at the spatial position corresponding to the three-dimensional model according to the position coordinate, thereby completing the construction of the three-dimensional fire-fighting design model.
[0028] Spatial position refers to an absolute specific point in a three-dimensional scene. In the embodiment of the present application, it can be understood as a position with precise coordinates in the three-dimensional model. It is used to deploy the three-dimensional object model of the fire-fighting facility at the corresponding spatial position of the three-dimensional model according to the position coordinates of the fire-fighting facility, so as to achieve accurate mapping correspondence between the fire-fighting facility model and the three-dimensional scene.
[0029] Specifically, for a fire hydrant with coordinates (x1, y1, z1) marked in the fire design drawing, identify the spatial point with the same coordinate position in the initial three-dimensional model, and then deploy the three-dimensional model of the fire hydrant at this point. Similarly, based on the position coordinates of the starting point and turning point of the evacuation passage, a connected evacuation passage three-dimensional object is constructed at the corresponding position of the initial three-dimensional model. Repeating this corresponding process, the three-dimensional models of all fire-fighting equipment and evacuation passages are mapped to the appropriate spatial positions within the initial three-dimensional model scene. Such feature mapping is performed to add relevant three-dimensional details of fire-fighting facilities to the three-dimensional model that initially only contains building structure information, so that it has sufficient fire design information, reflects the fire system layout of the target construction project, and provides accurate three-dimensional references for subsequent evaluation and inspection, so as to achieve the purpose of building a fine fire design three-dimensional model.
[0030] Step 102: Obtain the project type of the target construction project, and calibrate the three-dimensional model based on the project type to obtain a target three-dimensional model of the target construction project.
[0031] Among them, project type refers to the classification of buildings according to their functional use. In the embodiment of the present application, it can be understood that the target construction project can be divided into different functional types such as office buildings, residential areas, hospitals, subway stations, airports, etc., which is used to adjust and optimize the three-dimensional fire protection model in a targeted manner according to the different requirements of fire protection design for different types of projects, so that it can better meet the actual fire protection needs of this type of project.
[0032] The target three-dimensional model refers to the final fire protection design three-dimensional model after targeted adjustment and optimization of the project type. In the embodiment of the present application, it can be understood as an accurate three-dimensional fire protection model suitable for the project type obtained by customizing and correcting the original three-dimensional model according to the actual fire protection needs and specification requirements of different types of projects. It is used as an intuitive reference for the review of fire protection design plans, and further carries out fire protection design evaluation and inspection work through its detailed presentation of the internal and external structures of the building and the fire protection system configuration.
[0033] Specifically, obtain the project type of the target construction project, such as office buildings, hospitals, subway stations, etc. Then, according to the fire protection code requirements of different types of projects, check the compliance of the three-dimensional model and make targeted adjustments. For example, for subway stations with dense crowds, the number of evacuation passages needs to be increased; for high-rise office buildings, vertical evacuation needs to be strengthened. Finally, on the basis of meeting the relevant specifications of the project type, complete the customized correction of the three-dimensional model to better meet the actual fire protection needs of this type of project. The purpose of correcting the model in combination with the project type is to enable the three-dimensional model to truly reflect the specific conditions of the fire protection system of different types of projects, provide a reliable and personalized reference for subsequent evaluation work, and achieve the effect of building a target three-dimensional fire protection design model with strong applicability.
[0034] Based on the above embodiment, as an optional embodiment, in step 102: combining the project type, correcting the three-dimensional model to obtain the target three-dimensional model of the target construction project, this step may also include the following steps: Step 301: Obtain the fire protection standards corresponding to the area where the target construction project is located, and determine the quantitative indicators corresponding to the project type in the fire protection standards.
[0035] Among them, fire protection standards refer to regulatory documents that set forth requirements for building fire protection design and system configuration. In the embodiments of the present application, they can be understood as the various fire protection design and construction standards currently implemented in the area where the target construction project is located, which are used as the basis for judging the compliance of the fire protection design plan of the project, and include quantitative indicators that different types of buildings should meet.
[0036] Quantitative indicators refer to fire protection design compliance items that can be expressed in numerical values as specified in fire protection standards. In the embodiments of the present application, they can be understood as numerical fire protection design evaluation criteria clearly defined in the standards, such as the number of fire water sources, the upper limit of building height, and the lower limit of evacuation passage width. They are used to compare with the actual fire protection design parameters of the target construction project to determine whether its design scheme meets the requirements of fire protection standards.
[0037] Specifically, confirm the regional location of the target construction project and consult the fire protection design standards currently implemented in the area. Then, in the fire protection standard document, locate the chapters related to the project type, such as high-rise residential buildings, subway stations, etc. Finally, find the explicitly defined quantitative indicators in the corresponding chapters, such as building height restrictions, the lower limit of the number of evacuation passages, the upper limit of the area of each fire zone, etc. Obtaining the quantitative indicators that the target construction project should meet is the basis for conducting standardized fire protection design evaluation. Only by clarifying the standard values of each quantitative indicator can it be used to verify the compliance of the actual design parameters of the project. This step lays an objective and fair quantitative comparison basis for subsequent evaluation work.
[0038] Step 302: Based on the quantitative index, the corresponding three-dimensional model elements in the three-dimensional model are evaluated to obtain the deviation degree corresponding to each three-dimensional model element.
[0039] Among them, the three-dimensional model elements refer to the various components that constitute the three-dimensional model, which can be understood as building elements, evacuation channel elements, and fire-fighting equipment elements in the embodiment of the present application, such as walls, rooms, doors and windows in the building model, and fire hydrants, fire extinguishers, evacuation signs, ventilation systems and other types of three-dimensional virtual objects in the fire-fighting system model. When evaluating the quantitative indicators of fire-fighting regulations, the relevant parameters of these elements are extracted and compared with the standard values of the regulations to obtain the compliance results of each element.
[0040] The degree of deviation refers to the degree of difference between the parameters of the three-dimensional model elements and the standard values of the corresponding fire protection regulations. In the embodiment of the present application, it can be understood as quantitatively calculating the numerical deviation between the parameters of the three-dimensional model elements and the standard values of the regulations, such as converting them into percentages or specific values, to intuitively reflect the consistency between the parameters of the model element design and the requirements of the regulations, to determine whether there is a deviation exceeding the standard, and to provide a quantitative basis for subsequent fire protection design evaluation.
[0041] Specifically, in order to evaluate whether the various elements of the three-dimensional fire protection model meet the requirements of the specifications, it is necessary to perform quantitative detection on the corresponding elements in the three-dimensional model based on the determined quantitative indicators to obtain the deviation results of each element. Extract the parameters of each key element from the three-dimensional model, such as floor height, room area, number of evacuation doors and other calculable indicators. Then, according to the obtained standard quantitative indicators, calculate the deviation between the parameters of each three-dimensional element and the standard value one by one, such as the difference between the actual evacuation door width and the minimum width required by the specification. After calculation, the deviation result of each three-dimensional model element on the corresponding evaluation indicator can be obtained. Such quantitative detection can clarify the extent to which the design parameters of each model element meet the requirements of the specification, making the evaluation results more accurate.
[0042] Based on the above embodiment, as an optional embodiment, in step 302: based on the quantitative index, the corresponding three-dimensional model elements in the three-dimensional model are evaluated to obtain the deviation degree corresponding to each three-dimensional model element. This step may also include the following steps: Step 312: The difference between the fire protection distance corresponding to the building element and the building fire protection distance threshold is used as the deviation degree corresponding to the building element.
[0043] Among them, the fire separation distance refers to the spacing distance between different fire zones in a building, which can be understood as the spatial distance between building elements such as walls in the embodiment of the present application.
[0044] Building elements refer to the various components that make up a building. In the embodiment of the present application, they can be understood as walls, floors, doors and windows that constitute a three-dimensional building model. They are used to measure the fire separation parameters between building elements when evaluating the fire protection structure of a building, and compare them with fire protection standards to determine whether there are areas with insufficient fire separation inside the building.
[0045] Specifically, in order to evaluate whether the fire separation distance design between building elements is reasonable, it is necessary to calculate the difference between the fire separation distance parameters of each building element and the standard spacing threshold of the specification as its fire separation distance deviation. Measure the fire separation distance parameters of each building element, such as walls and floor slabs, in the three-dimensional building model. Then query the fire protection specification to obtain the fire separation distance design standards for different building types. Then calculate the numerical difference between the actual fire separation distance of each building element and the standard spacing threshold, that is, the deviation. For example, if the spacing of a wall is 3 meters and the standard stipulates that it should not be less than 5 meters, the fire separation distance deviation of the wall is -2 meters. By quantifying the fire separation distance deviation results of building elements, it is possible to intuitively judge which areas of the building may have defects or hidden dangers in the fire separation distance design, so as to facilitate targeted improvements to improve the rationality and safety of the building's fire protection structure.
[0046] Step 322: The difference between the evacuation channel size corresponding to the evacuation channel element and the evacuation channel size threshold is used as the deviation degree corresponding to the evacuation channel element.
[0047] Among them, the size of the evacuation passage refers to the size parameters of the elements that constitute the evacuation passage, such as stairs, corridors, etc. In the embodiment of the present application, it can be understood as the geometric dimensions of the evacuation passage, such as the width and height, which have an impact on the evacuation efficiency. It is used to measure the actual size of the evacuation passage when evaluating the evacuation passage design, and compare it with the fire protection standards to determine whether the evacuation passage has dimensional defects that hinder passage.
[0048] The evacuation passage elements refer to the various parts that make up the evacuation passage. In the embodiment of the present application, they can be understood as evacuation elements such as stairs, corridors, doorways, etc. in the three-dimensional building model. They are used to measure the dimensional parameters of each evacuation passage element when evaluating the evacuation system design, and compare them with fire protection standards to determine the rationality of the design and identify narrow or non-standard evacuation passage elements.
[0049] Specifically, in order to assess the compliance of the evacuation passage design, it is necessary to calculate the difference between the actual size of each evacuation passage element and the standard size standard as the deviation result of the evacuation passage element. Measure the dimensional parameters of each evacuation passage element such as the width and height of stairs and corridors in the three-dimensional building model. Then refer to the dimensional requirements for different types of evacuation passages in the fire protection regulations to obtain the standard dimensional threshold. Then calculate the difference between the actual size of each evacuation passage element and the standard threshold size, that is, the deviation. For example, if the actual width of an evacuation door is 0.8 meters and the standard requirement is not less than 0.9 meters, the deviation of the door is -0.1 meters. By quantifying the dimensional deviation results of the evacuation passage elements, it can be determined which areas of the evacuation passage design may have hidden dangers that hinder the escape of personnel and need to be improved in a targeted manner, thereby improving the overall fire safety of the building.
[0050] Step 332: The difference between the firefighting equipment arrangement spacing corresponding to the firefighting equipment element and the firefighting equipment arrangement spacing threshold is used as the deviation degree corresponding to the firefighting equipment element.
[0051] Among them, the fire equipment layout spacing refers to the spacing distance between different fire equipment elements in the fire protection system. In the embodiment of the present application, it can be understood as the spatial distance between equipment such as fire extinguishers and fire hydrants in the three-dimensional model. It is used to measure the actual distance between equipment when evaluating the fire protection system design, and compare it with fire protection standards to determine whether the equipment layout is too sparse and cannot achieve effective fire extinguishing coverage.
[0052] Firefighting equipment elements refer to the various equipment that make up the firefighting system. In the embodiment of the present application, they can be understood as firefighting equipment models such as fire extinguishers, fire hydrants, and fire alarms in the three-dimensional building model. They are used to measure the layout spacing between equipment elements when evaluating the firefighting system design, and compare them with firefighting standards to determine whether the equipment layout density is reasonable and whether there are areas with insufficient coverage.
[0053] Specifically, in order to evaluate whether the layout of fire-fighting equipment elements meets the standards, it is necessary to calculate the difference between the actual spacing between each equipment element and the specified standard spacing threshold as the layout deviation of the fire-fighting equipment. Measure the actual layout spacing between equipment elements such as fire extinguishers and evacuation indicator lights in the three-dimensional fire model. Then consult the fire protection regulations to obtain the spacing standards for different equipment, such as the spacing between fire extinguishers shall not exceed 50 meters. Then calculate the difference between the actual spacing between each equipment element and the standard spacing threshold to obtain the deviation. For example, if the distance between two fire extinguishers is 60 meters, and the standard requirement is not more than 50 meters, then the deviation is 60-50=10 meters. By quantitatively calculating the spacing deviation of the equipment layout, it can be clarified which areas have too sparse equipment density and cannot meet the requirements for effective fire control, which provides a basis for subsequent targeted addition of equipment.
[0054] Step 303: Filter out target 3D model elements whose deviation is greater than or equal to the deviation threshold, and correct the target 3D model elements based on the deviation to obtain a target 3D model.
[0055] Among them, the target three-dimensional model elements refer to the problem elements in the three-dimensional model that need to be focused on detection and correction. In the embodiment of the present application, they can be understood as those three-dimensional model components whose design parameters deviate greatly from the requirements of fire protection regulations, such as narrow evacuation passages, areas with sparsely arranged fire protection facilities, etc., which are used to screen out these problem elements in the evaluation and make targeted design modifications to improve their compliance with the regulations, thereby gradually optimizing the overall fire protection design of the three-dimensional model.
[0056] Specifically, according to the preset allowable deviation threshold, the target three-dimensional model elements that need to be adjusted first are screened out from the deviation evaluation results. Then, according to the specific deviation of these elements, targeted design corrections are made, such as appropriately increasing the number of fire-fighting facilities in the area, expanding the width of narrow evacuation doors, etc. By effectively correcting the design defects of the target elements, the degree of deviation between the elements and the requirements of the specifications can be continuously reduced. Finally, after iterative correction, a target three-dimensional fire protection design model in which all elements meet the specifications is formed. The purpose of such target element screening and design correction is to test and adjust the design weaknesses in the model, and to build an optimized target three-dimensional model that meets fire protection specifications and design requirements through continuous correction to approach the requirements of the specifications, so as to provide a reliable reference for subsequent evaluation work.
[0057] Step 103: Receive construction data of multiple fire protection facilities in the target construction project, and review and accept the construction data in the target three-dimensional model to determine multiple abnormal construction locations.
[0058] Among them, the construction data of fire-fighting facilities refers to the detailed record information generated during the construction process of fire-fighting engineering related facilities. In the embodiment of the present application, it can be understood as the actual location, quantity, technical indicators and other construction parameters of various fire-fighting facilities such as fire-fighting water sources and automatic sprinkler fire extinguishing. It is used to compare with the three-dimensional fire-fighting model to determine whether the fire-fighting facilities have been completed in accordance with the specifications and to find out abnormal locations where construction quality problems exist.
[0059] Abnormal construction locations refer to locations where fire-fighting facilities do not comply with design plans and specifications during the construction process. In the embodiments of the present application, they can be understood as locations where there are differences between the actual construction parameters of the fire-fighting facilities and the three-dimensional fire-fighting model. They are used to reflect the specific locations of construction quality problems and hidden dangers of fire-fighting facilities, and provide a basis for subsequent construction rectification.
[0060] Specifically, in order to comprehensively supervise the construction quality of each fire protection facility, it is necessary to collect detailed construction data of the facilities, check them one by one on the three-dimensional fire protection model, and find abnormal locations where there are differences in construction. Receive the location, quantity, technical parameters and other construction data of fire protection water sources, automatic sprinklers and other facilities reported by the construction unit. Then check whether the actual construction of the facilities is consistent with the data in the three-dimensional model, such as the setting spacing of automatic sprinkler nozzles, the number of fire hydrants, etc. Finally, by comparison, determine the abnormal construction locations where the actual construction of the facilities does not meet the requirements of the model and specifications. This three-dimensional model verification method based on the collection of construction data can intuitively discover the hidden quality problems in the construction process of fire protection facilities, and promptly find abnormal locations with installation errors or non-compliance. Ensure that each fire protection facility is constructed in a standardized manner, laying a solid foundation for subsequent project construction acceptance and completion fire supervision.
[0061] Based on the above embodiment, as an optional embodiment, in step 103: reviewing and accepting the construction data in the target three-dimensional model to determine multiple abnormal construction locations, this step may also include the following steps: Step 401: Based on the location coordinates and contour parameters of each facility in the construction data, create corresponding facility elements to be accepted in the target three-dimensional model.
[0062] Among them, the position coordinates and contour parameters refer to specific values that describe the actual layout position and external dimensions of the fire-fighting facilities. In the embodiments of the present application, they can be understood as the spatial installation coordinates and shape dimension data of facilities such as fire-fighting pools and fire alarms, which are used to accurately generate three-dimensional elements of fire-fighting facilities in the three-dimensional model so that their position and shape are highly consistent with the actual construction conditions.
[0063] The facility elements to be accepted refer to virtual elements that represent actual fire-fighting facilities in the three-dimensional model. In the embodiment of the present application, they can be understood as three-dimensional digital elements of fire-fighting equipment such as fire-fighting pools and fire alarms generated in a three-dimensional scene through the construction data of the fire-fighting facilities. They are used for visual comparison with the model to check whether the elements conform to the actual construction conditions of the facilities, so as to find abnormal construction locations where problems exist.
[0064] Specifically, in order to present the actual construction status of each fire-fighting facility in a three-dimensional scene, it is necessary to use the data of the location coordinates and contour parameters of each facility to generate the corresponding three-dimensional facility elements to be accepted in the target three-dimensional model. Obtain the actual layout location coordinates and external dimension data of facilities such as fire water sources and fire alarms. Then load the three-dimensional model, and accurately create facility elements such as fire pools and alarms based on these location and size parameters, so that their positioning and shape in the model are exactly the same as the facilities in the actual project. In this way, the construction status of the facility is reconstructed in the three-dimensional scene. By generating realistic elements of facilities to be accepted in the model, a virtual-real comparison of the actual project fire protection system can be achieved. Intuitively compare the differences between elements and models and planning requirements, discover problems in the construction process of fire-fighting facilities, and provide support for later standardized acceptance and rectification.
[0065] Step 402: among the facility elements to be accepted, filter out the facility elements to be accepted that have positional deviation or contour abnormality, and use the location of the facility elements to be accepted as the abnormal construction location.
[0066] Among them, position offset or contour anomaly refers to the phenomenon that the position or shape of the elements of the facility to be accepted is inconsistent with the actual construction situation. In the embodiment of the present application, it can be understood that the spatial coordinates or external dimensions of the three-dimensional elements are different from the actual layout position and form of the fire-fighting facilities. It is used to determine whether the elements accurately correspond to the actual project in order to discover quality problems in the construction process of fire-fighting facilities.
[0067] Specifically, in order to locate the specific parts of the fire protection facility construction quality problems, it is necessary to screen out the elements with position offset or shape distortion in the three-dimensional elements to be accepted, and lock the locations of these problem elements as abnormal construction locations. Load the three-dimensional model, check the various fire water tanks and fire alarm elements waiting for acceptance, and find that the positions of some elements are incorrect, such as the fire extinguisher is too far from the door, or the outer dimensions do not match the actual size. Then extract the coordinate positions of these problematic elements in the three-dimensional scene, and determine that the areas they represent are abnormal locations where there are quality risks in the construction of fire protection facilities. In this way, the characteristics of the elements can be judged through three-dimensional vision, and the specific parts of the actual fire protection facility project where errors exist can be found in a targeted manner. It provides clear orientation guidance for the subsequent rectification construction.
[0068] Based on the above embodiment, as an optional embodiment, in step 402: among the facility elements to be accepted, the facility elements to be accepted that have positional deviation or abnormal contour are screened out. This step may also include the following steps: Step 412: Obtain the position offset and contour overlap ratio between each facility element to be accepted and the corresponding three-dimensional model element in the target three-dimensional model.
[0069] Among them, the position offset refers to the distance difference between the facility element to be accepted and the corresponding three-dimensional model element in spatial coordinates. In the embodiment of the present application, it can be understood as the spatial distance between the center points of the two. It is used to quantitatively determine whether the actual layout position of the facility element to be accepted meets the model requirements. If the offset is too large, it means that there is a problem with the construction location of the facility and rectification is required.
[0070] The contour overlap rate refers to the ratio of the overlapping part of the contour range of the facility element to be accepted and the corresponding three-dimensional model element to the overall contour area of the element to be accepted. In the embodiment of the present application, it can be understood as the percentage of the overlapping part of the contours of the two to the total area of the contour of the element to be accepted. It is used to quantitatively determine whether the actual shape of the facility element to be accepted meets the model requirements. If the overlap rate is too low, it means that there is a problem with the construction size of the facility and rectification is required.
[0071] Specifically, in order to quantitatively analyze the differences between the elements of the facilities to be accepted and the requirements of the three-dimensional model, it is necessary to measure the data indicators of the position and shape of the two, namely, the position offset and the contour overlap rate. The corresponding model elements such as the fire water tank and fire alarm in the model are extracted. Then the center point distance between the elements to be accepted and the model elements in the three-dimensional scene is calculated as the position offset of the two. At the same time, the overlapping part of the contour range of the two is measured, and the ratio of its area to the element to be accepted is calculated to obtain the contour overlap rate. In this way, the two quantitative indicators of position offset and contour overlap rate can be used to accurately judge the degree of fit between the elements to be accepted and the model. If the offset is large or the overlap rate is low, it indicates that there may be problems in the construction of the facility and further verification is required. Finally, it can be determined which elements to be accepted have quality defects based on quantitative data, providing a reference for subsequent standardized construction.
[0072] Step 422: The facility elements to be accepted whose position offset is greater than or equal to the offset threshold are regarded as the facility elements to be accepted with position offset.
[0073] Specifically, in order to use the position offset data to determine which elements to be accepted have position problems, it is necessary to set a position offset threshold, and determine the elements with offsets greater than the threshold as problematic elements with position offsets. According to the project situation, determine a maximum allowable position offset as the position offset threshold. Then traverse all elements to be accepted and compare them with the position offset and threshold of the corresponding model elements. If the position offset data of an element is greater than the set threshold, it is determined that the element to be accepted has a position deviation problem. In this way, by setting the position offset threshold, the position matching of the elements can be judged based on the quantitative data, and the problematic elements whose actual positions differ too much from the model requirements can be automatically screened out. Finding these position offset elements will help to promptly discover the coordinate deviation problems in the construction of fire protection facilities and provide a basis for subsequent rectification.
[0074] Step 432: The facility elements to be accepted whose contour overlap rate is less than the overlap rate threshold are regarded as facility elements to be accepted with contour anomalies.
[0075] Specifically, in order to use the contour overlap rate data to determine which elements to be accepted have shape problems, it is necessary to set an overlap rate threshold, and determine the elements with an overlap rate lower than the threshold as problematic elements with contour anomalies. According to the project situation, determine a minimum acceptable value for contour overlap as the overlap rate threshold. Then traverse all elements to be accepted and compare them with the contour overlap rate and threshold of the corresponding model elements. If the overlap rate of an element is lower than the set threshold, it is determined that the element to be accepted has a contour anomaly problem. In this way, by setting the overlap rate threshold, the element contour matching situation can be judged based on quantitative data, and the problematic elements whose actual shapes differ too much from the model requirements can be automatically screened out. Finding these contour abnormal elements will help to promptly discover the dimensional deviation problems in the construction of fire protection facilities and provide a basis for subsequent rectification.
[0076] Step 104: Generate an acceptance report for the target construction project based on each abnormal construction location.
[0077] Among them, the acceptance report refers to a document that reflects the quality inspection results of the target construction project. In the embodiment of the present application, it can be understood as a document generated by the inspection of the three-dimensional model that contains abnormal construction locations of fire-fighting facilities and related information. It is used to intuitively display the quality problems existing in the project and provide a basis for rectification to guide subsequent standardized construction.
[0078] Specifically, in order to reflect the quality problems of fire protection facility construction, it is necessary to form a fire protection acceptance report for the project based on the abnormal construction locations identified in the early stage. Extract the coordinates of all the abnormal construction locations and mark them at the corresponding positions of the three-dimensional model to form a visual effect diagram. At the same time, generate attribute information tables for each location, such as location name, problem description, etc. Integrate the effect diagram and table into the report document to form a complete quality inspection and acceptance report. In this way, by combining visual display with attribute statistics, the relevant responsible parties can see at a glance the specific location and details of the quality problems of various fire protection facilities, including the distance of the fire alarm is too far and the shape of the fire hydrant is deformed. It is helpful to trace the cause of the problem and guide the subsequent standardized rectification.
[0079] Based on the above embodiment, as an optional embodiment, in step 104: generating an acceptance report of the target construction project based on each abnormal construction location, this step may also include the following steps: Step 501: determine the abnormal type corresponding to each abnormal construction location; determine the frequency of each abnormal type based on the number of times each abnormal type occurs, and determine the distribution area of each abnormal type based on each abnormal construction location.
[0080] Among them, the abnormal type refers to the category of problems occurring at abnormal construction locations. In the embodiment of the present application, it can be understood that each abnormal location is classified according to the quality inspection results. The problem attributes formed, such as position offset, contour abnormality, etc., are used to classify and count different quality problems, and analyze the frequency distribution of various abnormalities to find out the main problem patterns and concentrated areas, so as to provide a basis for the subsequent formulation of targeted quality improvement plans.
[0081] The distribution area refers to the concentrated location range where a certain type of abnormality appears multiple times. In the embodiment of the present application, it can be understood that based on all abnormal construction locations, a three-dimensional spatial area where the same type of abnormal problems are relatively dense is counted, which is used to determine the specific locations where a certain quality problem is mainly concentrated, so as to analyze the causes of the problems in a targeted manner and take improvement measures.
[0082] Specifically, in order to deeply analyze the quality problem patterns of each fire protection facility, it is necessary to categorize each abnormal construction location and count the frequency and distribution areas of different abnormal types. According to the detection results of each location, the problem attributes are judged and classified to form abnormal types such as "position offset" and "shape deformation". Then the total number of each type of abnormality is counted and its frequency ratio is calculated. At the same time, the concentrated areas of all position offset or shape deformation problems are marked on the 3D model.
[0083] Step 502: Generate an acceptance report for the target construction project based on the frequency and distribution area of each abnormal type.
[0084] Specifically, in order to reflect the pattern of quality problems through typological analysis, it is necessary to generate an acceptance report based on the frequency and distribution area of the abnormal type. Statistical data such as various abnormal types, frequencies, and distribution areas are collated. Then, areas where various abnormalities are concentrated are marked with different colors on the 3D model. At the same time, a statistical table is generated and inserted into the report. Finally, an acceptance report containing abnormal type frequency distribution statistics and area markings is formed. In this way, by combining visual display with data statistics, relevant parties can intuitively understand the distribution patterns and areas of different quality problems. For example, "position offset" problems are most concentrated in the east area of the 3rd floor. This helps to analyze the causes of various problems and formulate solutions. The final acceptance report can fully reflect the pattern of engineering quality problems and provide guidance for subsequent improvement of construction quality.
[0085] Reference Figure 2 , a fire protection design review and acceptance service system for construction projects provided in an embodiment of the present application, the system comprises: an information acquisition module, a three-dimensional model creation module, a review and acceptance module, and an acceptance report determination module, wherein: An information acquisition module is used to obtain fire protection design drawing information of a target construction project; The three-dimensional model creation module is used to construct a three-dimensional model of the target construction project based on the fire protection design drawing information; obtain the project type of the target construction project, and correct the three-dimensional model in combination with the project type to obtain a target three-dimensional model of the target construction project; A review and acceptance module is used to receive the construction data of multiple fire protection facilities in the target construction project, and to review and accept the construction data in the target three-dimensional model to identify multiple abnormal construction locations; The acceptance report determination module is used to generate an acceptance report for the target construction project based on each abnormal construction location.
[0086] Based on the above embodiments, the three-dimensional model creation module is also used to determine the building structure characteristics, fire equipment configuration characteristics and evacuation channel layout characteristics in the fire protection design drawing information; based on the building structure characteristics, an initial three-dimensional model of the target construction project is created; based on the position coordinates corresponding to the fire equipment configuration characteristics and the evacuation channel layout characteristics, the fire equipment configuration characteristics and the evacuation channel layout characteristics are mapped to the corresponding spatial positions in the initial three-dimensional model to obtain a three-dimensional model of the target construction project.
[0087] Based on the above embodiment, the three-dimensional model creation module is also used to obtain the fire protection standards corresponding to the area where the target construction project is located, and determine the quantitative indicators corresponding to the project type in the fire protection standards; based on the quantitative indicators, the corresponding three-dimensional model elements in the three-dimensional model are evaluated to obtain the deviation degree corresponding to each three-dimensional model element; the target three-dimensional model elements whose deviation degree is greater than or equal to the deviation degree threshold are screened out, and the target three-dimensional model elements are corrected based on the deviation degree to obtain the target three-dimensional model.
[0088] Based on the above embodiments, the three-dimensional model creation module is also used to use the difference between the fire protection distance corresponding to the building element and the building fire protection distance threshold as the deviation degree corresponding to the building element; use the difference between the evacuation channel size corresponding to the evacuation channel element and the evacuation channel size threshold as the deviation degree corresponding to the evacuation channel element; use the difference between the fire equipment layout spacing corresponding to the fire equipment element and the fire equipment layout spacing threshold as the deviation degree corresponding to the fire equipment element.
[0089] Based on the above embodiment, the review and acceptance module is also used to create corresponding facility elements to be accepted in the target three-dimensional model based on the location coordinates and contour parameters of each facility in the construction data; among the facility elements to be accepted, the facility elements to be accepted that have position offset or contour abnormality are screened out, and the location of the facility elements to be accepted is used as the abnormal construction location.
[0090] On the basis of the above embodiment, the review and acceptance module is also used to obtain the position offset and contour overlap rate between each facility element to be accepted and the corresponding three-dimensional model element in the target three-dimensional model; the facility elements to be accepted whose position offset is greater than or equal to the offset threshold are regarded as facility elements to be accepted with position offset; and the facility elements to be accepted whose contour overlap rate is less than the overlap rate threshold are regarded as facility elements to be accepted with contour abnormalities.
[0091] Based on the above embodiments, the acceptance report determination module is also used to determine the abnormality type corresponding to each abnormal construction location; based on the number of each abnormality type, the frequency of each abnormality type is determined, and based on each abnormal construction location, the distribution area of each abnormality type is determined; according to the frequency and distribution area of each abnormality type, an acceptance report for the target construction project is generated.
[0092] It should be noted that: when the device provided in the above embodiment realizes its function, only the division of the above functional modules is used as an example. In actual application, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.
[0093] The present application also discloses an electronic device. Figure 3 , Figure 3 The electronic device 300 may include: at least one processor 301 , at least one network interface 304 , a user interface 303 , a memory 305 , and at least one communication bus 302 .
[0094] The communication bus 302 is used to realize the connection and communication between these components.
[0095] The user interface 303 may include a display interface and a camera interface. Optionally, the user interface 303 may also include a standard wired interface and a wireless interface.
[0096] The network interface 304 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).
[0097] Among them, the processor 301 may include one or more processing cores. The processor 301 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 305, and calling data stored in the memory 305. Optionally, the processor 301 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 301 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface diagrams and applications, etc.; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 301, and it can be implemented separately through a chip.
[0098] Among them, the memory 305 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read-Only Memory). Optionally, the memory 305 includes a non-transitory computer-readable storage medium. The memory 305 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 305 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 305 may optionally also be at least one storage device located away from the aforementioned processor 301. Refer to Figure 3 , the memory 305 as a computer storage medium may include an operating system, a network communication module, a user interface module and an application program of a fire protection design review and acceptance service method for a construction project.
[0099] exist Figure 3In the electronic device 300 shown, the user interface 303 is mainly used to provide an input interface for the user and obtain the data input by the user; and the processor 301 can be used to call the application program stored in the memory 305 for a fire protection design review and acceptance service method for a construction project. When executed by one or more processors 301, the electronic device 300 executes one or more methods in the above-mentioned embodiments. It should be noted that for the aforementioned method embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.
[0100] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0101] In the several embodiments provided in this application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.
[0102] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0103] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0104] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to execute all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.
[0105] The above are only exemplary embodiments of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, those skilled in the art will easily think of other embodiments of the present disclosure.
[0106] This application is intended to cover any variation, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the art not recorded in the present disclosure. The description and examples are to be regarded as exemplary only.
Claims
1. A fire protection design review and acceptance service method for a construction project, characterized in that: include: Obtain fire protection design drawing information of the target construction project; Based on the fire protection design drawing information, construct a three-dimensional model of the target construction project; Acquire the project type of the target construction project, and correct the three-dimensional model based on the project type to obtain a target three-dimensional model of the target construction project; receiving construction data of a plurality of fire protection facilities in the target construction project, and reviewing and accepting the construction data in the target three-dimensional model to determine a plurality of abnormal construction locations; Based on each of the abnormal construction locations, an acceptance report for the target construction project is generated.
2. The fire protection design review and acceptance service method for construction projects according to claim 1 is characterized in that: The step of constructing a three-dimensional model of the target construction project based on the fire protection design drawing information includes: Determine the building structure characteristics, fire equipment configuration characteristics and evacuation passage layout characteristics in the fire design drawing information; Based on the building structure features, creating an initial three-dimensional model of the target construction project; Based on the position coordinates corresponding to the fire-fighting equipment configuration features and the evacuation channel layout features, the fire-fighting equipment configuration features and the evacuation channel layout features are mapped to the corresponding spatial positions in the initial three-dimensional model to obtain the three-dimensional model of the target construction project.
3. The fire protection design review and acceptance service method for construction projects according to claim 1 is characterized in that: The step of correcting the three-dimensional model in combination with the project type to obtain a target three-dimensional model of the target construction project includes: Obtaining fire protection standards corresponding to the area where the target construction project is located, and determining quantitative indicators corresponding to the project type in the fire protection standards; Based on the quantitative index, the corresponding three-dimensional model elements in the three-dimensional model are evaluated to obtain the deviation degree corresponding to each of the three-dimensional model elements; The target three-dimensional model elements whose deviation is greater than or equal to the deviation threshold are screened out, and the target three-dimensional model elements are corrected based on the deviation to obtain the target three-dimensional model.
4. The fire protection design review and acceptance service method for construction projects according to claim 3 is characterized in that: The quantitative index includes a building fire protection distance threshold, an evacuation passage size threshold, and a fire equipment layout distance threshold. The three-dimensional model elements include building elements, evacuation passage elements, and fire equipment elements. Based on the quantitative index, the corresponding three-dimensional model elements in the three-dimensional model are evaluated to obtain the deviation corresponding to each of the three-dimensional model elements, including: The difference between the fire protection distance corresponding to the building element and the building fire protection distance threshold is used as the deviation degree corresponding to the building element; Taking the difference between the evacuation channel size corresponding to the evacuation channel element and the evacuation channel size threshold as the deviation degree corresponding to the evacuation channel element; The difference between the fire-fighting equipment arrangement spacing corresponding to the fire-fighting equipment element and the fire-fighting equipment arrangement spacing threshold is used as the deviation degree corresponding to the fire-fighting equipment element.
5. The fire protection design review and acceptance service method for construction projects according to claim 1 is characterized in that: The step of reviewing and accepting the construction data in the target three-dimensional model and determining a plurality of abnormal construction locations includes: Based on the location coordinates and contour parameters of each facility in the construction data, creating corresponding elements of the facilities to be inspected in the target three-dimensional model; Among the facility elements to be accepted, the facility elements to be accepted that have positional deviation or contour abnormality are screened out, and the positions of the facility elements to be accepted are used as the abnormal construction positions.
6. The fire protection design review and acceptance service method for construction projects according to claim 5 is characterized in that: The step of screening out the facility elements to be accepted that have positional deviation or abnormal contours from the facility elements to be accepted, and using the positions of the facility elements to be accepted as the abnormal construction positions, includes: Obtaining the position offset and contour overlap ratio between each of the to-be-accepted facility elements and the corresponding three-dimensional model elements in the target three-dimensional model; Taking the facility element to be accepted whose position offset is greater than or equal to the offset threshold as the facility element to be accepted with position offset; The facility elements to be accepted whose contour overlap rate is less than the overlap rate threshold are regarded as the facility elements to be accepted with contour anomalies.
7. The fire protection design review and acceptance service method for construction projects according to claim 1 is characterized in that: The generating of the acceptance report of the target construction project based on each of the abnormal construction locations includes: Determine the abnormal type corresponding to each abnormal construction location; Determine the frequency of each abnormal type based on the number of times each abnormal type occurs, and determine the distribution area of each abnormal type based on each abnormal construction location; An acceptance report for the target construction project is generated based on the frequency and distribution area of each of the abnormal types.
8. A fire protection design review and acceptance service system for construction projects, characterized in that: The system comprises: An information acquisition module is used to obtain fire protection design drawing information of a target construction project; A three-dimensional model creation module is used to construct a three-dimensional model of the target construction project based on the fire protection design drawing information; obtain the project type of the target construction project, and correct the three-dimensional model in combination with the project type to obtain a target three-dimensional model of the target construction project; A review and acceptance module, used for receiving construction data of a plurality of fire protection facilities in the target construction project, and reviewing and accepting the construction data in the target three-dimensional model to determine a plurality of abnormal construction locations; The acceptance report determination module is used to generate an acceptance report for the target construction project based on each of the abnormal construction locations.
9. An electronic device, characterized in that: It includes a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes the fire protection design review and acceptance service method for construction projects as described in any one of claims 1-7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores instructions, and when the instructions are executed, the fire protection design review and acceptance service method for construction projects as described in any one of claims 1-7 is executed.
Citation Information
Cited By
Public building resource intelligent allocation method and system based on hydroelectric quota platform
CN119962912A
A Method and System for Intelligent Allocation of Public Building Resources Based on a Hydropower Quota Platform
CN119962912B
Fire-fighting inspection and acceptance system and acceptance method thereof
CN120235635A
Method for generating city-level live-action three-dimensional geographic scene data
CN120953525A
Automatic drawing auditing method based on deep learning semantic segmentation and shape matching
CN121053411A